y~s Ex-]

TABLE OF CONTENTS Attachment "A" -

Summary of the NSSS SQRT Evaluation Table 1 -

Zimmer Nuclear Safety Related NSSS Equipment List Table 2 -

Summary of the Seismic Qualification fcr Each Electrical & Mechanical Component Attachment "B" -

Definition of Three Plant Conditions (ie, Hot Shutdown, Hot Standby, Cold Shutdown)

)

l t

l l

l l

l l

I /"*g i As) g1(g23051 6 1

O t

I Attachment A ,

[]

%)

NSSS SQRT

SUMMARY

In response to the NRC request for information concerning equip-ment qualification for seismic and hydrodynamic loads on the Zim-mer Nuclear Station, a thorough review was performed in order to assess the adequacy of the existing NSSS qualification based on the N'RC Seismic Qualification Review Team (SQRT) requirements.

These requirements include:

o IEEE 344 - 1975 o USNRC Regulatory Guide 1.92 o USNRC Regulatoa y Guide 1.100 o USNRC Standard Review Plan 3.9.2 j o USNRC Standard Review Plan 3.10 o Zimmer unique building vibratory response to seismic and hydrodynamic loads.

Prior to the start of the SQRT evaluation, a list of all of the Zim-mor nuclear safety related NSSS squipment was developed. This list included all safety related mechanical components, electrical, instrumentation, and control equipment, including valve actuators and other appurtenances of active pumps and valves. This list is depicted in Table 1 and includes the following information:

o Equipment description o System in which the equipment is located o Hot standby / cold shutdown requirements o Location of the equipment o Availability for inspection I

j CGE-03-179 1

~ _ . . - - . - - . - ~ . - _ - _ - . . _ - _ - . _

o Vendor /model number i

() o Specification number.

Table 1 was prepared by reviewing several GE equipment lists and system drawings, and by contacting cognizant engineers at the plant site and at GE.

' Informa-The qualification information is summarized in Table 2.

tion on this table includes:

o Specification number ,

o Qualification method o Compliance to NRC SQRT criteria and justification-I o Plans for reevaluation /requalification i

During the evaluation phase of the work, GE transmitted analytical f results, test reports, and recirculation and mainstream piping loads. Sargent & Lundy (S&L) , who is the architect engineer, pro-() vided building response spectra and balance of plant piping loads.

In addition, inscrument specifications and qualification documen-tation were received from several equipnent vendors. The informa-tion which was received from GE, S&L, and the equipment vendors was reviewed in light of the current NRC SQRT requirements. Care-ful consideration was given to the effects of the high frequency j

i loads and the multi-modal response of the equipment.

^

SQRT Summary Forms were completed for the equipment items. These forms contain information concerning the equipment function, di-mensions, and location, as well as the results of tests and analy-ses which were performed.

The evaluation was divided into four (4) phases. During the first phase, the locally mounted racks and instruments were evaluated.

The seccnd phase of the work addressed the qualification of the

() CGE-03-179 2 4

y y , ,.,.# ,.--m..--,.,7 , , . _ . . . . v. - ,,y,~, ,~, - _ , - . _ . , , , - . ~ - , ,._m.m. ,, - . - . , y - . _ - - , .- - - . , , , , . -

control room panels and instruments. The floor mounted mechani-( cal equipment was evaluated in the next phase. Lastly, the pipe mounted mechanical equipment was evaluated.

The results of the evaluation are provided below. The percentages refer to the percent of the equipment in each category which met the current NRC SQRT requirements.

+

o Locally mounted instruments 15%

o Locally mounted racks 0%

o Control room instruments 70%

, o Control room panels 40%

o Floor mounted mechanical equipment 30%

o Pipe mounted mechanical equipment 65%

J It should be noted that the mechanical equipment which was found to be qualified will be reevaluated when the final GE T-Quencher and LOCA loads analyses are completed. The current qualification

("'s

(,,/ results for the mechanical equipment were reviewed by considering the methodology which was used to perform the analyses and tests.

I It was assumed that the same methodology will be used when per-forming the new loads (T-Quencher and LOCA) analyses since this methodology was found acceptable during the reevah stion. This will be verified during the final review.

f In order to bring all of the nuclear safety related Zimmer equip-ment into compliance with the current NRC SQRT requirements, several requalification programs were developed and are in pro-gress using state-of-the-art analytical and testing techniques.

j The locally mounted and control room instruments and panels have been qualified by multi-a::ial, multifrequency tests. Several of the small mechanical equipment items are also being qualified by test. These tests account for the effects of hydrodynamic and seismic loads on the equipment. The large mechanical equipment

items have been qualified by complex modal analysis which use the CGE-0 3-17 9 3 l

current hydrodynamic and seismic response spectra. Detailed qual-ification reports have been prepared for each analysis and test, and these reports have been submitted to Cincinnati Gas & Electric (CG&E) so that they may be included in an auditable file.

CG&E has developed plans for an SRV in-plant test program. The purpose is to provide actual measurements of pressure loads which are imposed on the suppression pool boundaries during SRV actua-tion and to verify that these measured pressure loads are conser-vative when compared to the T-Quencher design loads shown in the FSAR. Two additional objectives of the test are to verify the design adequacy of various submerged structures which are subject-ed to these SRV loads and to measure the suppression pool temp-erature distribution during an extended SRV discharge.

O CGE-03-179 4

( NOTES TO TABLE 1

1. Indicates whether the equipment is required for:
a. Hot Shutdown gQ I V
b. Cold shutdown l t

k~

c. Both -

t' .

d. Neither 1

'y

2. Gives building and elevation
3. Indicates yes or no as to whether the equipment is installed.
4. Refers to Design Specification, Purchased Part Drawing, or Assembly Drawing No.
5. Abbreviations:

ADS = Automatic Depressurization System CRD HYD Control = Control Rod Drive Hydraulic System

(

CRVICS = Containment & Reactor Vessel Isolation Control System ESF = Engineered Safety Features HPCS = High Pressure Core Spray System LDS = Leak Detection System LPCS = Low Pressure Core Spray System MSIV LCS = Main Steam Isolation Valves Leakage Control System NBS = Nuclear Boiler System NMS = Neutron Monitoring Syster PGCC = Power Generation Control Complex Process Rad / RPM = Process Radiation Monitoring System RCIC = Reactor Core Isolation Cooling System Reactor Recirc = Reactor Recirculation System RC&IS = Rod Control & Information System FHEET OF

- . - . _ . . . . = - . - . - . . .-. . - - .

i  !

i .;'

i 1

i NOTES TO TABLE 1

! RHR = Residual Heat Removal System I iO RPS = Reactor Protection System i

1 RPV = Reactor Pressure Vessel (

i -

RWCU = Reactor Water Clean Up j

, SLCS = Standby Liquid Control System l

! i i t

! VB = Vertical Board i e i i 6

l 't i

l i' i i

i

\

l l

}  !

l- t l

3 l +

t i

l-

i i

1 i 1

i t

I

**' Indicates information to be provided upon completion i

!pQ of Reevaluation. I i

i SHEET OF- j i

[

l i-i 1

- - -._ .- . ____r... . - _ _ - - . _ _ _ _ _ ~ ~ _ _ _ . - . . _ _ _ - - - - - - - ,

O 1 O

SEISMIC OUAI,IP! CATION REVITM Table 1 Zimmer Nuclear Safety Related I:<1ui pmen t. 1.i s t MASTER PARTS EQUIPMI:NT OR VENDOR AND SPt:CI FICATION EQUIPMENT LOCATION OF AVAILABLE 5 NUMHl:R REQtl IRED FOR EQUIPMENT FOR INSPECTION LIST NUMBER SYSTEM COMPONENT MODE!. NUMILER R21-D002 thru NDS Condensing GE/136D2798G001 214A9901 Both Reactor Bldg. Yes D009 Chamber D21-r013 Safety / Relief Crosby /6Rio-lin. 22A6441 noth Reactor Bldg.

Valve CP 21A9247 561'9" D21-r022 6 ttain Steam Rockwell/ 21A9257 Cold Shutdown Reactor Bldg. &

D21-F02C Isolation 24" x 20" x 24" 3RSIA758 Steam Tunnel Valve (ttSIV) rig. 1612 529' 2 7/8" Actuator JttMNTY Main Steam Lines (Supports are on 523' 4 3/4")

n21-t015 Pressure Darksdale/ NIT- 164C5159 Ilot Shutdown Turbine Bldg.

Switch M12SS B21- t1020 Presnure Darksdale/ NIT- 164C5359 Reactor nldg.

Switch tt12SS 546'0" Reactor nldg.

D21-N023 Pressure Darksdale/n1T- 164C5359 546'0" Switch M12SS Reactor Bldg. ,,

D21-rIO24 o Level Switch parton/288A 159C4304 y 546'0" SitEl:T Ol'

4 1

4 l I I

l 1

l 4

l SEISMIC OtlAI,1FICATION REVIEW l

, Table 1 Zimmer Nuclear Safety Related I 1:quipment I.ist 6

t MASTER PARTS EQUIPMENT OR VI-:NDOR AND SPI:CIPICATION EQUIPMENT . IDCATION OF AVAILABLE LIST NUMilER SYSTEM COMPONENT MODE!, Nt!MFLER NtfMinER RI:OtllRED FOR EQUIPMENT FOR INSPECTION i

I D21-N026 NDS Level Ind. Barton/384 159C4383 Ilot Shutdown Reactor Dldg. Yes j Switch 546'0"  !

D21-N027 Diff. Press. Dailey/555 163C1183 Neither Reactor Bldg.

Kmtr. 546'0" i D21-NO31 {g Ind. Bar ton /2 fib A 159C4384 Ilot Shutdown g9prDIdg. i D21-NO32 Diff. Press. Dailey/555 163C1183 Neither Reactor' Bldg. t Xmtr. 525'7" L

)

il21-NO 3 3 Diff. Press.

Xmtr.

Dailey/S55 163C1183 Neither Reactor Bldg.

525'7" i

l l D21-NO34 Diff. Press. Dailey/555 163C1183 Neither Reactor Bldg.

Kmtr. 525'7" fl21-NO36 Level Ind. Yarway/4418C 159C4445 Ilot Shutdown Reactor Bldg.

Switch 546'0"

, B21-NO37 tevel Ind. Barton/288A 159C4384 Ilot Shutdown Reactor Bldg.

Switch 546'0" D21-NO 38 Level Ind. Bar*.on/288A 15904384 flot Shutdown Reactor Bldg. .r Switch 546'0" i

Sill:l:T OP i

i i

. .- -- . . . . . . - - . . . - . . -- . . . _ . . . . . . . _ . . - .- - . ~ . . _ - - _

o s t

[

s f

SEISMIC QUALIFICATION RI:VltM i

Table 1 Zimmer Nuclear Safety Related I:quiliment 1.ist MASTER PARTS EQtlIPMENT OR VI NDOR AND SPECIPICATION EQUIPMENT IDCATION OF AVAILABLE  ;

$ MODE!, NUMBER FOR INSPECTION LIST NUMBER SYSTEM COMPONENT Nt M, iter Rt:QUIRI:D POR EQUIPMENT B21-NO39 Nils Pressure Darksdale/ 164C5359 Ilot Shutdown Reactor Bldg. Yes ,

Switch DIT-P112SS 546'0" D21-N044 tevel Switch Darton/760 159C4383 Reactor Bldg.

525*7" D21-N045 Pressure Darksdale/ 164C5359 Reactor Bldg.  ;

Switch. BIT-M12SS 546'0" B21-N047 Pressure Static-O-Ring / 145C3012 Switch 12-N-AA4-TT D21-N04R Pressure Static-O-Ring / 145C3012 'f '

Switch 12-N-AAS-TT D21-N051 Press. Xmtr. Dalley/556 163C1292 Neither 1r D21-N056 vacuum Switch Barksdale DIT- 163C1855 Ilot Shutdown Turbine Bldg.

Ill HSS B21-R004 Pressure Ind. Pot >ert shaw 163C1184 Neither Reactor R1dg.

  • 713n 546'0"  !

D21-0005 " Diff. Prens. narton/227 163C1181 Neither Reactor pidg. I' Ind. 525'7" Sill:I T __ Ol' i

i

ee O J O 1

I i

SEISMIC OUALIFICATION REVIEW Table 1 Zimmer Nuclear Safety Related Erluipment I.ist .

ftASTER PARTS EQUIPMENT OR VENDOR AND SPECIFICATION EQUIPMENT LOCATION OF AVAILABLE 5 FOR INSPECTION LIST NUMBER SYSTEM COMPONENT MODEL NUMDER NUMBER REQUIRED FOR EQUIPMENT t

B33-C001 Reactor Recire Pump Bingham- 21A9279 Neither Reactor Bldg. Yes Recirc. Willamette/ 22A6404, 530'3" 20x20x33 RV 22A6016 t B33-F023 Recire. Anchor- 921D075E, Reactor Bldg.

Suction Darling / 21A9280 526'1" Valve 94-13223 B33-F060 Recire. Control Hammel-Dahl/. 21A3873 Reactor Bldg. [

Valve V999L-26 530'3" ,

.h j B33-F067 Recirc. Dis- Anchor- 9210875E, if Reactor Bldg.  !

charge Darling / 21A9280 530'3" Valve 95-13225 i

l B33-N014 DifC. Prc~.. Rosemount/. 163C1561 Ilot Shutdown Reactor Bldg.

l Xmtr. 1151 503'6"  !

B33-N015 l

U oiff. press. Rosemount/ 163C1561 Neither . Reactor Bldg. I

!. Xntr. 1151 503'6" i

i l SnEET Or i

i s

W w , --,m e -. - , . . -- w -- p+.- tt < ww n v w e n - - - - - - -

! tj a

  • ljtj  ;  : I.

_!' I  :! riI! , t!f I  !! -!,

m N

O I

T EC LE BP A. S IN s .l II e i A Y VR

_ AO F

g g g g g F d d d d d

- OT l l l i l N B B B R B NE OM r r r r r IP TI o" o" o" o" o" t6 t6 t1t6 t1

.. AU c' c c'c c' CQ a5 a '5 a 6 a '3 a6 DE I R4 e7 e7 R4 e2 e0 R5R5 e2 R5

- R n n n

- O w w w TF o o o N d d d ED ME PR h t

u t

h u r e

t u

h' r

e i I S S h S h .

uU t t QQ t t i t i

_ EI : lo o e lo e R I 1 N I N M d I e I t V

a N l

_ i t

I e O t I

_. N i

t Tl t O ys AE I

t i.

Cf 4 l 6 0 1 5

.- T e1 I M l 0 2 6 l -

A I f FU 0 6 5 5 t

C at I N 4 P

_. I e Sn C 3 C

4 C

4 C C 1 3 C

O P l e E 5 9 9 3 7

_  !. b rm ap P

S 4 5 5 6 l

_  ! a 1 1 1 1 I A T ei _

U l u Q cq / -

uE q P f 1 T

C I

M N

r DE Ni t

l l iT t

n I P

5 3

5 5

l I 4 ll E

l i

AM T / / / 3 S

__. S e m U II e t t C I

E m RN OS l v n n 7 O - - a- u u l S i Z DL c3 dS o o I NE iA sS m n /0 ED tA k0 e e o4 VO a- r4 s s cP M tN a1 lo o y5 SS Dt f f R P8 R t O h h . n T c c r s

s e

TN t t t n NE i i m e e EN w w r l S S X P  :

MO I PP s s . .. .

I M s s p fr p UO e e m ft n QC r r e i m e E P P T DX T .

$ r.

M oe

_ E tr

_ T ci S ac 'I Y ee S Ri t S

TR RE _

AB A D O PM RN E

TT U 8 1

0 l

f 8

1 0

N 3

2 0

2 f

4 2

0 N

5 3

O N

SS - - - - -

3 3 3 3 3 AI 3 3 3 3 3 ML D )

! D D D I. .! !

- . . _ . - ._. . _ _ _ _ . . . _ _ . . . _ . . _ _ _ _ _ _ . - . _ _ _ _ _ _ _ _ _ _ __.__m . _ . - _ . _ . . _ _ . _ _ _ _ _ _ . _ _ . _ . _ _ . _ . . . . - . _ . -

! r 1

(

t t

l 1 s

] I I i i

4

! / i i SEISMIC OUAI,IFICATION REVIEW  ;

! Table 1 I .

4 Zimmer duelear Safety Related l Equipment List

] ,

l j

  • 4 1 2 3 i
MASTER PARTS OUI N NT OR W.NMR AND S EC UICATION QUI N NT W ATION & MAINE 5 FOR INSPECTION I LIST NUMBER SYSTEM COMPONENT MODEL NUM!!ER NttMitER RI:OllIRED FOR EQUIPMENT I i i Cll-0001 CRD llYD itydraulic 761E500G1 761E500G1 Ifot Shutdown Reactor Yes I Control Control Unit Bldg. 554'2" Cll-F009 Solenoid Automatic 21A9317 Reactor j valve switch company Bldg. 554'2"
832322

i I

! Cll-F010 Scram Discharge Itammel-Dahl/ 21A0657 j l Vol. Vent Valve SN 71/2006/

! 001-009 [

Cll-F0ll Scram Discharge llammel-Dahl/ 21A1747  ;

l

- Vol. Drain SN 71/2006/ I l Valve 001-025

! Cil-F012 Pressure Relief Crosby /3/4XI .!1A1749

Valve JMAK Spec. H. j i i j Cll-N013 p Level Switch Magnetrol/ 159C4361 1 r

' l'  ;

5.0-751 i

. i l t

,' Sit E P'I' OF t

t

_ . . , . , . . _ . . . _ . . _ , . . _ . . _ - _ . . - , . . , , .,.m. , _ , , , , . . . , , , , _ _ _ . _ _ . - . _ . -

/ \ /' N I t t

,'\__/ 'q,,/ Ad SI:ISMIC OtlA!.I t'! CATION HIN T IM Table 1 Zimmer Nuclear Safety Related Is tu i g > men t 1.i s t MASTER PARTS EQUIPMENT OR VENDOR AND SPECIFICATION

  • EQUIPMENT LOCATION OF AVAILABLE 5 FOR INSPECTION LIST NUMBER SYSTEM COMPONENT MODEL NtIMill:I4 NUM14ER I41: QUI RI:D FOR EQUIPMENT C34-N008 Feedwater Press Xmtr. Dailey/556 163Cll86 Neither Reactor Yes control Bldg. 546'0" C34-N017 Diff. Press Statham (Cnuld) 13309404 Peactor Xntr. ,4'D2 0 0 0- 0 4 0 0 Bldg. 546'0" C34-N003 Diff. Press Rosemo mt/ 163Cll82 Reactor Xmtr. 1151 Bldg. 503'6" C34-N004 Diff. Press Bailey /555 161C1183 Peactor Xntr. Bldg. 546'0" 1

C34-N005 Press XMTR Pailey/556 163C1186 Ecactor

D1dq. 546'0" Sill:1.T OF

__ __ - _ . _ . _ . - _ _ _ _ _ _ _ . . _ _ - -- . . . . . . . . - _. _ - . . - . . - . . . . - - . _ ~ _ . _ - - , - - - _ - - - . _ _

O O  :

I i

I

' i SETSMIC QUAI.IFICATION RINIEW Table 1  !

Zimmer Nuclear Safety Related Equipment I.ist MASTER PARTS EQUIPMENT OR VENDOR AND SPECIFICATION EQUIPMENT LOCATION OF AVAILABLE i LIST NUMBER SYSTEM COMPONENT MODEL NUMitt:lt NUMI1 Eft REQUIItED FOR JOUIPMENT FOR INSPECTION I C41-A001 SLCS SLC Storage GE 22A40llAC I!ot shutdown Reactor Yes l Tank nldg. 570'6" i

C41-C001 SLC Pump Union Pump Co., 2tA9342AK I 2X3 TD-60 i C41-C004 SLC Explosive CONAX/ 21A9370 Valve 1832-159-01 C41-N003 Temp. Switch PENWAL/ 157C4629 ,

l 22810

.'41 -N 0 0 4 Diff. Press Bailey /556 163Cll86 i Xntr. I C41-N006 Temp Element FENWAL/ 158B707?PM 158n7072P7 (Thermowe1I Only)

' I C41-R003 'I Press. Ind. Robertshaw /7130 163CllB4 1

[

SilEET OF ,

t I =

i t

i i

. . __ . . _ _ ~_. __., _ . . . , - . . . _ _ _ . _ . . - ,_

(~\ ,/ ,r y g )i r.

+

\ ,I 1 e L/

SI:ISMIC OUAbti'! CATION RFVIEW Tatile 1 Zimmer Nuclear Safet y Related I'q u i g een t List MASTER PARTS EQtflPMINT OR VI:NDOR AND S PECII'! CATI ON I,QUIPMENT IDCATION OF AVAILABLE COMPON!:NT MODEt, NtIMiti:P Nt!MiiER Pt:Utfl Pl.D FOR EQUIPMENT FOR INSPECTION LIST NUMIIER SYSTf:M C51-J004 NMS Shear Valve GE/HH6D391 8 H f> D 391 I:o t Shutdown Peactor yes Illas. 52 5 '-7" C51-J004 Solenoid Ball CE/ll2C2391 112C2391 Peactor Valve Bldq. 525'-7" C51-K002 Voltage Preanp GE/163Cl263 163Cl2ri Reactor nido. 530'-1" 1r C"il *:002 V TFM Detector GE/ll2C3144 Il2C3144 y Peactor Vessel

!;111:17 __ OF ___

4 O O 1 l

1-1 1

i i

i .l j

SEISMIC QtlAl.IPICATION RINi tM -

f l '

T.ible 1 Zimmer Nisclear Safety Related 1:quipment I.ist  ;

I MASTER PARTS 5 EWIMENT OR WNWR AND M CIFICATION @ lPMM WAN Oh MAMB LIST NUMf4ER . SYST!!M COMPONENT MODE!. Nt! miter NtiMilER Rt:QtlIRED FOR JQtilPMENT FOR INSPECTION

! C71-N002 RPS Press Switch Static-O-Rinq 145C3012 Hot Shutdown Reactor Yes 12N-AA4-TT Illdg . 546 '-0" 1

C71-N003 Ita rksda le/ 164C5359 Ilot Shutdown Turbine Bldg.

