ML050970316

From kanterella
Jump to navigation Jump to search
Entergy'S Proprietary Privileged Document Log
ML050970316
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/31/2005
From: Silberg J
Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee, ShawPittman, LLP
To:
Atomic Safety and Licensing Board Panel
Julian E
References
50-271-OLA, ASLBP 04-832-02-OLA, RAS 9726
Download: ML050970316 (52)


Text

1A15 _.qI-;

March 31, 2005 DOCKETED UNITED STATES OF AMERICA USNRC NUCLEAR REGULATORY COMMISSION March 31, 2005 (1:57 pm)

Before the Atomic Safetv and Licensing Board OFFICE OF SECRETARY RULEMAKINGS AND

) ADJUDICATIONS STAFF In the Matter of )

) Docket No. 50-271 ENTERGY NUCLEAR VERMONT )

YANKEE, LLC and ENTERGY ) ASLBP No. 04-832-02-OLA NUCLEAR OPERATIONS, INC. ) (Operating License Amendment)

(Vermont Yankee Nuclear Power Station) )

)

ENTERGY'S PROPRIETARY PRIVILEGED DOCUMENT LOG Pursuant to the terms of the Board's "Order (Protective Order Governing Non-Disclosure of Proprietary Information)" dated March 1, 2005 ("Order"), Applicants Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. ("Entergy") hereby provides a log, broken down by contention, of the documents ("Proprietary Documents") that counsel for Entergy in good faith believes contain information that qualifies under 10 C.F.R. § 2.390(a)(4) and (b)(4)(i)-(v) as a trade secret and commercial or financial information of Entergy or its vendors and contractors and should be protected in accordance with the terms of the Order.

Proprietary Documents Relating to DPS Contentions 1 and 2 Document Bates No Date Document Title To From Company

]ID _ _ _ _ _ _ _ _ _ _ _ _

VYC-1088 Rev. 3 Final Cover Page EPU000799 U 030215 - /222003 Signed Feedwater and Condensate E

0079 U 030219 8/220 ydraulic Model Analysis (PUSAR rBien VY Inotes)

Transmittal Letter PUSAR Section 6.4 EU003317 EU 062982 - 8/28/2003 6.4.I and 6.4.5 input Service Water for Nichols GE EPU 062985 T0604 from Mark LeFrancois; File No:

PUPVY-03-299 _ .

TeApl4e= 56CV- 031 56C/- 6l-

Document Bates-No Date Document Title To From Company ID _ _ _ _ _

U003318 EPU 062991 8/29/2003 Transmittal Letter. PUSAR Section 6.1 ichols GE PU 062986 put AC Systems in29203 _____

ransmittal Letter. PUSAR Section EPU003319 EPU 062992 - /29/2003 .2.6 input ECCS Net Positive Suction ichols GE 062994 Head for T0406 from Bruce Slifer, File No. PUPVY-03-312 _

Transmittal Letter PUSAR Section 6.7 EPU003320 U 062995 - 8/29/2003 and Table 6-5 input Appendix R/Fire Nichols GE U 062998 roection for T0O611I from Bruce Slifer;

. File No. PUPVY-03-313 0ransmittal Letter. Rev to PUSAR EPU003321 PU 062999 - 9/2/2003 ection 6.7 Table 6-5 and Table 1-1 ichols GE sPU 063006 input Appendix R/Fire Protection Transmittal Letter PUSAR Section PU003322 EPU 063007 - /29/2003 .3.2 Input Station Blackout for T0903 ichols GE EPU 063008 _om Bruce Slifer, File No. PUPVY-103-314

_ransmittal Letter. PORC Technical PU003323 PU 063009 - 9/4/2003 hanges to PUSAR Revision B and ichols GE

__U 063023 Comments; File No. PUPVY-03-321 VY PUSAR 07-21-03 Unverified Draft PU003324 EPU 063024 - /29/2003 SAFETY ANALYSIS REPORT _ chroll GE EU 063215 CONSTANT PRESSURE POWER

__ _ _ _ _ _ _ _ _ _ RATE _ _

_ 0AFETY ANALYSIS REPORT FOR EPU003325 EPU 063216 9/5/2003 S CONSTANT PRESSURE Schroll GE U 063427 POWER UPRATE_____

VY Draft PUSAR 08-20-03 w changes EPU003326 EPU 063428 - /20/2003 accepted SAFETY ANALYSIS chroll GE PU 063646 REORT CONSTANT PRESSURE SholG POWER UPRATE EPU063647

- roject Task Report for T0400: v-U003327 PU 063657 - /l/2003 Containnent System Response Dick GE PU063755 ~evision 0 it;Dc PU003328 EPU 063756 - 8/29/2003 Equipment Qualifications Engineering Yasi S&W

_______ U 063818 eport R____ Final EQ; Duplicate is #6654 _____

PU003331 EPU 064038 - /28/2003 Task 0400 Decay Heat Profile ick GE

_ _ _ _ _ _ _ U 064050 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _

EPU003333 EU 064051 - 5/19/2003 T0402 - Containmnent. Isolation- Slifer; GE EPU03333EPU 064053 - 519/003 edacted last 2 pages (GE Proprietary) evincentis U0309 - Reactor Core Isolation Cooling EPU003334 U 064057 7t3/2003 RCIC) System-redacted last 2 pages vincentis GE

_ ____ _____ _____ (GE Proprietary) _ _ _ _

PUUO0605335 0300 - Nuclear Boiler System- GEicets EPU003335 EPU 06405 6/26/2003 edacted last 6 pages (GE Proprietary) Deancis GE U 064066- ermont Yankee/GE Integrated EPU EPU003336 IEPU 064090 4/4/2002 rear Meeting - Fuel Cababilities with GE Document Bates No Date Document Title To From Company GE Proprietary Licensing Topical EPU003337 EPU 064091 - 2/6/2003 Report NEDC-33004P Constanttrmak G EPU 064144 Pressure Power Up rate Revision 3 tramback GE (TAC No. MB2510) I EPU003339 EPU 064275 - 3/31/2003 NRC review of GE Licensing Topical Ruland GE PU 3 9 U 064360 eport-CPPC Rev. 3 R____ unG NRC review of GE Licensing Topical EPU003340 EPU EPU 064361 064444 - /31/2003 Report fNuclearSafety Evaluation Reactor by the(See Regulation Office uland GE ID#1766) -

EPU003341 EP0034 EPU P~U 064445 064447 - 3___2037/203 T itle: Summary of GE Part 21 Evaluations of R'LB Loads on Internals asillas

__GE__ as_

GE U 064448 - 1Vermont Yankee ARTS/MELLLA EPU003342 U 064456 1122/2002 Task 304 Acoustic and Flow-induced Tran GE U064456 ~ Lads Evaluation _________

Licensing Topical Report Qualification U003343 EU 064457 - 2/1/2000 of the One-Dimensional Core Transient Marquino GE EPU 064619 Model for Boiling Water Reactors supplement I volume 4 PU 064620- DRAFT Shell; Safer/GESTR-LOCA EPU003344 EPU 064692 3/1/2003 ss-of-coolant Accident Analysis Bott GE

_____ _____ _ ___ __ (D uplicate is ID#I 9618) _ _ _ _ _

Errata & Addenda I Update of GE EPU003345 EPU 064693 - 12121/2001 Proprietary Licensing Topical Report Klaproth GE PU 064848 DC-33004P Constant Pressure

._ P ower Up rate Revision I UPU 064849 - Letter to NRC transmitting Errata &

EPU003346 EPU 064908 10/8/2002 Addenda 2 for Licensing Topical Stramback; GE

.R Report Constant Pressure Power Uprate U003347 E0037EU PU 064909 065062 11/1/2002

__l/l/200 icensingPower ressure Topical Report Uprate RevConstant 2 ole Cole GE GE_

U 065063 - Licensing Topical Report Generic .uino; U003348 U065236 21/1 999 Guidelines for General Electric Boiling cGeE 02Water

___________ ________ Reactor Extended Power Uprate ________ G Licensing Topical Report Generic PUE39 PU 0652364 -valuation of General Electric Boiling aqio G EPU003349 EPU 065237 - 1/2000 Water Reactor Extended Power Uprate arquino GE Volume 22 -.

Licensing Topical Report Generic 1PU 065365 - Evaluation of General Electric Boiling U003350 PU 065455 2/1/1999 E Reactor Extended Power Uprate Marguino GE r Supplement I Volume I Licensing Topical Report-Generic U003351 EPU 065456 - /1/1999 Evaluation of General Electric Boilingarun, G EPU 065694 Water Reactor Extended Power Uprate a xlinO GE Supplement I Volume 2 EPU003352 U 065695 - /1/2001 DYN Statistical CPR Analysis Schrum GE PU065753 _ _ _ _ __ _ _ _ _ _ _ _ __ _ _ _ _ _ _ I I_

Document Bates-No Date Document Title To From Company ID _ _ _ _ _ _ _ _ _ _ _ _

V Final APRM/RBM/Technical EPU 065754 - Specifications/ Maximum Extended PU003353 PU 065830 /4/2003 Load Line Limit Analysis Proprietary GE Version (See ID #1863 for Proprietary version) Duplicate is #6581 Letter to Nichols: Work Impact EPU003354 ePU 065831 - 12/18/2002 Notification 003 for Task T0902- ick; Hinds GE ATWS-Approved by Entergy EU003356 EPU 065871 - 12/1/1979 NDE-24222 Assessment of BWR GE

_____ ___ EPU 066688 - / Mitigation of ATWS Volume I EPU003357 EPU 066689 - 1/1/2020 GE Uprate Study (Duplicate is ID# GE

______PU 066950 _____10613 U 066951 - Final Task Report for Task T0400:

EPU003358 066973 10/1/2003 Containment System Response GE U 667(Transmittal is ID # 11483) _

EPU003359 PU 066974 - 11/1/2003 01I00 Final Task Report - Reactor Dick GE

__________ ,U 067002 ll/12003Heat Balance DickGE EPU003363 rPU 067442 1/1/2020 Vermont Yankee Feasibility Study GE PU 067181- 1//220 plicate is ID# 11 66) _____

PU003364 U003364_ OU PU 067443 067571 - 5/1/2002 Technical ESIGN GUIDE D____

Design Procedure I Rev. 2 OPL - 3 Bolger GE T0902 CP TSD VYNPS RevO PU003365 UU067580 067572- /1/2003 Approved Task T0902: Task Scoping Document Anticipated Transients GE G

Without Scram DRAFT Project Task Report GE- NE-U0 E3PU 067581 - /203 000-00 16-383 1-01 Revision 0 iglG EPU 067626 lass III Task T0902: Anticipated Transients Without Scram LICENSING TOPICAL REPORT /

ANTICIPATED TRANSIENTS U003367 UU 067627 067683 - /1/1987 WITHOUT NRC ATWSSCRAM / RESPONSE/ TO RULE. IOCFRSO.62 GE PREPARED FOR THE BWR

_OWNERS' GROUP U 067684 - /Technical Evaluation No. 2003-026 EPU003368 U 067753 /17/2003

Title:

Fuel and Peaking Information to Duda GE

___Support ERIN EPU Risk Assessment PU 067775 - Radiological Evaluation of a DBA-EPU003371 PU 067901 9/22/2003 Loss of Coolant Accident Duplicate is Polestar

____ ____ _ __ __ D #8497 PU 067903 - E Licensing Topical Report on U003373 PU 068211 -/1/2003 onstant Pressure Power Uprate; Rev 4 GE rietary.

ubmittal of GE Proprietary Licensing PU 068212 - popical Report NEDC.33006P PU003374 EPU 068335 8/23/2002 Revision I General Electric Boiling Stramback GE Water Reactor on Constant Pressure Power P_ Uprate Rev. 4 Proprietary U003375 PU 068336 - 10/1/2002 Task Scoping Document for ECCS- GE EP___U 068347 OCA SAFER/GESTR T0407____

L___

Document Bates No Date Document Title To From Company SAFETY ANALYSIS REPORT FOR VERMONT YANKEE NUCLEAR EPU003376 U 068348 - /1/2003 OWER STATION CONSTANT IEU 068559 PRESSTJRE POWER UPRATE;crulG NEDC-33090P Draft Revision B-2 Class III 0000-0007-5271 _

LECTRICAL POWER AND EPU003377 EPU 068566 8/4/2003 UXILIARY SYSTEMS PUSAR GE PUSAR Integration; SAFETY ANALYSIS REPORT FOR U003378 EPU 068793 8/1/2003 PRMONT YANKEE NUCLEAR Schrull GE PRESSURE POWER UPRATE;

[Unverified Draft; PUSAR Integration; SAFETY ANALYSIS REPORT FOR EPU003379 U 068794 - 8/1/2003 VERMONT YANKEE NUCLEAR ...chrull GE U 069025 POWER STATION CONSTANT PRESSURE POWER UPRATE;

_Unverified Draft; U003380 U 069026 - /28/2003 S 1.5.2 PUSAR Section 4.1.A ER

______PU 069054 K____evO0 WBS 1.7 PUSAR Section 10.3.1 ER EPU003381 EPU 069055 8/29/2003 with transmittal letter Duplicate is Yasi S&W PU 069117 #2514____

TRANSMITTAL OF SERVICE EPU003382 EPU 069118 - 8/25/2003 WATER PUSAR SECTIONS 6.4 6.4.1 Yasi S&W EU 069173 ~ N)6.4.5 AND ENGINEERING REPORT SECTION 3.5.3 U003383 EPU 069174- 9/2/2003 WBS 1.5.2 PUSAR Section 4.1.4 ER Yasi S&W U00383 U 069203 /2203 / transmittal letter_____

UU4 069204 - / 3WBS 1.4.9.1 PUSAR Section 6.2 DC EPU003384 PU 069220- 828/2003 Power ER section 3.8.4 w/transmittal Yasi S&W EU 069220 letter Duplicate is 1/2619 _________

EP335 U 069221 - //23 olestar Calculation: Radiologicaletaf Plsr U 069345 EP____ ___ E__valuation of a DBA-LOCA ____

EPU003386 EPU 069346 - 7/28/2003 Polestar Calculation: Radiological Metcalf Polestar

________ PU 069470 7/28200 Evaluation of a DBA-LOCA _ Mta Poea

_U 069471 - Submittal of Draft BOP Engineering EPU003387 EPU 069484 9/15/2003 Report ECCS Pump NPSH Evaluation Salter S&W U069484 Draft A ___

EPU 070836 - VERMONT YANKEE FEASIBILITY EPU003396 EPU 070841 1/1/2020 STUDY 3.12 Residual Heat Removal GE U 070841 ~ystem _ _ _ _

VERMONT YANKEE FEASIBILITY EPU003397 EPU 070842 1/1/2020 STUDY 3.19 Emergency Core Cooling GE

____ ___ _ 070846___ _ _ ystems S__

PU003398 PU 070847 070850

- 1/1/2020 VERMONT YANKEE FEASIBILITY GE

_________ _PU STUDY 3.20 Containment Capability Document Bates No Date Document Title To From Company ID_ _ _ _ _ _

DRAFT UNVERIFIED SAFETY ANALYSIS REPORT FOR U003399 EPU EPU 070851 070943 - 8/1/2003 VERMONT POWER STATION YANKEE NUCLEAR MAXIMUMchulG GE EXTENDED LOAD LINE LIMIT ANALYSIS PLUS DRAFT UNVERIFIED SAFETY ANALYSIS REPORT FOR EPU003400 U 071165 811/2003 VERMONT YANKEE NUCLEAR GE U 1P5OWER STATION MAXIMUM EXTENDED LOAD LINE LIMIT EPU003401 EPU 071166 1/1/2020 Feasibility Study 3.14 Special GE EPU003402 EPU 071171 - 1/1/2020 VY Feasibility Study 3.12 Residual GE

_______ U 071176 Removal H____eat System GE____

U0040 U 071177 - /1202 xtended Power U prate I MELLLA G

_U003403 EU 071472 -/1/2002 Feasibility Study GE EPU003404 EPU 071473 2S - AEP Verified Revision 0 OP D ick GE

_______ U 071522 15203 A for Entergy Approval _____

SAFETY ANALYSIS REPORT FOR EPU003405 EPU 071523 - /1/2003 P OCNT YANEE N chrull GE U00301734 OWER STATION CONSTANT I 1PRESSURE POWER UPRATE EPU 071735 - /1/2003 Project Task Report T0409 Standby Had GE EU003406 EPU 071751 2/l/2003 Gas Treatment System (draft) Head___ GE EPU003407 EPU 071752 6 - /4/2002 VYNPS/GE EPU and M+ Feasibilityt GE EPU 071752 4202 A ssessment Meeting NS SS Assessment ____ h____GE_

EU003408 EU 071763 - 9/1 5/2003 DatBOP Engineering Report ECCS Salter S&W

_________ EPU 071776 P_______

ump NPSH Evaluation Draft A -Saltr ___

U071984- Torus Temperature Response to EPU003410 072115 11/5/1998 Appendix R and Station Blackout DE&S U072115cenarios _____

PUh31 PU 072381 - 1//00 raft BOP Engineering Report der SW EPU003413 EPU 072461 l/1/2020 Condensate & Feedwater Draft A =_Bandeira S_ W Draft WPB Review Checklist from U 072462 - 9/22/03; Draft WPS High Energy Line EPU003414 EPU 07 /22/2003 Break Target Impact Project; EPU Task izauskas S&W U07coping Document/Task Report

_Comment Form from 7/24/03; T1001 EPU003416 U 072554 - 5/29/2003 Drft Task Report T03 07 Reactor G

_________ U 072556 R______

ecirculation System _____ GE U 072557 - Task Scoping Document DRF No.

