Issue date | Title | Topic | |
---|---|---|---|
ML19247A403 | 30 July 1979 | Amend 12 to Containment Design Assessment Rept.Amend Consists of App F, Containment Structure Assessment for LOCA Jet Impingement & Pool Swell Loads. | |
ML19254F965 | 30 June 1979 | Fire Protective Cable Tray Fire Test, June 1979 | Safe Shutdown Thermoset |
ML19281A094 | 14 February 1979 | Fire Protective Cable Tray Fire Tests, Sept 1978 Through Jan 1979 | |
ML19347D904 | 10 April 1981 | Amend 14 to Mark II Containment Design Assessment Rept. | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake |
ML19352B247 | 22 June 1981 | Response to Control of Heavy Loads. Eleven Oversize Drawings Encl.Aperture Cards Will Be in PDR | Control of Heavy Loads |
ML20002C948 | 7 January 1981 | Nonproprietary Version of Environ Qualification of Safety-Related Electrical Equipment, Vol 1-3 | |
ML20002E371 | 20 January 1981 | Equipment Qualification. | Anchor Darling |
ML20002E373 | 10 December 1980 | Zimmer Seismic Qualification Review Team Evaluation/ Qualification Status Rept. | Safe Shutdown Earthquake Finite Element Analysis Earthquake |
ML20002E374 | 15 April 1980 | Nuclear Safety-Related Equipment List for Zimmer Nuclear Generating Station. | |
ML20003F736 | 21 April 1981 | to Equipment Qualification Status Rept. | |
ML20003F738 | 21 April 1981 | Required Response Spectra Used for Equipment Qualification. | Operating Basis Earthquake Design basis earthquake Earthquake |
ML20003F739 | 21 April 1981 | Summary of Equipment Qualification. | Safe Shutdown Earthquake Anchor Darling Finite Element Analysis |
ML20003F743 | 21 April 1981 | NSSS Equipment Qualification Rept. | Safe Shutdown Anchor Darling Finite Element Analysis |
ML20003H324 | 1 May 1981 | Response to NRCs Human Factors Engineering Control Room Design Review/Audit Rept. | |
ML20004B923 | 31 May 1981 | Amend 15 to Mark II Containment Design Assessment Rept. | Fatigue Rule |
ML20004F188 | 30 June 1981 | Conceptual Design Submittal,Emergency Response Facilities. | Health Physics Network Earthquake |
ML20005A807 | 30 June 1981 | Amend 16 to Mark II Containment Design Assessment Rept | |
ML20027C554 | 7 October 1982 | Seismic Qualification Rept on Ite Series 5600 Motor Control Ctr, Revision 1 | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake |
ML20040H155 | 28 February 1982 | Amend 17 to Mark II Containment Design Assessment Rept. | Safe Shutdown Earthquake Hydrostatic Earthquake |
ML20042C128 | 24 March 1982 | BWR Control Rod Drive Sys Vessel Inventory Makeup Rate Aspects of NUREG-0619. | Safe Shutdown Reactor Vessel Water Level Fire Barrier Earthquake |
ML20049J632 | 5 February 1976 | Insps of Weld CY-606,replacement of Weld RH-42 by RH-K-262, Replacement of Weld WR-K-811 by WR-K-916.W/related Nonconformance Repts & Supporting Info | |
ML20052B253 | 8 March 1982 | Seismic Qualification Analysis for Differential Pressure Unit,Itt Barton Model 224. | |
ML20063N144 | 22 June 1982 | Requalification of 20-Inch Gpe Vacuum Breaker Valve Components Due to LOCA Conditions | |
ML20065Q196 | 30 August 1982 | Seismic-Stress Analysis of Horizontal Pumps | Hydrostatic |
ML20067C254 | 31 August 1982 | Public Version of Revision 1 to Design Submittal - Emergency Response Facilities | |
ML20069E646 | 14 March 1983 | Quality Confirmation Program Status, Monthly Rept for Feb 1983 | FLEX Scaffolding |
ML20070L676 | 28 December 1982 | Wh Zimmer Nuclear Power Station Seismic Qualification of Equipment,Supplemental Info. W/Three Oversize Drawings. Aperture Cards Are Available in PDR | |
ML20070R919 | 27 January 1983 | Quality Confirmation Program,Status as of 821231 | Scaffolding |
ML20071N088 | 18 May 1983 | Rev 4 to Transport of Toxic Chemicals & Control Room Habitability Study. One Oversize Graph Encl.Aperture Card Is Available in PDR | Coatings |
ML20071P714 | 1 June 1983 | Wh Zimmer Nuclear Power Station,Unit 1,Heavy Loads Rept | |
ML20072C664 | 24 February 1983 | Quality Confirmation Program Status,Jan 1983 | Scaffolding |
ML20072D280 | 10 June 1983 | Independent Review of Zimmer Project Mgt, Biweekly Status Rept 3,for 830521-0603 | |
ML20072U791 | 31 March 1983 | Independent Mgt Review of Zimmer 1 Nuclear Plant Project Proposal to Cincinnati Gas & Electric Co | Nondestructive Examination |
ML20073B996 | 1 April 1983 | Rev 11 to Natl Board Tasks Rept | |
ML20073M114 | 4 June 1982 | Seismic Qualification of Reactor Core Cooling Bench Board, Equipment Number 1H13-P601 | |
ML20076A999 | 5 August 1983 | Rev 20 to Natl Board Tasks Rept | Non-Destructive Examination Hydrostatic Nondestructive Examination |
ML20076E205 | 24 March 1983 | Rev 1 to Task V Radiographic Confirmation Rept | Nondestructive Examination Liquid penetrant |
ML20076G233 | 15 July 1983 | Structural Analysis of GE Spent Fuel Racks for Zimmer Nuclear Power Station | Earthquake |
ML20076G918 | 31 August 1983 | Amend 18 to Zimmer Power Station Mark-II Design Assessment Rept | |
ML20076J220 | 31 May 1983 | Quality Confirmation Program Status as of 830531 | Coatings Scaffolding |
ML20076J224 | 30 June 1983 | Quality Confirmation Program Status as of 830630 | |
ML20078A576 | 19 August 1983 | Rev 21 to Natl Board Tasks Rept | Non-Destructive Examination Hydrostatic Nondestructive Examination |
ML20078C432 | 16 September 1983 | Rev 23 to Natl Board Tasks Repts | Non-Destructive Examination Hydrostatic Nondestructive Examination |
ML20079E262 | 5 January 1984 | Quality Confirmation Program, Monthly Rept for Dec 1983 | Fire Barrier Coatings |
ML20079F154 | 10 October 1983 | Technical Proposal PR-6194, Independent Design Review of Zimmer Nuclear Power Station | |
ML20080R384 | 30 September 1983 | Rev 24 to Natl Board Tasks Rept | Non-Destructive Examination Hydrostatic Nondestructive Examination |
ML20081F237 | 31 August 1983 | Quality Confirmation Status as of 830831 | Coatings |
ML20081F291 | 30 September 1983 | Quality Confirmation Status Package as of 830930 | Coatings |
ML20082K532 | 31 October 1983 | Quality Confirmation Program, Monthly Rept for Oct 1983 | Safe Shutdown Coatings |
ML20083A140 | 28 October 1983 | Rev 25 to Natl Board Tasks Rept | Non-Destructive Examination Hydrostatic Nondestructive Examination |