, IIIT-M12SS C71-N004 o o Ilarton/288 15Rh1054 Neither Reactor Bldg. ir 546*-0" l

I e

Siit:I:T or

, , ,- , , , , , . , - , , , - - - - , , . . . , , , - _ , , . - , - - - . . , - , , , , , . , , , , - - ,, ,, . . . , , . , - - . - - - , , , - ,--- . - - ----,- ~. .,.. ,- ,._,.

)

v v v SEISMIC Of f AI,1PICAT10f4 RINT EW T_a til o 1 Zimmer Nuclear Safety Related D i uipment List MASTER PARTS EQUIPMF:NT OR VI:NDOR AND SPECirtCATION EOUTPMENT IDCATION OF AVAILABLE 5

LIST NUMIiER SYSTEM COMPONENT MODI;L NUMill:R Nt!Mi4ER REQUIRED FOR EQUIPMENT FOR INSPECTION D13-N003 Process Gamma Detector CE/237X731 237X731 liot Shutdown Steam Tunnel Yes Rad /RI'M D13-N009 Sens. & Conv. GE/194X927 194X927 Reactor Bldg.

Vent.

D13-N019 Sens, & Conv. GE/194X927 194X927 Reactor Bldg.

\/ 1 Vent.

Siir.VT Ol'

O O-SI ISMIC OllAI.IPICATION RIN!!N Table 1 Zimmer Nuclear Safety Related Dguipment f.i s t MASTER PARTS E0llIPMENT OR VI:NDOR AND SPECIPICATION EQtilPMENT IDCATION OF AVAILABLE

$ FOR INSPECTION 1.IST NUM11ER SYST!:M COMPONINT MODf:I. Nt! Mill lt NUMill:R lil:UtilHED POR _ EQUIPMENT E12-n001 RI R RilR llt. Exchgr. Delta Southern / 21A9227AR noth 513'-4" Yes NA Reactor Bldg.

E12-C002 HitR Pump / Motor Ingersol-Rand / 21A9243CT Reactor Bldg.

i' 475'6" 2 7- AI'K D 21 A')222CP E12-N004 Temp. Element PYCO/ l l7C 34 R 5 Neither Reactor Bldg.

117C3485P22 E12-N005 Thermocouple PYCO/ 117C3485 Peactor Ridg.

Il7C34RSP22 E12-N00R IcVel Xf1TR Darton 152/368 145C3156 S' E12-N009 DP Ind. Switch Barton 268 145C3009 Itot ThutrN N[

f:12-N010 DP Switch tiarton 289 145C300R Reactor Bldg.

475'6" E12-N013 DP XMTR Bailey 555 163CllR3 Noither Reactor nldg.

E12-N015 DP XMTR nailey 555 163CllR3 Neither Reactor Bldg.

E12-N016 3r Press. Switch S ta t i c ft i net / 145C3011 Ilot rhutdwn 475'6"h hf SN-AA3-SITT Slit:ET Ol'

- . . . . _ . _. _ _ _ . _ . m. . _ _ . . _. _ .. .

_ .._..m . _. <.m ... ._ -

o O O t i

k e-

'I

  • I i

1 I l

)

4 I (

SEISMIC OtJALIFICATION REVIPW I J

i .

i Table 1 i

Zimmer Nuclear Safety Related ,

j Dguipment I,ist 3

4 MASTER PARTS EQUIPMENT OR VENDOR AND SPECIPICATION ~ EQtlIPMENT LOCATION OF AVAILABLE LIST NUMBER SYST!:M COMPONENT MODEL NUM!ti:R Ntl miter RIOUIRED POR EQUIPMENT FOR INSPECTION l P 1 '

E12-N018 RifR Press. Switch Robert shaw 163Cll85 Neither Reactor Bldg. Yes

  • SP-222-C

! C12-N019 Press. Switch Static-0-Rinq/ 145C3011 flot Shutdown Reactor Bldg.

l SN-AA3-SITT 475'6" I

f C12-N022 Press. Switch Robert shaw 163Cll85 Neither Reactor Bldg.

i SP-222-C 475'6" 1

1 E12-N027 Temp. Element PYCO/ 11763485 Reactor Bldg.

Il7C3485P22

C12-N028 Press. XMTR nailey 556 163Cll86. Reactor Bldg. I i

- 475'6"

) E12-N029 DP Switch Barton 288 145C3009 Reactor Bldg.

475'6" 1 ,012-M031 Thermocouple PYCO/ 17C3485 Reactor Bldg.

, 117C3485P22

] E12-NO32 Press. Switch Barksdale/ 164C5359 Reactor Bldg. ,

DIT-M12SS 4?S'6" l I

C12-NO33 Press. Switch narksdale/ 164C5359 Reactor Bldg.

j DIT-M12SS 475'6" j E12-R002 gr Press. Ind. Pol >c r t shaw 163CllR4 3r Reactor Bldq.

, 711B 3;ig;g;7 gg. 475'6" $ f 3

i i

4

- . - . - - - . - - - . - _ _ ~ .

. _ - _ . - -. - . - _. - . .;.~..._ . - . . _ _ . . ~ - .- - . - - - -._.- -._

O O i

F

[

t I

l L

SEISMIC QUAI.lP! CATION RIA'llM L

Ta b l e _ _1 j Zimmer Nuclear Safety Related  ;

t I;t[uipment. List

-i I WATIONOM AMINE MASTER PARTS S EQUIPMEM OR WNMR AND SPECI M CATION EQUIIMr.W LIST NUMBER SYSTEM COMPONENT MODEL NUMill:H NtIM:tEft RI:OUlHl;D FOR EQUIPMENT FOR INSPECTION 021-C001 LPCS LPCS Pump / Motor Inqersol-Rand 21A9243CS Hot Shutdown Reactor Bld 9* YES 27-APKD-5 21A9222CT 475'6" .

E21-N0nl Press. Switch Barksdale/ 159C4606P002 Ilot Shutdown Reactor Bldg.

Pill-M340SS-V ,

r21-N003 DP XMTR Bailey 555 163Cil83P001 Neither Reactor Dldg. t 475'6" E21-N004 DP Switch parton 289 145C3008 Poll Ilot Shutdown j E21-N005 ~ Press. Switch Robertshaw / 163ClIB5P003 Neither SP-222-C C21-N006 DP Switch narton 288 14563009P012 Ilot Shutdown E21-N009 Press. Switch Darksdale/ 159C4606P002 Ilot Shutdown Pill-M34 0SS-V I:21-R001 163CllR4P002 Neither Press. Ind. Robertshaw /

713n E21-P002. V Press. Ind. Robertshaw / 163Cll84P002 Neither 3 ,

713n 3r.  ;

6 SllEIT (T y

._ _ . _ - . _ . . _ _ _ . _ _ . . . _ . - _ . - - _ . - . ~ . - - _ . - _ _ _ . . . _ . - - . . _ . . _. _ . _ _ . . _ . _ _ . - . _ _ _ . . . _ . . _ - _ . _ . _

O ' O i i 1

7  !

1 1

a 4

SEISMIC OtfA!.IFICATION REVIEW 2

4 Table 1 i

1 Zimmer Nuclear Safety Related Equigeent I.ist t

MASTER PARTS EQUIPMENT OR VENDOR AND SPECIFICATION EQuiPMF.NT IDCATION OF AVAIIABLE

} 5 FOR INSPECTION j LIST NUP3ER SYSTEM COMPONENT MODEL NUMiti:R NtiMBER RE:Qtit RED FOR EQUIPMENT i I llot Shutdown Reactor Bldg.

1 E22-C001 IIPCS IIPCS Pump / Motor Ingersol-Rand 21A9243CR YES .

1 21A9222CX 475*6" i i

E22-r001 IIPCS Suction Anchor-Da rl i ng/ 2]A1739 Ilot Shutdown Reactor Bldg. j i Valve From CST 94-13266 21A1941 l i j E22-r004 IIPCS Injection Anchor-Darliteq/ 21A1942 liot shutdown j Valve 94-13330 21A1740 E22-r010 IIPCS Test Return Anchor-Darling / 21A1939 Neither f Valve to CST 1750-3  !

1 E22-r011 IIPCS Test Return Anchor-Darlinq/ 21A1939

)

, Valve to CST 1750-3 3

(

l j E22-F012 IIPCS Bypass Olve Anchor-Darling / 21A1931 se i to Suppression 94-13329 j Pool E22-r015 , ,f IIPCS Suction Anchor-Darlinq/ 21A1941 Both , 3r Valve from 94-! 3M4 21At739 i i Suppression Pool 21AR657  ;

SNr.rr OF i

1 1- . , - .:-,-,- -- - m -,- - _ _ _ ., _ y _, , _ , , ,

-. _ _ . - . . .- -- - .. .- - . . . - . . . .. .~ --. .- - . .

f l' i i

4

?

1 1

i SI-:ISMIC etfALIFICATIOf3 REVIFW t

1 f Table 1 Zimmer Nuclear Safety Related I requipment I.ist I

i MASTER PARTS EQUIPMENT OR VENDOR AND SPECIFICATION EQUIPMENT LOCATION OF AVAILABLE 5 NUMilER FOR INSPECTION i LIST NUMBER SYSTEM COMPONENT MODEL NUMitER _RI[Qt!! RED FOR EQUIPMENT _

i

. E22-F023 HPCS ItPCS Test Return Anchor Darling / 21AR657 Neither Reactor Bldg. YES 2 Valve to 15-1751-3

Suppression Pool E22-N001 Level Switch Magnetrol/ 159C4294 noth Reactor Bldg.

3.5-751-IX-j MPG-M14HY 4 E22-N002 Level Switch Maonetrol/ -159C4294 Both Reactor aldg.

l 3.5-751-lX- -

1 MPG-M14ftY  !

E22-t:00 3 Press. Switch Pobert.shaw 163Cll85 Neither Reactor Bldg.

i SP-222-C 475'6" E22-N004 Press. XMTR Dailey 556 163Cll86 E22-N005 DP XMTR nailey 555 163Cll83 E22-N006 DP Switch parton 289 145C300R E22-t1009 DP Ind. Switch Darton 2RR 145C3009

, E22-N012 y Press. Switch Itarksdale/ 159C4606 3,f 3g P ilt-M 3 4 0SS-V  %/

Sill:ET OP ,

i i

2 .

i i t.

J

4 2

SEISMIC Ot!AI.IFICATIOf3 RINI t'W Tablo I Zimmer Nuclear Safety Relatest I:iq u i pmen t. I.i n t MASTER PARTS I:Ot!!!'Mt:NT OR VENIOR AND Sl'l:CI F I CATION I;Ollll' MENT IDCATION OF AVAILf lit.E

$ Mt)DI:1. Nt Miti:R Nt! Mitt:R Hl:UtII RI:D t'OR l'OllI PMENT l'O R INSP!:CTION 1,IST NtlMilElt SYSTEM COMI'ONI:NT I:22-M013 ItPCS Press. Switch itarton 2RR 145C1009 Neither Reactor Illdg. YES 475'6" E22-9001 Press. I ncl . Robert shaw/ 161CllH4 71311 l

E22-9002 y Press. In<l. Itobert shaw 163CllR4 se sj sr i

713It i

4 siirrr Or

O O 1

4 3

M SMIC OtlALIFICATIOf3 REVIFW i

^

Table 1 Zimmer Nuclear Safety Related inpailment List MASTER PARTS , EOt!!PMENT OR VI:HDOlt AND SPECIP! CATION EQtlIPMENT IDCATION OP AVAILABLE

' LIST NUMHER SYSTEM, COMPONE:NT MODI:1, NUMiti:R NUMitER RI:UUliti:D FOR EQtIIPMENT FOR INSPECTION

+

E31-N001 LDS Thermocouple PYCO/ 145C3224P001 Ilot Shutdown Reactor Ridq. YES 145C3224P1 E31-N00.; Thermocouple PYCO/ 145C3224P001 145C3224P1 E31-N003 Thermocouple PYCO/ i45C3224P001 145C3224P1 E31-N004 Thermocouple PYCO/ 145C3224P001 145C3221P1

! E31-N005 Thermocouple PYCO/ 145C3224P001 14563224P1 E31-N006 Thermocouple PYCO/ 14563224P001 )(

145C3224P1 E31-N007 DP Switch narton 288 145C3009P012 Reactor Bldg.

475'-6" a

E31-N008 DP Switch liarton 2RR 145C3009P012 %f Reactor Bldg. ,

503'-6" Danper Republic 163C1054P001 Neither Reactor Bldg.

E31-N009 s,/ DP Switch Darton 2RR 145C3009P012 flot Shutdown Reactor Bldg. %r SilE9"r 503'-6" OF ,_

. _ _ __ _ _ _ _ . . _ . - . __.~ . . . _ - , _ _ _ _ _ . _ _- . _ _- . 1__-._

o O o l

i i

l l

SETSMIC OHAEIPICATION REVIEW Table 1 I

j Zimmer Nuclear Safety Related j l>Iuipment List 4 MASTER PARTS EQUIPMENT OR VENDOR AND SPECIFICATION EQUIPMENT IACATION OF AVAILABLE LIST NUMilER SYSTEM' COMPONENT MODEL NUMilER NtiMilER REOt!! RED FOR EQUIPMENT FOR INSPECTION E31-N010 LDS DP Switch Barton 288 145C1009 Ilot Shutdown Reactor Bldg. YES 503'-6" Damper Republic 163C1054 Neither Reactor Bldg.

i E31-N011 DP Switch Barton 288 145C3009 Ilot Shutdown Ronctor Bldy. 503'4" i

Damper Republic 163C1054 Neither Reactor Bldg.

, E31-N012 DP Switch Barton 288 145C63009 Ilot Shutdown Reactor Bldg. ,

475'-6" E31-N013 DP Switch Darton 288 145C3009 E31-N015 Plow XMTR Dailey 555 163C11813 Reactor Bldg.

546'-0*

4 C31-N018 Thermocouple PYCO/ 14563224 i 145C3224P1 l

E31-N022 Press. Switch Barksdale/ 15464606 Reactor Bldg.

P III-M8 5 SS-V 475'-6" E31-N024 Thermocouple PVCO/ 145C3224 145C3224P1 i i

j C31-N025 3, Thermncouple PYCO/ 145C3224 s/ 3r 3r 145C3224P1 SIII;IT or 1

,- -- - , .. , ,= -. . . , . - -

. - - . . - -- . _..~- - -.....- _ .-. ....... - ..-.. ~ - - - - - - - _ -..~ - - u ~ ~.

l .

l O ;

I i

l.

i l 1

i 4

i

j. SE1SMIC OtlALIFICATIOli REVltM  !

t I

Talile 1 4 i

j. Zimmer Nurlear Safety Related '
Dluipment List i

MASTER PARTS EOllIPMENT OH VI;NDOR ANI) SPECIFICATION EQtilPMENT LOCATION OF AVAILABLE LIST NUMiiER SYST!:M COMPONI:NT MODEL NtiMitEft NtlMilER i<t:UtlIRI:D IMR EQtlIPMENT FOR INSPECTION 1

E31-N026 LDS Thermocouple PVCO/ 145C3224 Ilot Shutdown Reactor 81dg. YES  !

145C3224P1 l j E31-N027 Thermocouple PYCO/ 145C3224 l j 145C3224P1 1 i j E31-N028 Thermocouple PVCO/ 145C3224 [

t 145C3224P1  ;

i E31-N029 Thermocouple PYCO/ 145C3224 i 145C3224P1 j

., i.i j E31-NO30 Thermocouple PYCO/ 145C3224 1 145C3224P1

'i I f: 31-NO 31 Thermocouple PYCO/ 14%C3224 I45C3224P1 ' #

}

r E 31-N O 35 Plow Mntr. Dailey 555 16361183 . Reactor Bldg. t 546*-0" t E31-NO36 y rinw n,tr. Fulley 555 163611R3 ,r [

v  ;

4 j .

r j Sill:1 71* (IF i

i i i  !

I t i t

O s O .

i SI:ISMIC OUAbil'ICATION RINI EW T.s til e 1

?.immer Nuclear Safety Related IOitt i pmen t 1.ist MASTER PR' -

$ EQUIPMI:NT OR VENIK)R AND SPECIFICATION EOUIPMENT LOCATION OF AVAILABLE LIST NUMbt'k SYSTEM COMPONENT MOIM:L NUMlll:R NUMiiER RI:Qti! RED FOR EQUIPMENT FOR INSPECTION E32-D001 4. IV LCS McIV-LCS GE/21A3581 22A4631 Neither Reactor Bldg. Yes-ticater Steam Tunnel '

t 510'4" E32-C001 MSTV-LCS GE/21A3762 21A3762 Reactor Bldg.

E32-Com? nlower 510'5" E 3 2-U')0 6 Plow Meter Schutte & 169C8338 Reactor Bldg. t Koertinq/

20-9651-8550 E32-N050 Press. Xmtr. Posemount/fl51 163C1564 Reactor Bldg.

546'0" .

E32-N051 Press. Entr. Rosemount/1151 163C1564 Reactor Bldg.

503'6" E32-N053 Flow Xmtr. -Schutte & 169C8339 Reactor Bldg.

Foerting/ 503'6" 91X-16-4-20 E32-N054 gp n ress. Xntr. Rosemount/Il51 IGC1564 Reactor D1dg. qr 3r

-503'6" i

i silt:Irr OP . .

k l

-..-.~..--..---_-.....-_n.~ . - - . - - .

l-

.it a

1 i

+

l h 1 ,

1 i j i I i I

! f 1

  • I

! t i, ,

l SEISMIC QUAL.IPICATION REVIEW  ;

h l Table 1  !

l Zimmer Nuclear Safety I} elated j Diuipment Iist i

MASTER PARTS EQUIPMENT OR VENDOR AND SPECIPICATION EQU1PMENT IDCATION OF AVAIIABLE .

LIST NUMilER SYSTEM COMPONENT MODEl, NUMill:R NUMHElt REQtlIRED POR __EQUtPMENT FOR INSPECTION 032-N055 ttS IV-I,CS Press. Xntr. Rosenount/1151 163C1564 Neither Reactor Bldg. Yes l 503'6" E32-N056 Press. Xmtr. Rosenount/1151 Reactor Bldg. i 503'6" i

f E32-N058 Press. Xmtr. Rosenount/1151 Reactor Bldg. i

! 546'0" l i

E32-N059 Press. Xntr. Posemount/1151 Reactor Bldt 503'6"  !

5 l I E32-N060 Press. Xmtr. Rosemount/1151 Reactor-Bldg.

546'0" -

I

! E32-no61 Press. xntr. Rosenountn 151 C neactor Blag.

l 503'6" t' Y

t i

i Sill;ET OP l

! l

- . . - - - _ - . - - .. - . - - - - . _- - - , , _~ - . .

d l O Ov k

1 i

i I

J i

l l

l SETSMIC OUALIFICATION REVIEW T_able 1 Zimmer Nuclear Safety Related

{

. 1-:qu i pmen t I,i s t MASTER PARTS EQUIPMENT OR VENDOR AND SPECIPICATION EQUIPMENT LOCATION OF AVAILABLE

$ MODEL NUMill:R NUMIIER RI:OtIIRED POR EQUIPMENT POR INSPECTION LIST NUMBER SYSTEM COMPONENT 1

E51-C001 RCIC RCIC Pump Dingham/4X6X9CP 21A9243nL llo t Shutdown Reactor Bldg. Yes i 475'6" 1

l j E51-C002 RCIC Turbine Terry /GS-2 21A9201 4

j E51-t!002 AP Switch narton/289 '145C3008 E51-N003 Plow Xmtr. Rosemount/1151 163C1561 l' j

l E51-N004 Press Xmtr. Bailey /556 163Cll86 Neither E51-N005 Press Xmtr. Bailey /556 163Cll86 Neither

E51-N006 Press Switch Static-O-Ring / 145C3011 llot Shutdown 4 6N-AA21-VSITT f E51-t1007 Press Xmtr. nailey/556 163Cll86 Neither i

E51-N008 Press Xntr. Dailey/556 163c1186 Neither

E51-N009 Press Switch Darksdale/ 145C3046 Ilot Shutdown ir j D211-MnOSS E51-N010 <f Level Switch .Magnetrol/ 159C4361 Neither Reactor D1dg. IP 5.0-751 i

Sill:l:T or 6

+ ,_

>.!< i !!',Eriblfift:i(f;I  !  !,L ;i!!i4

!f b ' " ;I' i!i t I.;

N O -

I O T

. EC LE BP AS s e

p LN q II Y A

._ VR AO

_ F

_ g

. F d OT l

_ N B NE OM r ,

I P o" ,

TI t6

_ AU c CQ a '5 e7

_. D E_

I R4

_ R n O w

_ TF o

_ N d

. ED t ME u r PR . h e P

. t l s h '

ii t t t

, OQ t i

_. _ o e EE_ R f I N W d E e

. I t V

a N l

RI e O

._ R I N t TR

._ O ys A l.

Ci_ l 6 6 4 I

t i. 4 8

. T eI I M Ft i 4 0 0 1 A I f I N 3 h 1 r r C at C C C O C

i

._ I e Sn F l e E 5 5 3 -

b rm P 4 4 6 I.

I a ap S 1 1 1 A T ei

_ l t l u

_. O clO T uI E C N R E

_ I D :l / i

_ M r Ni l

/ / w i S

S e AM eS eS a I m U l S lS h

._ E m RN aO a0 s ,

S i O dR d8 t i Z D!, sM sM r

D t

I k - kr1 1- eD

_. I rt b3

_ VO a2l a2 o1 M DD DD R7 R h h

_ O T

c t t c . . . .