EPU003417 U 072567 1/1/2003 0000-0007-5271 Revision 0 Task GE U0 T0310: Residual Heat Removal System DRAFT Project Task Report GE- NE-EPU003418 EPU 072568- /1/2003 0000-0010-9610-01 Revision 0 Class en GE U348 U 072587 /203 IIITak T03 IOReidul HetenG Removal System _

PL-4A (Containment Analysis Input U003419 EPU 072588 - 3/2003 alues) For Vermont Yankee Nuclear EU 072637 owrStation EPUJMELLLA+ (Rev. ow GE Document Bates No Date Document Title To From Company PU 072638 - Transmital of OPL4A Rev 1; VYNPS EPU003420 EPU 072689 2/28/2003 AEP Verified Revision I OPL 4A for ick GE Entergy Approval U003421 EPU 072690 - /7/2003 Correspondence letter on T0400 (EPU) Dck GE E________ ffPU 072702 3._2003 Decay Heat for Containment Analysis ickGE

_ 0 - EPU T0400 Suppression Pool EPU003422 EPU 072703 - 4/5/2003 Temperature / Pressure Response to ick GE DBA-LOCA

_PU003423 EPU 072716 - /2/2003 ePU T0400 Containent System Dick GE 072726 E_____PU R____esponse- EBA_____

EPU T0400 - DBA LOCA with EPU003424 EPU 072743 5/7/2003 uppression Pool Cooling Event Dick GE PU 072743 Results U003425 EU 072744 - 1ll 00 Task Scoping Document Task T0400: GE EPU003425 _U 072752 11/1/22 Containment System Response GE DRAFT OPL-4A (Containment PU046 U072753 - 1//220 lysis Input Values) For Vermont G PU003426 PU 072793 l/l/2020 Yankee Nuclear Power Station ow GE

_EPU/MELLLA+ _

,PU 072794 - /RC contains information in support of PU003427 -PU 072843 226/2003 vision to OPL4A Rev 1; OPL-4A lifer GE

._ _ (_Containment Analysis Input Values); .

OPL-4A (Containment Analysis Input P 428 U 072844 - 27/2003 Values) For Vermont Yankee Nuclear ang K.

U003 PU 072897 Power Station EPU/MELLLA+ Rhow GE (Revision 1)

PU003429 PU 072898 - 1//2003 RAFT Project Task Report Task Rhow GE

-PU003430 PU 073007 -110 0400: Containment System Response PU00343 PU 073 EPU 073008 029.

- 123 EPU T0402 Draft TR.pdf ontainment Isolation _____ ____

GE PPU 073030 - /920 TR Review Checklist for T0402 e GE

-'PU003432 U033 _P20304 U 073032 l/2003 5/192003 Cntawnen Vontainnment ~

System nlR d sltP Response-.pdf ncent____ GE GE___

EU003432 U 073033 - 4/1/2003 VYP EPU T0402 Final TR~pdf GE

______ U 0730.54 C____ontainment Isolation ____

PU003433 h-U 073055 - 11/1/2002 Task Scoping Document Task T0405: GE RU 073063 ore Spray System C____

U 073064 - S EPU T0411 Final TRpdf-.

PU003434 PU 073089 1/2003 OST-LOCA COMBUSTIBLE GAS GE U073089 CONTROL EPU003435 PU 073090 - 14/2002 AsseS/GE EPU and M+ Feasibility Knecht GE

_______ U 073 100 ssessment Meeting NSSS Assessment A____ _____

U003436

_U00343 PU 073101 - /25/2002 Study PU 073260 3_25200 inzipand fileTask containing VY Feasibility related documents.

GE GE EPU 073261 - Project Tast Report; GE-NE-0000-U003437 5/12003 0011-7129-01 Revision 0 Class III iggel GE 073294 EPU T0900 Transient Analysis (draft)

AFETY ANALYSIS REPORT FOR VERMONT YANKEE NUCLEAR EPU003438 _PU 073295 - /24/2003 POWER STATION CONSTANT chrull GE PRESSURE POWER UPRATE (Unverified Draft)

Document Bates No Date Document Title To From Company SAFETY ANALYSIS REPORT FOR VERMONT YANKEE NUCLEAR EPU003439 U 073473 /29/2003 OWER STATION CONSTANT chrull GE U 073664 RESSURE POWER UPRATE (Unverified Draft)

Yankee Atomic Electric Company EPU003441 EPU EPU 073751 073882 - 11/511998 alculation/Analysis fortoTorus emeaueResponse Appendix R Fago aoD& DE&S d Station Blackout Scenarios orus Temperature Response to EPU003442 EPU 073883 11/5/1998 ppendx R and Station Blackout DE&S EU 074014ceros_____

Yankee Nuclear Services'Division PU 074015 - 1alculation/Analysis for Torus EPU003443 PU 074219 11/3/1998 Temperature and Pressure Response to Fago DE&S Pmall Break LOCA Scenarios-Model D__evelopment _

PU 074220 - 1 9 Analysis of Suppression Pool EPU003444 PU 0742 11/5/1998 Temperature for Relief Valve DE&S U074532 ~~ischarge Transients _________

Yankee Nuclear Services Division EPU003445 EPU 074533 - 11/5/1998 alculation/Analysis of Suppression anthner DE&S U 074845ool Temperature for Relief Valve Discharge Transients PU003451 EPU 075495 - /2/2003 roject Task Report for T0407: ECCS- Bott GE EPU 075563 LOCA SAFER/GESTR Revision 0 .

EPU003452 EPU 075564 - /1/2003 roject Task Report for T0407: ECCS- Ott GE

______PU 075632 _____ OCA SAFERIGESTR Revision 0 _________

U003453 EPU 075635 3/1/2003 Project Task Report T0310: Residual en GE

_____ PU 075652 eat Removal H____ SystemenG

'PU003454 EPU 075653 - _/1/2003 ask Scoping Document Task: T0310 Jen GE

._ EPU 075672 Residual Heat Removal System e PU003455 EPU 075934 1/1/2020 U ON YANKEE FEASIBILITY GE Letter TRANSMITTING FINAL U003456 EPUU075965 075935- /25/2003 RBCCW ADENGINEERINGPUSAR SECTION REPORT 6.4.3 asi S&W

_SECTION 3.5.2 Letter TRANSMITTING SERVICE U00357 EU 075966 - 2503WATER PUSAR SECTIONS 6.46.4.1 Ys &

U003457 EPU 076018 /25/2003 AND 6.4.5 AND ENGINEERING asi S&W REPORT SECTION 3.5.3 EU003458 U 076019 - 5/1/2003 DRAFT' Project Task Report Task snG

-PU03458EPU 076040 -5//200 T0609: Standby Liquid Control System Simpson GE

_PU003459 EPU 076041 5/1/2003 RAFT ProjectTaskReport Simpson GE

_______ U 076062 T____0609: Standby Liquid Control System___ psnG Duane Arnold Energy Center letter re:

esponse to Request for Additional Van U003460 U 076063 - /29/2001 nformation (RAI) to Technical Middles- GE Upecification Change Request TSCR- orth 042 - Extended Power Uprate Document Bates No Date Document Title To From Company EPU003463 EPU 076200 - 3/9/2004 Acceptance Letter for EPU T0407 GE- chols GE EPU0344EPU 076286 9/1/2002 13 LOCA Rebaserine Report GnioE EPU003464 EPU 076287 9/1/2002 ECCS-LOCA Evaluation for GE iso GE

____ __ _ U 076349 __ _ _ _13 EU003465 EU 076350 - 9//02 YECCS-LOCA- Evaluation for GE EcsGE

_______ U 076412 /1202 13 PU 076413 - Letter attaching Revision to PUSAR EPU003466 U 076418 9/2/2003 ection 4.2.6 Table 4-2 and Figure 4-6 ichols GE U 0768nput ECCS Net Positive Suction Head EPU 076419 - Letter transmitting PUSAR Section EPU003467 EPU 076421 8/29/2003 4.2.6 Input ECCS Net Positive Suction Nichols GE

____ ___ ____ ead T0406_ _ _ _ _

U 076422 -

Subject:

PUSAR Section 6.7 and Table EPU003468 U 076425 8/29/2003 65 Input Appendix R/Fire Protection Nichols GE PU ask T0611 FileNo: PUPW-03-313 PU 076426 - /ubject: PUSAR Section 9.3.2 Input EPU003469 PU 076427 /29/2003 Station Blackout Task T0903. File No: Nichols GE

__ ____ ___ ____ ___ U PW-03-314_ _ _ _ _

U 076428 - /orr. re: VYNPS PORC Technical EPU003470 EPU 076442 9/4/2003 Changes to PUSAR Revision B and Nichols GE U 07omments U003473 EPU 076753 - 4/22/2003 OPL-4 & -5 REVIEW FORM GE

_ __ __ _ _ _ _ U 076792 __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _

ntergy Nuclear Operations EPU003474 EPU 076793 - 3/1/2004 ncorporated Vermont Yankee Nuclear Bott GE EU 076864 Power Station SAFERIGESTR-LOCA Loss-of-Coolant Accident Analysis ermont Yankee Nuclear Power tation SAFER/GESTR-LOCA Loss-EPU003475 crU 076865 - /1/2004 f-Coolant Accident Analysis Ott GE PU 076950 upplement I /NEDC-32814P /DRF

.__ __ )000-0013-6912 / Class III _ .

DRAFT Vermont Yankee Nuclear EPU 076951 - 1ower Station SAFER/GESTR-LOCA EPU003476 EPU 077021 1/2003 _oss-of-Coolant Accident Analysis / Bott GE U 0770C-32814P DRAFTA / Supplement I / DRF 0000-0013-6912 / Class III DRAFT Shell Vermont Yankee Nuclear Power Station U 077022 - SAFERIGESTR-LOCA Loss-of-U003477 U 077094 3/1/2003 Coolant Accident Analysis / NEDC- Bott GE 2814P / Supplement I / DRF 0000-

_013-6912 / Class 3 DRAFT Shell Vermont Yankee Nuclear Power Station SAFER/

U003478 U 077095 - /1/2003 ESTR-LOCA Loss-of-CoolantBotG U 077167 ccident Analysis / NEDC-32814P / ott GE upplement I / DRF 0000-0013-6912 /

_lass 3 Document Bates-No Date Document Title To From Company VYNPS LOCA-DBA Long-Term NPSH Information Transmittal 1.5%

EPU003479 EPU 077168 - /6/2004 Day Leakage and 100% GE U 077199 Containment Spray Thermal Mixing Efficiency DRF Number 0000-0025-1645/Sec. 0000-0029-7076-RI ransmittal of VYNPS AEP T0407:

PU 077200 - Peak Cladding Temperature (PCT)

EPU003483 U 077203 8/2004 eUsitivity Study for Vermont 077E-VYNPS-AEP-344 Yankee /

/ DRF 0000- Dick GE 007-5271 Correspondence re: VYNPS EPU EU003485 PU 077228 /10/2004 T0400: DBA-LOCA for Long TermDikG U 077220 NPSH Evaluation / GE-VYNPS-AEP- ick GE 346 / DRF 0000-0007-5271 Correspondence re: VYNPS EPU PU003486 PU 077229 - 7/6/2004 0400: DBA-LOCA for Long Term ick GE U 077262 PSH Evaluation I GE-VYNPS-AEP- ikG

. 346 Revision I / DRF 000-0007-5271 Correspondence re: VYNPS EPU EPU003487 _PU 077263 - 7/6/2004 T0400: DBA-LOCA for Long Term Dick GE EU 077296 FqSH Evaluation I GE-VYNPS-AEP- ikG 346 Revision I / DRF 0000-0007-5271 Correspondence re; VYNPS EPU

-U003488 U077297 - /7/00 T0400: DBA-LOCA for Long TermDikG U 077331 NPSH Evaluation / GE-VYNPS-AEP- ick GE

.3 346 Revision 2 / DRF 0000-0007-5271 Correspondence re: VYNPS Extended Power Uprate - Response to NRC PU003489 _PU 077332 - /1/2004 Request for Additional Information Dick, Lalor GE EU 077498 Proprietary and Non-Proprietary Versions / GE-VYNPS-AEP-350 /

.____ _ __DRF 0000-0007 _ l Correspondence re: VYNPS Extended Power Uprate - Response to NRC U003490 _PU 077499 - 7/29/2004 Request for Additional Information ick GE EU 077511 Proprietary and Non-Proprietary Versions / GE-VYNPS-AEP-353 /

DRF 0000-0007 Correspondence re: VYNPS Extended Power Uprate - Response to NRC EPU003491 PU 077512 - 8/6/2004 Request for Additional Information Dick- Lalor GE EPU 077719 Proprietary and Non-Proprietary Versions / GE-VYNPS-AEP-355 /

DRF 0000-0007-5271 VYNPS CONSTANT PRESSURE

_ 0 POWER UPRATE - GENERIC EPU003499 EPU 077740 - 1/29/2004 DISPOSITION MATRIX Dick GE 077810 ROPRIETARY AND NON-PU PROPRIETARY VERSIONS U003501 U 077939 - 1/l/2020 Appendix E Power Uprate Task Report GE 1 ___P _ _ U 077959 __ _ _ _ m ir Document Bates No Date Document Title To From Company U 077960 TASK DESIGN INPUT REQUEST EPU003502 PU 078139 11/13/2002 0E400-CONTAINMENTSYSTEM GE

___ ___ __ ___ RE_ SPONSE ErPU 078140 - TASK DESIGN INPUT REQUEST U003503 PU 078180 11/11/2002 T0404 - HIGH PRESSURE GE PU 0 0COOLANT INJECTION SYSTEM EPU003504 EPU 078181- 1/1/2020 TASK DESIGN INPUT REQUEST GE

_ _ _ U 078332 ____ IR)

EU003505 PU 078333 - 11/15/2002 TASK DESIGN INPUT REQUEST. GE

______ EPU 078378 111/0 T0407 ECCS-LOCA EVALUATIONS =_GE PU 078379 - Extended Power Uprate / MELLLA+

EPU003506 PU 078674 6/1/2002 Feasibility Study DRF 0000-0001-0781 GE

______ __ __ _____ evision 0 Class III _ _ _ _

Project Task Report Tennessee Valley EU 078675 - Authority Browns Ferry Unit 2 and EPU003507 EPU 079080 5/1/2002 Unit 3 Extended Power Uprate; Task GE T0400: Containment System Response

_ _ __ __ _ _ _ _ _ [REV .0 EU003513 EPU 079372 - 6/1/2003 Task T0407: ECCS-LOCA GE

_______ PU 079440 6/1 0 SAFER/GESTR DRAFT =_GE EPU003514 PU 079441 - 2/1/2003 Task T0309: Reactor Core Isolation GE EPU 079441 -/1/2003 Cooling System DRAF REV. 0 PU00351 PU 079460 - /1/2003 ask T0309: Reactor Core Isolation GE EPU003515 ,PU 079477 51/2003 Cooling System REV. 0 _ GE EPU003516 ,PU 079478 - /1/2003 Task T0309: Reactor Core Isolation GE EPU003519 PU 079495 6 0 ooling System REV. 0 U003520 PU 079513 - Task T0309: Reactor Core Isolation GE U00351 PU 079549 - /1/2003 ooling System REV. 0 = Dick GE EPU003518 PU 07951 /1/20 T03 10: Residual Heat Removal GE 3 PU 079514 ystem DRAFT REV.

