Summary of Meeting with Dominion Nuclear Connecticut, Inc.,Surry & North Anna, Units 1 & 2, & Millstone, Units 2 & 3, Discuss Current Licensing Issues with Dominion. Enclosure 3 - Top Ten Millstone Licensing Tasks
ML051540093
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 04/25/2005
From: Stephen Monarque
NRC/NRR/DLPM/LPD2
To:
Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
Monarques, S R, NRR/DLPM, 415-1544
Shared Package
ML051530511 List:
References
TAC MC3333
Download: ML051540093 (2)


Text

04/25/05

-- TOP-TEN-MIL-STONE-LCENSING-TASKS 12nd Quarter 2005 1 7'MPS-3-AST --full implementation.

NRC Target Approval Date: 03/01/05.

TAC No. MC3333

  • Submitted 5/28/04
  • RAI response submitted 9/27/04
  • Additional RAI received 12/14/04
  • RAI Response submitted 12123/04
  • RAIs received 12/29/04, 2/9/05

- RAIresponse-submitted 3/23/05

[04-285] [04-538] [04-607] [05-077]

2. MPS Tech Spec Chanaes associated with Consolidated QAP submittal NRC Target Approval Date: 6/30/05 TAC No.
  • Submitted 9/8/04
  • Received RAI 3/10/05

[04-314]

3. *MPS 3 10CFR 50.55a Relief Request RR-89-52 Temporarv Non-Code Repair in Service Water System Brazed Joints

-a-Submitted 9/23/04 Received RAI 2/3/05

  • RAI response submitted 3/28/05

[04-535] [05-138]

4. MPS 3 Transfer Refueling Technical Sfecifications to TRM
  • Submitted to NRC, 12/23/04

[04-713]

5. *MPS 3 Chanae In QSS/RSS Surveillance Frequency NRC Target Date: 7/15/05 TAC No.
  • Submitted to NRC 9/7/04

[04-480]

6. MPS 3 Revised BurnuD Limit for One Lead Test Assembly (LBDCR LBC-MP3-04-004)
  • Submitted to NRC 12/16/04

[04-670]

7. LICENSE AMENDMENT REQUESTS (LBDCR 04-MP2-015, LBDCR 04-MP3-014)ADMINISTRATIVE CHANGES IN TECHNICAL SPECIFICATIONS
  • Submitted 2/25/05

[05-009]

8--w-MPS-2-and-3-Shutdown-OPerations.lnvolvina Positive Reactivity Additions Submitted to NRC 3/9/05

-j-04-7071

--- 9.-MPS-2-LBDCR-05-MP2-001T-risodium-Phosphate

  • Submitted to NRC 02/25/05

[05-049]

10. MPS Realianment of Intermediate Subsidiaries Bold type - at the NRC Plain type - pending submittal (*- outage-related)