TN i i d d d d NE w w n n nI n EN S S I I I MO s s s s s s

_ PP I M s s s s s s UO e e e e e e QC r r r r r r E P P P P P P 5

M E

T C S I r Y C 1 S B S

TR RE AB 2 3 4 PM 2 1 1 O U 1 2 0 0 0 0 RN 0 0 0 0 0 0 -

E N N R R R R TT - - - - - -

SS 1 1 1 1 1 1 AI 5 5 5 5 5 5 ML E E E E E E l!$ I; 5 4 l i- 4 .' kl:1 i IIIiiIIiii  :-

t O OL

.I q

~

.i

'l c

SEISMIC UtfALIFICATION REVII:M t

Table 1

.t

'i Zimmer Nurlear Safety..Related I>luipment List

. MASTER PARTS ,

EQUIPMENT OR VI:NDOR AND SPECIP1 CATION EQUIPMENT . LOCATION OP AVAILABLE LIST NUMI!ER SYSTEM' COMPONENT MOI)EL NtiMitER NUMBER REQUIRED FOR ' EQUIPMENT FOR INSPECTION ~  ;

i Fil-E001 Puel Fuel Prep Ceneral 23A2551 Neither Reartor Bldg. Yes Servicing Machine Electric / 627'9" 729E716 Fil-C0ll ruel Gen. Purpose General 148P478 , tlei ther ' Reactor Bldg. Yes Servicinq Grapple Electric .r

-f

.I >

  • h

..t t

'i i

-{

f l.

l1 ' Sill:ET _ OP I

{

(- ,

i t

A

, . - . - . - - - . , -- .- ~ .- -- . -- . ;_ . .. . - - - , , . . .___..,i

. _ . . . ~ _ _ . . - . . - , . _ ,

O ;O i l- i 1

[

I i

f SEISMIC QUALIFICATION REVIEW 5

[

I I

Table 1 i 1

' Zimmer Nuclear Safety Related  ;

Equipment List' l

4 1 2- 3 MASTER PARTS EQUIPMENT OR . VENDOR'AND SPECIFICATION EQUIPMENT IDCATION OF AVAILABLE l' LIST NUMBER SYSTEM COMPONENT MODEL NUMHER NUMBER REQtf! RED FOR EQUIPMENT FOR INSPECTION  ;

l

l I l 1- F13-E008 RPV Dryer / General 762n984 Neither Reactor Bldg. Yes j

( Service Separator Electric ,

! . Tools Sling 762E984 ,l i '

r13-E009 RPV RPV Itcad General 762E985 Meither . Reactor Bldg. Yes Service Strongback Electric / ,

Tools 762E985  ;

1 I

t 1

-l I l 1 -}

l-l i

. j; i 'f I -

-I

! Sill;l:T - OF I

I  !

i i i i

I

~. - . - _- - - . _ . .- - - -- . _ . . _- - ._. _ _ _ _ - -- _ -

- - . _ . _ _ _ _ . -- _.. _ . _ _ _ . - _ . - . - . . _ . - . _ . . _ . .__m_ _.__.____m._-.

e e e ]

4

, 5 l

t l

l r t t i

i l 'i SEISMIC OUALIFICATION REVIEW- i

,i l Table 1

-}

l Zimmer Nuclear Safety Related 'i tituipment List  ;

l MASTER PARTS EQUIPMENT OR ' VENDOR AND SPECIFICATION EQUIPMENT LOCATION OF ' AVAILABLE

$ NUMitER FOR INSPECTION LIST NUMBER SYSTEM COMPONENT MODEL NUMitER REQUIRED FOR EQUIPMENT 1 6

I '

F14-E002 ' Reactor Control Rod General 767ES93 Neither~ Reactor Bldg. Yes.

l Servicing Grapple Electric /

Equipment 767E593 3 I

'I I  :

b

+

i s

l SiiEET Or  ;

l  ;

{.

1  :

. _ - - . _ _ . = - - . .

. . - . - . ._ .__ .- _ .._._..~___. _ . _ ... ~__

l e* r L

O O

  • 1 i l  !

f t

i 1

I f l . t SEISMIC QUALIFICATIOt1 RI: VIEW i  !

l i.

, Ta. ble 1 i

I Zimmer Nuclear Safety Related Inquipment List i

IDCATION OF 2 4

MASTER PARTS r EQUIPMENT OR VI:NDOR AND SPECIFICATION EQUIPMENT 1

AVAILABLE 3 LIST NUMRER SYSTEM, COMPONENT MODEL NUMitER NtfMitER HUOUIRED FOR EQUIPMENT FOR INSPECTION i i

i F15-0003 Refuel Refuel Plat- General 762E852 Neither Reactor Bldg. Yes 'I

! -Equip. forn Equip. Electric / 627'9" 762E892 i

I l

I' 1

i I

4

,i 1

I t

i I

i 1

j Sill-:ET OP 4

1. _ _ . . .. -- . - _ . _ _ _ , . . _ - - . . _. _ _ . . . _ . _ _ - . . . - . _ _ _ _ . . _ _ _ _ _ . _

.- .. . . . - - - - . . - . . - , . .. . . - - . . . - ~ . . . . . . . - -_ . .

4 I I i ,

i l I

5 1 i

!, I i

i f

I SEISMIC UUALIFICATION RI: VIEW j Table 1 i

i Zimmer Nuclear Safety Related

] I:quipment I.ist I

MASTER PARTS EQUIPMENT OR VPNDOR AND SPECIPICATION -EQUIPMENT LOCATION OF AVAILABLE 5 MODI:L NUMill:lt NUMilER POR INSPECTION i LIST NUMI1ER SYSTEM COMPONENT Fl:QUIRI-:D POR EQUIPMENT 1

! P16-E002 Storage Spent Puel CE/762E210 22A2553 Neither 596' Reactor Yes *

{ Storaqe Hack D1dg.

4 P16-E004 CR and Defec- CE/731E670 22A2554 589' Reactor tive fuel Bldg.

, Storage Rack i

P16-E006 In-Vessel Rack GE/729E269 729E269G104 Reactor Bldg. ,

P16-E007 New Fuci GE/729E943 386tlA625 Reactor Bldg.

i Storage. Rack i

l P16-E009 l' Defective Puel GE/ll72072 22A4325 3r 589 Reactor f j Storage Con- Bldg.

1, tainer 1

4 1

i SilE!;T OP l

i 4

. ---- , . , - - ~.. -, - . . , - -. -

O 1 O Sili SM_I C _Otl Abil'I CATI ON REVIEW Table 1 Zimmer Nuclear Safety Related I:quipment 1.i s t MASTER PARTS EQUIPMENT OR VENmR AND UPicCI N ATION ICQU I PMF:NT W ATION OF' AVAII.ABLE

$ FOR INSPECTION LIST NUMBER SYSTEM COMPONENT MODEl, NilMIWR NtiMitER Hl:OU T RI:D FOR EQUIPMENT G33-N021 I'UCU Thernocouple PYCO/ Il7C3485 Neither Reactor Bldg. Yes ll7C3485

SilEl"I' __ 01' __

i

. _ . . _ _ . . . . . . _ _ _ . . _.4 . . _ z_ . __-. _ . . . - , , . _ -

e

' ~

l.  ;
\ \

b, -

!. l 1 s 1

i '?

i

!' i 1

I 3

4 b L i  !

I -

a j SE T SMI C_Ot{A_I,I F I_ CATION ItiNiljW - t

! ~f 1 i i  !

l T.3hle 1 ,

) - -

I Zimmer Nuclear Safety Itelated r Equipment I.ist l

' 4 1 2 3 MASTER PARTS EQUH' MENT OR VENNR AND SI'EC M CAMON E00 HMNT WAMON & AW W1.E

} 5 t,IST NUMITER SYSTEM COMPONENT MODEI, NUMit!'R NUMitER RI:OtilRED FOR-  ; EQUIPMENT FOR INSPECTION l '

Auxiliary Bldg.

l Yes

II13-P601 ECCS lteactor Core GE/ 323 X 50 lTit . 22A2702fiC' ' P, nth Control Room .
Cooling Itench- .546'  !

i j lil3-P603 Reactor Reactor Contrc,1 GE/328X503TU >

$ Control Ilenchboard ['

l, II13-P608 NHS Power Range CE/ 32RX105TU llot Shutdown Neutron

) Monitoring j Cabinet ,

4 <

l fi13-P609 RPS Reactor GE/ 328X509Til

+

Protection I System A j _

. Vertical Boarel 1 Ill3-P611 RPS Reactor GE/ 323X512Til .

! Protection System H lil3-P612 Feedwater reedwater and GE/ 328 X512Tt '

Auxiliary Bldg.

and Re- Recircul:ition Auxiliary Equip. Rm. ,

circulation Instrument 521'0"

Panel

! . 'i I Auxiliary Bldg.

j til 3-P613 NSSS Process Nuclear Stt'am GR/ 32 RX513Tti o it instrumen- Supply Sliut- Control Room off process. 546'0" tation SilEET ~~ Ol' 4-instrument

{

< panel j

I

+

, - - - - - - - . - , , < a - , ,- + w , ..,+,,,-r -. -- --~-soes ,

_ _ = . _ . _ _ . - _ .

l .

r i

h V i

i i.

I .'

i 1

SIMSMIC OllALIFICATION REVIIM  !

i-  !

1

( I.3ble 1  ;

i -t i r Zimmter Nuclear Safety Related ikluipment I.ist MASTER PARTS EQUIPMENT OR VENDOR AND SPECIPICATION EQUIPMENT LOCATION OF AVAILABLE LIST NUMBER POR INSPECTION SYSTEM COMPONENT- MODEt, NUMill:H NUMiti-:R RI:Otll RED POR EQUIPMENT ,

l Ill3-P618 RilR Division II t;E/ 32RX51 GTri 22A2702itC noth Auxiliary Bldg. Yes. [

, Residual ' Auxillary. Equip. Rm.  !

Ileat. Recovery 521'0"-  !

Relay Vertical  :

j Itoa rd 4 - . .

j II13-P621 RCIC Reactor Core GE/ 328X521TU llot Shutdown i Isolation j Cooling Relay Vertical Itoard

lil3-P622  !!RS Inboard Isola- GE/ 32 RX522Til Ilot Shutdown i tion Valve Re-
lay vertical .;

11oa rd J

!!! 3-P62 3 Nns Outboard Isola- CE/ 32RX521Tt' flot Shutdown '

i tion Valve Re .  ;

lay Vertical' tioard 1 ,

( li13-P625 llPCS Iligh Pressure CC/ 32 R X 525TU p If t Shutdown q, i,

} Core Spray .

i l . Relay Vertical

{ Boa nt ,

4 k

j Sill:1:T _ _ OP i

3 .

1 I~ ... _ __ ,_ _ _ ,_ _ _ _ _ _ __ _ _ . _ . , _ _ _ - _ _- . . _ . _.. _

i i

t O .

A 1

1 -

i 4

SEISMIC OUAI,IFICATION REVIIM t

Table 1

]

l

Zimmer Nuclear Sa fety Related i Equipment List 1

MASTER PARTS 5 EQUIPMENT OR VEN N R AND SPECIFICATION EQUI N N W ATION Oh AVAII,ABI E LIST NUMBER SYSTEM COMPONENT MODEL NUMBER N UM_It E R REQUIRED FOR _ EQUIPMENT FOR INSPECTION 4

i

!!13-P628 ADS Automatic De- GE/12 R x52 RTti 22A2702nC Ilot Shutdown Auxiliary Dldg. Yes.

J pressurization Auxiliary Equipment System Channel Room 521'0" A Relay Verti- r

cal Pqard 1113-P 629 LPCS Division I Low GE/ 32 R X 529TU Ilot Shutdown

} Pressure Core

! Spray and RilR Relay Vertical Board

) til 3-P6 31 ADS Automatic De- GE/ 323 X53] TU Ilot Shutdown II j pressurization ,

1 System Channel j H Relay Verti-cal Board

! Ill3-P632 LDS Division I GE/ 323 X5 32Til Ilot Shutdown Auxiliary D'dg. I j Leak' Detection Control Room .

} Vertical Board 546'0" t

j Ill3-P635 Radiation Division I GE/ 32R x5 32 Tit 1 liot Shutdoun it- 1' Monitoring Radiation Moni-tor Instrument i Panet SIIEET Ol' _

t

! [

i

l el O s O i

i

?

l SEISMIC QUAI.IPICATION REVIFW i

i

} Table 1 f Zimmer Nuclear Safety Related Equipment List i

MASTER PARTS 5 EQUIPMENT OR VENDOR AND SPECIPICATION EQt)IPMENT LOCATION OF AVAILABLE LIST NUMBER SYSTEM COMI'ONENT MODEL NUMilER NllMilER RI:OllIRI:D FOR EQUIPMENT FOR INSPECTION 1113-"636 Padiation Divinion II CU/ 328X 53 3Tti 22A2702P.C lio t Shutdown Auxiliary Bldg. Ye8 i

Monitoring Radia tion Control Room tionitor 546'0" I

Inntrument Panel

!!!3-P642 LDS Division II GU/ 32 R X54 2TU liot Shutdown '

t 1

f.cak Detection Vertical Board til3-P654 MSIV Plain Steam CE/ 386X541TU Neither Auxiliary pidg.

l Leakage Isolation Auxiliary Equip-l Valve Leakage ment Room 521'0"

Control l Division II 2

Vertical Board I

i ill3-P655 MSIV tlain Stean ct;/ 380.X54 2TU ir Neither p q i Leakage Isolation

! Valve Leakage l Control l Division I Vertical Board l

1 Sill;I:T . _ OF 3

l 1 -

1

+

.l

i. ,, , __ _ __,m , _ . _ . . - - , - . . , . - -, _ . _ . _ - -- - _ _ , . . -

- _ . . _ , - l

. _ . - _ _ _ . _ _ . _ - - . _ _ _ _ _ _ _ . . _ . _ . . _ _ . _ _ _ . . _ _ _ _ _ _ _ . _ . . _ _ . . . _ . - . - - , - . - - - . . ~ _ _ . . . ___- _ _ m o o I t

il SETSMIC OHALIFI, CATION RIN I I-M Table I Zimmer Nuclear Safety Related -l Equipment List 4 1- LOCATION OF 2

AVAILABLE 3

MASTER PARTS EQUII' MENT OR VENIX)R AND SPECIFICATION EQUIPMENT 5

LIST NUMBER SYSTEM COMPONENT MODEL NUMilElt' NtiMitER f(fyllRED FOR EQUIPMENT FOR INSPECTION:

Ill3-PR65 PCS Division I GE/ 368X465Tti 22A2702flC Neither Auxiliary Illdg. Yes T49-PC65 Flarnability ' Auxiliary P. quip.

Control Verti- Room.521'0" cal noard i ill3-P866 FCS Division II GE/ 36RX46'>Tti 1' fJei t.he r . Auxiliary Intda. I' T49-P866 Plnrnabili y Auxiliary Equip. '

control Ikx>m 521 ' 0" Vertical P.oard -}

SitEl;T ol' i

I t_._.. . ... . . - . . - - - , - - . . , - _ _ _ . _ . - . . , . . . . _ _ _ . . . . . . . - - - - . . _ _ . - , . , _ - . . . . . _ . , _ . . _ - . _ - - . ~, . . , . - . _ . . , _ _ - - _ - - - _ _ _ .

___ __ - _.._. _ , _ . - . = _ , - _ . . . . ..- . - . . _ _ . . . _ . . .-._.. -

4 l  % \  %

s d

f I

i i

l I 4

~

}

SEISMIC QUAI,IFICATION REVIIM i

L 4

i Table !

Zimmer Nucle.ir Safety rielated f Dptipment I.ist 4

MASTER PARTS QUIPMENT OR WNWR AND MC WAM ON EQU MM WCAN ON AVA M B 5 FOR INSPECTION LIST NUMBER SYSTEM COMPONENT MODI:1. NUMill.:I_t NilMl.il:l.t

_R_I:O_tf f_ R_IM F FOR _EQUIPMCNT e .

{

ll22-P001 LPCS I.PCS Inst. Pane'. GE/36HX262Ttt 22A2702ftC Ilot Shutdown Reactor Building Yes l 475'6" i  :

l  !!22-P002 RWCU Reactor water CE/ 368 X26 3Tti Neither Reactor Building Cleanup Inst. 546'0" i

Panel l Il22-P004 PPU Reactor Vessel GE/ 368 X264 Til - flot Shutdown Reactor Building Level & Pressure 546'0" *

! Inst. Panel A 1

Il22-P005 RPS Reactor Vessel GE/368X265Tti llot Shutdown ' Reactor Building I

!.evel & Pressure 546'0" l Inst. Panel C i

it22-P006 Recire Recire Pump A GE/368X266Tti Neither Reactor Building

} Inst. Panel 503'6" I

l ft22-P009 Recire Jet Pump GE/ 368X267Til Neither . Reactor Building t i Inst. Panel 527'7" i B i i

-If22-P010 Recire Jet Pump GE/368X268Tt! flot Shutdown Reactor Building r i Inst. Panel 527'7" 3

i Sill:ET OF ,

4 1

+

_ . . _ . _.4. _ _ . _ _ _ . . _ . _ _ - _ . _ _ . _ _ . . _ . ..

O O i

-[

i l

4 i

SEISMIC OUAI.IFICATION REVIEW Table !

Zimmer Nuclear Safety Related Equipment List MASTER PARTS EQUIPMENT OR VENDOR AND SPECIPICATION EQUIPMENT IDCATION OF AVAILABLE LIST NUMilER SYSTEM _ COMPONENT MODE!. NUMiti:R NUMitER RI:QUIRf'D FOR _ EQUIPMENT FOR INSPECTION li22-P015 RPS Main Steam Gt;/368X270TU 22A2702nc Itot Shutdown Reactor liuilding Yes Flow Inst. 503'6" Panel A It22-P017 RCIC RCIC Inst. GE/368X272TU llot Shutdown Reactor Building Panel A 975'6" I!22-P018 EllR Division I GE/368X273TU Cold Shutdown Reactor Building RilR Inst. 475'6" Panel ll22- P 021 RilR Division II GE/368X274TU Cold Shutdown Reactor Building RilR Inst. 475'6" Panel ll22-P022 Recirc Recire Pump GE/368X235Tt! Neither Reactor Building it Inst. Panel 503'6" ll22-P024  !!PCS IIPCS Inst. GE/368X276TU Itot Shutdown Reactor Building Panel 475'6" -

Il22-P025 RPS Main Steam CE/368X277Til i'

.Ilot Shutdown Reactor 'lullding - i Flow Inst. 503'6" Panel C Sill:!:T ,_ OF

__ _ _ _ _ _ . . . . _ _ _ _ . - . _ _ . ~ _ - _ . . . . _ _ _ .._e - .___.-_m... _ _.- -m_- m._,__m . _ _ _ ___ . . _ _ , . . _ . . ____ . . .-

O r O I I i i f

! I i i

) -

9EISMIC OllAIIFICATION REVIIM t

. Table 1 - t I

Zimmer Nuclear Safety Related i i Ihjuipment I.i s t MASTER PARTS EQtlIPMENT OR VENDOlt AND SPI
CIPICATION -EQUIPMENT LOCATION OF AVAILABLE 1

I,IST NUMilElt SYSTEM COMlHNENT MODEL NilMit!-:R NtiMilER RI!OlllRI:D FOR EQtlIPMENT FOR INSPECTION '

+

I 1122-P026 RPS Reactor Vessel GE/368X278TV 22A2702P.C tiot Shutdown Reactor Bldg. Yes t level Pressure 546'0" Inst. Panel'D l t i 1122-P 027 RPS Peactor Vessel' GE/368X279TV Reactor Bldg.'

t.evel Pressure 546'0" l Inst. Panel D e

l 1122-P029 RCIC RCIC Inst. GE/368X280TV Reactor Bldg'.

t Panel n 478'6"

} .

il22-P030 Neutron IRM 1. SRM CE/328X530TV Reactor Bldg. .I Moni to rinri Preamplifier 530'1"

Cabinet l  !!22-P031 Neutron I Pft f. SRN GE/328X530TV Reactor Bldg.

ttonitori nit . Preanniifier 530'1"

$ Cabinet 1122-P 0 3 2 Meutron IRM GE/328X510TV 'I Reactor Bldg. -

  • lionitoring Preamp 11fier 530'1" 1'

]

Cabinet

~

1

' i Sit El"I' of" 4

i

. , ., - - - - p - . , - - , . - - - p ,y__ e r w'w- -

7-- gw - --tw -

--m FM=- + e- - we --

-. . . . . . . _ . _ - . ~, - . . . - - . _ . . . - . .. . - . . . . - - - - - . . . - - .. . . . . . . . - . . - - . - . .

s -

, 3 1

1 5 (

1

  • 4 4

1 i

l' i l

i

! i i

l S._E_I SM I C _Otl AI,I F I CAT I OfJ RI'VitN 1

I

{ T... ital e _1 Zimmer Nisclear Safety itelated Eqisipment 1.ist

  • MASTER PARTS g EQUIPMENT OR VENDOR AND SPECIFICATION EQUIPMENT LOCATION.OP AVAILABLE LIST NUMi1ER SYSTEM-- COMPONENT MODI:L NUMiti:R NtiMi4 E. R _RI:QU t itED l'OR

-EQUIPMENT FOR INSPECT.I.O. N ,

Il22-P033 Neutron IRM 8. SRf1 GE/328X530TV 22A7702inc Ilot Shutdown Reactor nldg. Tes y Monitoring Preamplifier 530'1" '

4 Cabinet j lt22-PO41 RPS Main Steam CE/368X361TV Reactor Bldg.

Plow Inst. 503'6"

! Panel D l It22-P07 3 Leak MSIV Leakage GE/386X334 Reactor Dldg.

Detection Control Local 503'6" Panel Div. T 1, il22-P074 Leak .

MSIV Leakage CE/386X335 IF 3 p Reactor Illdg. q, j Detection Control Local 503'6" i Panel Div. II i

t-

' 5-1 l SilEl:T Ol' i

l

- - . = _ . . .. .-. - . . - - - _.. _

O f

i 4

[

~i t

t t

SEISMIC OUAI,IPICATION ItEVIEW TaMr_1  ;

Zimmer Nuclear Safety Related I;<1u i pmen t I.ist MASTER PARTS 5 U MENT OR WNNR AND SITC WICATION WORMEN !KATIONOh AVAII.AF.E I LIST NUMBER SYSTEM COMPON!;NT MODE!, NUMill;R NUMHER REQti1 RED FOR EOtlIPMENT FOR INSPECTION T49-D001 FCS Plannability GE 22A3004 Neither Reactor Dldg. Yes Control Unit 593'6" T49-D001 Strip I! caters U.D. Driver 22A3084 ' Reactor Bldg.