S/1/003 U003519 PU 079534 - 6/1/2003 Task T03 10: Residual Heat Removal GE

_________ ,U 079553 System REV. 0 EPU003520 ,PU 079554 - /1/2003 Task T310: Residual Heat Removal GE U0350 U 079573 /1203 ystem REV. 0 G U003521 U 079574 - 4/1/2003 TASK T0400: CONTAINMENT ick GE

_____ U079682 S____YSTEM RESPONSE REV. 0 ____

EPU003522 .PU 079683 - /1/2003 TASK T0400: CONTAINMENT GE

_______ U 079791 _____SYSTEM RESPONSE REV. 0 ____

UO353 U 079792 - /1203 ASK T0400: ONTAINMENT G EP_0_352 PU 079900 6_____0 YSTEM RESPONSE REV. 0 __ GE__

EU003524 PPU 079901 - 6/1/2003 TASK T0400: CONTAINMENT GE

____ U 080009 S___YSTEM REPONSE REV. 0 ___

EPU003525 PU 080010 - 4/1/2003 Task T0402: Containment Isolation GE EPU003529 PU 080031 DRAFT REV.0 H0 Ps C aS EU003526 IEU 080032-. /1/2003 Task T0402: Containment Isolation GE

__ __ __ PU 080053 ___E_ V. 0 _ _ _ _ _ _

E0057 PU 080054 - 4120 Task T0402: Containment Isolation GE U0327 P080075 /1203 V. 0 ____ __

U00528 U` 080076 - /1203 ask T0402: Containment Isolation G E__003528 VU 080097 4112003 RE.0 G EU003529 U 080098 - 1211/2002 Task T0404: High Pressure Coolant impson G

_____ U080112 _____njection System DRAFT REV. 0____ ___

- 11 -

Document Bates No Date Document Title To From Company ED __ _ 6/1/2003

____ u a _Hg PU003530 EPU 080112 6/1/2003 Task T0404: High Pressure Coolant GE EPU 080117 6/1/2003 Injection System REV. 0 GE PU003531 EPU 080142 1/1/2003 Task T0404: High Pressure Coolant GE kPU 080142 /1/2003 ction System REV. 0 GE EPU003532 EPU 080143 - /1/200 ask T0404: High Pressure Coolant GE

_______ U 080157 /1203 iection System REV. 0 ____ ____

EPU003533 EPU 080158 - 1/1/2003 ask T0405: Core Spray System REV. GE U080173 EPU___ __ _ _ DRAFT _ _ _ _ _ _ _

EPU003534 EPU 080174 PU 080242

- /1/2003

_SAFERTGESTR ask T0407: ECCS-LOCA DRAFT REV. 0FOR GE EPU003535 aPU 080243 - 1/1/2020 Task T0407: ECCS-LOCA GE U 080277 DRAFT REV. 0 WAFERIGESTR PU0035363 EPU0035_ EU U 080278 080347 - 1/1/2020

/1/2003 sk T0407: ECCS-LOCA AFER/GESTR REV. 0E GEGE 7nhU05U 080348 - /1203 ask T0407: ECCS-LOCA G EPU003544 EU 080417 91/2003 AFER/GESTR REV.Ipe GE SAFETY ANALYSIS REPORT FOR SECTONT YANKEENUCLEAR PU003538 EPU 080418 - 7/1/2003 POWER STATION CONSTANT chrull GE EPU 080609 pRESSURE POWER UPRATE

________ _ _ _ _ _ _ unverified drafi) _ _ _

EU003539 h-U 080610 - 7/19/2004 S&W BOP Engineering Report S&W

_ __ _ _ _ _ _ U 081396 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _

EU003540 U 081397 - Project Task Report:Core Spray System GE U 081412 EPU003543 U 081563 - 1/1/2020 U 081473 2003-043REFERENCES GE EPU003544 U 081564 - 9/4/2003 Technical Evaluation No. 2003-065 Slfe GE OU 081577 Appendix R PUSAR Input NSMITAL OF SERVICEU EU003545 EU 081578 - 8/25/2003 WATER PUSAR SECTIONS 6. AND Yasi EPU 081630 .5 AND ENGINEERING REPORT SECTION 3.5.3 U003546 PU 081631 - 7/1/2003 Licensing Topical Report Constant GE PU081939 Pressure Power Uprate seismic LICENSING TOPICAL REPORT GE EPU081940 - GENERIC GUIDELINES FOR arquino EPU003547 U 082113 -/1/1999 ENERAL ELECTRIC BOILING ckert WATER REACTOR EXTENDED POWER UPRATE LCENSING TOPICAL REPORT E EPU 8211

- ENERIC EVALUATIONS OF U003548 EU 082114- 1/1/2020 GENERAL ELECTRTC BOILING U 082352ATER FEACTOR EXTENDED rOWER UPRATE SUPPLEMENT I Document Bates No Date Document Title To From Company LICENSING TOPICAL REPORT GE GENERIC EVALUATIONS OF PU003549 U 082353 - 2/2000 GENERAL ELECTRIC BOILING arquino PU 082480 WATER REACTOR EXTENDED POWER UPRATE EPU003550 EPU 082481 - 1/1/2020 DRAFT BOP Engineering Report S&W UPU 082491 G eneric Issues/Programs Rev. A EPU003551 EPU EPU 082492 082503 - Il//2020 BOP Engineering Report Generic Issues/Programns S&W EPU 082504 - 27203 PL4A (Containment Analysis Input GE U03 E52U 082557 Values) Revision 1IO EPU00355 P U 082558 - 2t27/2003 OPLAA (Containment Analysis Input GE U003553 PU 082611 Values) Revision I LETTER FROM GE TO VY GE- GE S-AEP-355 VYNPS Extended U003559 EU 082612 - /6/2004 Power Uprate - Response to NRCLaoDc EPU 082819 Request for Additional Information . r, Dick Proprietary (GE) and Non-Proprietary Versions GESTARR II NEDE2401 IPA14US GE Plant Accident Anslysis Info and Flow EPU003560 EPU 082820 - 1/1/2020 chart LossofCoolant Accident Eval EPU 082822 Model Figure S-I (SAFE/REFLOOD Analysis Methods) and S-2 (SAFER/GESTR Analysis Methods)

GE LICENSING TOPICAL REPORT GE GENERIC EVALUATIONS OF EPU003561 _PU 082823 - /1/2000 ENERAL ELECTRIC BOILING oarnwello PU 082950ATER REACTOREXTENDornED POWER UPRATE NEDC-32523P-A Licensing Topical Report NEDC- GE U 082951 - / 9 32523P-A DRF-DRO-00033 Class II /

EPU003562 U 083189 4/1/1999 Generic Evaluations of General Electric Marquino U0818 Boiling Water Reactor EPU Supplement I Volume II U036 PU 083190 /1/004 AFER/GESTR-LOCA LOSS OF G U003563 EPU 083261 3/1/2004 COOLANT ACCIDENT ANALYSIS Ott E U003564 PU 083262 - 6/1/2003 SAFER/GESTR-LOCA LOSS OF Ot GE PU 083332 COOLANT ACCIDENT ANALYSISOtE U003565 U 083333 - /1/2003 SAFER/GESTR-LOCA LOSS OF GE EPU 083403 COOLANT ACCIDENT ANALYSIS o U003566 U 083404 - 3/1/2003 SAFERIGESTR-LOCA LOSS OF Bott GE PU 083476 COOLANT ACCIDENT ANALYSISOtE Document Title

ensing Topical Report Constant

,ssure Power Uprate rata & Addenda 1 Update of GE

)prietary Licensing Topical Report DC-33004P Constant Pressure wer Uprate Revision I rata & Addenda I Update of GE

)prietary Licensing Topical Report

,DC-33004P Constant Pressure wer Uprate Revision I

, LETTER TO NRC ERRATA &

)DENDA 2 UPDATE OF GE

)prietary Licensing Topical Report DC-33004P Constant Pressure wer Uprate Revision I ensing Topical Report Constant assure Power Uprate ensing Topical Report Constant

,ssure Power Uprate

ensing Topical Report Constant
ssure Power Uprate ensing Topical Report Constant
ssure Power Uprate SESSMENT OF BWR TIGATION OF ATWS VOLUME I UREG 0460 ALTERNATE NO. 3)

CENSING TOPICAL REPORT MTICIPATED TRANSIENTS THOUT SCRAM RESPONSE TO LC ATWS RULE IOCFR50.62

'NPS LOCA-DBA Long-Term

'SH Information Transmittal 1.5%

-Day Leakage and 100%

ntainment Spray Thermal Mixing

.iciency

'NPS LOCA-DBA Long-Term

'SH Information Transmittal 1.5%

-Day Leakage and 100%

ntainnent Spray Thermal Mixing

'NPS LOCA-DBA Long-Term

'SH Information Transmittal 1.5%

r Day Leakage Document Bates No Date Document Title To From Company EPU003580 EPU BOP Engineering Report AC er S&W EPU 085539 085581 - 1/16/2004 Distribution Section T0600 T0601 VY ENGINEERING RECORD GE CORESPONDENCE ERC NO. 2003-PU003581 U 085582- 1/14/2003 001 information being provided for Slifer, Perez U 085645 DIR Task T0400 Containment System Response for EPU/MELLLA+

VY ENGINEERING RECORD GE EPU 085646 1/14/2003 CORESPONDENCE ERC NO. 2003- LIFER; U003582 1/420 01 information being provided for EU050DIR Task T0400 Containment System erez Response for EPU/MELLLA+

EU003583 PU 085722 - /820 ask T0400: Decay Heat for Dick GE PU 085722 8/28/2003 Containment Analysis 0 - OPLAA (Containment Analysis Input GE EPU003586 U 085723 - 1/1/2020 Values) For Vermont Yankee Nuclear U085763 Power Station EPU/MELLLA+ Draft U057 U 085764 - /3203 &W Submittal of Draft Report: GE UP03587 U 085776 /2003 Emergency Diesel Generator PU &W EU 003588 PU 085777 085785 - 1/1/2020 BOP Engineering Management Report Configuration Calculation Matrix IEPU003589 _PU 085786 - 1/1/2020 BOP Engineering Report Structural _ ananos S&W U089 U 085790 Engineering - Rev. A allO VERMONT YANKEE OPLA/5 - GE EPU003590 U 085791 7 1/1/2020 OPA4for GE14 NFI and GE13 U085829 Reanalysis AFETY ANALYSIS REPORT FOR GE PU003591 EPU EU 085830 086041 - 9/1/2003 OWERONT YANKEE STATION NUJCLEAR CONSTANT chrull RESSURE POWER UPRATE Vermont Yankee Nuclear Power GE tation License No. DPR-28 (Docket PU003592 PU 086042 - /3/2004 No. 50-271) Technical Specification 0392 PU 086240 7/20 Proposed Change No. 263 Extended ae Power Uprate - Response to Request for Additional Information EPU003593 U 086274 U082745/1/2003 Project Task ransient Report(draft)

Analysis Task T0900 Niggel GE U Project Task Report Task T0902: GE EPU003594 U 0862750 1o03 Anticipated Transients Without Scram iggel U 0863720 0 RAFT PU055 U 086321 - /1203 roject Task Report Task T0902:E PP0355 U 086372 120 [Aticipated Transients Without Scram Biggel Document Bates-No Date Document Title To From Company ID I _ _ _ _ _ _ _ _ _ _ _ _

PU003596 PU 086373 - 7/1/2003 Project Task Report Task T0902: el GE VPU 086424 Anticipated Transients Without Scram iggel PU084253 597' roject Task Report Task T0902: Ggge EP03570U 086476 0 [Aticipated Transients Without Scram ge U 086477 - Project Task Report Task T0902: GE EPU003598 06529 /U

/l/2003 Anticipated Transients Without Scram Niggel U 08529 IP;DRAFT U003599 PU 086530 - P/12003 roject Task Report Task T0400: GE EPU0359 PU 086639 6//00 ontainment System Response DRAFT Ro U030 PU 086653 Submittal of ECCS NPSH Engineering aSte EPU003600 EPU 086640- 4/29/2004 Report Section 3.7.1 Rev.0 T0406 Salter SAFETY ANALYSIS REPORT FOR E

_ 5 VERMONT YANKEE NUCLEAR PU003601 086654 - 6U 27/2003 POWER STATION CONSTANT chrull EPU 086840 PRESSURE POWER UPRATE (unverified draft)

SAFETY ANALYSIS REPORT FOR GE 02 PU 086841 - 123202 RMONT YANKEE NUCLEARclul U0036 U 087028 POWER STATION CONSTANT PRESSURE POWER UPRATE SAFETY ANALYSIS REPORT FOR GE EPU003603 EPU 087029 - 12/3/2002 VERMONT YANKEE NUCLEAR Schrull EPU 087216 POWER STATION CONSTANT PRESSURE POWER UPRATE SAFETY ANALYSIS REPORT FOR GE EPU003604. U 087217- /21/2003 RMONT.YANKEE NUCLEAR cchrull U087430 OWER STATION CONSTANT RESSURE POWER UPRATE U 087431 - Task Scoping Document Task T1701: GE EPU003605 U 874- 111/2002 NSSS Feasibility Assessment (EPU and Hinds U 087439LLLA+)

Vermont Yankee GE14 New Fuel GE U003606 PU 087440 - /2020 troduction Task Scope Document aradiso EPU 0874405 1//00 greement for Task T0407 ECCS Performance Revision 0 087451 - 1ECCS Net Positive Suction Head GE U003607 U087457 1//2020 USAR Section 4.2.6 PUSAR Pages:

-10 and 4-1 IT0406 P 087458- ECCS Net Positive Suction Head GE U003608 U B74 -/l/2020 4USAR Section 4.2.6 PUSAR Pages:

U 087464-10 and 4-1 IT0406 Document Bates No Date Document Title To From Company

_PU 087465 - ECCS Net Positive Suction Head GE EPU003609 PU 087469 -/l/2020 PUSAR Section 4.2.6 PUSAR Pages:

PU 087469 4-10 and 4-1 IT0406 UPU 087470 - ECCS Net Positive Suction Head GE EPU003610 EPU 087474 1/1/2020 PUSAR Section 4.2.6 PUSAR Pages:

4-10 and 4-1 1T0406 U 087475 - /CCS Net Positive Suction Head E EPU003611 087479 7/17/2003 UPUSAR Section 4.2.6 PUSAR Pages:

I4-1and 4-1 IT0406 UU 087480 - ECCS Net Positive Suction Head GE EPU003612 ,U 087484 1/1/2020 PUSAR Section 4.2.6 PUSAR Pages:

4-10 and 4-1 IT0406 VYNPS LOCA-DBA Long-Term GE NPSH Information Transmittal - 1.5%

U003613 U 087485- 7/6/2004 per Day Leakage and 100%

Containment Spray Thermal Mixing Efficiency PL-4A (Containment Analysis Input GE EPU003614 U 087518 - 1/1/2020 alues) For Vermont Yankee Nuclear Power Station EPU/MELLLA+ Rev 0 0PL-4A (Containment Analysis Input GE EPU003615 U 087565 - 1/1/2020 Values) For Vermont Yankee Nuclear Power Station EPU/MELLLA+ Rev I OPL-4A (Contairnent Analysis Input E U003616 PU 087612 - 1/1/2020 Values) For Vermont Yankee Nuclear Power Station EPU/MELLLA+ Rev 0 U VERMONT YANKEE FEASIBILITY E PU003617 FPU 087661 - 1/l/2020 STUDY 3.13 Miscellaneous Systems U 087668 aluation VYNPS LOCA-DBA Long-Term GE NPSH Information Transmittal - 1.5%

EPU003618 EPU 087669- 7/6/2004 per Day Leakage and 100%

EU 087701 ontaimnent Spray Thermal Mixing fficiency Corr. attaching VYNPS Extended GE Power Uprate - Response to NRC EPU003619 PU 087908 8/6/2004 Request for Additional Information ick; Lalor Uroprietary and Non-Proprietary Versions U 6 U 087909 - 3.1 IPressure Relief and Reactor Vessel E EPU003620 PU 087912 1/1/202O Overpressure Protection DRAFT Document Bates No Date Document Title To From Company Vermont Yankee Nuclear Power E Station License No. DPR-28 (Docket EPU003621 PU 087913 - 6/30/2004 No. 50-271) Technical Specification Wanczyk EPU 088070 Proposed Change No. 263 -

Supplement No. 8 Extended Power Uprate - Response to Request for Add..

