Category:FUEL CYCLE RELOAD REPORTS
MONTHYEARML20217H3631999-10-14014 October 1999
[Table view]Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20148J8351997-05-31031 May 1997 COLR North Anna Unit 1 Cycle 13 Pattern Og ML20129F8591996-10-21021 October 1996 COLR North Anna 2 Cycle 12 Pattern Cv, Rev 0 ML20112E2341996-04-30030 April 1996 Rev 0 to NE-1068, North Anna Unit 1,Cycle 11 Core Performance Rept, for Apr 1996 ML20107D2231996-02-29029 February 1996 COLR North Anna 1 Cycle 12 Pattern Bl, Rev 0 ML20107K1141995-05-31031 May 1995 Rev 0 of COLR North Anna 2 Cycle 11 Pattern Um ML20084G9211995-05-12012 May 1995 Rev 0 to NE-1024, North Anna Unit 2,Cycle 10 Core Performance Rept, Dtd May 1995 ML20078P9611994-11-30030 November 1994 Cycle 10 Core Performance Rept ML20076J1461994-09-30030 September 1994 Rev 0 to COLR North Anna Cycle 11 Pattern Bw ML18153B3851993-11-30030 November 1993 Reload Nuclear Design Methodology. ML20058F1311993-11-0505 November 1993 Rev 0 to North Anna Unit 2,Cycle 9 Core Performance Rept ML20059G8951993-10-31031 October 1993 COLR for North Anna 2 Cycle 10 Pattern Re, Rev 1 ML20101U1881992-06-24024 June 1992 Rev 0 to NE-895, North Anna Unit 2,Cycle 9 Startup Physics Tests Rept ML20101J5871992-05-31031 May 1992 Rev 0 to Technical Rept NE-876, North Anna Unit 2,Cycle 8 Core Performance Rept ML20096C6161992-04-30030 April 1992 Rev 0 to North Anna 2,Cycle 9 Loading Pattern ET Core Operating Limits Rept ML20094K3351992-02-29029 February 1992 Core Operating Limits Rept ML20077E4111991-05-31031 May 1991 Rev 0 to Technical Rept NE-838, North Anna Unit1,Cycle 8 Core Performance Rept ML20066F9541991-01-18018 January 1991 1,Cycle 9,Pattern R8 Core Surveillance Rept ML20028H8601991-01-16016 January 1991 Rev 0 to NE-817, North Anna Unit 2,Cycle 8 Startup Physics Test Rept. W/910128 Ltr ML20028H8621991-01-0909 January 1991 Rev 0 to NE-799, North Anna Unit 2,Cycle 7 Core Performance Rept. W/910128 Ltr ML20058F3841990-10-30030 October 1990 Revised Proposed Changes to Core Operating Limits Repts ML20058C1661990-10-25025 October 1990 Core Surveillance Rept for North Anna 2 Cycle 8 Pattern Qf ML20064A8731990-09-11011 September 1990 Cycle 8 Core Surveillance Rept ML20043G1921990-06-0808 June 1990 Core Surveillance Rept for North Anna 2,Cycle 7 W/Extended License Burnup Limit. ML20012E8311990-03-26026 March 1990 Cycle 8 Core Operating Limits Rept. ML20012E8321990-03-26026 March 1990 Cycle 7 Core Operating Limits Rept. ML20247H0291989-08-31031 August 1989 Cycle 7 Core Performance Rept ML20245C4931989-06-0505 June 1989 Cycle 8 Relaxed Power Distribution Control Pattern - Core Surveillance Rept ML20245L0931989-04-30030 April 1989 Rev 0 to North Anna Unit 2 Cycle 6 Core Performance Rept ML18149A4301986-09-30030 September 1986 Rev 1-A to Reload Nuclear Design Methodology. ML20155K6461986-05-22022 May 1986 Rev 1 to North Anna Unit 2,Cycle 5,Relaxed Power Distribution Control Core Surveillance Rept for FQ=2.20 ML20155F5721986-03-31031 March 1986 Cycle 4 Core Performance Rept ML20151N5671985-11-30030 November 1985 Cycle 5 Core Performance Rept ML20135H9491985-08-31031 August 1985 Rev 1 to Reload Nuclear Design Methodology ML20069K3671983-04-30030 April 1983 Cycle 2 Core Performance Rept 1999-07-31 Category:TEXT-SAFETY REPORT MONTHYEARML20217N9281999-10-20020 October 1999
[Table view]Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08 |