Co./ Core Cool- 593'6" ing 29905 T49-D001 SCR Control CTI/ 22A3084 Reactor Bldg.

Cabinet 593'6" r T49-r002 Cate Valve llenry VOGT/ 22A3084 ReacMv" Bldg.

r004 Control Unit 1343315 593'# '

0005 T49-r002 tiotor (Valve Limitorque 22A3084 Reactor Bldg. ,

F004 Operator) Sit 000 593'6" t F005  :

T49-E001 Temp. Xmtr. Rosemount/ 163C1917 Reactor Bldg. , ,

control Unit 535E T49-N002 4 Press Xmtr. Rosemount/ 163C155P U Reactor Bldg. 1r ,

1151 SHEET OP l

- _ - _. _ _ , , . - , m. . .,v- , .mm ,- -- - ,# . 4

O O Sf0TSMIC OtlAI.IFICATIOri RI' VIEW Table 1 Zimmer Nuclear Safety Related Equi [> ment List MASTER PARTS E00H' MENT OR VEN NR AND SMCIFICATION EQUI N NT IKATIONOh AVAIIAB1.M LIST NUMBER SYSTEM COMPONENT MODEt,NtlMBER NUMBER ._ REQUIRED FOR EOt!! PMENT - FOR INSPECTION T49-N004 FCS Flow Ind. Barton/280 145C3009 Neither Reactor Bldg. Yes Switch T49-N005 Plow Ind. Barton/288 145C3009

  • Switch T49-N006 Plow Xmtr. Rosemount/1151 163C1561 T49-N007 V Plow Xmtr. Rosemount/1151 163C1561 u if 3r SHEET OF

l O

NOTES TO TABLE 2

1. Indicates the general standard used, i.e., IEEE 344-1975 or IEEE 344-1971, and any modifications, additions or exceptions.
2. If qualified by test, describes whether it was single or multi-frequency test or whether input was single or multi-axis. If qualified by analysis, describes whether static or dynamic, single or multi-axis analysis was used; provides natural frequencies of equipment. jl N

-H il

\s -

SHEET OF

l O O O 3

SEJSMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary

SPECIFICATION NUMBER
234A9901 EQUIPMENT / COMPONENT: MPL No. B21-D002-9

! Condensing Chamber 4

QUALIFICATION METIIOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date
a. SQRT Criteria Met: X Yes; No

! General-Electric Co. Report 234A9901. Sargent b. Reason for

Conclusion:

& Lundy Report EMD-022516 Actual bending moments from dynamic analysis within allow-
b. Qualification by: X Analysis: Test

$ c. Qualification Information  :

! Static Analysis - GE allowable moment calcula-i tions Dynamic Analysis - S&L applied moment

, calculations f c. Plans for Reevaluation /Requalifi-cation:

! The condensing chamber is qualified 4 to SQRT requirements pending results of instrument line' analysis using

! T-Quencher plus LOCA (CO) loads.

4 l

l i SilEET Of

)

?

i

-- Q '

SEISMIC OUALIFICATION REVIEW- t Table 2 ,

Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: 21A9247 EQUIPMENT / COMPONENT: B21-F013 Safety Relief Valve I

QUALIFICATION METIIOD:

j SQRT REVIEW RESULTS:

l a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No Wyle Labs 43445-2 GE Piping analysis 122A5686, thru 22A5690 b. Reason for

Conclusion:

Multi-Axis Multi-Frequency Testing j performed. TRS enveloped RRS '

Operability demonstrated during

b. Qualification by: X Analysis: X Test test.
c. Qualification.Information  :

Multi Frequency Multi Axis

Frequency-range 1 IIz to 40 Hz Min IIZPA-4. 79 Min. VZPA-3,2g Input g level S/S 12g, F/13 12g V-6g Operability demonstrated during and c. Plans for Reevaluation /Requalifi-following each SSE. cation
Dynamic analysis V lve meets SQRT requirements Resonance search 1-40 IIz pending results of GE Resonant frequency-S/S 21 liz F/B 21 IIz V-O Main steam piping analyses

! using T-Quencher plus LOCA (CO).

loads.

SilEET Of s-N

0 O O SEISf1IC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary l

SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

21A9257 MPL No. B21-F022 and B21-F028 38511A758 Main Steam Isolation Valve and Actuator QUALIFICATION METilOD: Test: Actuator only, GE, 2

NEDE 24122-2. Analysis as part of piping analysis. SQRT REVIEW RESULTS:

a. Company / Report Number /Da te : a. SQRT Criteria Met: X Yes; No GE 22A5686, 22A5687, 22A5688
22A5689, 22A5690 b. Reason for

Conclusion:

ACTUATOR: Multi-axis multi-frequency test performed. TRS enveloped RRE Operability

b. Qualification by: X Analysis: X Test demonstrated. VALVE: Dynamic 1'2 : analysis performed.
c. Qualification Information Test: Multi-frequency and' Multi-axis, random motion No. of Qualification Tests: 2SSE Frequency Range: 1 to 64 Ilz TRS enveloped RRS using multi-frequency test. Test results showed that actuator always closed on signal. Yoke tube c. Plans for Reevaluation /Requalifi-i lubrication was recommended. cation:

The main steam isolation valve is Analysis: Dynamic, response spectrum. qualified to SQRT requirements-Resonance Search 1-35 liz. pending completion of the General

Electric main steam piping analysis j using T-Quencher plus LOCA (CO) loads.

SilEET Of 4

1

SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIPICATION NUMBER: 21A9279 EQUIPMENT / COMPONENT: MPL No.

I 22A6404, 22A6016 B33-C001 Recirculation Pump QUALIFICATION METi!OD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRTCriteria Met: X Yes; No Motor: GE-Large Motor & Gen. Department Pump: GE-NEBG Both filed in NEDG DRP b. Reason for

Conclusion:

  1. 206B33C00lLp Pump effects included in dynamic piping analysis j b. Qualification by: X Analysis: Test
c. Qualification Information  :

Static Analysis: Motor = 4.2g horiz., 3.6g vergical pump = 3.3g horiz., 1.5g vertical

! Recirc. Piping Analysis: Time history and Response Spectrum Plans for Reevaluation /Requalifi-

' c.

cation:

The recirculation pump is qualified pending a review of the piping analysis using the Seismic + T-Quencher Loads.

l i

SilEET Of I

i t

SEISf4IC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification. Summary SPECIFICATION NUMBER: 921D875E EQUIPMENT / COMPONENT: MPL No. B33-21A9280 F023 Recirculation Pump Suction

  • Valve QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No Darling Valve, GE VPF #3134-4-5 b. Reason for

Conclusion:

Required accelerations determined from dynamic analysis of piping.

b. Qualification by: X Analysis: Test Frequency calculations performed to support static analysis method.
c. Qualification Information  :

Static Analysis: (1.5g-horiz., 0.5g vert.)

performed by vendor.

Dynamic Analysis: Response spectrum on piping.

c. Plans for Reevaluation /Requalifi-cation:

The recirculation pump suction valve is qualified to SQRT re-quirements pending analysis using T-Quencher plus LOCA (CO) loads.

SilEET Of

i O O O i

SEISMIC QUALIFICATION REVIEW Table 2 7

Zimmer Equipment Qualification Summary 1

SPECIFICATION NUMBER: 21A3873 EQUIPMENT / COMPONENT: MPL No. B33-F060 Recirculation Flow Control Ball Valve QUALIFICATION METilOD:

SORT REVIEW RESULTS:

I

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No GE, O.I. Ford, FCV Design, M/C 755 and 22A5681, 22A5682, 22A5683 b. Reason for

Conclusion:

Required accelerations determined from dynamic analysis of piping.

Frequency calculations performed

+

b. Qualification by: X Analysis: __ Test to support static analysis method.

l,2

c. Qualification Information Dynamic Analysis: Response Spectrum (Piping) i Analysis showed stud, holding "topworks" to

-body good for 6 9V, 99H.

j Natural Frequencies S/S 114 llz

c. Plans for Reevaluation /Requalifi-I cation:

The recirculation flow control valve is qualified to SQRT re-quirements pending the results of the General Electric recircu-lation piping analysis using T-Quencher plus LOCA (CO) loads. -

SilEET Of s

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary  ;

SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: Cll-D001 GE/761E500G1 Hydraulic Control Unit QUALIFICATION METilOD: Test SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No Wyle #53540 b. Reason for

Conclusion:

(GE Document No. 384HA183 Multifrequency testing operability demonstrated. Analysis performed

b. Qualification by: Analysis: X Test to account for high frequency loads.
c. Qualification Information  :

Multi Frequency Single Axis (three directions)

Frequency range 1.1-38Hz horizontal 1.2-100Hz vertical g-level test at h y -14, h 2 -ll, V-18 c. Plans for Reevaluation /Requalifi-

^'I "*

g-level required h y -l.8, h 2 -1.2, V-2.8 Natural Frequencies: None Horizontal - 2Hz (E-M) F/B 2,75Hz (N-S) S/S Vertical - 1CHz SilEET Of

! O O:

}

i j SEISMIC QUALIFICATION REVIEW i

4 Table 2 Zimmer Equipment Qualification Summary

' SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: Cl ? -F009 21A9317 Solenoid Valve 832322 QUALIFICATION METi!OD:

I j a.- Company / Report Numbar/Date: a. SQRT Criteria Met: Ye s; X No None .

1

b. Reason for

Conclusion:

f 1. No test data or report available

{ . . . 2. No seismic analysis available

< b. Qualification by: Analysis: Test 1

Qualification Information 1'2 : None 1

1 c.

1 4

Y i

j c. Plans for Reevaluation /Requalifi-I cation: i a

j 1. Valve should be tested to SQRT

{ requirements.

l 2. Vendor recomends replacing with j NP8323A22E,'NP series have been i through testing to IEEE 344-1975. ,

! 3. Testing plans underway.

1 1

SIIEET -Of l ,

i l

i i . . . -

__ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . _ _ _ . _ . _ .___ _ _ _ _ . _ _ __ ~. ._ _ . . _ . - . _ . .- _

o O o SEISMIC QUALIFICATION REVIEW i Table 2 Zimmer Equipment Qualification Summary '

SPECIFICATION NUMB * : EQUIPMENT / COMPONENT: Cll-F010 GE21A8657 SN71/26 o/001-009 Scram discharge vol. vent valve 8660 8658 1750 QUALIFICATION METIlOD: Static Analysis SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes;_X No Hammel-Dahl #406 b. Reason for

Conclusion:

No deflections were calculated, thus operability not demonstrated.

b. Qualification by: X Analysis: Test
c. Qualification Information  :

Static analysis

3. Fundamental frequency was 12511z, thus valve is rigid.
2. Seismic acceleration nsed was 6.0g horizontal and vertical for valve c. Plans for Reevaluation /Requalifi-analysis. . cation:
3. Valve has large stress margins.
4. Actuator analysis was.done separately , . Requalification by test is and used 1.5g horizontal and 14g vertical. underway.

SIIEET Of

f-O > .0  !

)

SEISMIC QUALIFICATION REVIEW

Table 2 i

Zimmer Equipment Qualification Summary  ;

SPECIFICATION NUMBER
EQUIPMENT / COMPONENT: Cll-F0li j Scram Discharge Vol. Drain Valve 4 71/2006/001-025 l QUALIFICATION METl!OD: 1 i SQRT REVIEW RESULTS:

i

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No None b. Reason for

Conclusion:

j l. No qualification records available

2. No stress report available I j b. Qualification by: Analysis: Test 3. No test report available

.I c. Qualification Information 1'2 ~  : None

. I I

t i c. Plans for Reevaluation /Requalifi-I cation:

I i . Requalification by test is '

underway.

i J

l SilEET Of I

I i

o O o SEISMIC UALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: Cll-F012 GE21A1749 Pressure Relief Valve 3/4 X 1 JMAK Spec. B.

QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; No Franklin Institute F-C3541 b. Reason for

Conclusion:

Valve operability not demonstrated during or-after test.

b. Qualification by: Analysis: x Test Resonance search indicated that valve 1 is flexible. Multi-frequency,
c. Qualificatior. Information '2 : multi-axis testing should be performed.

Sinusoidal, single axis, testing performed Dwells performed at 5, 12, 23, 3011z Tested to 6g's Leakage test performed.

c. Plans for Reevaluation /Requalifi-cation:

Requalification by test is underway.

SIIEET Of

. _ _ _ . - -. . . - . - . - - . . - - . . - = - - . .- . . . _ ~ . . ._ .. -

O O i

j SEISMIC QUALIFICATION REVIEW

) Table 2  :

4 Zimmer Equipment Qualification Summary l SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: C41-A001 22A40llAC Design Spec. Standby Liquid Control Storage tank

, QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date
a. SQRT Criteria Met: X Yes; No 4 GE: RA542;22A4068 .
b. Reason for

Conclusion:

] Dynamic analysis performed.

Natural frequencies calculated j'

b. Qualification by: X Analysis: Test and significant modes considered in the analysis.

Qualification Information 1'2 :

c.

a Dynamic analysis - First mode only, higher '

modes not considered important for overall i tank loads. Frequency range considered was j 0-60 Hz.
c. Plans for Reevaluation /Requalifi-cation

]

Evaluation to T-Quencher loads is underway.

1 k -

SIIEET Of i

i t

i O O O I

SEISMIC QUALIFICATION REVIEW

! Table 2 i

j Zimmer Equipment Qualification Summary

SPECIFICATION NUMBER: EQUIPMENT / COMPONENT : C41-C001-l 21A9342AK Standby-Liquid Control Pump [

i QUALIFICATION METilOD: Test and Analysis i SQRT REVIEW RESULTS: i

{ a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No i

' Union Pump Co. 430-16 Rev. 3, GE DRFC41-21

! Approved Engineering 5430-6958 b. Reason for

Conclusion:

1 Test Lab Pump resonance frequencies not l determined.

i . . . Pump operability not clearly j b. Qualification by: X Analysis: X Test established.

i ' M tor resonant frequency search did

c. Qualification Information  :

not include 1 to 10 Hz region, i Natural frequency search performed between

, 10 and 80 Hz on motor.

i Motor was tested using sinusoidal input of

2.0g's.

. Pump was analyzed statically to 1.75g's. . .

4 c. Plans'for Reevaluation /Requalifi-l cation:- ,

j Coupled dynamic analysis of pump /notor

! assembly to be performed. _

1. s i i i

f Si!EET .Of I 4

1

- - _ . , - - . . , _ _ . . . , __ - . - . , m , ,.. . . . , _ - _ _ _ . _ _ .

d -

o eey i N rlt f O

i

- ebi l 1 val 4 owi a C cob u sl a q

. n il r e o e dAe p R N Y /

n n Le Pv X n oit e.O i o

Ml i cn . t a  :

s ned a V t u uei ere u

: e l l Te S M c qtf a Nv Ei T

L a n

o rii ens v e

Ns U i C f t o Oo S r fa H Pl E e r l on Mp H t o a . r Ox i f rend o CE W r ugee f :

/ E C n tnni n TC I o aanf no .

y NL V T n nrei ni e r E S E R a rr at n a M R Q o onte l a o m

m P

I4 T S R Nisv PcN u U0 R W S Q0 O . . .

E EC S a b c I n V o E i R t a

1 f c O i I f T 2 i OI A C

P I.

l b

e a

l Q

a u

l f

O

! T t t a A n n t d U e e nl n T Q m T eaa C p md E C i ei) l i E I u X l ol S 1

f q pna S E put I

E r a

unn Sio S e i Sz m  :

e n 2 y

i m e t ,

. r i 0 t u l d . o Z 7 a t a n edh 3 D i n o me(

9 A

/

r t1 s0 A i rm t ors 1 e n3 a f o' 2 b I - m rf9 m 1 r er5 u h8 o pe..

N c66  : f p6)

R D r47 y nh l E O a9 b I cnoa

  • l i

l i t c21 ret c M T r u0 n n as i U

N E o p R e , o o eyet M 4 i i nl nr u o1 t t aoe N N H tN a a endv O O / s r c c ca .(

I I y ete i i n g T T n wcb f f asnn A A a hem i i nsi' C C p tje l l oet9 m ore uoc a o a nrs5 I I P F o u u ete.

I I C SPD Q Q Rst4 C L E A P U . . .

S Q a b c

o O O SEISMIC QUALIFICATION REVIEW Table 2 i

Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

136B1302C002 Assembly C51-J004 TIP System Shear Valve i ll7C2484P002 Outline QUALIFICATION METIIOD:

SQRT REVIEW RESULTS:

.i

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No Ogden Technology Laboratories, Inc. b. Reason for

Conclusion:

. 70865 GE VPF No. 886D393 1. No resonances bel'ow 60 Hz

2. Input acceleration was well above peak and ZPA values in RRS
b. Qualification by: Analysis: X Test 3. Valve operability was demonstrated during test.

1'2 :

I

c. Qualification Information Single frequency, single axis frequency range 30 Hz. Resonance search 5 to 1000 Hz two units were test fired and leak tested with 10g/30Hz input applied.

I

c. Plans for Reevaluation /Requalifi-cation:

. . None.

i

(

4 SilEET Of I

4

o O o SEISMIC QUALIFICATION REVIEW Table 2 4

Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

136B1302G002 Assembly C51-J004 TIP System Ball Valve 117C2484P002 Outline QUALIFICATION METilOD: Test

SQRT REVIEW RESULTS
a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No GE - 225A6603 Rev. O and Addendum b. Reason for

Conclusion:

B of 994-75-019 Rev. 2 (a GE Sensor j Products Eng. Memo) Covering Modified Valve 1. No resonances below 33 Hz GE VPF No. 112C2391 2. Operability verified

b. Qualification by: Analysis: X Test 3. Additional test performed at 25g, 33 IIz demonstrated satisfactory Perability
c. Qualification Information Single axis sine sweep frequency range 2 to 33 11z, Valve was subjected t

to a 25g sine input at 33 IIz without

malfunction during original qualification 4

tests. . .

c. Plans for Reevaluation /Requalif1-cation:

, None.

4 j SilEET Of 4

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: E12-B001 21A9227AR RIIR IIeat Exchanger QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No GE DRF No. E12-12 b. Reason for

Conclusion:

November 1977 Dynamic analysis performed.

Seismic and hydrodynamic loads

b. Qualification by: X Analysis: Test considered. Allowable stresses satisfied.

l,2

c. Qualification Information Dynamic analysis performed. Response spectrum techniques used. Seismic and hydrodynamic loads were considered.
c. Plans for Reevaluation /Requalifi-cation:

Deing reanalyzed using T-Quencher and LOCA loads information.

SIIEFT Of

l O O O i

SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

21A9243CT E12-C002 RIIR Pump & Motor 21A9222CF QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

l

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No NUTECII/CGE-04-016 April 30, 1981 b. Reason for

Conclusion:

i Dynamic analysis performed. Seismic and hydrodynamic loads considered.

, Operability assessment performed.

j b. Qualification by: X Analysis: Test

. c. Qualification Information 1'2 :

?

Coupled dynamic analysis using normal mode

superposition performed on pump and j motor assembly. Input response spectrum enveloped

! absolute sum of SSE, SRV line chugging and I

condensation oscillation. Operability assessment l performed. c. Plans for Reevaluation /Requalifi-

! cation:

a None.

SIIEET Of i

b

l O O O SEISMIC QUALIFICATION REVIEW Table 2 i

Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

21A9243CS E21-C001 LPCS Pump / Motor 21A9222CJ

, QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

]

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No NUTECil/CGE-04-016 b. Reason for

Conclusion:

April 30, 1981 Dynamic analysis performed. Seismic and hydrodynamic loads considered.

Operability assessment performed.

l b. Qualification by: X Analysis: Test Qualification Information 1'2 :

i' c.

Coupled dynamic analysis using normal mode superposition performed on pump / motor assembly.

Input response spectrum enveloped absolate

, sum of SSE, SRV line chugging and condensation oscillation. Operability assessment performed.

c. Plans for Reevalration/Requalifi-cation:

i . . None i

A I

SilEET Of i

e

o O O SEISMIC QUALIFICATION REVIEW 1

Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

21A9243CR E22-C001 HPCS Pump / Motor

21A9222CX j QUALIFICATION METHOD

4 SQRT REVIEW RESULTS:

1

a. Company / Report Number /Date: a. SORT Criteria Met: X Yes; No a

NUTECH/CGE-04-016 b. Reason for

Conclusion:

April 30, 1981 ,

Dynamic analysis performed. Seismic

and hydrodynamic loads considered.
b. Qualification by: X Analysis: Test Operability assessment performed.
c. Qualification Information ' :
Coupled dynamic analysis using normal mode superposition 1 performed on pump motor assembly. Input response 3 spectrum includes SSE, SRV chugging and condensation i oscillation. Operability assessment performed.

i c. Plans for Reevaluation /Requalifi-i cation:

i None.

1 4

i l

4 SHEET Of

. - - - . . - . . _ - - -- . . - = ~ . . . . . ._ __ - - ..

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary l

SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: E22-F001 21A1739 IIPCS Suction Valve from CST 21A1941 QUALIFICATION METIIOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No Darling Valve & Mfg. Co. b. Peason for

Conclusion:

VPF-3173-104-3 Natural frequencies not calculated.

Response spectra not used.

b. Qualification by: X Analysis Test Operability not evaluated.
c. Qualification Information  :

Static Analysis Seismic and operating loads considered.

c. Plans for Reevaluation /Requalifi-cation:

Roanalysis oy Anchor-Darling in progress.

SIIEET Of i

l

g _. - . _ _ _ , _ , _ _ _ . . . _ . . . . . _ - _ ._. . . _ _ _ - . . _ _ . _ _ _

_ _ . _ _ . _ _ __ . . _ . - ,_- _ . - _ . - _ _ _ - _ _ - - . _.__m i

  • l O O .

I.

l SEISMIC QUALIFICATION REVIEW Table 2 .

< l Zimmer Equipment Qualification Summary a'

SPECIPICATION NUMBER: EQUIPMENT / COMPONENT:

4 j 21A1942 E22-F004 M. O. Gate Valve i 21A1740 ,

QUALIFICATION METilOD-SQRT REVIEW RESULTS:

' Company / Report

a. Number /Date: a. SQRT Criteria Met: Yes; X No l Darling Valve & Mfg. Co.