EPU003622 U 088071 - 1/1/2020 FEASIBILITY STUDY FOR EPU GE U 088080 EPU003623 PU FEASIBILITY STUDY FOR EPU E PU 088081 088088 - l/1/2020 U064EU PU 088089 088093 - 1/1/2020 .//00 6 Transient ortion Analyses.

of a larger doc. Appears to be a GE U003624 EPU003625 PU 088094 - 1/l/2020 VERMONT YANKEE FEASIBILITY GE PU 088107 STUDY PPU 088108 - 3.11 Pressure Relief and Reactor E U003626 088111 1/1/2020 Vessel Overpressure Protection.

ppears to be a portion of a larger doc.

EPU003627 PU 088112 - 1/1/2020 3.12 Residual Heat Removal System. GE EPU 088117 Appears to be a portion of a larger doc.

EPU 088118 - ONT YANKEE FEASIBILITY E EPU003628 PU 088124 1/1/2020 TUDY 3.13 Miscellaneous Systems U 0 2valuation EPU003629 EPU 088125 - 1/1/2020 3.14 Special Events Appears to be a E PU 088129 portion of a larger doc.

UPU 088130 - VERMONTYANKEEFEASIBILITY GE EPU003630 U 088135 1/l/2020 STUDY 3.15 Steam Separation Uerformance VERMONT YANKEE FEASIBILITY E EPU003631 EPU 088136- 1/1/2020 STUDY 3.16 Emergency Core Cooling U 088142 System Performance UU 088143 - 3.19 Emergency Core Cooling E EPU003632 EU 088147 /l/2020 ystems. Appears to be a portion of a arger doc.

EPU003633 EPU 088148 - 1/1/2020 .20 Containment Capability. Appears GE EPU 088151 o be a portion of a larger doc.

EPU 061327 - Proposed Technical Specification GE EPU003635 U 061417 130/2004 Change 263 Response to Request for Additional Information C letter in regards to Technical E PU 061418 - pecification Proposed Change 263 EPU003636 061672 /PU 12/2004 upplement 11 - Extended Power NRC prate Request for Additional ormation Document Bates No Date Document Title To From Company EPU003637 EPU 088155 1111/2002 T0902 CP TSD VYNPS RevO DRAFT GE U 088 163 Transmittal is ID# 10276) T0902 CP GE EPU003638 U 088164 - 3/1/2003 SD VYNPS Rev Draft Comment Uesolutions EPU003639 U 088173 - 1/1/2002 Task Scoping Document T0903 Station GE U 088181 Blackout EU 088182 - GE EPU003640 U 088198 /1/2003 IYNPSEPUT1008FTR; 003641 EPU 088199 - 3/1/2002 1009 EPU TSD Rev 0; Task T1009: GE EPU 088207 EPU0 /0LB Subcompartment Evaluation ask Scoping Document VYNPS; GE EPU 088208 - 1/2003 1104: Safety Analysis Report EU003642 EU 088216 2/1 ntegration; Rev 0; DRAFT Comment esolution 088217 - Task Scoping Document; VYNPS; GE EPU003643 U 088225 11/1/2002 1104: Safety Analysis Report PU ntegration; Rev 0 U003644 U 088226 - 1111/2002 Task Scoping Document Task TI 500: GE PPU 088236 PE Project Management DRAFT

_ 088237 - .1 IPressure Relief and Reactor Vessel GE U003645 PU 088240 6/1/2002 verpressure Protection Feasibility Study (Duplicate is ID# 1186 & 1758)

.12 Residual Heat Removal System E U003 EPU 088241 - /1/2002 omments on VY Feasibility Study on onasch EPU 088246 E Proprietary Info. (Duplicate is ID#

1205)

VERMONT YANKEE FEASIBILITY GE 088247- /TUDY GE PROPRIETARY U003647 088253 6/112002 INFORMATION 3.13 Miscellaneous lonasch Uystems Evaluation (Duplicate is ID#

1206)

.19 Emergency Core Cooling Systems E PU003648 PU 088254 - omments on VY Feasibility Study on onasch

_PU 088258 G/1/2002 E Proprietary Info. (Duplicate is ID#

1207)

ONT YANKEE FEASIBILITY E U 088259 - TUDY GE PROPRIETARY U003649 EPU rU 088266 088266 1/2002 INFORMATION ystems Evaluation 3.13 Miscellaneous (Duplicate is ID# aeck 1210)

U 088267 - /28/2003 W Service Water 022803 andeira PU003650 U088281 Document Title To From Company Work Package Scope - ECCS Pump S&W NPSH - GE Task No. 0406 dated Salter 2/13/03 (Transmittal is ID #11323)

(Transmittal is ID# 11072) Work S&W PackageScope - ECCS Pump NPSH - Salter GE Task No. 0406 dated 3/11/03 Stone & Webster Work Package Scope S&W Power Dependent Heating Ventilation and Air Conditioning (HVAC) T061 0 Lind (Transmittal is ID# 11139) WPS WVAC DRAFT A.doc (Transmittal is ID# 11268) Work S&W Package Scope - Operator Mission Feruson Dose During Post-LOCA Vital Access rg

-GE Task No. T0803 dated 3/28/03 VERMONT YANKEE FEASIBILITY GE STUDY Section 0313 Miscellaneous System Evaluations (Duplicate is ID#

10576)

VERMONT YANKEE FEASIBILITY E STUDY Section 0315 Steam Separation Performance (Duplicate is

[D# 10578)

DRAFT UNVERIFIED SAFETY GE ANALYSIS REPORT FOR VERMONT YANKEE NUCLEAR POWER STATION MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS ro9o2 Mellla+ FTR Work In Progress - GE Anticipated Transients Without Scram iggel 3.11 Pressure Relief and Reactor GE Vessel Overpressure Protection (Duplicate is ID# 10628 & 1758) 3.12 Residual Heat Removal System GE Feasiblity Study for EPU Section (Duplicate is ID# 10647)

Feasiblity Study for EPU Section 3.13 E Miscellaneous Systems Evaluation (Duplicate is ID# 10648)

Feasiblity Study for EPU Section 3.19 GE Emergency Core Cooling Systems (Duplicate is ID# 10649)

Document Bates No Date Document Title To From Company EPU 088523 - Feasiblity Study Section 3.13 GE EPU003664 PU 088523 /1/2002 Miscellaneous Systems Evaluation PU 088530 (Duplicate is ID# 10652)

EU003665 EU 088531 - 1/1/2004 SAFERIGESTR-LOCA Loss-of- ott; Du E EPU 088604 Coolant Accident Analysis - _______G EU003666 EPU 088605 - 12/8/2003 Egineering Report Section 3.10 Johnson &

U 088612 eneric Issues/Programs Selection from VY Feasibility Study - E EU003667 PU 088613 - /1/2002 Section 3.11 Pressure Relief and PU 088616 Reactor Vessel Overpressure Protection (Duplicate is iD#1186 & 10628)

Asset Enhancement Program Oracle E EPU 088617 - /1/2002 Project Number 26852 Project-Specific EPU003668 PU 088644 11 Project Work Plan Draft with comment resolutions Safety Analysis Report for Vermont GE EPU003669 U 088645 - /27/2003 keNuclear Power Station for hrull U 088831 Constant Pressure Power Uprate Unverified Draft PU 088832 - 1Task Scoping Document Task T1701 E 00360 U 08840 EP 088840 /l/202 SSS Feasibility ELLLA+) Rev Assessment 0 (EPU and ONT YANKEE EPU PUSAR GE U 088842 - SECTION SERVICE WATER EPU003672 PU 088843 8/25/2003 SYSTEM PUSAR Sections 6.4 6.4.1 U 0PUSAR Pages: 6-6 and 6-7 Service Water Systems Final PUSAR Sections CCS Net Positive Suction Head GE 7PU 088844 - PUSAR Section 4.2.6 PUSAR Pages:

003674 PU 088848 1712003 4-10 and 4-11 PUSAR 4.2.6 Draft AIT0406 OCS Net Positive Suction Head GE 3 7 PU 088849 - /17/2003 PUSAR Section 4.2.6 PUSAR Pages:

U 088853 4-10 and 4-11 PUSAR4.2.6DraftA T0406 ECCS Net Positive Suction Head GE EUU003676 061674 - 1/1/2020 PUSAR Section 4.2.6 PUSAR Pages:

U 061675 4-10 and 4-11 T0406 PUSAR 4.2.6 VY Input FINAL 8-29-03 ECCS Net Positive Suction Head GE U003677 PU 088854 - 1/1/2020 PUSAR Section 4.2.6 PUSAR Pages:

_PU 088858 4-10 and 4-11 T0406 PUSAR 4.2.6 VY Input FINAL 9-2-03 Document Bates No Date Document Title To From Company FIRE PROTECTION PUSAR Section GE EPU003678 EPU 088859 - 1/1/2020 6.7 Table 6-5 PUSAR Page: 6-12 6-13 EPU 088865 6-20 FINAL 8-29-03 T0611 EPU DRAFT PUSAR SECTION E FEEDWATER AND CONDENSATE EPU003679 EPU 088866 - 8/28/2003 SYSTEMS PUSAR Section 7.4 rU 088867 PUSAR Pages: 7-3 and 7-4 T0701 PUSAR 7.4 FINAL 8-28-03 CPPU PUSAR SECTION STATION GE EPU0360 EU 061676 - 8/29/2003 BLACKOUT PUSAR Section 9.3.2 PU003680 EPU 061676 PUSAR Page: 9-6 PUSAR 9.3.2 VY Input FINAL 8-29-03 T0903 CCS Net Positive Suction Head GE EPU003681 U 088868 - 8/8/2003 PUSAR Section 4.2.6 PUSAR Pages:

U 088874 -10 and 4-11 T0406 PUSAR 4.2.6 -

incl VY comments Unverified Draft SAFETY ANALYSIS GE U003682 EU 088875 - /1/2003 REORTCONSTANT PRESSUREScrl EPU 089096 POWER UPRATE PUSAR Draft 08- chrull 13-03.doc Unverified Draft SAFETY ANALYSIS GE PU003683 PU 089097 - 8/1/2003 REPORT CONSTANT PRESSURE Schrull EU 089289 POWER UPRATE (Transmittal is ID# crl 3401) Section 10-5 08-13-03.doc SAFETY ANALYSIS GE U003684 U 089290 9/9/2003 PORTCONSTANT PRESSURE Schrull U089497 OWER UPRATE PUSAR VY USAR Rev B-1 09-03-03 SAFETY ANALYSIS REPORT GE U003685 U 089498 - /9/2003 CONSTANT PRESSURE POWER Schrull U 089705 PRATE VY PUSAR Rev B 09-03-03

_ SAFETY ANALYSIS REPORT GE EPU003686 U 089706 - /4/2003 CONSTANT PRESSURE POWER Schrull U 089931 PRATE VY Draft PUSAR 08-04-03 SAFETY ANALYSIS REPORT GE PU003687 EPU 089932 - /12/2003 CONSTANT PRESSURE POWER chrull EU 090166 URATE VY Draft VY Draft PUSAR crl 08-12-03 SAFETY ANALYSIS REPORT GE U003688 U 090167- 8/1/2003 ONSTANT PRESSURE POWER Schrull U 090403 PRATE VY Draft PUSAR 08-20-03

_ - SAFETY ANALYSIS REPORT GE PU003689 U 0905 - /1/2003 CONSTANT PRESSURE POWER chrull U 090635 PRATE VY Draft PUSAR 09-02-03 Document Bates No Date Document Title To From Company ID_ _ __ _ _ _ _ _ _ __ _ _

SAFETY ANALYSIS REPORT GE CONSTANT cchrull EPU003690 EPUU 090636 090849 - 8/1/2003 RAEVY PRESSURE Draft Rev APOWER Project aster PUSAR 08-29-03 PUE391 U 090850 - /1203 roject Task Report Task U003691 EPU 09095- 6/1/2003 T0400:Containment System Response Rhow GE PU VYNPS EPU T0400 FTR AFETY ANALYSIS REPORT EPU003692 PU 090960 - /1/2003 CONSTANT PRESSURE POWER chrull GE PU091192 URATE Rev 0VYNPS EPU TI 104chl G PUSAR Draft 07-31-03 U 061677 - 1/0 GE14 New Fuel Introduction Task PU003693 U 061686 -/1/2020 Scope Document AgreementRev for Task aradiso GE U 061686 .0407 ECCS Performance 0 PU 091193 - Task Scoping Document AIM task EPU003694 U 091203 10/1/2002 r0407 ECCS-LOCA SAFER/GESTR GE U2th proposed comment resolutions Unverified Draft CPU 091204 - APRM/RBM/Technical Specifications PU003695 EPU 091279 2/1/2003 Maximum Extended Load Line Limit chrull GE Analysis (ARTS/MELLLA) A/M MSAR with comments Unverified Draft EPU 091280 - APRM/RBMfTechnical Specifications /

EPU003696 EPU 091358 3/1/2003 Maximum Extended Load Line Limit Schrull GE U 09Analysis (ARTSIMELLLA) A/M MSAR with comments Task Scoping Documenit VY AM U003697 U 091359 10/1/2002 T0303 TSD Rev 0 Draft Comment GE Resolution Task Scoping Document EU068 PU 091380 -ATS/MELLLA - Task T0400: G EPU003698 EPU 091380 9/1/2002 Containment System Response - GE DRAFT Comment Resolution UPU 091381 - Task Scoping Document VY AM EPU003699 PU 091391 10/1/2002 T0407 ECCS-LOCA SAFER/GESTR GE Rev I DRAFT comment resolution PU 091392 - .Task Scoping Document VY AM EPU003700 U 091402 10/1/2002 T0407 ECCS-LOCA SAFER/GESTR GE Rev 0 DRAFT comment resolution Task Scoping Document EPU003701 U 091403 - 9/12002 ARTS/MELLLA - Task T0902: GE U 091413 ticipated Transient without Scram -

