Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML18149A43030 September 1986Rev 1-A to Reload Nuclear Design Methodology.Shutdown Margin
ML18153B38530 November 1993Reload Nuclear Design Methodology.
ML20012E83126 March 1990Cycle 8 Core Operating Limits Rept.
ML20012E83226 March 1990Cycle 7 Core Operating Limits Rept.Shutdown Margin
ML20028H86016 January 1991Rev 0 to NE-817, North Anna Unit 2,Cycle 8 Startup Physics Test Rept. W/910128 Ltr
ML20028H8629 January 1991Rev 0 to NE-799, North Anna Unit 2,Cycle 7 Core Performance Rept. W/910128 LtrFuel cladding
ML20043G1928 June 1990Core Surveillance Rept for North Anna 2,Cycle 7 W/Extended License Burnup Limit.
ML20058C16625 October 1990Core Surveillance Rept for North Anna 2 Cycle 8 Pattern Qf
ML20058F1315 November 1993Rev 0 to North Anna Unit 2,Cycle 9 Core Performance Rept
ML20058F38430 October 1990Revised Proposed Changes to Core Operating Limits Repts
ML20059G89531 October 1993COLR for North Anna 2 Cycle 10 Pattern Re, Rev 1
ML20064A87311 September 1990Cycle 8 Core Surveillance ReptPower change
ML20066F95418 January 19911,Cycle 9,Pattern R8 Core Surveillance ReptPower change
ML20069K36730 April 1983Cycle 2 Core Performance Rept
ML20076J14630 September 1994Rev 0 to COLR North Anna Cycle 11 Pattern Bw
ML20077E41131 May 1991Rev 0 to Technical Rept NE-838, North Anna Unit1,Cycle 8 Core Performance ReptFuel cladding
ML20078P96130 November 1994Cycle 10 Core Performance ReptFuel cladding
ML20084G92112 May 1995Rev 0 to NE-1024, North Anna Unit 2,Cycle 10 Core Performance Rept, Dtd May 1995Fuel cladding
ML20094K33529 February 1992Core Operating Limits Rept
ML20096C61630 April 1992Rev 0 to North Anna 2,Cycle 9 Loading Pattern ET Core Operating Limits Rept
ML20101J58731 May 1992Rev 0 to Technical Rept NE-876, North Anna Unit 2,Cycle 8 Core Performance ReptFuel cladding
ML20101U18824 June 1992Rev 0 to NE-895, North Anna Unit 2,Cycle 9 Startup Physics Tests Rept
ML20107D22329 February 1996COLR North Anna 1 Cycle 12 Pattern Bl, Rev 0
ML20107K11431 May 1995Rev 0 of COLR North Anna 2 Cycle 11 Pattern Um
ML20112E23430 April 1996Rev 0 to NE-1068, North Anna Unit 1,Cycle 11 Core Performance Rept, for Apr 1996Fuel cladding
ML20129F85921 October 1996COLR North Anna 2 Cycle 12 Pattern Cv, Rev 0
ML20135H94931 August 1985Rev 1 to Reload Nuclear Design MethodologyBoric Acid
Shutdown Margin
ML20148J83531 May 1997COLR North Anna Unit 1 Cycle 13 Pattern Og
ML20151N56730 November 1985Cycle 5 Core Performance ReptFuel cladding
ML20154L06914 October 1998COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy
ML20155F57231 March 1986Cycle 4 Core Performance ReptFuel cladding
ML20155K64622 May 1986Rev 1 to North Anna Unit 2,Cycle 5,Relaxed Power Distribution Control Core Surveillance Rept for FQ=2.20Power change
ML20210Q99331 July 1999Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud
ML20216A8976 May 1998Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2
ML20217H36314 October 1999Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su
ML20245C4935 June 1989Cycle 8 Relaxed Power Distribution Control Pattern - Core Surveillance ReptPower change
ML20245L09330 April 1989Rev 0 to North Anna Unit 2 Cycle 6 Core Performance ReptFuel cladding
ML20247H02931 August 1989Cycle 7 Core Performance Rept