VPF-3173-209-3 b. Reason for

Conclusion:

l Natural frequencies not calculated

Operability not. demonstrated

{ b. Qualification by: X Analysis: Test Qualification Information 1*2 :

i -

l c.

j Static Analysis performed. '

i

! i i

l c. Plans for Reevaluation /Requalifi-

! cation:

Requalification by analysis is j underway.

i I i 4

l 1

l 1 SilECT Of

) . ' >

i 4

i i

1 .

'i O O i r

SEISMIC QUALIFICATION REVIEW ~

i

Table 2 ,

Zimmer Equipment Qualification Summary 4

SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: E22-F010

5. 21A1939 IIPCS Test Return Valve to CST.

I QUALIFICATION METilOD:

l- SQRT REVIEW RESULTS:

j a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; ' X No

b. Reason'for

Conclusion:

l Natural frequencies not calculated i . . . Operability not demonstrated

b. Qualification by: X Analysis: Test

! c. Qualification Information  :

Static analysis performed.

t a

c. Plans for Reevaluation /Requalifi-j cation:
, Requalification by analysis is 1 underway i

l i

)

i l SIIEET Of.

f

, . ,-,--_s - m . - , _ _ _ r.....

O O O  :

SEISMIC QUALIFICATION REVIEW f Table 2 l Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

21A1737 E22-F0ll IIPCS Test Return Valve to CST.

i QUALIFICATION METIIOD:

SQRT REVIEW RESULTS:

l a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No

! b. Reason for

Conclusion:

}

Natural frequencies not calculated f-

b. Qualification by: X Analysis: Test
c. Qualification Information  :

l Static analysis performed.

t I

c. Plans for Reevaluation /Requalifi-l cation: i l Requalification by analysis is underway, s

4 3

SilEET Of t

=.

d

O O O SEISf11C QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIPICATION NUMBER: EQUIPMENT / COMPONENT:

21A1931 E22-F012 IIPCS Bypass Valve to Suppression Pool.

QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company /Itoport Number /Date: a. SQRT Criteria Met: Yes; X No Darling Valve & Mfg. Co. b. Reason for

Conclusion:

VPF 3173-316-2 Rev. 2 7119179 Natural frequencies not calculated Operability not evaluated.

b. Qualification by: X Analysis: Test

,2

c. Qualification Information Static Analysis
c. Plans for Reevaluation /Requalifi-cation:

Requalification by analysis is underway.

SilEET ' Of s

e

. e O O i

i' SEISMIC QUALIFICATION REVIEW i: .

l Table 2 .

l Zimmer Equipment Qualification Summary 4

. SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

1 .

2 21A1941 E22-F015 IIPCS Suction Valve from Suppression pool.

QUALIFICATION METIIOD:

SQRT REVIEW RESULTS
a. Company / Report Number /Date: .a. SQRT Criteria Met: Yes; X No Darling Valve & ' Mfg. Co.

b.

i ypF-3173-200-2 Reason for

Conclusion:

. Natural frequencies not determined j Operability not' evaluated

b. Qualification by: X Analysis: Test

]

c. Qualification Information

Static Analysis i i

e

c. Plans for Reevaluation /Requalifi-cation:
, Requalification by analysis is

! underway.

s l

1 l

1 SitEET Of i

1 i

4 l

O O O SEISf1IC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

21A8657 E22-F023 IIPCS Test Return Valve to Suppression Pool QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No Anchor Valve Co. 25-1715 Rev A b. Reason for

Conclusion:

Operability not evaluated.

b. Qualification by: x Analysis: Test
c. Qualification Information  :

Static Used operating and seismic loads Natural frequency calculated (original in error)

c. Plans for Reevaluation /Requalifi-cation:

Requalification by analysis is underway SIIEET Of i

o O o SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIPICATION NUMBER: EQUIPMENT / COMPONENT:

22A4633 E32-B001 MSIV LCS Heater QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: y Yes; No Approved Engineering Test Laboratories b. Reason for

Conclusion:

Report No. 5430-7186 Actual stresses were less than allowables.

b. Qualification by: Analysis: X Test
c. Qualification Informationl ,2 Frequency search performed.

Single frequency, single axis excitation utilized (3-35 Hz).

Operability was demonstrated.

Resonant frequency was identified at 88 IIz, and stress analysis was performed. c. Plans for Reevaluation /Requalifi-cation:

, Mone SIIEET Of s

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

21A3762 E32-C001 MSIV LCS Dlower E32-C002 QUALIFICATION METIIOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No Approved Engineering Test Laboratories ,
b. Reason for

Conclusion:

Resonance search and sine testing was not performed beyond 33 IIz.

b. Qualification by: Analysis: y Test
c. Qualification Information  :

Frequency search' done below 33 IIz.

Single frequency multi-axial excitation utilized (0 . 3 3 IIz) .

Operability was demonstrated.

c. Plans for Reevaluation /Requalifi-cation:

nequalification by analysis is underway.

SilEET Of

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

21A9243 E51-C001 RCIC Punp QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No GE Report No. 4060-52-2
b. Reason for

Conclusion:

g values used in analysis in the vertical direction were not high

. enough. .14g was used, 1.275g

b. Qualification by: y Analysis: Test is required. Operability was not

. 1,2 demonstrated,

c. Qualification Information  :
1. Natural frequency calculated.
2. Seismic and hydrodynanic loads were combined using absolute sum.
3. .14g war,used in vertical directions.
4. Pump analyzed is not RCIC pump but results c. Plans for Reevaluation /Requalifi-are claimed to be applicable due to similarity. cation:

Similarity study is not referenced.

5. .

The RCIC pump has been analyzed to 1.5g horizontal Requalification by analysis is and .14g vertical for SSE (vertical component not underway.

large enough to meet RRS).

SIIEET Of l

. ~ _ - .-

o O O SEISMIC QUALIFICATION REVIEW Table _2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: E51-C002 RCIC 21A9201 Turbine Terry Turbine Co., GS-1 QUALIFICATION METHOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No Wyle Report No. 58030 April 8, 1978
b. Reason for

Conclusion:

Operability was not demonstrated.

Resonance search was not performed beyond 35 Hz.

b. Qualification by: Analysis: X Test
c. Qualification Information  :

Multi-axial, multi-frequency test performed.

Resonance search performed to 35Hz. TRS enveloped RRS.

c. Plans for. Reevaluation /Requalifi-cation:

. Adequate dynamic test performed on GS-2 model. Similarity study is in progress to qualify GS-1 model.

SHEET Of

i O

~

2' O

SEISMIC QUALIFICATION-REVIEW I

Table 2 Zimmer Equipment Qualification Summary 1

SPECIFICATION NUMBER:

EQUIPMENT / COMPONENT:

1 22A2551 Fll-E001 Fuel Prep. Machine QUALIFICATION METIIOD:

{

SQRT REVIEW RESULTS:

[ a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No l I General Electric Report No. F00-01

{ b. Reason for

Conclusion:

T

! Equipment not analyzed to sufficiently l high g levels.

~b. Qualification by: X Analysis: Test l

1

i; c. Qualification Information  : j i 1. Equipment was analyzed dynamically using  !

j SAP 4 program. 1.296 to 67.494 IIz frequency

range and 16 modes considered. '

l 2. Analysis used ABS method of load combination.

i j c._ Plans for Reevaluation /Requalifi-j cation: .

Requalification by analysis is ,

underway. ,

I 1

4 SilEET Of ,

r .  !

l 1

. l

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

148F478G001 Fll-E0ll General Purpose Grapple QUALIFICATION METilOD:

SQRT REVIEW RESULTS:-

a. Company / Report Number /Da te - a. SQRT Criteria Met: X Yes; No GE DRF 139-Fil-E0llK, Suppl. b. Reason for

Conclusion:

Hydrodynamic loads do not exist during plant shutdown. . No Qualification by: X Analysis: significant. application of

b. Test seismic loads due to extremely c.

low frequency of suspended Qualificati..>n Information ' :

equipment.

Equipment supported from wire rope and used only during refueling. Effects of vibratory loads considered small because:

1) Extremely low functional frequency. c. Plans for Reevaluation /Requalifi-
2) No hydrodynamic loads exist during cation:

re.'aeling.

None.

l 9

SilEET Of _  ;

1 i

(

O O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification S'immary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

762E984 F13-E008 Dryer / Separator Sling QUALIFICATION METIlOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No GE DRF F13-9 b. Reason for

Conclusion:

Ilydrodynamic loads do not exist during plant shutdown. No

b. Qualification by: X Analysis: Test significant application of seismic loads due to extremely
c. Qualification Information1 '2 : low frequency of suspended equip-ment.

Equipment supported from wire rope and used only during refueling. Effects of vibratory loads considered small because:

1) Extremely low fundamental frequency.

, c. Plans for Reevaluation /Requalifi-

2) No hydrodynamic loads exist during cation:

refueling.

None.

SilEET Of 4

o O O

-SEISMIC QUALIFICATION REVIEW Table 2 ,

l Zimmer Equipment Qualification Summary I

] SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

i 1 762E985 F13-E009 RPV Head Strongback QUALIFICATION METHOD:

SQRT REVIEW RESULTS:

i

! a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No GE DRF F13-ll b. Reason for

Conclusion:

I Hydrodynamic loads do not exist' during plant shutdown. No

b. Qualification by
Analysis: Test significant application of seismic loads due to extremely
c. Qualification Information 1'2  : low frequency of suspended . j .. ?

, equipment. *'

Equipment supported from wire rope and used

only during refueling. Effects of vibratory .

loads considered small because:

1) Extremely low functional frequency. c. Plans for Reevaluation /Requalifi-
2) No hydrodynamic loads exist during cation:

i refueling.

None, q

i

'F SHEET Of s :

6

o C O i

4 SEISMIC QUALIFICATION REVIEW Table 2 l Zimmer Equipment. Qualification Summary i

SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

767E593G001 F14-E002 Control Rod Grapple i i QUALIFICATION METilOD:

SQRT REVIEW RESULTS:  ;

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No GE DRF No. 139-F14-E002K, Suppl *
b. Reason for

Conclusion:

I flydrodynamic loads do not exist

, during plant shutdown. No

b. Qualification by
Analysis: Test significant application of seismic loads due to extremely
c. Qualification Information 1'2 : low frequency of suspended equipment.

j Equipment supported from wire rope and used only during refueling. Effects of vibratory loads considered small because:

Extremely low functional frequency. c. Plans for Reevaluation /Requalifi-

1) cation:
2) No hydrodynamic loads exist during refueling. ..

1 None.

i 4

SilEET Of I

e

- , - e

O i

i O U O SEISt>iIC QUALIFICATION REVIEW Table 2

{ Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

762E852 P15-E003 Refuel Platform Equipment QUALIFICATION METHOD:

i SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes;_X_No ,

- General Electric Report No. 138-F15E003 M*9

b. Reason for

Conclusion:

Reanalysis needed using T-Quencher loads and SAP 4 model to include all X Test 36 modes below 60 Hz.

b. Qualification by: Analysis:
c. Qualification Information  :

j 1. Dynamic Analysis using SAP 4 Program.

2. Appropriate floor RRS were used (seismic and hydrodynamic).
3. Frequency evaluation covered range >60 Hz, however the dynamic analysis did not include
c. Plans for Reevaluation /Requalifi-

, all modes from 33 to 60 Hz.

4. Loads were combined.by both ADS and SRSS methods. cation:

Requalification by analysis is ,

underway.

l 1

SHEET Of w>

O O O 4

SEISMIC QUALIFICATION REVIEW i

Table 2 Zimmer Equipment Qualification Summary I

SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: F16-E002 Spent

22A2553 Fuel Storage Rack

, QUALIFICATION METHOD:

SQRT REVIEW RESULTS:

! a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No GE DRF F16-10 b. Reason for

Conclusion:

Static analysis supported by frequency 4 calculations. Response spectra used
b. Cualification by: X Analysis: Test which account for hydrodynamic loads.
c. Qualification Information  :
Static Analyses performed.

Seismic, Hydrodynamic loads considered.

. RRS used Resonant frequencies calculated.

, ABS Load Combination used. c. Plans for Reevaluation /Requalifi-cation:

Since racks are being replaced with high den. city design, revised analysis is being performed in accordance with l SQRT requirements i SHEET Of 4

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: F16-E004 Control 22A2554 Rod & Defective Fuel Storage Rack QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: 'Yes; X No GE DRF-F16-3 4/15/77 b. Reason for

Conclusion:

Additional effort required to'suggest-static analysis and to include hydro-

b. Qualification by: Analysis: Test dynamic loads.
c. Qualification Information  :

Seismic coefficient used.

c. Plans for Reevaluation /Requalifi -

cation:

Additional evaluation using T-Quencher and revised CO loads underway.

SIIEET Of

SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: F16-E006 22A2549 In-vessel rack QUALIFICATION METi!OD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No NUTECil Report No. CGE-03-126 b. Reason for

Conclusion:

September 1980 Dynamic analysis performed. Seismic loads considered. Actual stresses were

b. Qualification by: X Analysis: Test less than the allowables,
c. Qualification Information  :

Detailed finite element dynamic analysis performed. Seismic loads were considered.

Stress analyses were performed.

c. Plans for Reevaluation /Requalifi-cation:

4 None SIIEET Of

o O O

, SEISMIC QUALIFICATION REVIEW Table 2 I Zimmer Equipment Qualification Summary

! SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: F16-E007 New Fuel Storage Rack 386HA625 j QUALIFICATION METHOD:

SQRT REVIEW RESULTS:

j a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No NUTECH Report No. CGE-03-146 December 1980 b. Reason for

Conclusion:

Dynamic analysis performed. Seismic i

and hydrodynamic loads considered.

b. Qualification by: X Analysis: Test Calculated stresses less than j allowable stresses.

) c. Qualification Information  :

Detailed finite element analysis, response spectrum envelopes the absolute sum combination of SSE, SRV and CO response spectra. Stress analysis i'

Performed. c. Plans for Reevaluation /Requalifi-cation:

4 None.

4 SHEET Of i

ll b O O V V SEISMIC QUALIFICATION REVIEW i Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: F16-E009 Defective Fuel Storage Container 22A4324

] QUALIFICATION METIlOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No GE Report No. 139-F16-E009-K b. Reason for

Conclusion:

October 13, 1979.

l Resonance calculations not performed.

1 Ilydrodynamic loads not considered.

i b. Qualification by: X Analysis: Test

c. Qualification Information  :

j Static analysis performed.

i Seismic loads considered.

j c. Plans for Reevaluation /Requalifi-cation:

l Evaluation of equipment to T-Quencher j loads is in progress.

1 i,

l 1 .

SilEET Of i

I

j l

0 O O SEISMIC QUALIFICATION REVIEW l Table 2 4

g Zimmer Equipment Qualification Summary j SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

i 22A3084 T49-D001 Flammability Control Unit 1

1 QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

) .t. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No 4

l GE Report No. T49-10 b. Reason for

Conclusion:

-March 16, 1979 Actual stresses exceeded allowables

in the support saddle for the blower.

j b. Qualification by: x Analysis: Test i

c. Qualification Information  :

d Response spectrum analysis implemented

! calculation includes calculation of I resonant frequencies, modal shapes and

participation factors, element accelerations i and stresses. c. Plans for Reevaluation /Requalifi-cation
'

Equipment is being reanalyzed to T-Quencher loads.

4 i

.SilEET Of

+,

4

.~, x .-  %

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

22A3084 T-49-D001 Strip IIcaters QUALIFICATION METIIOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No tiple Report No. 50432-2 August 3, 1979 b. Reason for

Conclusion:

Test accelerations exceeded required accelerations. Operability was

b. Qualification by: Analysis: X Test demonstrated.
c. Qualification Information  :

Frequency search performed.

Multi-axial, Multi-frequency excitation used.

TRS envelopes preliminary T-Quencher RRS.

c. Plans for Reevaluation /Requalifi-cation:

Reevaluation to new loads is underway.

SilEET Of

0 O o l1 SEISMIC QUALIFICATION REVIEW j Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

22A3084 T49-D001 SCR Control Cabinet i

QUALIFICATION METIIOD:

SQRT REVIEW RESULTS:

! a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; ho l

j Uyle Report No. 58432 b. Reason for

Conclusion:

July 25, 1979 TRS envelopes RRS. Operability j was demonstrated.

! b. Qualification by: Analysis: X Test

c. Qualification Information I'

?

i Multi-axial, Multi-frequency testing performed.

A Resonant frequency search conducted.

i j c. Plans for Reevaluation /Requalifi-cation:

j .

-None i

i, SilEET Of f

1 4

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

22A3084 T-49-F002, F004, F005 Gate Valve. Control Unit and Valve Operator ,

QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; 'No Wyle Report No. 58432-1 b. Reason.for

Conclusion:

July 31, 1979 Test accelerations exceeded required accelerations and moment.

b. Qualification by: Analysis: X Test operability demonstrated.
c. Qualification Information 1'  :

Frequency search performed.

Test fixture resembles field mounting. '

Multi-axial, multi-frequency excitation used.

TRS envelopes preliminary T-Quencher RRS. c. Plans for Reevaluation /Requalifi-cation:

, Mone S!!EET Of

i O s O j SEISMIC QUALIFICATION REVIEW j Table 2 i

Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: B- 21-N0 24 i 159C4383 Barton 384 j Level Ind. Switch l QUALIFICATION METilOD:

SQRT REVIEW RESULTS: ,

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No i

! Wyle Laboratories, Report No. 53314 b. Reason for

Conclusion:

l Operability was not demonstrated.

F

b. Qualification by: Analysis: X Test Qualification Information 1'2 :

i c.

i Resonance search was performed to 500 IIz.

j Sinedwell testing performed at 33 IIz to j 5.0g's.

l .

1 .

c. Plans for Reevaluation /Requalifi-

] cation:

j .

Requalification by test _is underway.

j SilEET Of l

3 i

I

! O O 1

SEISMIC QUALIFICATION REVIEW i

j Table 2 1

j Zimmer Equipment Qualification Summary 1 i

i SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: B21-N036 i

j 159C4445 Yarway 4418C j Level Ind. Switch ,

j QUALIFICATION METl!OD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No i

a j None. b. Reason for

Conclusion:

.i j Qualification information was j b. Qualification by: Analysis: Test not available.

Qualification Information 1'2 :

e c.

i None.

l c. Plans for Reevaluation /Requalifi-

! cation:

1 1 Requalification by test is j underway.

i f

i SilEET Of i s i 1

i a

SEISMIC QUALIFICATION REVIEW

! Table 2 1

Zimmer Equipment Qualification Summary 1

SPECIFICATION nub)BER: EQUIPMENT / COMPONENT: B21-N044 159C4383 Barton 760 l Level Switch QUALIFICATION METlIOD:

SQRT REVIEW RESULTS:

i

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No i

Wyle Laboratories, Report No. 53314 b. Reason for

Conclusion:

i January 5, 1973 Operability was not demonstrated.

! b. Qualification by: Analysis: X Test Qualification Information 1'2 i

4

c.  :

I Resonance search was performed to

]j 500 11z . Sine dwell testing performed at 33 11z to 5. 0g 's.

I

, c. Plans for Reevaluation /Requalifi-cation:

i Requalification by test is j underway.

l

I i

i SIIEET Of 5

l

o O O .

SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: B21-N056 163C1855 Barksdale DIT-Ill8SS Vacuum Switch QUALIFICATION METilOD:

SQRT REVIEW RESULTS: ,

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No None, b. Reason for

Conclusion:

Qualification information was not available.

b. Qualification by: Analysis: Test
c. Qualification Information 1'  :

None.

c. Plans for Reevaluation /Requalifi-cation:

Requalification by test is underway.

SIIEET Of

o O 0 SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: B-21-R005 163Cll81 Barton 227 AP Ind.

QUALIFICATION METHOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. .SQRT Criteria Met: Yes; X No None. b. Reason for

Conclusion:

Qualification information was not available.

b. Qualification by: Analysis: Test
c. Qualification Information  :

None.

c. Plans for Reevaluation /Requalifi-cation:

Requalification by test is underway..

SilEET Of i

_ . _ . ~ _ . . . _ _ . . _ _ _ . _ _ _ . _

o O O SEISflIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUM13ER: EQUIPMENT / COMPONENT:- C34 N017 STATi!AM (GOULD) AP XMTR PD2000-400 QUALIFICATION METilOD:

SORT REVIEW RESULTS:

a. Company / Report Number /Date: a. SORT Criteria Met: Yes; X No None, b. Reason for

Conclusion:

Qualification information is not available.

b. Qualificatien by: Analysis: Test l,2
c. Qualificaticn Information None,
c. Plans for Reevaluation /Requalifi-cation:

To be replaced with. qualified component.

SilEET Of i

! O O o SEISMIC QUALIFICATION REVIEW l

i Table 2 i

Zimmer Equipment Qualification Summary l SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

1 4

Fenwal 22810 C41-N003 Temp-Switch QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No
None b. Reason for

Conclusion:

)

Qualification Information is not

available f b. Qualification by
Analysis: Test l,2 l c. Qualification Information ,

t None i

c '. Plans for Reevaluation /Requalifi-cation:

Requalification by analysis is underway.

SIIEET Of

- - - - . . - - .-- . - - . . . . ~~-. . . . - .-- ..-.... =. .. .,- ~ . .

i O O O j  !

] SEISMIC QUALIFICATION REVIEW

} Table 2 1

j Zimmer Equipment Qualification Summary 1

SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: C41-N006

158B7072 Fenwal 158B7072P7 l Temp. Element - Thermowell only i

QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

1

{ a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No-None b. Reason for

Conclusion:

i

Qualification information is not available.
b. Qualification by:_ Analysis: Test

- c. Qualifical.ian .Information 1'2 :

l3 l None

}

i I c. Plans for Reevaluation /Requalifi-j cation:

] ,

' Reevaluation to new loads is underway.

I 4

)

I i'

Si, 'ET Of 4

)

i I

l .- . , , . _ , . _ . . - - . . __ .

?

O O O  :

i .

SEISMIC QUALIFICATION REVIEW  ;

4  ;

I Table 2 l l  ;

Zimmer Equipment Qualification Summary

! SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: C51-K002 ~

i

) GE 163C1263 Voltage Preamp.