RAFT Comment Resolution Document Bates No Date Document Title To From Company ID_ _ _ _ _ __ _ _

EPU003703 EPU 091414 - 1/1/2020 Critique of Hope Creek Calculation H- Polestar EU 091419 1-ZZ-MDC-1880 EPU003704 PUU 091420 091434 - 1/1/2020 ost emntLOCA Suppression Yankee REV. 0Pool pH for Polestar EPU003705 EPU 091435 - 1/1/2020 diological Evaluation of a DBA- Metcalf Polestar PU 091512 Lss of Coolant Accident upplement I to Phase I Study (Non-Safety Related) Regarding Application U003706 U 091513 - /32003 of the Alternative Source Term to the etcalf Polestar U 091567 Vermont Yankee Nuclear Power Plant -

ocused Study of Alternative Leakage Treatment (ALT) And NRC Methods upplement I to Phase I Study (Non-afety Related) Regarding Application EPU003707 PU 091568 - 3/3/2003 of the Alternative Source Term to the Polestar EPU 091622 Vermont Yankee Nuclear Power Plant -

ocused Study of Alternative Leakage Treatment (ALT) And NRC Methods ENVY COMMENTS Task Scoping U003708 EPU 091623 - //2002 Document ARTS/MELLLA Task Task GE EPU 091632 T0407: ECCS-LOCA SAFER/GESTR DRAFT VERMONT YANKEE EPU PUSAR EPU003709 PU061687- 8/25/2003 SECTION SERVICE WATER GE PU 061688 SYSTEM PUSAR Sections 6.4 6.4.IPUSAR Pages: 6-6 and 6-7 CCS Net Positive Suction Head EP372 U 091633 - P1/23 USAR Section 4.2.6 PUSAR Pages: G EPU003712 EPU 091637 11312003 -10 and 4-11 T0406 PUSAR Section GE 4.2.6 draft final ONT YANKEE EPU DRAFT

_ 0USAR SECTION SERVICE WATER PU003713 EU 061691 - /1/2020 SYSTEM PUSAR Section 6.4 PUSAR GE Pages: 6-6 and 6-7 6.4 WATER SYSTEMS RAFT PUSAR SECTION FEEDWATER AND CONDENSATE EPU003716 PU 061696- 1/1/2020 YSTEMS PUSAR Section 7.4 GE cPU 061697 USAR Pages: 7-3 and 7-4 PUSAR rection 7.4 final T0701 & 702 CCS Net Positive Suction Head EPU003717 PU 091638 - /8/2003 4USAR Section 4.2.6 PUSAR Pages: S&W U091644 4-10 and 4-11 T0406 PUSAR Section 4.2.6 incorporating VY comments Document Bates No Date Document Title To From Company ECCS Net Positive Suction Head U003720 EPU032 U 091693 PU 091697 - 7/720/17/2003 PUSAR

-10 andSection 4.2.6PUSAR 4-11 T0406 PUSARSectionSW Pages:

.2.6 draft A PU003721 U 091698 - /1/2002 RTS/MELLLA Task TO 100 Reactor GE U 091707 Heat Balance TSD VY comments Draft V AM T0304 Reactor Internal EPU003722 U 091708 - 9/1/2002 Pressure Differences TSD Rev 0 GE U091718 Comment Resolution SAMPLE/DRAFT Task Scoping EPU003723 U 091719- 1/1/2002 EU011-1/202 Document Utility -Plant ATSIMELLLA Task T040 1: GE PU 091726 Subcompartment (Annulus)

Pressurization Loads U003724 PU 091727 - 9/1/2002 Task Scoping Document for T0609 GE UPU 091736 Standby Liquid Control System Draft SAFETY ANALYSIS REPORT U003726 U 091745 - /10/2003 ONSTANT PRESSURE POWER Schrull GE U091952 URATE Draft Revision B Draft PUSAR Unverified Draft EPU 091953 - APRM/RBM/Technical Specifications /

PU003727 /1/2003 Maximum Extended Load LineA/MLimit U 09202 -28 Analysis (ARTS/MELLLA) Schrull GE MSAR with comments Unverified Draft UPU 092029 - APRM/RBM/Technical Specifications /

U003728 2/1/2003 Maximum Extended Load Line Limit Schrull GE U 0Analysis (ARTS/MELLLA) Draft MSAR Unverified Draft PU 092108 - APRM/RBM/Technical Specifications /

PU003729 2/1/2003 Maximum Extended Load Line Limit Schrull GE EPU 092187 Analysis (ARTS/MELLLA) Draft SAR APRM/RBM/Technical Specifications /

EPU003730 EPU 092262 -3l20 Maximum Extended Load Line Limit GE EPU 092262 3/1/2003 ysis (ARTS/MELLLA) Draft MSAR nverified Draft PU 092263 - PRM/RBM/Technical Specifications /

U003731 U 092339 1/2003 Maximum Extended Load Line Limit chrull GE U 0Analysis (ARTSIMELLLA Draft MSAR Document Title To From Company APRMIRBM/Technical Specifications Maximum Extended Load Line Limit GE Analysis (ARTSJMELLLA) Draft MSAR Unverified Draft APRM/RBMMfechnical Specifications /

Maximum Extended Load Line Limit Schrull GE Analysis (ARTS/MELLLA Draft ASAR Unverified Draft APRMJRBM/Technical Specifications Maximum Extended Load Line Limit Schrull GE Analysis (ARTS/MELLLA Draft qSAR APRMfRBM/Technical Specifications VMaximum Extended Load Line Limit GE Analysis (ARTSIMELLLA) Final ASAR Project Task Report Task T0307:

Kreactor Recirculation System 0Rs GE

)RAFT UNVERIFIED SAFETY ANALYSIS REPORT MAXIMUM EXTENDED LOAD LINE LIMIT chrull GE ANALYSIS PLUS Mellla+ Safety Analysis Report D)RAFT UNVERIFIED SAFETY ANALYSIS REPORT MAXIMUM EXTENDED LOAD LINE LIMIT . chrull GE ANALYSIS PLUS Mellla+ Safety Analysis Report Duplicate is #1901 Service Water Systems (Non-Safety SW RHRSW & ACS) T0604 T0608 r0613 WBS 1.4.3.1 PUSAR Sections andeira S&W 5.4.1 & 6A.5 ER rask Scoping Document Task T03 10:

Residual Heat Removal System Draft GE comment resolution Project Task Report Task T03 10:

Residual Heat Removal System WIP en GE VYNPS EPU T0310 task report.doc Project Task Report Task T03 10:

Residual Heat Removal System WIP en GE VYNPS EPUT03IO FTR .doc Document Title To From Company Task Scoping Document Task T03 10:

Residual Heat Removal System T03 10 GE TSD VYNPS RevO DRAFT.doc OPIAA (Containment Analysis Input GE Values) for VYNPC EPU / M+ (Draft)

Task Scoping Document T0400 Containment System Response TSD GE VYNPS RevO DRAFT Project Task Report Task T0402: eller GE Containment Isolation WIP Project Task Report Task T0402:

Containment Isolation WIP eller GE Task Scoping Document Task T0404:

High Pressure Coolant Injection GE System Rev 0 DRAFT.doc Project Task Report Task T0405: Core Spray System WIP GE TaskO4O5 Draft en GE Task Report Comments Resol.doc Project Task Report Task T0405: Core Spray System WIP TaskO4O5 Draft en GE Task Report Comments-L.doc Project Task Report Task T0405: Core Spray System WIP Task 0405 GE en GE T0405 FTR.doc Project Task Report Task T0405: Core Spray System WIP (Transmittal is ID# en GE 9602) VY T0405 FTRdoc Project Task Report Task T0405: Core Spray System WIP T0405 TSD en GE VYNPS RevO DRAFT.doc Task Scoping Document Task T0407:

ECCS-LOCA SAFER/GESTR DRAFT GE Comment Resolution TASK DESIGN INPUT REQUEST (DIR) V AEP T0407 DIR Rev O.doc CCS-LOCA SAFER/GESTR.

ttached is OPL-4 for GE14 NFI and ott GE E13 Reanalysis. Proprietary (See Item 24670) ask Scoping Document Task T0407:

CCS-LOCA SAFERIGESTR DRAFT GE evO DRAFT.doc Document Title To From Company ask Scoping Document T0609 Standby Liquid Control System CP GE SD VYNPS RevO DRAFT.doc

~e proposed response to NRC RAI GE SPSB-C- 1I for review - unverified Proposed GE E response to NRC RAI SPSB-C-4 E proposed response to NRC RAI GE PSB-C-5 OPL-4A (Containment Analysis Input ow GE alues) Draft Project Task Report; Task T0400: Rhow; Dick GE Containment System Response VYNPS EPU - RAI Responses- SPSB- Mintz GE

-C-5 16 andC-24 ask Scoping Document Task T0400: GE Containment System Response DRAFT Task Scoping Document Task T0400: GE Containment System Response DRAFT G Task Scoping Document Task T0405: GE Core Spray System DRAFT DRAFT REDLINED TASK SCOPING DOCUMENT; Task T0407: ECCS- GE LOCA SAFERIGESTR DRAFT TASK REPORT DOCUMENT; Task T0407: ECCS- GE LOCA SAFER/GESTR Task Scoping Document; Task T0411:

Post-LOCA Combustible Gas Control; GE Scope: Evaluate EPU effect on Post-LOCA Combustible Gas Control Task Scoping Document Rev 0; Task GE 608: Ultimate Heat Sink Task Scoping Document; Task T0610: GE Power-Dependent HVAC Task Scoping Document Task T061 1: GE Appendix R/Fire Protection DRAFT Task Scoping Document Task T0902: GE Anticipated Transients Without Scram Document Bates No Date Document Title To From Company PU 093802 - DRAFT; Task Scoping Document Task EPU003788 U 093810 11/1/2002 T0902: Anticipated Transients Without GE P 1 Scram EU003789 EU 093811 - 1/1/2002 Task Scoping Document Rev. 0; Task GE EPU 093819 T0903: Station Blackout PU 093820 - This letter report provides the GE scope EPU003790 U 093961 1/1/2020 of response for NRC RAls 29 30. 32 GE and 33 of Ref. 1.

EPU 093962 - Conservatism in the Containment Calculation GE EPU003794 PUU 093963 0996 1/1/2020 Pressure Evaluations NRC RAIforSPSB-C NPSH 11 Resolution to Entergy Comments on GE VYNPS EPU RAI Responses U _PU 093964 - 1/1/2020 Document addresses the Entergy GE PU003795 _U 093972 comments (Refs. 1 and 2) to the GE esponses to the VYNPS EPU NRC s SPSB C-29 C-30 C-32 and C-33 U003796 PU 093973 093974 - 1/1/2020 ECCS PUSARNPSH Page:PUSAR Section

-PU 4-10 4-11 T04064.2.6 GE EPU003797 _PU 093975 - 1/1/2020 ECCS NPSH PUSAR Section 4.2.6 GE

_PU 093979 PUSAR Page: 4-10 4-11 T0406 EPU 093980 - Vermont Yankee CPPU Pusar Section EPU003798 EPU 093982 1/1/2020 6.7 Table 6-5 T0611 NEDC-33090P GE U 9evision U 093983 - ont Yankee CPPU Pusar Section EPU003799 U 093989 1/1/2020 7 Table 6-5 T0611 NEDC-33090P GE Uevision 0 U 061823 - 1/1/2 ermont Yankee CPPU PUSAR EPU003800 U 061823 1/1/2020 Section 9.3.2 T0903 Station Blackout VY PEDC-33090P-Revision 0 EPU 093990 - CCS NPSH PUSAR Section 4.2.6 EPU003801 1/1/2020 USAR Page: 4-10 4-11 T0406 with GE Uble attached.

PU 093997 - 1CCS NPSH PUSAR Section 4.2.6 EPU003802 EPU 094003 1/l/2020 USAR Page: 4-10 4-11 T0406 with GE able attached.

U0383 U 094004 - 1//00 CS NPSH PUSAR Section 4.2.6 G EPU003803 11 094008 l/USAR Page: 4-10 4-11 T0406 GE U 094009 - aft BOP Engineering Report - MOV EPU003805 U 094037 7/31/2003 ection; PUSAR 4.1.4 DRAFT A; S&W U0403 Document Bates'No Date Document Title To From Company 0 Draft BOP Engineering Report - MOV EPU003806 EU 094038 7/31/2003 Section; DRAFT A; PUSAR 4.1 A s&w EPU 094066 T0403 VERMONT YANKEE EPU PUSAR EPU003807 EPU EPU 061826-061827 8/25/2003 SECTION SYSTEM PUSAR SERVICE WATER Sections 6.4 6.4.1 GE G

REV. 0 REDLINED REDLNED VERMONT YANKEE EPU003808 EPU 061828 - /25/2003 EU PUSAR SECTION SERVICE GE EU 061829 WATER SYSTEM PUSAR Sections G 6.4 6.4.1 REV. 0 AL PUSAR SECTION ECCS Net EU003809 U 094067 - 8/13/2003 Positive Suction Head PUSAR Section GE U 094071 4.2.6 PUSAR Pages: 4-10 and 4-11 T0406 U 094072 - W S EPU - Responses to VYNPS U003810 U 094210 1/1/2020 U RAI SPSB C-29 C-30 C-32 and GE U-33. Verfied Final.

IPU 094211 - VYNPS EPU - Responses to VYNPS EPU003811 EPU 094 49 1/1/2020 EPU RAISPSB C-29 C-30 C-32 and GE EP PU 09434-33.

1 Verfied Final.

U00381 PU 094350 - /1/2003 roject Task Report Task T0405:Core en GE EU 094365 pray System WIP EU003813 EU 094366 - 6/1/2003 Project Task Report Task T0405:Core JnG EU 094381 Spray System WIPenG EPU003814 U 094382- /1/2003 Project Task ReportTask Rev 0 T0900: _ iggel GE U 094416 Transient Analysis FIR wiriglG EPU003815 EPU 094417 - 6/1/2003 Draft Project Task Report Rev. 0 Task GE PU 094485 T0407: ECCS-LOCA SAFER/GESTR Response to: Reference 3 Project Deliverable: RAI Responses: VYNPS EPU003816 EPU00816 _PU 094486 EU 094559 - 1/29/2004 12204 tended Power C Request forUprate - Response to Additional iclc Lalor Dc;Llr GE G

nformation Proprietary and Non-Proprietary Versions. RE: NEDC-330 Response to: Reference 3 Project Deliverable: RAI Responses: VYNPS U003817 U 094560- 1/29/2004 Extended Power Uprate - Response to Dick; Lalor GE EU 094634 NC Request for Additional nformation Proprietary and Non-Proprietary Versions. RE: NEDC-330 Document Bates No Date Document Title To From Company ID _ _ _ _ _ _ _ _ _

Subject:

VYNPS Constant Pressure PU 094635 -

EU088 1/9204 ower Uprate - NRC EPU Review EPU003818 PU 094669 1/29/2004 tandard Matrix 8 Input Proprietary ick; Schrull GE d Non-Proprietary Versions VY.NPS Extended Power Uprate -

EPU003820 U 094670 - /6/2004 Response to NRC Request for LlrG U 094876 Additional Information Proprietary and br GE Non-Proprietary Versions U047-S EPU - Responses to VYNPS EPU003821 U 094877 1/l/2020 U RAI SPSB C-29 C-30 C-32 and GE U 095020-33. Verfied Final.

-VYNPS EPU - Responses to VYNPS EPU003822 U 095021 - 1/l/2020 EPU RAI SPSB C-29 C-30 C-32 and GE PU095163 F-33. Verfied Final.

