Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML00370520422 February 2000Citizens Awazreness Network'S Request for Hearing & Petition to Intervene in License Transfer for Vermont Yankee, Request for Stay of Proceeding & Request for Subpart G Hearing Due to Special CircumstancesSafe Shutdown
Unanalyzed Condition
Fitness for Duty
Hydrostatic
Systematic Assessment of Licensee Performance
ML04254014630 August 2004Vermont Department of Public Service Notice of Intention to Participate and Petition to Intervene
ML04272022210 September 2004Letter from Raymond Shadis Enclosing a Corrected Page Two of Arnold Gundersen'S Declaration in Support of New England Coalition'S Request for Hearing...And New England Coalition'S Supplemental Exhibt GStroke time
ML04278053529 September 2004Vermont Yankee - NRC Staff Answer to Request for Hearing of New England Coalition
ML04278055829 September 2004Vermont Yankee - NRC Staff Answer to Vermont Department of Public Service Notice of Intention to Participate and Petition to InterveneSafe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake
Fuel cladding
ML04278057629 September 2004Vermont Yankee - Certificate of Service
ML0428100126 October 2004Vermont Yankee - NRC Staff'S Errata to Its Answers to Request for Hearing of New England Coalition and Vermont Department of Public Service Notice of Intention to Participate and Petition to Intervene
ML04281036710 September 2004Letter from Raymond Shadis to Emile L. Julian Enclosing an Original and Two Copies of Page 27 of New England Coalition'S Supplemental Exhibit G, Entergy Report CR-VTY-2004-0918, MSIV As-Found LLRTs Show and Adverse TrendStroke time
ML04282009029 September 2004Entergy'S Answer to the New England Coalition'S Request for HearingAnticipated operational occurrence
Safe Shutdown Earthquake
Nondestructive Examination
Exemption Request
Earthquake
ML04282010029 September 2004Entergy'S Answer to Vermont Department of Public Service Notice of Intention to Participate and Petition to InterveneEarthquake
Fuel cladding
Backfit
ML0428802357 October 2004Vermont Department of Public Service Reply to Answers of Applicant and NRC Staff to Notice of Intention to Participate and Petition to Intervene
ML04294032811 October 2004New England Coalition'S Reply to Applicant and NRC Staff Answers to New England Coalition'S Request for Hearing, Demonstration of Standing, Discussion of Scope of Proceeding and ContentionsUltimate heat sink
Incorporated by reference
Aging Management
ML0429904623 September 2004Exhibit F of New England Coalition'S Request for Hearing, Demonstration of Standing, Discussion of Scope of Proceeding and Contentions
ML04301016130 August 2004New England Coalition'S Request for Hearing, Demonstration of Standing, Discussion of Scope of Proceeding and ContentionsSafe Shutdown
Unanalyzed Condition
Ultimate heat sink
Post Accident Monitoring
ML04301043819 October 2004New England Coalition'S Errata to Its Reply to NRC Staff and Entergy Nuclear Vermont Yankee Answers to New England Coalition'S Request for a Hearing
ML04309045528 October 2004Letter from Sarah Hofmann to Administrative Judges and Parties Enclosing a Cd Containing State of VT, Department of Public Service'S Initial Petition, Reply, 6th Contention, Affidavits, and Exhibits 1 Through 39 (Excluding Exhibit 16 and 27
ML04317012110 November 2004Vermont Yankee - NRC Staff Response to Vermont Department of Public Service Request for Leave to File a New ContentionSafe Shutdown
Fire Barrier
Emergency Lighting
Fire Protection Program
ML05097031631 March 2005Entergy'S Proprietary Privileged Document LogUltimate heat sink
MELLLA
ML05270038221 September 2005New England Coalition'S Request for Leave to File a New ContentionSafe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Design basis earthquake
Earthquake
ML05293034117 October 2005Vermont Yankee - NRC Staff Answer to New England Coalition Request for Leave to File a New ContentionEarthquake
ML05300020019 October 2005Entergy'S Response to the New England Coalition'S Request for Leave to File a New ContentionSafe Shutdown
Loop seal
Packing leak
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Coatings
Operating Basis Earthquake
Temporary Modification
Significance Determination Process
Design basis earthquake
Code Reconciliation
Earthquake
Fire Protection Program
ML05306012926 October 2005New England Coalition'S Reply to Applicant and NRC Staff Answers to New England Coalition'S Request for Leave to File a New ContentionEarthquake
ML06087013427 March 2006Vermont Yankee - NRC Staff'S Answer to New England Coalition'S Statement on the Scope of NEC Contention 3
ML06096014727 March 2006Entergy'S Response to New England Coalition'S Statement on the Scope of New England Coalition Contention 3Exemption Request
ML06096014828 March 2006Entergy'S Response to New England Coalition'S Brief on the Legal Scope of Modified NEC Contention 4Earthquake
ML0610400906 April 2006New England Coalition'S Request for Leave to File New Contentions and the Declaration of Dr. Joram HopenfeldTime of Discovery