QUALIFICATION METiiOD:

3 SQRT REVIEW RESULTS: .

! a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No S

i None, b. Reason for

Conclusion:

f Qualification information is not available.

l b. Qualification by: Analysis: Test Qualification Information 1'2 :

2 l c.

h

} None.

i '

i I

l c. Plans for Reevaluation /Requalifi-

cation

1-

Requalification by test is 4

underway.

I i

) -

i SIIEET Of 6

4

J o O O 4

SEISMIC OUAI.IFICATION REVIEW ~

Table 2

't

Zimmer Equipment Qualification Summary

{ !iPECIFICATION NUMilER: -

EQUIPMENT / COMPONENT: C51-N002 GE/112C3144G008 IRM Detector 135B8363P208

. QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No f GE Heport No. 994-79-007 b. Reason for

Conclusion:

May 14, 1979 Testing performed to sufficiently high g levels. Operability was

. verified,

, b. Qualification by: Analysis: X Tent

$ c. Qualification Information '

1 i Resonance search performed.

j Operability assessment performed.

Sinusoidal testing conducted.

i c. Plans for Reevaluation /Pequalifi-l cation:

. Evaluation to new loads is i

! underway.

! SilEET Of i ,

i i

}

-- - - , ~. - - -.

o O O-SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: C71-N002 STATIC-O-RING 12N-AA4-TT Press. Switch QUALIFICATION METi!OD: ,

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No Static-0-Ring Report No. 7013-100 April 1974 b. Reason for

Conclusion:

Test conducted to sufficiently i high levels. Operability X

demonstrated.

b. G alification by: Analysis: Test ,

1,2

c. Qualification Information l Natural frequency search performed from
0 - 1000 IIz. Sinusoidal testing performed.

Operability demonstrated.

3 c. Plans for Reevaluation /Requalifi-

! cation:

None.

1 i

1 l SIIEET Of l

l

l O O o SEISMIC QUALIFICATION REVIEW 4

Table 2 Zimmer Equipment Qualification Summary i

SPECIPICATION NUMBER: EQUIPMENT / COMPONENT: D13-N003 Gamma Detector i GE 237X731 QUALIFICATION METi!OD:

SORT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No

! GE Report No. 994-79-015 b. Reason for

Conclusion:

September 5, 1979 Testing performed to sufficiently
high g level. Operability was
b. Qualification by: Analysis: X Test verified.

l '

c. Qualification Information  :

Resonance search performed to 60 IIz.

Sinusoidal testing performed to

, 20 g's @ 3 3 11z . Operability was i demonstrated.

c. Plans for Reevaluation /Requalifi-cation:

Evaluation to new loads is j

in progress.

I 1

i

) SlIEET Of A

o O O i

SEISMIC QUALIFICATION REVIEW Table 2 t

Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: E31-N022 154C4606 Barksdale PIII-M85SS-V Switch QUALIFICATION METi!OD:

SQRT REVIEW-RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No Ogden Technology Laboratories Report No. b. Reason for

Conclusion:

F-73493, September 24, 1973 Resonance search was not performed beyond 3311z.

b. Qualification by: Analysis:- x Test
c. Qualification Information  :

Resonance. search performed from 2.to.3311z.

Fragility testing performed to 29g's @ 30'liz.

Operability was demonstrated. t

-c. Plans for Reevaluation /Requalifi-cation: ,

Requalification by test is underway.

l SilEET Of

e l-

____ . . _ - - _ _ _ - , . - . . --. -- .--. .- _ - _ - ._ . . - ~ _ _ _ .

I O O O l SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary i

SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

! 169C8338 E32-N006 Schutte and Koerting

{ 20-9651-8550

, QUALIFICATION METilOD: '

j SQRT REVIEW RESULTS:

i j a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No None b. Reason for

Conclusion:

! Qualification information is not .

l available i b. Qualification-by: Analysis: Test Qualification Information 1'2 :

! c.

f None i

}-

t t

t

c. Plans for Reevaluation /Requalifi-I cation:

i  !

,. Requalification by test is underway i

I i

j '

SIIEET Of I si 4

i I _

o O O SEISMIC QUALIFICATION PEVIEW Tabic 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: E32-N053 169C8339 Schutte & Koerting 91-X-16-4-20 Plow Xmtr.

QUALIFICATION METIIOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; 'X No None .b. Reason for

Conclusion:

Qualification information is not available

b. Qualification by: Analysis: Test
c. Qualification Information  :

None

c. Plans for Feevaluation/Requalifi-cation:

Requalification by test is underway.

SIIEET Of s

i SEISMIC QUALIFICATION REVIEW Table 2 l

Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

3 145C30ll E51-N006 Static-O-Ring 6N-AA21-VSTT Pressure Switch QUALIFICATION METilOD:

1 SQRT REVIEW RESULTS:

I i

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No i Static-O-Ring Report no. 7013-100 b. Reason for

Conclusion:

j April 26, 1974 Testing performed to sufficiently high g level. Operability was demonstrated.

b. Qualification by: Analysis: X Test l,2
c. Qualification Information l Resonance search performed to 1000 Itz. Sinusoidal
testing performed to 39's horizontal and lg

} vertical. Operability was demonstrated.

l

c. Plans for Reevaluation /Requalifi-cation
None 1

SilEET Of i

I l

i

. - . .. .- -. . . . - . ~ - - . . _ . . - _ .- -__-. . . . _ _ - . _ - . _ . . - .

O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

163C1186 Diff. Press Transmitter Bailey 556 e M st below QUALIFICATION METilOD: Test SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No 1

l GE 262A7391 b. Reason for

Conclusion:

a Testing performed to sufficiently high 1

g levels. Operability was demonstrated.

b. Qualification by: Analysis: X Test
c. Qualification Information  :

I Vibration up to 10g's (all 3 areas) resulted

) in output changes of .03%, 12% and 1.5% in

horizontal f-r, horizontal s-s, and *

! vertical axes respectively during the vibration,

] and a max. .03% deviatien after the test.

Resonant frequencies vertical 40.0, horizontal- c. Plans for Reevaluation /Requalifi-l none, longitudinal-none. cation: None E51-N007 B21-N051

E51-N008 C34-N005
E51-N004 C41-N004
j. E51-N005 E12-N026

! C34-N008 E12-N028 l ,

C34-N008 E22-N004 l SIIEET Of i '

i

,m f's ,.o ud ,

SEISMIC QUALIFICATION REVIEW Tabic 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

163C1183 Bailey 555 Transmitter See MPL List below QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No None b. Reason for

Conclusion:

Qualification information is not

b. Qualification by: Analysis: Test availabic.
c. Qualification Information  : None
c. Plans for Reevaluation /Requalifi-cation:

Obsolete - To be replaced by a qualified item.

B21-N027 E31-N015 B21-N032 E31-N035 B21-NO33 E31-NO36 B21-NO34 C34-N004 S!!EET Of E12-N013 '

E12-N015 E21-N003 E22-N005

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT /FOMPONENT:

145C3009P012 Barton 288A Pressure Switch See MPL List Below QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X _,Yes; No ITT Barton/R3-288A-1/10-2-79 b. Reason for

Conclusion:

Multif requency , multiaxial testing performed. TRS enveloped RRS.

b. Qualification by: Analysis: X Test Operability was demonstrated.
c. Qualification Information ' :

Bi-axial random motion test.

1-33 112 5 tests at OBE, level one at SSE, level 35 seconds each. Resonance search performed and operability demonstrated c. Plans for Reevaluation /Requalifi-cation:

None 288A 288 B21-N024 C71-N004 T49-N004 B21-NO31 E12-N029 T49-N005 B21-NO37 E12-N009 B21-NO38 E21-N006 E22-N009 S!!EET Of E22-N013 E31-N007 .

E31-N008 E31-N009 E31-N010 E31:n811

O O 1 t SEISMIC QUALIFICATION REVIEW Table 2 l Zimmer Equipment Qualification Summary i

j SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

5' 145C3046 Barksdale D2H-M80SS

! Pressure Switch QUALIFICATION METilOD: See MPL List Below SQRT REVIEW RESULTS:

j a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No

, Ogden Technology Laboratories, Report No. b. Reason for

Conclusion:

, F-10670, ' November 21, 1968 l

Natural frequencies were not i calculated. Operability was not

b. Qualification by: Analysis: X Test demonstrated. Test duration was short, l,2
c. Qualification Information i

Subjected to high impact shock tests. .

4 r

c. Plans for Reevaluation /Requalifi-j cation:

I .- Requalification by test is underway i E51-N009 .

E51-N012 I

! E51-N021 1

i i

f

^

i SilEET Of 1

I

O O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

164C5359 Barksdale BIT-M12SS Switch See MPL List Below QUALIFICATION METI!OD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No None b. Reason for

Conclusion:

Qualification information is not available.

b. Qualification by: Analysis: Test
c. Qualification Information  : None c.. Plans for Reevaluation /Requalifi-cation:

Requalification by test is underway.

B21-N020 B21-N023 B21-N024.

B21-NO39 B21-N045.

- C71-N003 SilEET Of E12-NO32 '

E12-N033

i SEISMIC QUALIFICATION REVIEW -

j Table 2 1

l Zimmer Equipment Qualification Summary

\

SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

, 159C4606. Barksdale PIH-M340SS-V Switch i

1  !

QUALIFICATION METHOD

j SQRT REVIEW RESULTS:  !

j a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; x No ,

i l Ogden Technology Laboratories b. Reason for

Conclusion:

i Report No. F-73493, Sept. 24, 1973 ,

Resonance search was not performed l i beyond 33 Hz. Operability was not t Qualification by: Analysis: x Test adequately demonstrated. j l

b.

t i

c. Qualification Information 1'2 : '

l 4  :

1 Resonance search performed from 2-33 Hz. .

j- Sinusoidal testing performed up to 29 9's930Hz Chatter' monitored.  ;

1 c. Plans for-Reevaluation /Requalifi- l cation:

}

^

Requalification by test is. underway.  !

i i

+

1 i '

B33-N018B SHEET Of E21-N001 E21-N009  ;

E22-N012 ,

i

! b I, I i

1 i

r-~x r~'s ,s C' \ -

! (,'

SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

145C3008P011 Barton 289 Switch See MPL List Below QUALIFICATION METIIOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No GE/ Report 225A6225 b. Reason for

Conclusion:

May 1970 Resonance search was not performed beyond 33Hz. Duration of sine test Qualification by: Analysis: was not specified.

b. X Test
c. Qualification Information  :

Resonance search performed from 5-33Hz Sinusoidel test performed. Operability was demonstrated.

c. Plans for Reevaluation /Requalifi-cation:

Requalification by test is underway.

E12-N010 SIIEET Of E21-N004 E22-N006 E51-N002

o O o SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIPICATION NUMBER: EQUIPMENT / COMPONENT:

GE/194X927 Sens. & Conv.

See MPL List Delow QUALIFICATION METi!OD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No GE Report No. 225A6607 .
b. Reason for

Conclusion:

November 1970 Resonance search was not performed beyond 33 11z.

b. Qualification by: Analysis: X Test
c. Qualification Information  :

Resonance search performed to 37 I!z.

Fragility test perforned to 159's 0 33 I!z.

Operability was demonstrated.

c. Plans for Reevaluation /Requalifi-cation:

Requalification by test is underway.

D13-N009 D13-N019 SilEET Of

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Sumnary ,

1

, SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

Magnetrol 5.0 - 751 Level Switch i

159C4361 See MPL List Below 4,

QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

i I

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; No Ogden Technology Lab. F-73436 b. Reason for

Conclusion:

No indication of chatter in excess ,

i of one microsecond during resonance i b. Qualification by: Analysis: X Test search or endurance test. No visible i

evidence of damage or deformation -

c. Qualification Information '
resulting from the vibration.
Equipment tested to sufficiently high Resonance search test 4 to 1000 IIz input g-level operability.vas demonstrated.

I level .3g at rate of 1 octave per min.

, Resonance endurance test, 15 sec. dwell I

test at each discrete frequency from 4 to i 30 IIz at an input of .5g vertical and 1.5g c. Plans for Reevaluation /Requalifi-horizontal. Fragility test performed up cation:

! to 10g's. Operability was demonstrated.

None

, Cll-N013 E51-U010 e

SilEET Of j

t I

O O SEISMIC QUALIFICATION REVIEW l Table 2 ,

Zimmer Equipment Qualification Summary i

, SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

117C3485 Pyco Temp Element l QUALIFICATION METilOD:

i SQRT REVIEW RESULTS:

l a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No None b. Reason for

Conclusion:

No qualification information is avail-1 able

b. Qualification by
Analysis: Test i c. Qualification Information I'  :

i i None i

l l c. Plans for Reevaluation /Requalifi-1 cation:

1 j . Requalification by analysis is under-l way B33-NO35 1 j E12-N004

. E12-N005

! E12-N027 E12-NO31 933-N021 a

i Si!EET Of s '

l a

r r-, - sv , , - - -. , -- _

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

145C3224P001 PYCO 145C3224P1 Thermocauple See MPL List Below QUALIFICATION METHOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No

. ason for

Conclusion:

Ogden Technology Laboratories Report No. 70822, February 7, 1972 Resonance search was not performed beyond 33 Hz. Operability was not

b. Qualification by: X Analysis: Test demonstrated during the test.

Fragility level and duration info

c. Qualification Information 1'2  : was not specified.

Resonance search performed from 5-33 Hz.

Operability verified after test.

Fragility test perforned.

c. Plans for Reevaluation /Requalifi-cation:

7 Requalification by test is underway.

E31-N001 E31-N002 E31-N004 E31-N003 E31-N005 E31-N006 SHEET Of E31-N018 E31-N024 E31-N027 E31-N025 ,

E31-N028 E31-N026' E31-N029 E31-N030 E31-N031

o O o SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

163C1184P016 Robertshaw 713B Pressure Indicator See MPL List Below QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No TII Testing Laboratories Report No. 4938 February 7, 1973 b. Reason for

Conclusion:

Resonance search was performed.

Equipment tested to sufficiently high g levels. Operability was

b. Qualification by: Analysis: X Test demonstrated.
c. Qualification Information  :

Resonance search performed to 200 !!z.

Sinusoidal testing performed at all resonances to 4G horizontal and 2G vertical. Operability was demonstrated.

c. Plans for Reevaluation /Requalifi-cation:

None B21-R004 E51-R002 C41-R003 E51-R003 E21-R001 E51-R004 E21-R002 E22-R001 E22-R002 E51-R001 SIIEET Of

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary r SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

163C1185P003 Robertshaw SP-222-C Pressure Switch See MPL List Below QUALIFICATION METHOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No None b. Reason for

Conclusion:

Qualification information not available.

b. Qualification by: Analysis: Test
c. Qualification Information  : None
c. Plans for Reevaluation /Requalifi-cation:

, Requalification by test is. underway.

E12-N018 E12-N022 SHEET Of E21-N005 .

E22-N003

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

163C1917 Rosemount 535E Temperature Transmtr See MPL List Below QUALIFICATION METl!OD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No None b. Reason for

Conclusion:

Qualification information is not

b. Qualification by: Analysis: Test available.

l,2

c. Cualification Information  : None
c. Plans for Reevaluation /Requalifi-cation:

Requalification by-test is underway.

B33-N023 T49-K001 SilEET Of

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

163C1558P612313 163C1561P412203 Rosemount 1151 AP Transmitter See MPL List Below QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria' Met: X Yes; No Rosemount/117415 Rev. A/5/3/76 b. Reason for

Conclusion:

Sinusoidal testing perforned at the resonant frequencies. Test to I b. Qualification by: Analysis: X Test sufficiently high g levels.

Operability was demonstrated.

c. Qualification Information  :

4 Single axis sine dwell testing performed at all resonant frequency with bracket and at 10,20,30, IIz without bracket. Amplitude 3" at 10!!z , 3g at the resonant frequencies.

Operability was demonstrated. c. Plans for Reevaluation /Requalifi-j cation:

None i B33-N014 T49-N001

, B33-N015 T49-N002

] B33-N024 T49-N006 l C34-N003 T49-N007 E32-N050 i

E32-N051

. E32-N054 SilEET Of E32-N055 '

E32-N056 E32-N058 E32-N059 E32-N060

, E32-N061 E51-N003

o o o SEISMIC QUALIFICATION REVIEW >

Table 2  ;

Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

145C30ll Static-O-Ring SN-AA3-SITT [

f Pressure Switch j QUALIFICATION METIlOD: See MPL List Below SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SnRT Criteria Met: X Yes; No Static-O-Ring Report No. 7013-100 4/26/74 b. Reason for

Conclusion:

Testing performed to sufficiently high g level. Operability was

b. Qualification by: Analysis: X Test dem nstrated.

I

c. Q'talification Information 1'2 :

Resonance search performed to 1000 IIz. Sinusoidal testing performed to 3 g's horizontal and lg vertical. Operability was demonstrated.

i-I J

c. Plans for Reevaluation /Requalifi-cation:

I None B33-N018A E12-N016 i E12-N019 4

SilEET Of

, s 1

o O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

Design Spec. 22A2702BC Used as the basis for qualification of the Test Spec. CGE-03-092 following Zimmer Local Panels:

H22-P002 H22-P015 H22-P021 H22-P027 QUALIFICATION METHOD: H22-P004 H22-P017 H22-P025 H22-PO41 H22-P005 H22-P018 H22-P026 H22-P073 SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No Soutitwest Research Institute 02-6056-001 b. Reason for

Conclusion:

November 7, 1980 Testing conducted per IEEE 344-1975.

Seismic and Hydrodynamic Loads were considered. TRS enveloped RRS.

b. Qualification by: Analysis: X Test
c. Qualification Information  :

Multi-frequency, Multi-axis response spectra testing of Zimmer 72" Local Panel Mock-up,

c. Plans for Reevaluation /Requalifi-cation:

. None SHEET Of

o O O

] .

SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

Used as the basis for qualification of I

Design Spec. 22A2702BC the following Zimmer Local Panels:

Test Spec. CGE-03-102 H22-P001 H22-P010 H22-P021 H22-P024 QUALIFICATION METHOD: H22-P009 H22-P017 H22-P022 H22-P027 SQRT REVIEW RESULTS: H22-P029

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No i Southwest Research Institute 4 02-6056-001 b. Reason for

Conclusion:

1 December 30, 1980 Testing conducted per IEEE 344-1975.

Seismic and Hydrodynamic Loads were i considered. TRS enveloped RRS.

i b. Qualification by: Analysis: X Test 4 c. Qualification Information  :

Multi- frequency, Multi-axis response spectra
testing of Zimmer 48" Local Panel Mock-up.

1 c. Plans for Reevaluation /Requalifi-

! cation:

i None

SilEET Of i

I

1 o O O SEISMIC OUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

Design Spec. 22A2702BC Used as basis for Qualification of the Test Spec. CGE-03-104 following Zimmer Local Panels:

II22-P004 . H22-P006 II22-P074 QUALIFICATION METi!CD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date
a. SQRT Criteria Met: X Yes; No Southwest Research Institute b. Reason for

Conclusion:

02-6056-001 January 23, 1981 Testing conducted per IEEE 344-1975.

Seismic and 'llydrodynamic Loads were 1 b. Qualification by: . Analysis: X Test considered. TRS enveloped RRS.

c. QualificatEon Informationl ,2 Multi-frequency, Multi-axis response
spectra testing of Zimmer 30" Local Panel Mock-up,
c. Plans for Reevaluation /Requalifi-cation:

. None i

SilEET Of

O O o SEISMIC QUALIFICATION REVIEW i

Tabic 2 '

Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

22A2702BC Ill3-P601 Reactor Core Cooling Benchboard QUALIFICATION METilOD: 204" Nide Benchboard SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No
1) General Electric Seismic Summary: 249A1711 July 9, 1976, Test Report: 22A4315 b. Reason for

Conclusion:

2) Sargent & Lundy, E or D 021333 February 8, 1980 Seismic loads were considered. The actual stresses were lower than the
b. Qualification by: X Analysis: X Test allowable stresses. The test ZPA level was higher than the Zimmer
c. Qualification Information 1'2 : Control Room floor ZPA level.

Natural frequencies determined to be 15 IIz for S/S, 13 & 19 IIz for F/B and 31 & 33 IIz for V.

Test results recommend rear support for all recorders. Low transmissabilities indicate successful operation during a seismic event of c. Plans for Reeva?xuation/Requalifi-0.75G. cation:

A dynamic analysis was performed in which all natural frequencies were calculated. NONE.

SIIEET Of i

~ ~

l e 1

i

)

i

~

1 TABLE 2 EQUIPMENT QUALIFICATION

SUMMARY

' CONTROL ROOM PANELS l

t 1

)

EQUIPMENT / COMPONENT i

lil3-P601 Reactor Core Cooling Benchboard I

i l CLASS lE INSTRUMENTS i

1 l NAME IDENTIFICATION I 159C4486 Square Root Converter j

Switch (Type CR2940) 145C3040

Controller 163Cl392 1 Switch (Pushbutton) 145C3230 Switch (SBM Control) 234A9329 Switch (Series 40) 249A1892 Switch (SBM Control) 262A6023 Switch 163C1420 Switch (SBM Control) 262A7721 i

a l

g (^s, (~1 U V V SEISf11C QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT: II13-P603 Reactor 22A2702BC 124" wide benchboard QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SORT Criteria Met: X Yes; No
1) General Electric 994-78-140 November 3, 1978 ATR-510-EA004-01 August 1977 b. Reason for

Conclusion:

2) Sargent & Lundy EMD 021333 February 8, 1980 Seismic loads were considered. The actual stresses were lower than the Qualification by: all wable stresses. The test ZPA level
b. X Analysis: X Test was higher than the Zimmer control room 1,2 floor ZPA level
c. Qualification Information Natural frequencies determined to be 14 & 23 Ilz for S/S, 12 IIz for F/B and none observed for V.

Analysis based on results of Fermi 2 lill-P603 Seismic Test. Single frequency, single axis, sine beat test. 3 tests - 1 each axis. . .

c. Plans for Reevaluation /Requalifi-Frequency range 1 IIz - 33 IIz. Test results show seismic requirements met structurally and cation:

functionally. None A dynamic analysis was performed in which all natural frequencies were calculated.

