Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML020330069 | 25 January 2002 | Proposed Improved Technical Specifications Request for Additional Information ISTS 3.7.7 and ITS 3.7.9 Beyond Scope Issue (TACs MB1439, MB1440, MB1451 and MB1452) | Ultimate heat sink Large early release frequency |
ML020330139 | 31 January 2002 | Proposed Improved Technical Specifications, Request for Additional Information (RAI) Section 3.8 | Safe Shutdown Anticipated operational occurrence Reserve Station Service Transformer Qualified Offsite Circuit Recently irradiated fuel Offsite Circuit |
ML020510089 | 11 February 2002 | Part 1 of 2, North Anna Power Station, Units 1 & 2, Proposed Improved Technical Specifications, Request for Additional Information (RAI) Section 3.6 (Tacs Nos. MB0799 & MB0800) Miscellaneous Dominion Changes to Its Submittal | Time of Discovery Shutdown Margin High Radiation Area Stroke time Hydrostatic Missed surveillance Power-Operated Valves |
ML020510117 | 11 February 2002 | Part 2 of 2, North Anna Power Station, Units 1 & 2, Proposed Improved Technical Specifications, Request for Additional Information (RAI) Section 3.6 (TAC Nos. MB0799 & MB0800) Miscellaneous Dominion Changes to Its Submittal | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Time to boil Post Accident Monitoring Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Earthquake Deep Dose Equivalent Offsite Circuit Fire Protection Program |
ML020640021 | 27 February 2002 | Proposed Improved Technical Specifications, ITS 3.3.1 Decalibration Issue (TAC MB2074), ITS 3.9.1 Bases Change, Changes Not Associated with Request for Additional Information | Missed surveillance |
ML020850565 | 18 March 2002 | Proposed Improved Technical Specifications (Its), Requested Change to Submittal | |
ML020870707 | 26 March 2002 | Proposed Improved Technical Specifications Request for Additional Information, ISTS 3.7.7 Beyond Scope Issue | |
ML020930212 | 28 March 2002 | Proposed Technical Specifications Changes & Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel | Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Exemption Request Earthquake Fuel cladding Flow Induced Vibration |
ML021220108 | 5 April 2002 | Part 1 of 6 - Tech Spec Pages for Amendments 231 and 212 for North Anna, Units 1 & 2. Table of Contents Through Page 3.5.2-3 | Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Grab sample Post Accident Monitoring Hydrostatic Pressure Boundary Leakage Recently irradiated fuel Power change |
ML021220166 | 5 April 2002 | Part 2 of 6 - Tech Spec Pages for Amendments 231 and 212 for North Anna, Units 1 & 2. Pages 3.5.3-1 Through 5.7-5 | Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Post Accident Monitoring Operating Basis Earthquake Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Deep Dose Equivalent Recently irradiated fuel Offsite Circuit Fire Protection Program |
ML021220192 | 5 April 2002 | Part 3 of 6 - Tech Spec Pages for Amendments 231 and 212 for North Anna, Units 1 & 2. Table of Contents Through Page B 3.3.2-45 | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Anticipated operational occurrence Post Accident Monitoring Missed surveillance Fuel cladding Recently irradiated fuel Offsite Circuit Power change |
ML021220214 | 5 April 2002 | Part 5 of 6 - Tech Spec Pages for Amendments 231 and 212 for North Anna, Units 1 & 2. Pages B 3.6.1-1 Through B 3.8.1-37 | Safe Shutdown Boric Acid High Radiation Area Ultimate heat sink Stroke time Anticipated operational occurrence Hydrostatic Coatings Reserve Station Service Transformer Qualified Offsite Circuit Earthquake Recently irradiated fuel Offsite Circuit Power change |