.VYNPS LOCA-DBA Long-Term PU003823 EPU 095164 - /10/2004 NPSH Information Transmittal - 1.5% .mtz GE EPU05186 er Day Leakage VYNPS LOCA-DBA Long-Term PU 095187 - NPSH Information Transmittal - 1.5%

GE PU 0 1Containment per Day Leakage PU003824 09518 9128/2004

/U andThermal Spray 100% Mixing Efficiency Verified and Final S LOCA-DBA Long-Term U 095219 SH Information Transmittal - 1.5%

U003825 U 095250 9/28/2004 per Day Leakage and 100% GE PU 09 0Containment Spray Thermal Mixing Efficiency Verified and Final VYNPS LOCA-DBA Long-Term U 095251 - NPSH Information Transmittal - 1.5%

U003826 /28/2004 per Day Leakage and 100% GE U 095282 Containment Spray Thermal Mixing Efficiency Verified and Final U 095283 - VYNPS LOCA-DBA Long-Term EPU003827 EPU 095305 9/28/2004 NPSH Information Transmittal - 1.5% intz GE U 095305 Day Leakage PU003830 EPU 095548 - /1/2003 Project Task Report - T0902 el; Chu GE U 095593 -Anticipated Transient Without Scram) iggel; Chu GE EU003831~ U 095594- 7/1/2003 Project Task Report - T0902Nige;Cu G U 095645 (Anticipated Transient Without Scram)igeCu G Memo re: T0400 (Containment System U003832 EPU 095646 /5/2003 Response) W/ Attachment (LOCA- ick GE PU 095658 BA Short and Long Term N.SH Information Transmittal)

Document Bates No Date Document Title To From Company EU003841 EPU 097908-30 /99 AFER/GESTR-LOCA Loss of GE EPU 097030 oolant Analysis C/1/1998 GENERAL ELECTRIC COMPANY U003843 rPU 097720 EPU 097776 - 21/1987 LICENSING ATCIPATED TOPICAL REPORT TRANSIENTS GE WITHOUT SCRAM EU003844 U 097777 - 3/1/1985 SSESSMENT OF ATWS GE U 097851 OMPLIANCE ALTERNATIVES EPU003847 U 098104 - 7/1/2003 roject Task Report Task T0902: GE VPU 098155 ticipated Transients Without Scram V`YNPS LOCA-DBA Long-Term U 098156 - NPSH Information Transmittal - 1.5%

PU003849 PU 098188 815/2004 per Day Leakage and 100% GE Containment Spray Thermal Mixing Efficiency EPU 098189 -

Subject:

VYNPS EPU T0400: DBA-EU003850 923 610/2004

/P LOCA for Long Term NPSH Dick GE Evaluation; Attached study, U 098263 - Technical Design Procedure - Main EPU003854 PU 098300 6/12002 team Isolation Valve Closure ATWS Chu GE events -Rev 2 PU 098301 - / 2 Technical Design Procedure - Pressure EPU003855 EPU 098342 6/1/002 Regulator Failure (Maximum Demand) Chu GE EPU 098342 ATWS Events - Rev 2 U 098343 - Technical Design Procedure - ODYN EPU003856 09847 /1/2002 6U asedeck Preparation for ATWS Event Chu GE Rev. I U 098475 - Technical Design Procedure Peak EPU003857 PUU 098495 945 6120 ladding Temperature Analysis for ATWS Events - Rev. 2 Chu GE PU003858 EPU 09846 - 1/1/2020 TE 2003-043 References GE EPU003860 PU 098664 - 8/7/2004 0400 DBA-LOCA for Long Term ick GE EU 098698 PSH Evaluation EPU003861 EPU 098699 - 6/1/2003 roject Task Report T0400 ow; Mintz GE EPU 098807 -ontainment System Response EU003862 EU 098808 - 1/1/2020 ft BOP Engineering Report - ECCS alter S&W EU 098821 mpNPSH Evaluation T0406 Document Bates No Date Document Title To From Company Anderson; Cheung; U 098822 - 1//00 ICENSING TOPICAL REPORT - Heck-PU003865 EPU 099155 TRACG QUALIFICATION Klebanov; GE Shaug; Shiralkar U003867 U 099156 - -mail re: Final TSD 1701 for VYNPS GE EPU 099166 - Power Uprate Scoping Study. GE PU003870 EPU 099167 - E-mail attaching CTQ Updated T1500 GE EU 099176 TSD and PWP PU003871 EPU 099177 - E-mail attaching CTQ Updated TI500 GE EPU 099202 TSD and PWP EPU 099203 - E-mail attaching proposed comment U003873 PU 099362 esolutions for T0405 and T0310 DTRs GE EPU 099363 - ENERGY VY HB; VY EPU HEAT GE U 099364 PU003875 BALANCE DRAWING

Subject:

example task report EPU 099365 - Attachment is Browns Ferry Nuclear U003877 EPU 099770 FN) CP FTR T0400,"Containment GE

_ystem Response".

U003879 U 099771 - example task report - T0400 GE UPU 100176 Containment System Response EPU 100177 - RE: GE's Proposals for Extended PU003881 FPU 100213 Power Uprate Feasibility Studies at GE Pilgrim and FitzPatrick E-mail attaching GE TASK DESIGN

_- INPUT REQUEST (DIR) Task No.

U003883 PU 100214- 404 and 09/17/2004 EPU Task GE EPU 100218 Scoping Document/Task ReportComrent Form U003890 EPU 100219 - Proposed comment resolutions for GE EPU 100232 T0407 and T0603 TSDs U003893 EPU 100233 - Proposed comment resolutions for GE EPU 100242 T0407 and T0603 TSDs EPU 100243 - Rev I of VY ARTS/MELLLA MSAR PU003895 EPU 100321 Section 6.01 (Attachment is ID# 6575) GE Mellla safety analysis input PU 100322 - E-mail transmitting of the decay heat PU003897 PU 100322 tble for the VY AEP containment GE 100334 evaluation (T0400).

Document Bates No Date Document Title To From Company E-mail attaching Comments on EDG PU003899 PU 100335 - work package scope and EEDG IVF S&W PU 100338 (Attachments are ID# 10905 and 10903)

EPU003902 U 100339 - WPS 1.4.7 & IVF 1 A.7 Review S&W U. 100344 U003907 U 100345 - E-YNPS-AEP-146 GE E U 100357 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _

Balance of Plant and Torus Attached Piping WPS and IVFs - WBS 1.4.5.2 U 100358 - Draft BOP Engineering Report -

U003909 U 100363 Balance of Plant Piping Analyses S&W T0308; Vermont Yankee Power Uprate gineering Input V Balance of Plant and Torus Attached Piping WPS and IVFs - WBS I.A.5.2 U003910 EPU 100364 - Draft BOP Engineering Report - S&W

_P EPU 100369 Balance of Plant Piping Analyses T0308; Vermont Yankee Power Uprate Engineering Input V RBCCW WPS Rev 0 / IVF REV 0/

PU003914 EPU 100370- comment incorporation - WBS 1.4.3.2 S&W EPU 100374 (Attachments are lD# 11191, 11192, 11193) _

Email attaching Draft T0902 Project U003918 U 100375- Task Report Draft T0307 MELLA+ GE U 100420 Project Task Report 100421 --Report EUmail attaching Draft T0902 Project GE PU003919 ask1042 Draft T0307 MELLA+

EPU 100436 roject Task Report U0392 PU00921 PU 1004 PU 100482 EPU DTR 0902 ATWS Comments GE 100483 - (PU Attachments are ID#'s 9608 and 9612)

EPU003926 6 100498 ropo0098sed VY Resolution andT0405 DTR Comment FTR.msg GE PU003932 PU 100499 - E-mail attaching T0407 ECCS-LOCA GE PU 100567 Draft Task Report for EPU EPU 100568 - E-mail attaching T0400 Containment EPU003936 PU 100677 lysis Draft Task Report for EPU GE P 0th review forms E-Mail re: VY EPU T0902 FTR WIP EPU003938 U 100678 attaching Unverified Work In Progress GE U10728f theT0902 FIR Document Bates No Date Document Title To From C ID DouetIil T rmIopn U003942 U 100729 - FW:

DraftT0400 Containment U 100838 Task Report for EPUAnalysis GE U0039M U 100890 100839 -  : VY T0902 Anticipated Transients GE EIPU Without Scram Comment Resolution Proposed comment responses and WIP EPU003947 PU 100891 - version of EPU T0902 Anticipated GE PU 100943Transient Without Scram FTR U 100944- E-mail attaching Proposed comment EPU003950 U100996 responses and WIP version of EPU GE T0902 FTR EPU003953 PU 100997 101067 - GE-13 Re-baseline GE EPU PU 10 1068- F: Proposed comment responses and EPU003955 PU 101120 IWL version of EPU T0902 FTR, GE attached.

EPU 10 121 - FW: Proposed comment responses and EPU003958 PU 101173 WIP version of EPU T0902 FTR, GE attached.

-nail attaching PUSAR 5.2 Signout PC WBS 1.4.10 Draft A, PUSAR I&C EPU003963 U 101174 - WBS 1.4.10 DRAFT A, ER 3.9 ICE S&W PU 101185 Eng Report wbs 1.4.10 DRAFT A, and ER 3.9 ICEng Report Data Matrix mail (Attachments are ID#'s 6367 and PU 101186 - 368) PUSAR Section 6.4.4 draft GE U003966 PU 101190 TBCCW - DRAFT A T0406 AND T0607 U 101191 - F PUSAR 6.4.4 TBCCW - DRAFT PU003969 U 101195 AT0406 ECCS NPSH & T0607 GE U 1CCW U003975 U 101196- E-mail attaching ER 3.10.2 GL 89-10 S&W U 101224 Program DRAFT A - WBS 1.5.2 VY Unverified Draft PUSAR attaching Electronic PUSAR Comment Form and PU003978 PU 101225 - nverified Draft SAFETY ANALYSIS GE PU 101456ORT for VY CONSTANT RESSURE POWER UPRATE PU003981 U 101457 FW VY PUSAR Section 6 Input GE U 101463 Review FW: VY PUSAR Section 6 Input PU003983 PU 101464 - Review T0604, T0608 Ultimate Heat GE PU 101470 ink, T0610, T0613 Emergency ervice Water System Document BaeNo Dt Dm Bates No Date Document Title To From Company U03985 EPU 101471 - F:VY PUSAR Section 6 Input GE EPU 101477 Review (Attachments are IDls 3413,3414, U003987 U U 101478 101485 - 3415,3417 & 7795)toemail from Alan GE Traft to Cizauskas O'Connor containing PUSAR Sections and Tables EPU 101486 - ubject: Comments on T0406 ECCS U003996 -PU 101490 Pump NPSH; Two attachments on the GE U10bject and two Re: PUSAR.

U 101491- E-mail attaching PUSAR for ECCS EPU004004 U 101497 - SH Section 4.2.6 including VY GE comment U004006 EPU 101498 - (Attachment is IDN 3274) FW: PUSAR GE EPU 101504 for ECCS NPSH Section 4.2.6 PU004008 EPU 101505 - PUSAR for ECCS NPSH Section 4.2.6 GE U 101511 EPU004010 EPU 101512 - (Transmittal is ID# 2596) WBS 1.4.3.1 S&W EPU 101559 PUSAR Sections 6.4.1 & 6.4.5 ER E-mail re: SW Engineering Report and U004012 EPU 101560 - attaching SECTION 3.5.3 and 3.5.4 U 101607 Service Water Systems (Non-Safety SW, RHRSW, & ACS) Draft A FW: SW Engineering Report T0604 U004014 EPU 101608 - Service Wtare System, T0608 Ultimate S&W EPU 101655 Heat Sink, T0613 Emergency Service Water System 101656 -

U Attachments are ID#s 3443,3444)

PU004017 U 101883 il from Dick to Jacobs containing GE 1006 comment documentation FW: SW Engineering Report T0604 U004019 EPU 101884 - Service Wtare System, T0608 Ultimate S&W EPU 101931 Heat Sink, T0613 Emergency Service Water System E-mail attaching Unverified Draft PU 101932 - SAFETY ANALYSIS REPORT, U004021 U 102171 VYNPS PUSAR Action Items, VY GE U 1Draft PUSAR Comments and PUSAR Assignments.

U 102172 - Attachments are ID#s 3302,3303, U004026 U 102411 304,3305) email from Dick to VY GE Uontaining PUSAR information Document Bates No Date Document Title To From Company IPU 102448 - (Attachment is ID# 3426) email from EPU004031 ,PU 102675 Ed Schrull (GE) to Jacobs containing GE PUSAR Section 10.5 EPU004034 EPU 102676 - E-mail re: Lastest MOV and PUSAR S&W PU004038 PU 102705 - (Attachments are ID#s 3265,3266) GE PU 102923 email GE draft PUSAR 8-20-03 EPU004039 PU 102924 - (Attachments are ID#s 3265, 3266) GE PU 103163 email GE draft PUSAR 8-20-03 PU 103168 - W: EPU Comment Form Service PU004045 PU 103216 aterERWBS 1.4.3.1.doc S&W EPU004051 PU 103221 - FW: EPU Comment Form Service S&W PU 103269 Water ER WBS 1.4.3.1.doc PU 103270 - email from Beren to Nichols containing PU004054 PU 103283 Calculation VYC 2279 and PUSAR GE Pection 6.6 documentation E-mail attaching VY 2003-0077 and U004060 PU 103302 - PUSAR & ER signature sheet, PUSAR S&W PU 103330 Sections 4.1.4 and 3.11 partial, ER ection 3.10.2, ER Section 3.10.3 E-mail attaching VY 2003-0077 and PU004065 PU 103331 - PUSAR & ER signature sheet, PUSAR S&W PU 103335 Sections 4.1.4 and 3.11 partial, ER Section 3.10.2, ER Section 3.10.3 PU004070 PU 103342 PUSAR Section 10.3 GE EPU004071 PU 103343 - Transmittal of Final EQ Engineering S&W PU 103405 Report and PUSAR Section 10.3 E-mail attaching SAFETY ANALYSIS REPORT FOR VERMONT YANKEE PU004073 PU 103406- NUCLEAR POWER STATION GE PU 103640 CONSTANT PRESSURE POWER RATE Draft Revision A E-mail re: Rev B PUSAR attaching

-PU 103641 - SAFETY ANALYSIS REPORTFOR PU004075 EPU 103849 VERMONTYANKEENUCLEAR GE POWER STATION CONSTANT RESSURE POWER UPRATE EPU004077 PU 103850 - ent PUPVY Letters; Safety Analysis GE PU 104061 eport, Daft Rev. B-2 Document Bates No Date Document Title To From Company ID_ _ _ _ _ _ _ _ _ _

Email (Attachments are ID#'s 8494 and 8495) Attached Stone & Webster letter EPU004080 U 104062 - 2003-0090 ""Transmittal of Draft S&W U 104075 CCS NPSH Engineering Report Section for Entergy Review."" T0406 E-Mail re: VY 2003-00107 Transmittal of Engineering Report Section 3.9 PU004083 PU 104076- Instrumentation & Controls - T0507 S&W 8NON-POWER U 1 CYCLE INSTRUMENT SETPOINTS mail (Attachments are IDI's 8915, 916, and 8917) SW ""Transmittal of

.PU004087 U 104090 - Engineering Report Section 3.9 S&W EPU 104103 Instrumentation & Controls"" VY 2003-00107, Contract Order Revl of FinalER 3.9 ICEng Reportwbs (Attachments are ID#'s 8918 and 8919) attaches SW ""Transmittal of PU004091 PU 104104 - Engineering Report Section 3.4.3."" S&W PU 104184 V 2003-00108 and Draft 3.4.3 ondensate and Feedwater.pdf from 2003-00108 (Proprietary)

Latest and Greatest VY CPPU PU004093 EPU 104185 - Transient Testing Evaluation; VYNPS GE U EPU 104198 CPPU & MELLLA+ Startup Test Specifications (TI005)

U004095 EPU 104199 - E-mail attaching Updated Generic GE EU 104218 Confirmation Matrix ElU004097 U 104219 - Generic Disposition Matrix GE U 104248 U004106 PU 104249 -

Subject:

WBS 1.4.4.0; I included the S&W U 104262 attached calc. also.