Si!EET Of

i TABLE 2 l

EQUIPMENT QUALIFICATION

SUMMARY

l i

CONTROL ROOM PANELS i

EQUIPMENT / COMPONENT H13-P603 Reactor Control Benchboard i

CLASS lE INSTRUMENTS ,

NAME IDENTIFICATION i

Switch (Pushbutton) 145C3230 Relay 145C3238 Switch 169C8044 Switch 17489070 i j Range Switch 126X494 Switch (Type CR2940) 145C3040 i

c - . ,,, , - - . .- -

hJ mj O) u SEISMIC O 'ALIFICATION REVIEW Table 2 Zimmer Equiprent Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

22A2702BC H - 608 Powgr Range Neutron Monitoring Cabinet Y

QUALIFICATION METHOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No General Electric Seismic Summary: 262A7235 October 29, 1974 b. Reason for

Conclusion:

Qualification Test Report: 235A1893 January ll, 1972 Operability demonstrated during test Test Report: 22A4563 August 26, 1975 suggested modifications will be Qualification by: Analysis: X Test implemented at Zimmer. Test ZPA

b. ,

level was higher than the Zimmer l,2 control room floor ZPA level.

c. Qualification Information Natural f;equencies determined to be 8 & 16 Hz for S/S, 19 and 24 Hz for F/B and 14 & 26 Hz for V.

Analysis based on results of Hanford 2 H13 - P608 seismic test. Single frequency, single axis, sine beat 3 tests - 1 each axis. Frequency . c. Plans for Reevaluation /Requalifi-range 1 Hz - 33 Hz. Test results show panel will .

^ #UU*

operate successfully at 0.7G horizontal and 0.4G vertical ZPA. Suggested modifications to module restraint system, power supply plugs, card support None.

cage, and door latches to meet 1.2G level.

CLASS lE INSTRUMENTS:

General Electric classifies this entire panel as a single device.

SHEET Of

O O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

MK2-02-057 I!13-P609 Reactor Protection System A Vertical Board QUALIFICATION METilOD: Ill3-P611 Reactor Protection System B Vertical Board SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: . X Yes; No Wyle Laboratories, Report 58626 April 1981 b. Reason for

Conclusion:

Testing conducted per IEEE 344-1975. Seismic loads were

. . . considered. TRS enveloped RRS.

b. Qualification by: Analysis: X Test ,
c. Qualification Information  :

Multi-frequency, multi-axis response spectra testing of Ill3-P609 panel mock-up. Panel Ill3-P611 is of the same size and construction as Ill3-P609.

c. Plans for Reevaluation /Requalifi-cation:

None.

l

[

SIIEET Of i.

O O o i

I 4

s TABLE 2 EQUIPMENT QUALIFICATION

SUMMARY

CONTROL ROOM PANELS i EQUIPMENT / COMPONENT i

H13-P609 Reactor Protection System A Vertical Board H13-P611 Reactor Protection System B Vertical Board ,

i t

CLASS lE INSTRUMENTS NAME IDENTIFICATION Relay (Time Delay) 145C3035 Relay (Panel Auxiliary) 136B3137 Switch (Type CR2940) 145C3040 Contactor 145C3209 ,

e

-,e~_ - m -.. , ,

2

! O O i

j SEISMIC QUALIFICATION REVIEW t

Table 2 l Zimmer Equipment Qualification Summary i SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

l 1113-P612 Feedwater and Recirculation

, MK2-02-057 Instrument Panel 60" Wide Instrument Rack QUALIFICATION METi!OD:

SQRT REVIEW RESULTS:

,1 j a. Company / Report Number /Date: a. SQRT Criteria Met: X-Yes; No Wyle Laboratories, Report 58626 April 1981

b. Reason for

Conclusion:

!q Testing conducted per IEEE 344-1975. Seismic loads were j b. Qualification by: Analysis: X Test considered. TRS enveloped RRS.

I '

c. Qualification Information  :

1 4

Multi-Frequency, Multi-Axis Response Spectra Testing of Ill3-P612 Panel

Mock-up.
c. Plans for Reevaluation /Requalifi-cation:

i NONE.

l

, SIIEET Of l

l i

o

?

i O

l i

a i ,

TABLE 2 -l

/

1 '!

{

EQUIPMENT QUALIFICATION

SUMMARY

i I CONTROL ROOM PANELS i

l l l

i i EQUIPMENT / COMPONENT 1

l lil3-P612 Feedwater and Recirculation Instrument Panel .

i t

3 1

l I i t a I

1 CLASS lE INSTRUMENTS  !

l i l i '

NAME IDENTIFICATION Inverter 145C3027 Relay 145C3238 Power Supply 159C4487 L 1 Filter, Inverter 163C1566 t i i 1

J -

i

}

1  :

( l i

_ _ _ _ _ _ _ _ _ _ _ _ . - - - _ _ _ . . _ _ _ _ _ _ _ _ _ . . . _ _m._

o O O -

SEISMIC QUALIFICATION REVIEW f

, Table 2 f i

Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

MK2-02-057 H13-P613 NSSS Process Instrumentation 4

Panel j QUALIFICATION METHOD: 30" Wide Instrument Rack

SQRT REVIEW RESULTS:
a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No

! Wyle Laboratories, Report 58626 b. Reason for

Conclusion:

April 1981 l Testing conducted per IEEE 344-1975. Seismic.lcads were

b. Qualification by: Analysis: X Test considered. TRS enveloped RRS.

{

l,2

c. Qualification Information Multi-Frequency, Multi-Axis Pesponse '

j Spectra Testing of Zimmer HlJ-P613 Panel Mock-up.

j c. Plans for Reevaluation /Requalifi-i 4

cation:

I .

None.

2 a

4 b

4 SIIEET Of s ..

l 1

i

1 i

O O l

l 1

TABLE 2

} '

} EQUIPMENT QUALIFICATION

SUMMARY

l j CONTROL ROOM PANELS  !

1 i i  :

4

.i l

  • l EQUIPMENT /COMPGNENT i H13-P613 NSSS Process Instrumentation Panel I

t  :

I r

CLASS lE INSTRUMENTS i i  !

I NAME IDENTIFICATION j Relay 145C3238 Power Supply 159C4560 l

4 5

i i

I w 4 h +r . . . - - ,

O O O SEISMIC QUALIFICATION REVIEW

' Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

MK2-02-057 Ill3-P618 Div. II RIIR Relay Vertical Board Ill3-P625 IIPCS Relay Vertical Board Ill3-P629 DIV. I LPCS & PJIR a Vertical Board QUALIFICATION MET 110D: 48" Wide Vertical Board SQRT REVIEW RESULTS:

a. Company / Report Number /Da te : a. SQRT Criteria Met: X Yes; No Wyle Laboratories Report 58626 b. Reason for

Conclusion:

April 1981 Testing conducted per IEEE 344-1975.

Seismic Loads were considered. TRS

b. Qualification by: Analysis: X Test enveloped RRS.
c. Qualification Information  :

Multi-Frequency, Multi-Axis Response Spectra Testing of Zimmer lil3-P618 Panel Mock-up.

Panels Ill3-P625 and lil3-P629 are of the same size :and construction as Ill3-P618 c. Plans for Reevaluation /Requalifi-cation:

None SIIEET Of L

j

! O O o j

4

. r 4

I i

TABLE 2 EQUIPMENT QUALIFICATION

SUMMARY

i

~

CONTROL ROOM PANELS 1

j EQUIPMENT / COMPONENT Ill3-P618 Div. II RilR Relay Vertical Board 1

i t CLASS lE INSTRUMENTS

}

4 NAME IDENTIFICATION i

l Relay, Panel Auxiliary 159C4251

!. Relay, Panel Auxiliary 136B3137 I Relay, Time Delay 145C3035 Switch (Type CR2940) 145C3040 l

i, l

4 e

e J

i l

I i

_ _- _ _ _ _ ~ _ _ _ _ . . _ . _ _ . _ _

)-

i O O i

l i

i

?

i TABLE 2 -

! EQUIPMENT QUALIFICATION

SUMMARY

l CONTROL ROOM PANELS l

EQUIPMENT / COMPONENT i

Ill3-P625 IIPCS Relay Vertical Board CLASS lE INSTRUMENTS t

l NAME IDENTIFICATION l

l Relay, Panel Auxiliary 159C4251 t

Relay, Panel Auxiliary 136B3137 i

i ,

t i

T

}

j .;

i _ . . _ _ . _ _ . - __. _-

1 O O o I

l -

i i

1

TABLE 2 ,

j EQUIPMENT QUALIFICATION

SUMMARY

i CONTROL ROOM PANELS 1

I EQUIPMENT / COMPONENT i Ill3-P629 Div. I LPCS & RIIR A Relay Vertical Board l

i CLASS lE INSTRUMENTS i

l NAME IDENTIFICATION

. i j

Relay, Panel Auxiliary 136D3137 j Relay, Time Delay 145C3035 Switch, (Type CR 2940) 145C3040 Relay, Panel Auxiliary 159C4251 Relay .145C3230 i

l i

i 1

i O O O

SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER
EQUIPMENT / COMPONENT:

MK2-02-057 Ill3-P621 RCIC Relay Vertical Board Ill3-P622 Inboard Valve Relay Vertical Board Ill3-P623 Outboard Isolation Valve Relay Vert. Brd.

QUALIFICATION METIlOD: 24" Wide Vertical Board SQRT REVIEW RESULTS:

! a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No 4 Wyle Laboratories Report 58626 b. Reason for

Conclusion:

April 1981 Testing conducted per IEEE 344-1975.

Seismic Loads were considered. TRS

b. Qualification by: Analysis: enveloped RRS.

X Test

c. Qualification Information 1' :

Multi-Frequency, Multi-Axis Response

, Spectra Testing of Zimmer Ill3-P621 i Panel Mock-up. Panels Ill3-P622 and Ill3-P623 are of the same size and 1

construction as Ill3-P621.

c. Plans for Reevaluation /Requalifi-cation:

4 Mone SIIEET Of n

J

i O O o i

t i

1 i

TABLE 2 EQUIPMENT QUALIFICATION

SUMMARY

CONTROL ROOM PANELS EQUIPMENT / COMPONENT

' H13-P621 RCIC Relay Vertical Board I

i

! CLASS lE INSTRUMENTS 1

e l

1 l NAME IDENTIFICATION i

! Relay, Panel Auxiliary 159C4251

! Relay, Panel Auxiliary 136B3137 Relay, Time Delay 145C3035 t

I i

o 1

O l

a TABLE 2 i EQUIPMENT QUALIFICATION

SUMMARY

l CONTROL ROOM PANELS l

l EQUIPMENT / COMPONENT Ill3-P622 Inboard Valve Relay Vertical Board l Ill3-P623 Outboard Isolation Valve Relay Veritical Board i

i I

j CLASS lE INSTRUMENTS i

1

NAME IDENTIFICATION I

j Relay, Panel Auxiliary 136B3137 l

Relay 145C3238 I

l I

i

}

l ,

t 1

I i

)

. o O O SEISMIC QUALI1'ICATION REVIEW Table 2 Zimmer Equipment Qualification Summary '

SPECIFICATION NUMBER: 22A2702BC EQUIPMENT / COMPONENT:

H13-P628 ADS Channel A Vertical Board H13-P631 ADS Channel B Vertical Board H13-P642 DIV. II Leak Detection Vert. Board:

QUALIFICATION METHOD: .36" Vertical Board  !

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No General Electric Company Un-numbered seismic summary dated 1/13/79 b. Reason for

Conclusion:

by N. Luria. H13-P654, P655-Apparent Test Report - Perry H13-P654 and P655 Testing conducted per IEEE 344-1975.

Seismic Loads were considered. TRS

b. Qualification by: Analysis: X Test enveloped RRS.
c. Qualification Information  :

Natural frequencies determined. Analysis based

on results of Perry H13-P654 Seismic Test Multi-frequency, multi-axis, random motion test.

50DE, 4SSE, 3 sine sweep tests, 3 transfer functions tests 4 MSIV response spectrum tests (Exceeds GE plant response spectrum between c. Plans for Reevaluation /Requalifi-8Hz and 40Hz) - No abnormalities, cation:

! Frequency Range: Random lHz to 45Hz Mone Sine sWdep 3Hz to 60Hz Test results show no instrument malfunction.

Panels are capable of withstanding seismic events comparable to those associated with the Plant Response Spectra.

SHEET Of i

i

l 0 O O l

A I

i i

4 j TABLE 2

! EQUIPMENT QUALIFICATION

SUMMARY

CONTROL ROOM PANELS i

j EQUIPMENT / COMPONENT l H13-P628 Automatic Depressurization System Channel A Vertical. Board i

i l

i CLASS lE INSTRUMENTS l

NAME IDENTIFICATION 1

Relay 136B3137 j Relay 145C3035 l Switch 145C3040

Relay 159C4251 4

1 4

i .

1 1

l o

o o i

l i

o i

i

! TABLE 2 i

I EQUIPMENT QUALIFICATION

SUMMARY

CONTROL ROOM PANELS l

l EQUIPMENT / COMPONENT l

H13-P631 Automatic Depressurization System Channel B Vertical Board l

1 1

! i

}

CLASS lE INSTRUMENTS NAME IDENTIFICATION Relay, Panel Auxiliary 136B3137 i Relay, Time Delay 145C3035 i Switch (Type CR2940) 145C3040 -

1 Relay, Panel Auxiliary 159C4251 i

i i

1 3

I

0 O o TABLE 2 EQUIPMENT QUALIFICATION

SUMMARY

CONTROL ROOM PANELS i

EQUIPMENT / COMPONENT Ill3-P642 Division 2 Leak Detection Vertical Board CLASS lE INSTRUMENTS NAME IDENTIFICATION Relay, Panel Auxiliary 159C4251 Switch (Type CR2940) 145C3040 Timer, Motor Driven 145C3043 Temperature Monitor 163Cl252 Alarm 159C4660

. . _ - . ~ - . - - - . - - - . - - - -- - . . .-

o O O

)

SEISMIC QUALIFICATION' REVIEW Table 2 l Zimmer Equipment Qualification Summary i

I SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

1 MK2-02-057 Ill3-P632 Div. I Leak Detection i Vertical Board 72" wide vertical l board.

QUALIFICATION METilOD:

SORT REVIEW RESULTS:

l a.- ' Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No Wyle Laboratories Report 58626 b. Reason for

Conclusion:

April 1981 Testing conducted per IEEE 344-1975.

Seismic loads were considered. TRS

b. Qualification by: Analysis: X Test enveloped RRS.
c. Qualification Information  :

Multi-frequency, multi-axis response spectra

- testing of Zimmer Ill3-P632 panel mock-up.

c. Plans for Reevaluation /Requalifi-

. cation:

None SilEET Of

O O o i

TABLE 2 EQUIPMENT QUALIFICATION

SUMMARY

CONTROL ROOM PANELS EQUIPMENT / COMPONENT lil3-P632 Division I Leak Detection Vertical Board CLASS lE INSTRUMENTS NAME IDENTIFICATION .

Relay, Panel Auxiliary 159C4251 Switch (Type CR2940) 145C3040 Timer, Motor Driven 145C3043 Temperature Monitor 163Cl252 Square Root Converter 159C4486 Power Supply 159C4487 Summer 159C4659 Alarm 159C4660 i

1

.o O O SEISMIC QUALIFICATION REVIEW

) Table 2 i

j Zimmer Equipment Qualification Summary j SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

Ill3-P635 Div. I. Radiation Monitor

MK2-02-057 Cabinet Ill3-P636 Div. II. Radiation QUALIFICATION METIIOD

Monitor Cabinet 48" Wide Instrument Rack-SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes;- No Wyle Laboratories j Report 58626 April 1981 b. Reason for

Conclusion:

! Testing conducted per IEEE 344-1975.

j Seismic loads were considered. TRS j b. Qualification by: Analysis: X Test enveloped RRS.

j, c. Qualification Information 1' :

Multi-frequency, multi-axis response spectra testing of Zimmer fil3-P635 Panol mock-up.

Panel Ill3-P636 is of the same size and construction as Ill3-P635.

c. Plans for Reevaluation /Requalifi-cation:
_ ,, None

]

i i

SilEET .Of i

4 1

J 4

i; O O o i l

i i t

l'.

1 TABLE 2 i EQUIPMENT QUALIFICATION

SUMMARY

l l CONTROL ROOM PANELS I

i EQUIPMENT / COMPONENT

{  !

! H13-P635 Division I Radiation Monitor Cabinet H13-P636 Division II Radiation Monitor Cabinet i

l

)

CLASS lE INSTRUMENTS i )

3 l i i l NAME IDENTIFICATION i l Trip Auxiliary Unit 238X697 l WRM-MSV 368X102AA Ind/ Trip Unit 129B2802 i Log. Rad. Mon. 238X660 -i r

+

l l

I - - _ _ . - - _ ,_. _ - _ . . . .

O O o SEISMIC QUALIFICATION REVIEW Table _2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

22A2702BC H13-P655 Div. I. Main Steam Isolation Valve Leakage Control Vertical Board. 60" Wide Vertical Board.

QUALIFICATION METHOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes;-~~~No General Electric Company 994-78-122 Seismic Test Report Summary b. Reason for

Conclusion:

H13-P654/P655 Perry H13-P654, H13-P655 Seismic Test Report Testing conducted per IEEE 344-1975.

Seismic loads were considered. TRS

b. Qualification by: Analysis: X Test enveloped RRS.
c. Qualification Information I' :

Natural frequencies determined. Analysis based on results of Perry H13-P655 Seismic Test. Multi-frequency, multi-axis random motion. 3 sine sweep tests, 3 trans. func. tests 4 MSIV Response Spectrum Tests (Exceeds GE plant response spectra between 8Hz and 40-Hz (no abnormalities). Frequency range: c. Plans for: Reevaluation /Requalifi-Random: lHz - 45Hz Sine Sweep: 3 Hz - 60 Hz cation:

Test results show panel will operate successfully None with a ZPA of .56G but not t6'GE Standard Plant ZPA of 1.8G.

SHEET Of

4 O o l TABLE 2 i '

j EQUIPMENT QUALIFICATION

SUMMARY

l

' CONTROL ROOM PANELS 4

1 l

1 EQUIPMENT / COMPONENT l lil3-P655 Div. I Main Steam Isolation Valve Leakage Vertical

?

Board.

i l,

CLASS lE INSTRUMENTS i

! NAME IDENTIFICATION i

Timer, Motor Driven 145C3043 Relay 145C3238 Power Supply 195C4487 Alarm 159C4660 MV Converter 164C5630

- Switch (Type CR2940) 145C3040

! Meter 169C8317 I

1 1 o O O l

SEISMIC QUALIFICATION REVIEW Table 2 .

Zimmer Equipment Qualification Summary 4

SPECIFICATION NUMBER: EQUIPMENT /COMPCNENT: '

1

, MK2-02-057 H13-P654 MSIV Leakage Control Division II Vertical Board H13-P865 Division I ,

Flammability Control Vertical Board II13-P866 Division II Flammability Control' Vertical Board 30" Wide Vertical Board QUALIFICATION METHOD: SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: x Yes; No

.Wyle Laboratories Report 58626 April 1981 b. Reason for

Conclusion:

Testing. conducted per IEEE 344-1975.

Seismic loads were considered.- TRS enveloped RRS.

i b. Qualification by: Analysis: X Test 1,2

c. Qualification Information j Multi-frequency, multi-axis response spectra c. Plans for. Reevaluation /Requalification:

testing of surplus Zimmer panel H13-P689. Panels j H13-P654, H13-P865, and Ill3-P866 are of the same None.

, size and construction as H13-P689.

1 SHEET OF i

e ~ ,

O O o 1

1 k t i TABLE 2 l

j EQUIPMENT QUALIFICATION

SUMMARY

i

) CONTROL ROOM PANELS i

i i

1

] EQUIPMENT / COMPONENT 1

! H13-P654 MSIV Leakage Control Division II Vertical Board k

i i.

j CLASS lE INSTRUMENTS 1 NAME IDENTIFICATION i

Timer, Motor Driven 145C3043 i

Relay 145C3238 Power Supply 159C4487  ;

l Alarm 159C4660 Switch (Type CR2940) 145C3040 l Meter 169C8317  ;

i 4 -

s l

O O O l

i t

< a e

1 TABLE 2 EQUIPMENT QUALIFICATION

SUMMARY

CONTROL ROOM PANELS I

i r

5 i EQUIPMENT / COMPONENT

H13-P865 Division I Flammability Control Vertical Board j lil3-P866 Division II Flammability Control Vertical Board i

I CLASS lE INSTRUMENTS i

i NAME IDENTIFICATION Switch (Type CR2940) 145C3040 i

Relay 145C3238

, Alarm 159C4660 i Controller 163Cl392 i Multiplier / Divider 163C1919 l Switch, SBM Control 234A9874 Switch, SBM Control 249A1392 i Power Supply 159C4497 i

i i

i 4

O O O SEISMIC QUALIFICATION REVIEW Table 2

! Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

i 129B2802 GE Indicator and Trip Unit QUALIFICATION METIIOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No.

GE Report No. 225A6608 July 21, 1970 b. Reason for

Conclusion:

Duration information was not specified in test report.

b. Qualification by: Analysis: X Test
c. Qualification Information  :

Resonance search performed to 33 IIz. Sinusoidal testing performed.

Input g-level S/S 15g F/B-15g V-15g.

j Functional operability verified.

j c. Plans for Reevaluation /Requalifi-j cation:

Requalification by test is underway.

SIIEET Of

_ . _ ~ _ _ _ - __ . _ _ _ _ _ - _ . _ .. -

L o O O 4

SEISMIC QUALIFICATION REVIEW a

Table 2 Zimmer Equipment Qualification Summary i

SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

136B3137 Gn Auxiliary Panel Relay j 1211FA51A QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No
Wyle Labs. July 14, 1975 Report No. 53303
b. Reason for

Conclusion:

Tested to sufficiently high g levels.

Operability was demonstrated.

l b. Qualification by: Analysis: X Test Qualification Information 1'2 :

I c.

j Resonance search performed to 33 liz.

l Sinusoidal testing performed.

l Input g-level energized.