Flow Induced Vibration
ML0610401074 April 2006New England Coalition'S Reply to Applicant'S Response on the Legal Scope of New England Coalition Contention 4Earthquake
ML06143002822 May 2006Vermont Yankee - NRC Staff'S Response to the Atomic Safety and Licensing Board'S Order of May 10, 2006
ML06143047417 May 2006New England Coalition'S Statement of Position; Prefiled Written Testimony of Dr. Joram Hopenfeld Regarding Contention 3, with Attachments 1 and 2; and Affidavit of Dr. Joram HopenfeldEarthquake
ML06144024517 May 2006Entergy'S Initial Statement of Position on New England Coalition Contention 3; Testimony and Affidavits of Craig J. Nichols and Jose L. Casillas on NEC Contention 3 - Large Transient Testing, with Exhibits 1 - 22Safe Shutdown
Time of Discovery
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Stroke time
Slow transfer
Anticipated operational occurrence
Probabilistic Risk Assessment
Abnormal operational transient
Large early release frequency
MELLLA
Overtravel
Earthquake
Fuel cladding
Liquid penetrant
Power change
Flow Induced Vibration
ML06145008917 May 2006Entergy'S Initial Statement of Position on New England Coalition Restated Contention 4, with Exhibits 1 - 21Safe Shutdown
High winds
Safe Shutdown Earthquake
Coatings
Operating Basis Earthquake
Temporary Modification
Design basis earthquake
Code Reconciliation
Earthquake
Scaffolding
Operability Assessment
Power Uprate
Affidavit
ML06150020725 May 2006Vermont Yankee - NRC Staff'S Response to New England Coalition'S Request for Leave to File a New Contention
ML06163008826 May 2006Pilgrim- Massachusetts Attorney General'S Request for a Hearing and Petition for Leave to Intervene with Respect to Entergy Nuclear Operations Inc.'S Application for Renewal of the Pilgrim Nuclear Power Plant Operating LicenseTornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Finite Element Analysis
Large early release frequency
License Renewal
Exemption Request
Earthquake
Chernobyl
Fuel cladding
Stolen
Backfit
Fatality
Affidavit
Depleted uranium
ML06163012525 May 2006Pilgrim - Pilgrim Watch Request for a Hearing and Petition to Intervene
ML06164003027 April 2006Request for Hearing in Entergy Vermont Yankee License Extension Proceeding Submitted by the Town of Marlboro, VT
ML06164003130 May 2006Letter from Diane Curran Submitting the Originals of Several Documents for Which Copies of Faxed Signature Pages Were Filed on May 26, 2006 in Connection with the Massachusetts Attorney General'S Hearing Request and Backfit PetitionBackfit
ML06164003526 May 2006Vermont Department of Public Service Notice of Intention to Participate and Petition to InterveneFitness for Duty
Aging Management
License Renewal
Power Uprate
ML06164006526 May 2006Massachusetts Attorney General'S Request for a Hearing and Petition for Leave to Intervene with Respect to Entergy Nuclear Operations Inc.'S Application for Renewal of the Vermont Yankee Nuclear Power Plant Operating License and Petition.Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Finite Element Analysis
Large early release frequency
License Renewal
Exemption Request
Earthquake
Chernobyl
Fuel cladding
Stolen
Backfit
Fatality
Affidavit
Depleted uranium
ML0616503155 June 2006Notice of Intent to Adopt Contentions and Motion for Leave to Be Allowed to Do So
ML0616503175 June 2006New England Coalition'S Notice of Adoption of Contentions or in the Alternative, Motion to Adopt Contentions
ML06167020415 June 2006NRC Staff Answer to New England Coalition Notice of Adoption of Contentions or Alternative Motion to Adopt ContentionsBackfit
ML06171008619 June 2006Pilgrim - NRC Staff'S Response to Request for Hearing and Petition to Intervene Filed by Pilgrim WatchProbabilistic Risk Assessment
Aging Management
License Renewal
Backfit
Affidavit
ML06172010914 June 2006Entergy'S Rebuttal Statement of Position on New England Coalition Contention 3, with Rebuttal Testimony of Craig J. Nichols and Jose L. Casillas on NEC Contention 3 -- Large Transient Testing and Exhibits 1 and 2Incorporated by reference
ML06172012514 June 2006Entergy'S Answer to the Town of Marlboro'S Request for Hearing
ML06172027721 June 2006NRC Staff Answer to Vermont DPS Notice of Intent to Adopt Contentions and Motion for LeaveBackfit
ML0617203845 June 2006Pilgrim - Notice of Adoption of Contention by Pilgrim WatchBackfit
ML06173048222 June 2006Pilgrim - NRC Staff Answer Opposing Massachusetts Attorney General'S Request for Hearing and Petition for Leave to Intervene and Petition for Backfit OrderAging Management
License Renewal
Earthquake
Fuel cladding
Backfit
Affidavit
ML06174005822 June 2006NRC Staff Answer to Request for Hearing of New England CoalitionAging Management
Moisture barrier
License Renewal
Flow Induced Vibration
Power Uprate
ML06174009922 June 2006NRC Staff Answer to Town of Marlboro'S Request for Hearing
ML06174011222 June 2006NRC Staff Answer to Vermont Department of Public Service Notice of Intention to Participate and Petition to InterveneAging Management
License Renewal
Power Uprate
Affidavit