RE: Comments on ER. Attachments 1)

EPU004108 PU 104263 ECCS Pump NPSH Evaluation 2) S&W U 1W.B.S 1.4.4.0 Comment Matrix

Subject:

DBA LOCA long term NPSH case with 1.5% La; Attach. Re: This PU0041 EPU 104276 - document provides the DBA-LOCA GE EPU 104300 esults after 600 seconds for input to ong-term NPSH evaluations per Reference 2.

Document Bates No Date Document Title To From Company

Subject:

DBA LOCA long term NPSH.

case with 1.5% La; Attach. Re: This PU04112 EPU 104301 - ocument provides the DBA-LOCA EPU 104323 results after 600 seconds for input to GE ong-term NPSH evaluations per Reference 2.

U 1 U 104733 - omparison of DBA-LLOCA ith EU004117 PU 104841 MAAP-LLOCA GE

Subject:

Calculation Impact Review-U 104842 - WC-2396, Containment System PU004131 U 104950 Response for EPU; Six docs attached GE

.PU1049e: T0400 Containment System esponse;

Subject:

Calculation Impact Review-U 104951 - C-2396, Containment System U004132 EPU 104985 Response for EPU; Six docs attached GE Re: T0400 Containment System

[Response; Licensing Topical Report; Safer Model PU004240 EPU 105567 - 10/1/1987 for Evaluation of Loss-of-Coolant GE EPU 105705 accidents for Jet and Non-Jet Pump Plants LICENSING TOPICAL REPORT EU 105706 - /1 GENERIC GUIDELINES FOR Marquino; G PU004241 U 105879 21/1999 GENERAL ELECTRIC BOILING Berry Eckert GE WATER REACTOR EXTENDED POWER UPRATE LICENSING TOPICAL REPORT EPU10880 ENERIC EVALUATIONS OF on U04242 EPU 10580-9 /1/2000 GENERAL ELECTRIC BOILING welr ruio-G PU 106800 -//00 WATERREACTOREXTENDED ell arquino GE POWER UPRATE GESTR-LOCA and Safer Models for EPU 106010 - Evaluation of Loss-of-Coolant accident PU004243 MU 106042 3/1/2002 Volume m, Supp.I. Additional proth ApponeGE information for Upper Bound PCT Calculation Licensing Topical Report; Safer Model Bhum; for Evaluation of Loss-of-Coolant hurgess U004244 EPU 106043.- 10/1/1987 Accidents for Jet Pump and Non-Jet i-Adre; G EPU 106292 Pump plantsVol I. Safer Long Term idersen; GE nventory Model for BWR Loss-of as lamgr, oolant analysis. kar Proprietary Documents Relating to NEC Contentions 3 and 4 Document Bates No Date Document Title To From Company SAFETY ANALYSIS REPORT OR VERMONT YANKEE U52CLEAR POWER STATION EPU500927 EPU 522769 8/1/2003 ONSTANT PRESSURE POWER chnill GE PPu 522987 UPRATE; NEDC-33090P Draft Revision A Class III 0000-0007-5271 EPU500928 EPU 522988 - 7/1/2003 Project Task Report Transient iggel GE

___ __ __ PU 523023 __ An__alysis T0900 _ _ _ _ _____

PUSAR Integration; SAFETY ANALYSIS REPORT FOR PU50029 EPU 523024 - /1/2003 VERMONT YANKEE NUCLEAR Schrull GE Pu 523250 POWER STATION CONSTANT RESSURE POWER UPRATE; Unverified Draft; PUSAR Integration; SAFETY ANALYSIS REPORT FOR EPU 523251 - /1203 RMONT YANKEE NUCLEAcRul G PPU500930 EPU 523482 /1/2003 POWER STATION CONSTANT Schrull GE RESSURE POWER UPRATE;

. Unverified Draft; EPU 523483 - ontant Pressure Power Uprate PU50093 PU 523501 /9/2001 LTR Startup Test Evaluation GE DRAFT UNVERIFIED SAFETY EPU 523502 - ANALYSIS REPORT FOR EPU500932 U 523729 8/1/2003 VERMONT YANKEE NUCLEAR GE U 2OWER STATION MAXIMUM EXT ENDED LOAD LINE LIMIT . -

EPU500933 EU 523730 - 7/1/2003 Licensing Topical Report Constant GE EPU50093EPU 524038 7/1/203 Pressure Power Uprate GE SAFETY ANALYSIS REPORT FOR VERMONT YANKEE EPU500934 U 5242039/1/2003 NUCLEAR POWER STATION Schrull GE 524250 CUONSTANT PRESSURE POWER UPRATE PU500935 PU 524251 - / 1/2003 Licensing PU500935_ PU 524463 Topical Report for Constant Pressure Power Uprate ____

GE GE_________

PU 524464 - Project Tast Report; GE-NE-0000-PU500936 PU 524497 5/1/2003 -011-7129-01 Revision 0 Class III Niggel GE 70900 Transient Analysis (draft) .

roject Task Report GE-NE-0000-EPU500937 EPU 524498 - 2/1/2002 0011-4860-0lRevision 0 Class M Quinn GE EU 524498 21/02 T 1005 Startup Test Specifications (draft)

Project Task Report GE-NE-0000-PU500938 U 524536 - 2/1/2003 001 14860-OlRevision 0 Class III Quinn GE PU 524573 T1005 Startup Test Specifications

_ _ _ _ _ _ final) _ _

roject Task Report GE-NE-0000-EPU50093 PU 524574- 001 1-4860-OlRevision 0 Class III PU 524611 11i005 Startup Test Specificationsl

_ _ __ _ _ _ _ _ _ _ _ _ _ final) I _ _ _ _ _ _ _ _ _ _

Document Bates No Date Document Title To From Company Project Task Report GE-NE-0000-PU500940 EPU 524612 - 1/2003 01 1-4860-OlRevision 0 Class IIQuinn GE PU 524649 T1005 Startup Test Specifications

_ _ _ __ _ _ _ _ _ _ _ final)

SAFETY ANALYSIS REPORT EPU 524650 - FOR VERMONT YANKEE EPU500941 EPU 524827 4/24/2003 NUCLEAR POWER STATION chrull GE CONSTANT PRESSURE POWER

_ __RATE (Unverified Draft)

SAFETY ANALYSIS REPORT EPU 524828 -FOR VERMONT YANKEE EPU500942 PU 524828 7/29/2003 NUCLEAR POWER STATION Schrull GE PU 525019 CONSTANT PRESSURE POWER UPRATE (Unverified Draft)

PU500943 EPU 525020- 1/1/2020 RMONT YANKEE GE PUPU05252EASIBILITY STUDY______ G PU500946 EPU 525302 - 7/30/2001 U LTR Startup Test GE EU 525302 -/021 pecifications Summary___________

PU500947 EPU 525307 - 7/19/2001 onstant Pressure Power Uprate GE

______ U 525325 L____TRStartup Test Evaluation _____

Title:

Normal Operation Shielding EPU500948 EPU 525326 - 9/26/2003 Adequacy and On-Site / Off-Site eng; Yasi S&W EPU 525347 Rdiation Levels; PUSAR Sections 8.5 SAFETY ANALYSIS REPORT PU 525348 - FOR VERMONT YANKEE PU500949 U 525539 3/1/2003 NUCLEAR POWER STATION Schrull GE CONSTANT PRESSURE POWER

___ RATE_(unverified draft)

EPU500950 PU 525540 - 7/1/2003 Licensing Topical Report Constant GE

_ _U 525848 Pressure Power Uprate seismic U 525849 - NEDC-33090P Draft Revision A EPUS500951 PU 525849 8/22/2003 8/22/2003 GE Proprietary GE 8 nfonnation_ _

SAFETY ANALYSIS REPORT PU 525850 - / 3 FOR VERMONT YANKEE EPU500952 _ 9/1/2003 NUCLEAR POWER STATION chrull GE EPU 526061 CONSTANT PRESSURE POWER UPRATE ermont Yankee Nuclear Power tation License No. DPR-28 U 526062 - (Docket No. 50-271) Technical PU500953 U 526260 7/3/2004 Specification Proposed Change No. Thayer GE PU 52626063 Extended Power Uprate -

Response to Request for Additional Information REVIEW OF GE NUCLEAR ENERGY LICENSING TOPICAL PU500956 EPU 526261 - 3/31/2003 REPORT NEDC-33004P Ruland GE EU 526344 RVSION 3 CONSTANT PRESSURE POWER UPRATE

_TAC NO. MB2510)

Document Bates No Date Document Title To From Company ED I _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

REVIEW OF GE NUCLEAR ENERGY LICENSING TOPICAL PU500957 EPU 526345 - 3/31/2003 ORT NEDC-33004P Ruland GE PU E097 U 526428 VSION 3 CONSTANT PRESSURE POWER UPRATE (TAC NO. MB2510)

EPU500958 EPU 526429 - 1/201 onstant Pressure Powe Uprate LTR GE

________ EPU 526447 19/2001 tartup Test Evaluation = GE EPU500959 EPU 526448 5/112003 Project Task Report Task T0900 Niggel GE EPU 526481 1/03 ransient Analysis (draft) ____ _____ ____

PU500960 EPU 5264821 12/1/2002 DRAFT Project Task Report Task Quinn GE

_______ EPU 526519 -T2/0 1005: Startup Test Specifications inn GE EPU500961 ~PU 526557 //2003 1 Poject Task Report Task TI1005 QinG PU___526557____ S____tartup Test Specifications inG EPU500962 rPU 526558 - 2/03 Project Task Report Task T1005 Quinn GE

_________ EPU 526595 /2003 Startup Test Specifications = Quinn GE EPU500963 EPU 526596 - 2//2003 Project Task Report Task T1005 Quinn GE

_________PU 526633 1/03 tartup Test Specifications ____ _____ ____

SAFETY ANALYSIS REPORT

_U 526634 - FOR VERMONT YANKEE EPU500964 EPU 526820 6/27/2003 NUCLEAR POWER STATION chrull GE CONSTANT PRESSURE POWER UPRATE (unverified draft) _

SAFETY ANALYSIS REPORT EOU 526821 - 2 FORVERMONT YANKEE EPU500965 EPU 52682 12/3/2002 NUCLEAR POWER STATION chrull GE 527008 CUONSTANT PRESSURE POWER UPRATE SAFETY ANALYSIS REPORT U 52709

- OR VERMONT YANKEE PU500966 U 527009 - 8/21/2003 CLEAR POWER STATION Schrull GE PU 527225 CONSTANT PRESSURE POWER UPRATE Vermont Yankee Nuclear Power tation License No. DPR-28 U 527226 - (Docket No. 50-271) Technical PU500967 U 527383 6/30/2004 Specification Proposed Change No. Wanczyk GE 263 - Supplement No. 8 Extended Power Uprate - Response to Request for Add..

PU500969 U 527387 - 2/28/2003 WPS Service Water 022803 Bandeira S&W

_____ ___ U 527402 _ _ _ _ _ _ _ __ _ _ _

Safety Analysis Report for Vermont EPU500970 EPU 527403 - 6/27/2003 Yankee Nuclear Power Station for hrull GE EU 527589 Constant Pressure Power Uprate

_Unverified Draft Unverified Draft SAFETY PU500973 U 527592 - 8/1/2003 ANALYSIS REPORTCONSTANT chrull GE P527819 PRESSURE POWER UPRATE

____ ____ ____ ___ USAR Draft 08-13-03.doc _ _ _ _ _ _ _ _ _ _ _ _ _

Document Bates No Date Document Title To From Company Unverified Draft SAFETY ANALYSIS REPORT CONSTANT PU500975 PU 527820 - /1/2003 PRESSURE POWER UPRATE Schrull GE 528013 (Transmittal is D# 3401) Section 10-5 08-13-03.doc SAFETY ANALYSIS REPORTCONSTANT PRESSURE Schrull GE EPU500976 PU 528222 - 9/9/2003 U 528014 POWER UPRATE PUSAR VY PUSAR Rev B-i 09-03-03 SAFETY ANALYSIS REPORT 5PU500977 _PU 528223 - 9/9/2003 CONSTANT PRESSURE POWER chrull GE EU 528431 9/203 RATE VY PUSAR Rev B 09-03-chilG 03 SAFETY ANALYSIS REPORT PU500978 PU 528432 - 8/4/2003 CONSTANT PRESSURE POWER Schrull GE U 528662 RAEVY Draft PUSAR 08 SAFETY ANALYSIS REPORT 5099EU 528663 - 8/220 ONSTANT PRESSURE POWER ShulG PU500979 PU 528902 /12/2003 UPRATE VY Draft VY Draft chrull GE

.___ _ __PUSAR 08-12-03 . . -

SAFETY ANALYSIS REPORT PU500980 U 528903 - 8/1/2003 CONSTANT PRESSURE POWER Schrull GE U 529142 UPRATE VY Draft PUSAR 08 SAFETY ANALYSIS REPORT PU500981 U 529143 - 8/1/2003 CONSTANT PRESSURE POWER chrull GE U 529377 RATE VY Draft PUSAR 09 _ _ _ __ _ _ _ _ _ _ _ _ _ 3

_ 0__ _ _ IS__ _ _ _ __ _ _ _ _ _ _ _

SAFETY ANALYSIS REPORT PU500982 EPU 529593 - S/I/2003 CONSTANT PRESSURE POWER =csiall GE U529593 -1203 RATE VYDraft RevAProject

____ ____ ___ ___ M aster PUSAR 0 8-29-03 _ _ _ _ _

EPU500983 ,PU 52964 - 8/1/2003 00656 EPU T506 FRR WIP ROd Poulos; Dayal GE Project Task Report GE-NE-0000-EPU500984 ,PU 52973 8tl/2003 0016-5688-01 Revision Of Class IN Poulos; Dayal GE U 529683 /1 3 SSS TS Instrument Setpoints

_ ___ _ _ ___ __ T 0506 _ _ _ _ _

Project Task Report GE-NE-0000-PU500985 PU 529690 - 8/1/2003 0016-5688-01 Revision Og Class III Poulos; Dayal GE PU 529736 T0506 NSSS TS Instrument Setpoints Project Task Report GE-NE-C0000-PU0086 U 529737 - /12 03 016-5688-01 Revision QJ Class IIIols Dyl G PU5098 EU 529783 506 NSSS TS Instrumentous;Dyl 0//03 G

__ _ _ __ _ __ _ _ _ _ _ _ _ _ _ etpoints _ _ _

SAFETY ANALYSIS REPORT PU500987 PU 529784 - /1/2003 CONSTANT PRESSURE POWER Schrull GE U 530012 PRATE Rev 0 VYNPS EPU

_______ ___ TI1104 PUSAR Draft 07-31-03 _ _ ___

Document Bates No Date Document Title To From Company SAFETY ANALYSIS REPORT EPU500988 EPU 530013 - 9/10/2003 ONSTANT PRESSURE POWER DSchrull GE EPU 530221 URATE, Draft Revision B Draft

_USAR DRAFT UNVERIFIED SAFETY ANALYSIS REPORT MAXIMUM EPU500989 EPU 530222 - 8/1/2003 EXTENDED LOAD LINE LIMIT Schrull GE PU 530310 ANALYSIS PLUS Mellla+ Safety Analysis Report DRAFT UNVERIFIED SAFETY EPU 530311 - ANALYSIS REPORT MAXIMUM EPU500990 EPU 530403 8/l/2003 EXTENDED LOAD LINE LIMIT Schrull GE ANALYSIS PLUS Mellla+ Safety Analysis Report DRAFT UNVERIFIED SAFETY EPU 530404 - ANALYSIS REPORT MAXIMUM PU500991 EPU 530496 8/1/2003 EXTENDED LOAD LINE LIMIT chrull GE ANALYSIS PLUS Mellla+ Safety Analysis Report Duplicate is #1901 Circulating Water System including Condenser and Cooling Tower asi S&W PU500992 PUU 530497 530518 - 1/1/2020 T0703 T0605 WBS 1.4.1.5 PUSAR Section 6.4.2 & 7.2 ER Draft A Circulating Water System including PU 530519 - 1/ Condenser and Cooling Tower PU500993 EPU 530540. 1/1/2020 T0703 T0605 WBS WBS 1.4.1.5 Yasi S&W PUSAR Section 6.4.2 & 7.2 ER Draft B EPU500995 EPU 530615- 6/1/2003 VY EPU T0504 Project Task Report Hicks; Royal; GE 530628 E____PU ______ doc (FDWLC) Dick____

LeFrancois;

. PU 530692 - EPU Task Scoping Document/Task Rainey, EPU500997 PU 530693 8/20/2003 Report Comment Form 1.4.3.1 Jonasch; S&W ervice Water dwards;

_ _reite EPU500998 rPU 530694 - 10/1/2003 VNS CPPU & MELLLA+ G

_________ PU 530707 10/1/200 Startup Test Specifications (T1005) GE Draft for review - unverified: NRC PU 530708 - RAI IPSB-A-1: GE's proposed EPU500999 U 530709 1/1/2020 response to The application dated GE September 10 2003 (Reference 1)

Attachment 7 EPU501001 EU 530710 - 11120 ask Scoping Document T1005 GE

________ EPU 530718 /1/2002 (Startup Test Specification) = GE EPU501002 EPU 530719 - 7/1/2003 Project Task ReportTask Rev 0 Niggel GE U 530753 EP____ T0900: Transient Analysis FTR WIP iglG BVY 04-008 Attachment 2- CPPU Submittal RAI Response Non-PU50 1003 EU 530754 - 1/1/2020 Proprietary Information RE: G EPU 530874 Response to EEIB-AI BI B2 B3 B4 GE EMCB-Al A2 BI B2 B3 Cl C2 C3

. EMEB-B I B2 B3 B4 B5 etc.