S/S-11g F/B-llg V-7.5g '

de-energized S/S-llg F/B-llg V-7.5g c. Plans for Reevaluation /Requalifi-g Operability was demonstrated, cation:

l . None.

4 1

SIIEET Of 1

.l

o O O .

SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

145C3027 GE Inverter GWR-125-60 ,

QUALIFICATION METHOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X.Yes; No Ogden Labs, Report No. 70579 June 10, 1971 b. Reason for

Conclusion:

' Tested to sufficiently high g levels.

Operability was demonstrated.

b. Qualification by: Analysis: X Test
c. Qualification Information  :

Resonance search performed to 33 Hz.

l Sinusoidal testing performed.

! Input g level S/S-15g F/B-10g V-79 i Operability was demonstrated.

) c. Plans for Reevaluation /Requalifi-cation:

l , None.

i t

l SHEET Of i

4 4

~ +rs n ,

SEISMIC OUALIFICATION REVIEW i

l Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

i 145C3035 Time delay relay CR2820

QUALIFICATION METilOD

j SQRT REVIEW RESULTS:

i

. a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No 1

GE DVF No. 145C3035

.' b. Reason for

Conclusion:

Duration information was not '

j specified in test report.

  • l b. Qualification by: Analysis: X Test
c. Qualification Information  :

f Resonance search performed to 33 Itz.

Sinusoidal testing was performed.

4 Input g-level S/S-25g, F/D-25g, V-25g.

i Functional operability verified.

, c. Plans for Reevaluation /Requalifi-I cation:

.. Requalification by test is underway.

I 1

i SIIEET Of e

t

4 o O O i SEISMIC QUALIFICATION REVIEW i

. Table 2 >

! Zimmer Equipment Qualification Summary ,

i '

l SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

174B9070 GE Switch CR2940 145C3040 QUALIFICATION METHOD:

., SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No I Report No. 225A6280 .

December 17, 1969 b. Reason for

Conclusion:

f

Tested to sufficiently high g levels.- i j Operability was demonstrated.
b. Qualification by: Analysis: X Test 4
c. Qualification Information  : +

l Resonance search performed to 33 Hz. Sinusoidal testing performed. '

Input g-level S/S-20g F/B-20g V-20g.

Functional operability verified.

c. Plans for Reevaluation /Requalifi-i i

cation: I l . None l

1 SHEET Of I

f

! O O o

} SEISMIC QUALIFICATION REVIEW I

Table 2 t Zimmer Equipment Qualification Summary

SPECIFICATION NUMBER
EQUIPMENT / COMPONENT:
145C3043 Timer, Motor Driven j IIP 51A6 (to 55A6) l l QUALIFICATION METilOD

{

SQRT REVIEW RESULTS:

a. Company / Report' Number /Date: a. SQRT Criteria Met: Yes; X No Eagle Signal Report No. OLR-IIP 55A6 January 3, 1972 b. Reason for

Conclusion:

i

! Operability was not demonstrated.

I i

b. Qualification by: Analysis: X Test j c. Qualification Information 1'2 :

l

,7 -

Resonance scarch. performed to 1000 I!z. t

Sinusoidal testing perforned.

Input g-level S/S-10g, F/B-10g, V-10g.

i

c. Plans for Reevaluation /Requalifi-j cation:

l ,

Requalification by test is underway.

9 SilEET Of 4

, e-, , r- --y. - . - - c ..

v ,

i O O

SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary

]

SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

145C3209 Contactor j CR205 1

! QUALIFICATION METl!OD:

j SQRT REVIEW RESULTS:

j a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No GE Report No. 225A6279 4

Ilay 20, 1970 b. Reason for

Conclusion:

} Duration information was not

! specified in test report.

b. Qualification by
Analysic, X Test I
c. Qualification Information1 '2

i Resonance search performed to 33 I!z.

l Sinusoidal testing performed.

l Input g-level S/S-12g, F/D-12g, V-12g.

t Functional operability verified.

!- c. Plans for Reevaluation /Requalifi-4 cation:

Requalification by test is underway.

! ~

i SIIEET Of j

J

O O O

{ SEISMIC QUALIFICATION REVIEW Table 2 1

1 Zimmer Equipment Qualification Summary I SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

i

, 145C3230 Cutler Hammer Pushbutton Switch

! 10250T1 QUALIFICATION METHOD:

3 SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No
Inland Testing Labs b. Reason for

Conclusion:

Report No. 3359B November 19, 1971 Duration information was not specified in test report.
b. Qualification by: Analysis: X Test
c. Qualification Information ' :
Resonance search performed to 35 I!z.

] Sinusoidal testing performed.

1 Input g-level S/S-10g, F/B-10g, V-10g.

Functional operability verified.

I c. Plans for Reevaluation /Requalifi- I cation:

l , Requalification by test is underway.

s i I i

SIIEET Of l

i

___ _ . _ _ . . . _ . _ . . _ _ - . _ _ _ _ . . _ _ -__ . . - _ . _.. --_-_ _ _ . - _ _ _ __ .. . . _ _ _ _ . . _ . _ ~ . . . _ . . _ _ _ _ . _.

1 O O O .

i

] SEISMIC QUALIFICATION REVIEW ,

t Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

145C3238 Agastat Relay, GPI Model l

i

QUALIFICATION METHOD: ,

SQRT REVIEW RESULTS:

l a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X- No i

i Hyle Laboratories Report No. 53303 b. Reason for

Conclusion:

r

. June 30, 1975 Operability was not demonstrated 1

b. Qualification by: Analysis: X Test i
. c. Qualification Information1 '2
4 Resonance search performed to 33 Hz.

Sinusoidal testing performed.  !

Input g-level S/S-llg, F/B-llg, V-7.5g. t i

I

c. Plans for Reevaluation /Requalifi- ';
cation-

.. Requalification by test is underway.

.. t SiiEET Of l i

O O SEISMIC OUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT /COMPONEI;T:

159C4251 Relay, Panel Auxiliary

. IIMA QUALIFICATION METIIOD:

SQRT REVIEW RESULTS:

l a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No Uyle Labs Report No. 53303 .

b. Reason for

Conclusion:

December 28, 1972 . .

Test to sufficiently high g levels.

Operability was demonstrated.

b. Qualification by: Analysis: X Test
c. Qualification Information1 '2 :

I Resonance search performed to 35 IIz.

i Sinusoidal testing performed.

Input g-level S/S-llg, F/B-llg, V-7.5g.

4

/ c. Plans for Reevaluation /Requalifi-l cation:

None t i, ,

a 5

4 i

SilEET Of l

I, -

l

)

SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

159C4486 Bailey Square Root Converter 750020AAAEl l QUALIFICATION METHOD:

SQRT REVIEW RESULTS:

I

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; Nc GE Report No. C61-P001
b. Reason for

Conclusion:

Tested to sufficiently high g levels.

Operability was demonstrated.

I b. Qualification by: Analysis: x- Test l c. Qualification In' formation ' :

l Resonance search performed to 60 Hz. Sinusoidal l testing performed. Input g-level S/S-8g F/B l 10g V-10g. Functional operability veri fied.

c, Plans for Reevaluation /Requalifi-

! cation:

. None l

SHEET Of s

(

l

. _ . ~ - . .

O O j SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIPICATION NUMBER
EQUIPMENT / COMPONENT:

159C4487 GE Power Supply 9T66Y987G03 4

i QUALIFICATION METIlOD:

SQRT REVIEW RESULTS:

i

! a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No t

GE Report No. 262A6764 b. Reason for

Conclusion:

i

, April 30, 1974 i Operability was not demonstrated.

4 1-

b. Qualification by: Analysis: X Test

! c. Qualification Information  :

I Resonance search was performed to 33 IIz.

. Sinusoidal testing performed.

l Inpug g-level S/S-2.5g F/B-2.5g V-2.5g

, c. Plans for Reevaluation /Requalifi-cation:

]

Requalification by' test is underway.

I ,

I i

7 b

d SiiEET Of i

l l

O O O SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

159C4659 Summer Bailey Meter 752410AAAEl QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SORT Criteria Met: X Yes; No GE/MAC Report Nos. 471 and 525 b. Reason for

Conclusion:

November 16, 1972 and June 14, 1973 Tested to sufficiently high g levels.

Operability was demonstrated,

b. Quali fication by: Analysis: X Test 1,2
c. Qualification Information Resor.ance search performed to 100 112.

Sinusoidal testing performed.

Input g-level S/S-9g F/B-99 V-13g. Functional operability verified.

c. Plans for. Reevaluation /Requalifi-cation:

None SilEET Of

-M

O O o SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

159C4660 Bailey Alarm 7451X0AAAEl QUALIFICATION MET!!OD:

SQRT REVIEW RESUL75:

a. Company /R'eport Number /Date: a. SQRT Criteria Met: X Yes; No GE/MAC Report.No. 468 November 16, 1972 b. . Reason for Conclusior.:

Tested to sufficiently high g levels.

Operability was demonstrated,

b. Qualification by: Analysis: X Test ac . Qualification Information  :

Resonance search performed to 100 IIz.

Sinusoidal testing performed.

Input g-level.S/S-9g F/B 9.5g V-13g.

Functional operability verified.

c. Plans for Reevaluation /Requalifi-cation:

. None ,

i

\

SilEET Of  ;

'l-i i

l

, ,- -- .-- , . ~ . - , - , . . . - - - - - , .--

- - _ . - . . _ _ _ . . . . . --- . . . . - - - _ - . - - .- . . . -- -. _. ~ ~ ~ - _ - - _

O O O 4

SEISMIC QUALIFICATION REVIEW Table 2 3

Zimmer Equipment Qualification Summary SPECIPICATION NUMBER: EQUIPMENT / COMPONENT:

t 163Cl252 Temperature flonitor Relay 86 1

QUALIFICATION METilOD:

E SQRT REVIEW RESULTS:

+

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No i Riley Report No. 900037 .
b. Reason for

Conclusion:

) March 9, 1872 i j Tested to sufficiently high g levels.

j Operability was demonstrated.

b. Qualification by: Analysis: X Test
c. Qualification Information  :

i j Resonance search performed to 30 IIz.

Sinusoidal testing performed.

j Input g level S/S-9g, F/D-8.5g, V-8.0g.

]

Functional operability verified.

J

c. Plans'for Reevaluation /Requalifi-

! cation:

l ,,

None i,

1 i

i i ,

4 SilEET Of 4

i

O O <

i i

SEISMIC QUALIFICATION REVIEW >

f i i Table 2 -

i  !

Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:  !

163Cl392 Bailey Controller 701003AAAEl 2  ;

QUALIFICATION METilOD:

SQRT REVIEW RESULTS: '

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No l GE/MAC' Report No. 502 3 December 21, 1972 b. Reason for

Conclusion:

j Tested to sufficiently high g levels.

Operability was demonstrated.

h b. Qualification by: Analysis: X Test i*

c. Qualification Information 1'2

Resonance search performed to 100 liz. Sinusoidal t - testing performed. Input g level, S/S-20 g F/B-8,5 g V-7.5g. Functional operability verified.

i c. Plans for Reevaluation /Requalifi- i

, cation:

a

. , None k'

t

?

?1 SIIEET Of

s.

[ o O O SEISMIC QUALIFICATION REVIEW i Table 2 ,

l Zimmer Equipment Qualification Summary i

j SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

249A1892 Switch-Electro Switch Series 40 163C1420 i QUALIFI2ATION METHOD:

SQRT REVIEW RESULTS:-

a. Company / Report Number /Date
a. SQRT Criteria Met: X Yes; No i Action Corp. b. Reason for

Conclusion:

l Report No. 2070-01 Tested to sufficiently high g levels.

j Operability was demonstrated.

! b. Qualification by: Analysis: X Test

c. Qualification Information ' :

! Resonance search performed to 25 Hz.

t Sinusoidal testing performed.

I Input'g level.S/S-10g F/B-10g, V-10g.

Functional operability verified.

)j c. Plans for Reevaluation /Requalifi-l cation:

None.

l J

1 SHEET Of s

2

i O O O

! SEISMIC QUALIFICATION REVIEW

, Table 2 i

Zimmer Equipment Qualification Summary

)

, SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

1 1 163C1566 Filter, Inverter i

i Powermark 3/74 a

QUALIFICATION METIIOD:

, SQRT REVIEW RESULTS:

l a. Company / Report Number /Date: a. SORT Criteria Met: X Yes; No Viking Labs., Sunnyvale. Report No. 30430-1 b. Reason for

Conclusion:

September 25, 1975.

i Tested to sufficiently high g levels.

Operability was demonstrated.
b. Qualification by: Analysis: X Test 1
c. Qualification Information

Resonance search performed to 50 IIz.

! Sinusoidal testing performed.

1 Input g-level S/S 10g F/B 10g V-10g.

Functional operability verified.
c. Plans for Reevaluation /Requalifi-cation:

1 None.

l 4

i i

Si!EET 'Of-a s

O O l SEISMIC QUALIFICATION REVIEW i

Table 2

~

Zimmer Equipment Qualification Summary  ;

SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

)

i PPD 163C1919 Bailey Multiplier Divider '

753010AAAEl

QUALIFICATION METilOD

j SQRT REVIEW RESULTS: .

j- a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; y No j U.P.A.P.D. Report No. 548 October 16, 1973 b. Reason for

Conclusion:

Operability was not demonstrated.

  • i

?

i b. Qualification by: Analysis: X Test

c. Qualification Information  :

4 Resonance search performed to 60 IIz.

i Sinusoidal testing was performed.

j Input g-level S/S-10g F/B-79 V-9g. t 1

I c. Plans for Reevaluation /Requalifi-l cation:

i l , Requalification by test is underway.

I SIIEET Of i

I i

4 0 O O

, SEISMIC QUALIFICATION REVIEW

~

Table 2 4 i

Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

164C5630 Bailey Millivolt Converter 740110AAAEl QUALIFICATION METHOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: X'Yes; No UPAPD Report No. 549 b. Reason for

Conclusion:

Tested to sufficiently high g levels.

j Operability was demonstrated.

b. Qualification by: Analysis: X Test
c. Qualification Information  :

j Resonance search performed to 60 Hz.

1 Sinusoidal testing performed.

2 Input g-level S/S-9g F/B-99 V-9g.

Functional operability verified.

4

c. Plans for Reevaluation /Requalifi-
cation

. None.

h i

4 9

3 SHEET Of

pJ . OG f)i

~

SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

169C8044 GE Switch SB-9 QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

C. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; No Ogden Technology Labs. Report No. 70709-2 September 21, 1971. b. Reason for

Conclusion:

Test to sufficiently high g levels..

Operability was demonstrated.

b. Qualification by: Analysis:- X Test
c. Qualification Information  :

Resonance search to 33 IIz . Sinusoidal testing performed.

Inpug g-level S/S-25g F/B-25g V-259.

Functional operability verified.

c. Plans for Reevaluation /Requalifi-cation:

, None.

SIIEET 13f s

O O o SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIPICATION NUMBER: EQUIPMENT / COMPONENT:

169C8317 Meter 180 type E32-N65 thru N661 QUALIFICATION METHOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No GE Report No. 234A9804 b. Reason for

Conclusion:

April 14, 1971 Operability was ne' demonstrated. ,

b. Qualification by: Analysis: X Test
c. Qualification Information 1'2 :

i

! Resonance search performed to 33 liz.

i Sinusoidal testing performed.

Inpug g level S/S-189 F/B-189 V-79 a
c. Plans for' Reevaluation /Requalifi-

. cation:

l Requalification by-test is underway.-

l t i

9 SilEET Of i

l l

O O o SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

216X494 Range Switch C51A-ZO8'& ZO9 QUALIFICATION METilOD:

SQRT REVIEW RESULTS:

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X 'No

- GE Report No. 994-78-136 b. Reason for

Conclusion:

October 31, 1978 Natural frequencies were not calculated. Operability was not Qualification by: X Analysis: Test demonstrated.

b.

c. Qualification Information  :

Static analysis was performed.

c. Plans for Reevaluation /Requalifi--

cation:

. .Requalification by test is underway.

I SilEET Of

- - _ _ - _ _ - . _ . . = . _ _ _ _ _ . _ . . . - ---

, SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

i 262A7721 234A9897 GE Switch SBM Control I

262A6023 _

234A9329 I

QUALIFICATION METHOD:

3 SQRT REVIEW RESULTS:

l

a. Company / Report Number /Date: a. SQRT Criteria Met: X Yes; _ _ No Ogden Technology Laboratories Report No. 70709-2 September 21, 1971.
b. Reason for

Conclusion:

Tested to sufficiently high g levels. I Operability was demonstrated.

j b. Qualification by: Analysis: X Test f c. Qualification Information  :

j Resonance search performed to 33 Hz.

i Sinusoidal testing performed.

. Input g-level S/S-25g F/B -25g V-25g 3 Functional operability verified.

l c. Plans for Reevaluation /Requalifi-I cation:

+

1 i

i l

l l

SHEET Of j l 4

o

~

I O O a

SEISMIC QUALIFICATION REVIEW Table 2 i

Zimmer Equipment Qualification Summary

! SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

GE238X660 Log Rad Monitor l QUALIFICATION METilOD:

. SQRT REVIEW RESULTS:

l a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No GE Report No. 225A6609 b. Reason for

Conclusion:

Duration information was not specified ,

in test report, j b. Qualification by: Analysis: X Test

c. Qualification Information  :

! Resonance search performed to 33 IIz.

Sinusoidal testing performed.

) Input g-level S/S-18g F/B-18g 11 -189

c. Plans for Reevaluation /Requalifi-cation:

- Requalification by test is underway.

4 5

1 4

SIIEET Of l

l

. . .-= ,

o o o SEISMIC QUALIFICATION REVIEW Table 2 Zimmer Equipment Qualification Summary SPECIFICATION NUMBER: EQUIPMENT / COMPONENT:

GE 238X697 Trip Auxiliary Unit QUALIFICATION METIIOD:

SQRT REVIEW RESULTS: *

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No Phileo Ford, P.A., Ca
b. Reason for

Conclusion:

Duration information was not specified in test report.

b. Qualification by: Analysis: X Test
c. Qualification Information  :  !

Resonance search performed to 33 IIz.

Sinusoidal testing performed.

Input g-level S/S-179, F/B-17g, V-17g.

Functional operability verified.

c. Plans for Reevaluation /Requalifi-cation: ,

Requalification by test is underway.

SilEET Of

_ __ _ _ __ _._.._ _ . _ _ _ _ _ . . . _ _ . _ _ _- _ _. . . _ _ _ . _ _ . _ . . _. _. ~ _ _ _ ..__m _ . _ _ _ _ .

O O o 4

SEISMIC QUALIFICATION REVIEW _

i Table 2 i

Zimmer Equipment Qualification Summary ,

. i.

SPECIFICATION NUMBER
EQUIPMENT / COMPONENT: [

GE/NID 368X102AA IIide Range 11onitor i

QUALIFICATION METilOD:

SQRT REVIEW RESULTS: l l

a. Company / Report Number /Date: a. SQRT Criteria Met: Yes; X No  !

l GE Report No. 225A6612

b. - Reaion for

Conclusion:

! July 20, 1970 Duration information was not specified in test report.

j b. Qualification by: Analysis: X Test

c. Qualification Informatio:t 1'2 :

i

} Resonance search performed to 33 IIz.

j Sinusoidal testing performed. ,

Input g-level S/S-8.5g, F/B-8.5, V-8.5g.

I c. Plans for Reevaluation /Requalifi-t cation:

, Requalification by test is underway.

4 4

i I

SIIEET Of I

l

x Attachment B i

CRITERIA FOR EVALUATION OF EQUIPMENT REQUIREMENTS FOR HOT STANDBY AND COLD SHUTDOWN De finitions :

Hot Shutdown Condition -

The reactor is in the hot shutdown con-dition when the mode switch is in the shutdown position and the reactor coolant temperature is greater that 212 F.

Hot Standby Mode -

The condition of the reactor when it is oper-ating with coolant temperature greater than 212 F, system pressure less than 600psig, and the mode switch in the startup position. #Eh

/ Cold Shutdown Condition -

Condition of the reactor when the reac- L tor is shut down, the reac'or vessel coolant is maintained at less [ d

.i than 2120 F and the reactor vessel is vented to atmosphere. (j)

All safety related equipment is classified as essential active or passive because it is required to prevent or mitigate the consc-quences of those design basis accidents described in Chapter 15 of the Zimmer FSAR. Safety related equipment either initiates a safety function in response to a variable exceeding an allowable value or it completes a safety function such that the reactor is in a safe shutdown condition and of f-site exposures are less than 10CFR100 limits. Each of these potential events are analysed in the FSAR (Chapter 15) .

Since the hot standby mode is a normal operating mode and is CGE-03-179 1

r rarely an end point state following any abnormal or design basis

(

event, the hot shutdown state is the terminology selected for preparation of Tabic 1.

Typically all active mechanical and electrical components which initiate or carry out such safety functions as reactor scram, con-tainment isolation, or emergency core cooling have been designated as required to achieve hot shutdown. Included with the above men-tioned instruments are those auxiliary items, although they do not directly initiate or carry out the safety function, they are re-quired for the proper and safe operation of the safety related system. .

For cold shutdown requirements, a scenario has been identified in 4 Reference 1 which identifies all safety related equipment neces-sary to achieve a cold shutdown. The listing also includes all items which are needed to reach a hot safe shutdown prior to the s completion of the cooldown using the balance of the equipment.

)

For the purpose of completing the table, only those mechanical and electrical components which are required to bring the reactor from a hot shutdown condition to a cold shutdown condition are i listed as required for cold shutdown. For example, if the MIR system pumps are initiated following a LOCA from a high drywell pressure signal, the pressure sensing instrument is listed as re-quired for hot shutdown. However, since at least one of the RHR pumps would remain running in the shutdown cooling mode, these pumps are listed as required for both hot shutdown and cold shut-down. If should also be noted that although other equipment may be used in different cold shutdown scenarios, only those items required for the scenario in Reference 1 are identified.

Reference 1: Letter from E.A. Borgmann (CG&E) to H. Denton (NRC) , dated May 4, 1979, Docket No. 50-538.

CGE-03-179 2