ML021220221 | 5 April 2002 | Part 6 of 6 - Tech Spec Pages for Amendments 231 and 212 for North Anna, Units 1 & 2. Pages B 3.8.2-1 Through B 3.9.7-2 | Safe Shutdown Boric Acid Shutdown Margin Anticipated operational occurrence Time to boil Reserve Station Service Transformer Qualified Offsite Circuit Battery sizing Fuel cladding Recently irradiated fuel Offsite Circuit |
ML021220224 | 5 April 2002 | Tech Spec Pages for Amendments 231 and 212 | |
ML021220254 | 5 April 2002 | Part 4 of 6 - Tech Spec Pages for Amendments 231 and 212 for North Anna, Units 1 & 2. Pages B 3.3.3-1 Through B 3.5.6-5 | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Grab sample Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Fuel cladding Pressure Boundary Leakage Power change Unidentified leakage |
ML021550518 | 28 May 2002 | Improved Technical Specifications Correction of Administrative Error | |
ML022420065 | 4 September 2002 | License Amendment, Irradiation of One Lead Fuel Assembly with Advanced Cladding Materials Beyond Current Lead Rod Burnup Limit | Exemption Request |
ML022520069 | 5 September 2002 | License Amendments 232 & 214, Technical Specification Changes to Revise Containment Analysis (Tac Nos. MB3530 and MB3531) | |
ML022560434 | 5 September 2002 | Technical Specification Pages for License Amendments 232 & 214, Technical Specification Changes to Revise Containment Analysis (Tac Nos. MB3530 and MB3531) | |
ML022760129 | 1 October 2002 | Technical Specification for Amendments 233 & 215 Quench Spray and Recirculation Spray Nozzles Surveillance Frequency | |
ML030090492 | 31 December 2002 | Technical Specification Page for Amendment No. 234 Proposed Risk-informed Technical Specification Change to Extend the Type a Test Interval by 5 Years | |
ML030710581 | 20 March 2003 | Issuance of Renewed Facility Operating Licenses Nos. NPF-4 and NPF-7 for North Anna, Units 1 & 2, and Renewed Facility Operating Licenses Nos. DPR-32 and DPR-37 for Surry Power Station, Unit Nos. 1 & 2 | Safe Shutdown Safeguards Contingency Plan License Renewal Fire Protection Program |
ML040970340 | 1 April 2004 | Tech Spec Pages for Amendment No. 216 Use of Framatome Anp Advanced Mark-BW Fuel | Post Accident Monitoring |
ML041590339 | 4 June 2004 | Tech Spec Pages for Amendment No. 218 Regarding Deletion of Note Referring to Differences Between Unit 1 and Unit 2 Boron Concentrations | |
ML042050457 | 23 July 2004 | Proposed Emergency Technical Specification Change One Time Extension of the Completion Time for the Low Head Safety Injection (Lhsi) Train a | Boric Acid High winds Non-Destructive Examination Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment VT-2 Large early release frequency Maintenance Rule Program Fuel cladding Liquid penetrant |
ML042090031 | 23 July 2004 | TS for North Anna, Unit 1, Enclosure 1, Emergency Amendment, One Time Extension of Low-Head Safety Injection Train a | |
ML042330560 | 20 August 2004 | Technical Specification Amendment No. 237, Pages 2.0-1, 4.0-1, 5.6-3, 5.6-4, 5.6-5 | Post Accident Monitoring |
ML043560339 | 17 December 2004 | Proposed Technical Specifications Changes for Extended Fluid Systems Completion Times Mark-Up of Proposed Changes | Power change |
ML043560498 | 21 December 2004 | Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupation Radiation Exposure Reports | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Incorporated by reference Annual Radiological Environmental Operating Report |
ML043560499 | 21 December 2004 | Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupation Radiation Exposure Reports | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML050490046 | 17 February 2005 | Proposed Technical Specification Changes Implementation of Alternate Source Term Request for Additional Information Emergency Ventilation System | |