Document Bates No Date Document Title To From Company BVY 04-008 Attachment 2- CPPU Submittal RAI Response Non-U50 1004 EP 385-ll22 roprietary Information RE: G U 530995 esponse to EEIB-A1 BI B2 B3 B4 GE EMCB-A1 A2 BI B2 B3 Cl C2 C3 EMEB-BI B2 B3 B4 B5 etc.

PUO105PU 530996 - /1203 roject Task Report - T1005 is op G EPU51005EPU 531033 -2/12003 (Startup Test Specification)

Technical Design Procedure - Loss ckert; EPU501006 cPU 531034 - 4/1/2001 of FW Flow Long-Term Transient Liffengren; GE U 51Analysis - Rev. I Diaz-Quiroz EPU501007 EPU 531090- 7//2003 Task T0900: Transient Analysis; Niggle; Hicks; GE

______ U 531124 /1/2003 EPU5O01008 EP 315-ll22 itle: VYNPS CPPU & MELLLA+ G EPU50108 EPU 531138 tartup Test Specifications (T1005)

S__no__ GE EPU 531141 - DRF-A22-YYYYY-ZZ(GE PU501012 EPU 531149 Proprietary Information) GE Attachments Re ID 13051 and 10361) VY EPU T1005, Startup Tes PU501016 EPU 531150 - Specification, Proposed DTR GE EPU 531187 Comments Resolutions & a marked-up draft of the T1005 FTR with those proposed comment resolutions.

(Attachment is ID# 10362)

UPDATED VY CPPUT1005 -

PU501018 EPU 531188 - Draft B of FTR Email Quinn to GE EPU 531225 Jacobs 2/26103. Att. is VY CPPU T1005 FTR Rev Draft B 26-03.pdf Attachment is ID# 10362)

UPDATED VY CPPU T1005 -

010 EPU 531226 - Draft B of FTR. Email Quinn to PU5I20 EPU 531263 Jacobs 2126/03. Att. is VY CPPU E T1005 FTR Rev Draft B 26-03.pdf

Subject:

EPU DTR T0900 Transient Analysis; "Attached is EPU Draft EPU 531264 - Task Report 0900 for your review.

PU501022 EPU 531297 Also attached are comment review GE forms and the DTR Review Checklist." _

EPU501026 EPU 531331 RE: EPU DTR 0900, attached; GE EPU 531332 - Please review the attached EPU FTR EPU501030 U 53133WIP 0900 and comment responses GE EU 531339 fo E EU 531340 - Please review the attached EPU FTR EPU501031 EPU 531374 0900 and comment responses GE

_ _ _ _ _ _ _ _ _ _ _ _ o~m G E._ _ _ _ _ _ _ _ _ _ _

EPU 531375 - ubject: FW: VY EPU T0900 PU501033 U 531382 omment Resolution; "No GE Uomments;"

Document Bates No Date Document Title To From Company ID_ _ _ _ _ _ _ _ _ _ _ _ _

PU 531383 -

Subject:

FW: VY EPU T0900 EPU50 1034 Comment Resolution; "No GE EPU 531417 comments;"

EPU501036 PU 531418- EPUT900 Comment GE EPU501036 PU 531425 Resolution GE EPU 531426 - SubEPUt T900 Comment EPU501037 PU 531460 Comment Mesolution GE PU 531461 -

Subject:

RE: VY EPU T0900 EPU501039 U 531461 Comment Matrix Reloaded; docs GE attached U 531470- ubject: RE: VY EPU T0900 PU 1040 PU 53150 Comment Matrix Reloaded; P ocs GE PU 531504 ttaedTask T090:Trnsiet E-mail attaching VY EPU T0900 U501042 ,PU 531505 - Comment Matrix and Project Task GE U 531516 Report TaskT0900: Transient Analysis

_-mail attaching VY EPU T0900 EPU501043 PPU PU 531517 - omment Matx and Project Task GE 531551 ReportcTask T0900: Transient

__ _ __ _ _ _ _Analysis_ _ _

EPU501045 EU 531552 - VYEPU T0900 Comment Matrix GE

______ U 531563 R____eloaded____

PU501046 PU 5315640- IVEPU T0900 Comment Mat GE

______ U 531598 _____eloaded____

,PU 531599 -

Subject:

FW: VY EPU T0900 PU E08PU 531607 Cmment Matrix Reloaded; G U5149EU 531608 -

Subject:

FW: VY Reloaded; EPU T0900 G GE PU501049 U 531642 Comment Matrix EPU501052 PU 531647 - FW: PUSAR 6.4 & 6.4.5 SW & GE PPU 531648 CS DRAFT AWBS 1.4.3.1 U 531649- PS EPU - Summary of Original PU501054 ;U 531653 Startup Test Specs and Generic GE CPPU Evaluations U 531654- NPS EPU - Summary of Original PU501055 EPU 531672 Startup Test Specs and Generic GE 531672 PU Evaluations ubject: VYNPS EPU - Summary of riginal Startup Test Specs and PU501057 PU 531675 - eneric CPPU Evaluations. Attaced GE PPU 531679 are CPPU LTR Startup Test Specs.

Summary & CPPU LTR Startup Test Evaluation.

Subject:

VYNPS EPU - Summary of Original Startup Test Specs and PU501058 PU 531680 - Generic CPPU Evaluations. Attaced GE PPU 531698 are CPPU LTR Startup Test Specs.

Summary & CPPU LTR Startup Test Evaluation.

PU 531700 - (Transmittal is ID# 2596) WBS PU501062 U 531747 1.4.3.1 PUSAR Sections 6.4.1 & S&W P.4.5 ER Document Bates No Date Document Title To From Company (Attachments are ID#s 3443,3444)

EPU 531748 - mail from Dick to Jacobs EPU5O1065 PU 531975 ontaining T1006 comment GE documentation PU 531976 - (Attachments are ID#s 3302, 3303, PU501067 U 532215 3304,3305) email from Dick to VY GE

_ _c ontaining PUSAR information PU 532216 - (Attachment is ID# 3426) email PU501072 EPU 532443 from Ed Schrull (GE) to Jacobs GE containing PUSAR Section 10.5 CW/Cond ER Comment Responses EPU 532444 - (Attachments are ID# 7632 and PU51075 EPU 532465 7633) Circ Water, Condenser, S&W r__Cooling Tower evaluation (Attachment is ]D# 7337) email EPU 532466 - from Garozzo to Felumb - RE:

PU50107 PU 532466 PUSAR Comment Section 10.4, GE

._ _T _esting '

EPU 532467 - FW: PUSAR Comment Section PU501079 EPU 532467 10.4, Testing GE EPU 532468 - FW: PUSAR Comment Section EPU501081 PU 532468 _____10.4, Testing GE PU E103 U 532469 - F: PUSAR Comment Section 10.4 G EPU501083 EU 532469 (DRAFT), Testing GE U 53 2470 -(Attachment is ID# 7337) Email PU501085 PU 532470 om Hobbs to Jacobs containing ID GE U 532470 7337 PU501087 EPU 532471 - (Attachments are ID#s 3265,3266) GE PU50107 EPU 532689 email GE draft PUSAR 8-20-03 GE PU501088 U 532690 - (Attachments are ID#s 3265,3266) GE PU50108 PU 532929 email GE draft PUSAR 8-20-03 (Attachments are ID#s 2582,2583, PU501091 PU 532930 - 2584) email from Manny Bandeira S&W PU 532931 o VY containing Service Water Information Attachments are ID#s 2582, 2583, PU501093 PU 532932 - 2584) email from Manny Bandeira S8W U 532933 oVY containing Service Water S nformation (Attachments are ID#s 2582, 2583, U501094 PU 532934 - 2584) email from Manny Bandeira EPU 532982 o VY containing Service Water Information (Attachments are ID#s 2588, 2589, U501096 U 532983 - 2590,2592,2593, 2594) Service U 1 U 533035 Water ER and PUSAR documentation- Final (Attachments are ID#s 2588, 2589, PU501097 EPU 533036 - 2590,2592,2593,2594) Service GE EPU 533038 Water ER and PUSAR G documentation- Final Document Bates No Date Document Title To From Company (Attachments are ID#s 2588, 2589, PU501101 PU 533044 - 2590, 2592, 2593, 2594) Service Ol UPU U533045 aterER and PUSAR GE documentation- Final tUT0DU 533047 - RE PUSAR Comment Section 10.4, EPU501104 RU533047 T____esting _ ____ GE EPU501106 EPU 533048 - Comments regarding Comment GE PU0106 U 533048 S____ection 10.4 G (Attachments are ID#s 3237,3238, P EPU 533049 - 3239,3240) email S&W PUSAR S&

U501108 EPU 533075 Sections 6.4.2 & 7.2 final, W Engineering Reports (Attachments are II)#s 3237,3238, PU501109 PU 533076 - 3239,3240) email S&W PUSAR S&W PU 533086 Sections 6.4.2 & 7.2 final, Engineering Reports (Attachments are ID#s 3237,3238, E PU 533087 - 3239, 3240) email S&W PUSAR EPU5O1110 PU 533102 Sections 6.4.2 & 7.2 final, GE Engineering Reports (Attachments are ID#s 3237,3238, U501111 EPU 533103 - 3239,3240) email S&W PUSAR GE PSi PU 533104 Sections 6.4.2 & 7.2 final, Engineering Reports E-mail attaching SAFETY ANALYSIS REPORT FOR PU U 533106 -

EPl113 ONT YANKEE NUCLEAR GE EPU 533340 OWER STATION CONSTANT RESSURE POWER UPRATE Draft Revision A PU50 5 EPU 533341 - VYNPS CPPU & MELLLA+

c;PU5011 EPU 533354 Startup Test Specifications (T1005) GE Latest and Greatest VY CPPU PU 533355 - Transient Testing Evaluation; PU501117 PU 533368 VYNPS CPPU & MELLLA+ GE Startup Test Specifications (T1005)

Subject:

RE: Transient Selection U 533369 - Review; A review of the fuel cycle PUSO1119 U 533372 indicates that there is not enough rod GE ensity at MOC to support MOC limits Anderson; Cheung; O EPU 533373 - l/1/2000 LICENSING TOPICAL REPORT - Heck; PU50117 EPU 533706 TRACG QUALIFICATION ebanov; GE haug; Shiralkar Compact discs containing copies of the documents listed in this log have been prepared and are available for distribution to counsel for the Vermont Department of Public Service

("DPS") and the New England Coalition ("NEC") upon receipt by Entergy's counsel of Confidentiality and Non-Disclosure Agreements, in the form provided in the Order, executed by counsel, consultants, employees, and others representing those parties.' The Proprietary Documents included in the above log are also available for review by representatives of the NRC Staff upon their request.

The above Proprietary Privileged Document Log will be supplemented from time to time as additional Proprietary Documents are identified, and copies of such documents will be provided to the appropriate parties and made available for review by the NRC Staff.

Respectfully submitted, J( E Silberg Matias F. Travieso-Diaz Douglas J. Rosinski SHAW PITIMAN LLP 2300 N Street, N.W.

Washington, DC 20037-1128 Tel. (202) 663-8063 Counsel for Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.

Dated: March 31, 2005 As of the date of this filing, no executed Confidentiality and Non-Disclosure Agreements have been received.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board

)

In the Matter of )

) Docket No. 50-271 ENTERGY NUCLEAR VERMONT )

YANKEE, LLC and ENTERGY ) ASLBP No. 04-832-02-OLA NUCLEAR OPERATIONS, INC. ) (Operating License Amendment)

(Vermont Yankee Nuclear Power Station) )

)

CERTIFICATE OF SERVICE I hereby certify that copies of "Entergy's Proprietary Privileged Document Log" were served on the persons listed below by deposit in the U.S. mail, first class, postage prepaid, and where indicated by an asterisk by electronic mail, this 31st day of March, 2005.

  • Administrative Judge *Administrative Judge Alex S. Karlin, Chair Lester S. Rubenstein Atomic Safety and Licensing Board Panel 4270 E Country Villa Drive Mail Stop T-3 F23 Tucson AZ 85718 U.S. Nuclear Regulatory Commission lesrrr(tcomcast.net Washington, D.C. 20555-0001 ask2 ()nrc.oov
  • Administrative Judge Atomic Safety and Licensing Board Dr. Anthoy J. Baratta Mail Stop T-3 F23 Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop T-3 F23 Washington, D.C. 20555-0001 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 aib5ei)nrc. ov
  • Secretary Office of Commission Appellate Att'n: Rulemakings and Adjudications Staff Adjudication Mail Stop 0-16 CI Mail Stop 0-16 C1 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Washington, D.C. 20555-0001 secy(v)nrc.gov hearingdocket(q)nrc.gov
  • Sarah Hofmann *Brooke Poole, Esq.

Special Counsel *Robert Weisman, Esq.

Department of Public Service *Nathan Wildermann, Esq.

112 State Street - Drawer 20 Office of the General Counsel Montpelier, VT 05620-2601 Mail Stop 0-15 D21 Sarah.Hofmann(,state.vt.us U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 bdp2(.nrc.gov rmw(i)nrc.gov, nrwenrc.gov

  • Anthony Z. Roisman *Jonathan M. Block National Legal Scholars Law Firm 94 Main Street 84 East Thetford Rd. P.O. Box 566 Lyme, NH 03768 Putney, VT 05346-0566 aroisman(tvalley.net ionb(isover.net
  • Chris Wachter *Raymond Shadis Atomic Safety and Licensing Board Panel New England Coalition Mail Stop T-3 F23 P.O. Box 98 U.S. Nuclear Regulatory Commission Shadis Road Washington, D.C. 20555-0001 Edgecomb ME 04556 cmwa)nrc.gov shadis()prexar.com
  • Jonathan Rund Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 jmr3 (inrc.gov M a 6' //4AA'4; Matias F. Travieso-Diaz