From: Hartz L
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
02-328, NUREG-1431, TAC MB0799, TAC MB0800
Download: ML021550518 (8)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 28, 2002 U.S. Nuclear Regulatory Commission Serial No.:

02-328 Attention: Document Control Desk CM/RAB R0 Washington, D.C. 20555-0001 Docket Nos.:

50-338 50-339 License Nos.:

NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNITS I AND 2 IMPROVED TECHNICAL SPECIFICATIONS CORRECTION OF ADMINISTRATIVE ERROR (TAC Nos. MB0799 AND MB0800)

On April 5, 2002, the Nuclear Regulatory Commission issued Amendment Nos. 231 and 212 to Facility Operating License Nos. NPF-4 and NPF-7 for the North Anna Power Station, Unit Nos. 1 and 2 (letter Serial No.02-275). These amendments converted our current Technical Specifications (CTS) to a set of improved Technical Specifications (ITS), based on NUREG-1431, "Standard Technical Specifications, Westinghouse Plants."

In preparing to implement these amendments, we have identified an administrative error in Technical Specification 3.3.1, page 17. The inequality associated with rt3 should be not "_." In our CTS, we refer to what is called 't7 in NUREG-1431 as T3. In converting to the ITS, we inadvertently adopted the inequality sign convention of the NUREG's -r3 for our T3, which is not correct. We should have adopted the inequality sign convention for the NUREG's 7.

Therefore, we are requesting that the NRC issue a revised page to Amendments 231 and 212 to the Facility Operating Licenses for North Anna Power Station, Unit Nos. 1 and 2. The revised page, which is attached, corrects the administrative error. Also, the page that was originally issued by the NRC is attached, with the change shown.

To avoid unnecessary administrative burden and support the current ITS implementation schedule, we request that you issue the revised page by June 30, 2002.

If you have any further questions or require additional information, please contact us.

Very truly yours, Leslie N. Hartz Vice President - Nuclear Engineering Attachment Commitments made in this letter: None cc:

U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303-8931 Mr. Tommy Le U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 12 H4 Rockville, MD 20852-2738 Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station Commissioner (w/o attachments)

Bureau of Radiological Health 1500 East Main Street Suite 240 Richmond, VA 23218 Mr. J. E. Reasor, Jr. (w/o attachments)

Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.

Suite 300 Glen Allen, Virginia 23060

SN: 02-328 Docket Nos. 50-338/339

Subject:

ITS - Correction of Admin. Error COMMONWEALTH OF VIRGINIA

) )

COUNTY OF HENRICO

)

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Leslie N. Hartz, who is Vice President - Nuclear Engineering, of Virginia Electric and Power Company. She has affirmed before me that she is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of her knowledge and belief.

Acknowledged before me this 28th day of May, 2002.

My Commission Expires: March 31, 2004.

otary Public (SEAL)

Attachment Improved Technical Specifications Markup and Revised Pages 3.3.1-17 Virginia Electric and Power Company (Dominion)

North Anna Power Station Units 1 and 2

RTS Instrumentation 3.3.1 Table 3.3.1-1 (page 5 of 5)

Reactor Trip System Instrumentation Note 2: Overpower AT The Overpower AT Function Allowable Value shall not exceed the following nominal trip setpoint by more than 2% of AT span.

AT

-ATO{K 4 -K 5[ T3 s]

K6[T-T'] - f 2(AI)}

Where:

AT is measured RCS AT, °F.

ATo is the indicated AT at RTP, OF.

s is the Laplace transform operator, sec-1.

T is the measured RCS average temperature, OF.

T' is the nominal Tavg at RTP, * [*]OF.

K4 < [*]

K5 _ [*]/OF for increasing Tavg

[*]/OF for decreasing Tavg T3 N

sec K6 _ [*]/IF when T > T'

[*]/OF when T _*

T' f 2 (AI)

= [*]

The values denoted with [*] are specified in the COLR.

North Anna Units 1 and 2 Amendments 231/212 3.3.1-17

RTS Instrumentation 3.3.1 Table 3.3.1-1 (page 5 of 5)

Reactor Trip System Instrumentation Note 2: OverDower AT The Overpower AT Function Allowable Value shall nominal trip setpoint by more than 2% of AT span.

not exceed the following AT_<ATO K4 -K 5[

+3sT-K6[T-T']-f2(Al)

Where:

AT is measured RCS AT, OF.

AT0 is the indicated AT at RTP, OF.

s is the Laplace transform operator, sec-1.

T is the measured RCS average temperature, °F.

T' is the nominal Tavg at RTP,

_* [*]OF.

K4 _< [*]

K5 _ [*]/oF for increasing Tavg

[*]/OF for decreasing Tavg K6 _ [*]/OF when T > T'

[*]/OF when T _< T'

'13 -> [*] sec f 2 (AI) = [*]

The values denoted with [*] are specified in the COLR.

North Anna Units 1 and 2 Amendments 231/212, 3.3.1-17