ML050870183 | 22 March 2005 | Technical Specifications, Elimination of Monthly Operating and Occupational Radiation Exposure Report Requirements, | Shutdown Margin Offsite Dose Calculation Manual Post Accident Monitoring Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML051300548 | 5 May 2005 | Enclosure 1, Response to Requests for Additional Information - Revised Technical Specification Replacement Pages | |
ML051540091 | 20 May 2005 | Summary of Meeting with Dominion Nuclear Connecticut, Inc.,Surry & North Anna, Units 1 & 2, & Millstone, Units 2 & 3, Discuss Current Licensing Issues with Dominion. Enclosure 2 - Priority of North Anna & Surry Licensing Tasks at the NRC | |
ML051540093 | 25 April 2005 | Summary of Meeting with Dominion Nuclear Connecticut, Inc.,Surry & North Anna, Units 1 & 2, & Millstone, Units 2 & 3, Discuss Current Licensing Issues with Dominion. Enclosure 3 - Top Ten Millstone Licensing Tasks | |
ML051680241 | 16 June 2005 | Proposed Technical Specification Changes on Revised Frequency for Tadot of P-4 Interlock Response to Request for Additional Information | Anticipated operational occurrence |
ML051730448 | 15 June 2005 | Tech Spec Page for Amendment 241 and 222, RCP Flywheels Inspection Interval Extension | |
ML051730677 | 15 June 2005 | Technical Specifications, Amendment Nos. 240 and 221 on Implementation of Alternate Source Term (Tac No. MC0776, MC0777) | Recently irradiated fuel |
ML051890034 | 5 July 2005 | Proposed Technical Specification Changes Addition of Analytical Methodology to COLR | Post Accident Monitoring Exemption Request |
ML051960435 | 14 July 2005 | Proposed Technical Specification Changes Correction to Equation for Overtemperature T Function Allowable Value | |
ML052630104 | 15 September 2005 | Tech Spec Pages for Amendment Nos. 243 and 224, Revise the Administrative Controls Section | |
ML052990015 | 24 October 2005 | Technical Specifications, Revised Test Frequency of P-4 Interlock Function | |
ML052990085 | 25 October 2005 | Enclosure, Technical Specifications, Amd MC7612, Equation for Over-Temperature Delta T Function Allowable Value | |
ML052990145 | 20 March 2003 | Current Facility Operating License NPF-4, Tech Specs, Revised 11/12/2019 | Safe Shutdown Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Reserve Station Service Transformer Nondestructive Examination Cyber Security Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Open Phase Condition Annual Radiological Environmental Operating Report Process Control Program Safeguards Contingency Plan Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Fire Protection Program Power change Unidentified leakage Power Uprate |
ML053350279 | 21 November 2005 | 10 CFR 50.9 Correction of Information Provided to Support Technical Specification Change for Quench Spray and Recirculation Spray Nozzles Surveillance Frequency | |
ML061510199 | 30 May 2006 | Proposed Technical Specifications Change Diesel Fuel Oil Testing Program | |
ML062060467 | 18 July 2006 | Technical Specifications, Issuance of Amendments on Changes to Analytical Methodology and Core Operating Limits Report, MC7526 and MC7527 | Post Accident Monitoring |
ML062770018 | 25 September 2006 | Technical Specification Bases Pages | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Stroke time Anticipated operational occurrence Time to boil Post Accident Monitoring Hydrostatic Coatings Reserve Station Service Transformer Qualified Offsite Circuit Missed surveillance Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Power change Unidentified leakage |
ML063000028 | 16 October 2006 | Tech Spec Pages for Amendments 248 and 228 Regarding Consolidated Line Item Improvement Process for the Steam Generator Tube Integrity | Ultimate heat sink Non-Destructive Examination Post Accident Monitoring Nondestructive Examination Fuel cladding Pressure Boundary Leakage |
ML063450259 | 11 December 2006 | Tech Spec Pages for Amendments 249 and 229 Regarding Diesel Fuel Oil Testing Program |