Summary of Meeting with Dominion Nuclear Connecticut, Inc.,Surry & North Anna, Units 1 & 2, & Millstone, Units 2 & 3, Discuss Current Licensing Issues with Dominion. Enclosure 2 - Priority of North Anna & Surry Licensing Tasks at the NRC
ML051540091
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 05/20/2005
From: Stephen Monarque
NRC/NRR/DLPM/LPD2
To:
Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
Monarque, S R, NRR/DLPM, 415-1544
Shared Package
ML051530511 List:
References
Download: ML051540091 (2)


Text

PRIORITY OF NORTH ANNA/SURRY LICENSING TASKS AT THE NRC 2nd Quarter-2005

1. *SPS - Relief Requests SR Requests alternative acceptance criteria for surface examinations on Class 2 austenitic stainless steel pump casing welds.

Requested Approval Date: 04/26/05 NRC Target Date: 05/15/05

2. *NAPS Alternate Source Term - Change licensing basis and TS to take advantage of 10 CFR 50.67, Alternate Source Term.

Requested Approval Date: N/A NRC Target Date:

05/15/05

3. *NAPS T-SCR N-029 - Revised PT limits for Units 1 and 2 - These limits will be applicable until renewed license expiration.

Requested Approval Date:

NRC Target Date: 07/01/05

4. SPS - TSCR 379 - Increased Lead Rod Average Burnup Limit - Proposed License Condition would permit irradiation of Surry fuel assemblies to a lead rod average burnup of 62,000 MWD/MTU.

Requested Approval Date:

NRC Target Date:

09/05

5. *NAPS - TSCR N-030 - Revise P-4 Surveillance Requirements - Revise the P-4 interlock surveillance requirements from "once per reactor trip breaker cycle" to "i 8 months" Requested Approval Date: 10/1/05 NRC Target Date: 10/01/05
6. NAPS/SPS - Topical Report DOM-NAF VIPRE reactor core thermal-hydraulics code and qualification of the F-ANP BWU CHF correlations.

Requested Approval Date:

NRC Target Date: 09/15/05

7. *NAPS - Relief Requests - ASME Section Xl ISI Program, Revision to Snubber Testing Alternatives (CS-3 and CS-1)

Requested Approval Date:

NRC Target Date: 12/31/05

8. *SPS - Risk Informed Inservice Inspection Program (SPS 2) - Fourth interval RI-ISI program update.

3 Requested Approval Date: N/A NRC Target Approval Date: 05/4-3/05

9. SPS TSCR 330B - AFW Requirements and Surveillance Revisions* - Clarify AFW pump requirements with regard to the operability requirements of TS 3.6.B.1 and 3.6.C versus the action statement of TS 3.6.F.

Requested Approval Date:

NRC Target Date:

11/30

10. NAPS/SPS/MPS - Combined QA Program Description (QAPD) - Topical Report DOM-OA A new combined QAPD (Dominion QA Topical Report DOM-QA-1) to replace the existing NAPS, SPS, and MPS Quality Assurance Programs.

Requested Approval Date: 05/05 NRC Target Approval Date: 06/06/05 NAPS/SPS/MPS - TSCR Oraanizational Changes

- These changes are required to support the QA Topical Program change to NQA-1.

Requested Approval Date: 05/05 NRC Target Date: 06/30/05

PRIORITY OF NORTH ANNA/SURRY LICENSING TASKS AT THE NRC 2nd Quarter-2005 I

NAPS - ISFSI TSCR - Organizational changes - These changes are required to support the QA Topical Program change to NQA-1. -

Requested Approval Date: 05/05 NRC Target Date:

11. SPS - TSCR - Revised PT limits for Units I and 2 - These limits will be applicable until renewed license expiration. (Separate Submittals)

Requested Approval Date: N/A NRC Target Date: 12/17/05 12.SPS - TSCR 376 - Change of ASME Code Reference for Insdrvice Tdstinq Activities - TS change request updates the ASME IST Code references in the TS from ASME Xl to ASME OM Code.

Requested Approval Date: 05/05 NRC Target Date: 04/05

13. NAPS - SCR N 025 Fluid System Completion Times - Plant specific risk informed TS change after NRC rejected the WOG WCAP on fluid systems.

Requested Approval Date: N/A NRC Target Date: 12/01/05 14.NAPS/SPS - TSCR - RCP Flywheel Inspection Frequency - NRC CLIIP reduces the RCP flywheel inspection frequency from once every 10 years to once every 20 years.

Requested Approval Date: 08/05 NRC Target Date: 08/01/05 15.SPS - TSCR Change of ASME Code Reference for Inservice Testing Activities -

TS change request updates the ASME IST Code references in the TS from ASME Xl to ASME OM Code.

Requested Approval Date: 05/05 NRC Target Date: 05/01/05 16..NAPSISPS - Relief Requests -

Extended Classl boundary - pressure test at or near the end of the 1SI interval for numerous systems Requested Approval Date: 1/06 NRC Target Date: 01/01/06 17.NAPS - ISI Relief Request - ORS and Si pump casing weld examinations in accordance with 95/95 ASME Code.

Requested Approval Date: N/A NRC Target Date:

  • Requested to use during next refueling outage for that Unit.