Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML17285A2346 January 1989Discusses Issues Highlighted at BWR/6 Alternate Ac Task Force Meeting on 881115,including Need for Capability of Div III Sys to Maintain Plant in Safe Shutdown Condition (Hot Shutdown) for Min of 4 HSafe Shutdown
ML17285A2356 February 1989Forwards Proprietary Draft Conformance of HPCS Div to NUMARC 87-00 App B Aac Criteria, for 890214 Meeting
ML17309A27728 June 1982Repts Under Purchase Order DR-82-0961 Re Review of Two Draft SEP Integrated Assessments for Facilities.Ltr Comprises Rept on Ginna SEP (Draft NUREG-0821)High winds
Probabilistic Risk Assessment
Backfit
ML17341B64423 February 1982Advises That Project Has Escalated to Approx 60 to 70% of Current Billings
ML17342A77413 July 1987Forwards Technical Evaluation of Rept, Retran Code: Transient Analysis Model Qualification, Dtd Jul 1985. Criteria for Use of Single & Two Loop Plant Models Listed. NRC Audit of Util QA Procedure Recommended
ML18052B19117 June 1987Forwards EGG-NTA-7720, Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28,Reactor Trip Sys Vendor Interface:Calvert Cliffs-1 & -2,Millstone-2 & Palisades, Final Informal Rept. Plants Conform to Generic Ltr Item
ML18150A11714 April 1987Forwards Final rept,EGG-NTA-7625, Conformance to Item 2.1 (Part 2) Generic Ltr 83-28,Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2.
ML18150A1861 May 1987Forwards EGG-NTA-7612, Conformance to Generic Ltr 83-28, Item 2.2.2 - Vendor Interface Programs for All Other Safety- Related Components,North Anna Units 1 & 2 & Surry Units 1 & 2, Final Informal Rept
ML19298C3752 October 1985Forwards User List for Svc Advisory for Series 28 Calibr W/Preset Time 1 Time Option
ML19327A8697 September 1989Submits Info Re Alchemie & Anderson County Bank Financing Transaction
ML19332F21710 July 1989FOIA Request for Documents Re Communications Between Ofcs of Edo,Deputy Edo,Ofc of Director,Regional Administrators & Commissioners Ofcs Re Plants During period,890301-0615
ML20002A75327 October 1980Submits Preliminary Technical Evaluation Rept for IE Bulletin 80-06, Engineered Safety Feature Reset Controls. Util Identified 11 Sys Which May Change Position Upon Manual Reset at Sys Level for Valves & Equipment
ML20023D03124 July 1982Repts Allegation Re Zack Co Falsified Documents Concerning HVAC Activities at Facilities Per Nbc Nightly News Broadcast
ML20023D03826 July 1982Repts Investigation Re Possible Flawed Equipment at Facilities,Per Eyewitness News Broadcast
ML20041E1554 March 1982Responds to Generic Ltr 82-01,new Application Survey.Info Requests Re Crbr Should Be Submitted to DOE & to Wa Public Supply Sys Re Hanford.Application Will Be Submitted Under 10CFR50 During 1982-83
ML20042C54329 March 1982Forwards Responses to Comments Received on Geology & Geotechnical Engineering at 820317 Meeting.Formal Responses Will Be Submitted on 820419 W/Amend 24 to PSARUltimate heat sink
Earthquake
ML20052B51828 April 1982Responds to 820112 Generic Ltr 82-01 Re Plans for Submittal of Application & Requests for Review Prior to 841231.Early 1983 Application Planned to Extend 810209 Preliminary Design Authorization Request
ML20054C08614 April 1982Part 21 Rept Re Airlock Door Seals Presenting Potential Safety Problem.Seals Should Not Be Used After Startup W/O Recertification.Seals Will Be Replace If Approved Test & Insp Program Cannot Be Developed
ML20054D84621 April 1982Forwards Paleomagnetic Investigation of Pre-Missoula Gravels,Pasco Basin & Vicinity,Wa, Per 820317 Meeting
ML20064J55713 January 1983Clarifies Request for Addl Info Re IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety-Related Sys Components by Asiatic Clams & MusselsBiofouling
ML20076K2097 June 1983FOIA Request for SECY-83-98B & SECY-83-98D Re Salem 1 ATWS Events & Four Documents Concerning TMI-1 Restart
ML20078A1601 June 1983FOIA Request for 821021 Document Re Palisades 820204 Cooling Tower Pump Trip & 821117 Document Re San Onofre 2 Auxiliary Feedwater Pump Vent Failure
ML20079Q97717 June 1983Forwards Matl Presented at Anderson,Greenwood & Co (Agco) Vacuum Breaker Test Program Owners Group 830607 Meeting W/ NRC Re Dynamic Testing & Analysis of Agco Vacuum Breaker Valve AssembliesSafe Shutdown
Operating Basis Earthquake
Finite Element Analysis
Liquid penetrant
ML20083E82821 September 1983FOIA Request for Listed LERs
ML20084C05322 March 1969Forwards Metallurgical Exam & Review of Casting Defects in Stainless Steel Valves Bodies .., Evaluation of Welding & Insp Techniques... & Rept of Participation in Intensive QA Audit by Region Iii,Div of Compliance... W/O Repts
ML20084C76116 November 1967Clarifies Participation at ANS Chicago,Il Meeting.No Employees or Consultants Registered Nor Attended Any Formal Sessions Sponsored by ANS or Aif.Not Responsible for Disclosure of Info
ML20084N2193 March 1973Summarizes Incident Rept,Turkey Point Unit 3,Valve Headers. Rept DC-94A Being Written by Parameter,Inc Re Header Failure Investigation
ML20084R65224 February 1984FOIA Request for Computer Printout from Sept 1980 to Present of Civil Penalty Info on 27 Listed Nuclear Facilities.Sample Format Encl
ML20091G17724 May 1984Forwards Part 21 Rept Re Bug in Computer Code Affecting Calculation of Tech Specs for Nuclear Enthalpy Rise Peaking Factor.Bug Corrected
ML20101E28415 June 1984FOIA Request That Exercise Repts for Waterford 3 & Comanche Peak Re Emergency Preparedness Exercises Held in 1983 & 1984 Be Placed in PDR
ML20106A15125 November 1983Forwards Preliminary & Independent Assessment of Fault Capability & Max Earthquake Parameters.Review Includes Local & Regional Study of Repts,Responses to Questions & Relevant Geological,Seismological & Geophysical DataEarthquake
ML20107K6231 November 1984FOIA Request for Four Categories of Documents Re Results of Written Operator Exams at Listed Facilities,Including Dates of Exams & Number of Candidates Taking Exams
ML20107K88316 November 1984FOIA Request for Six Categories of Documents to Be Available in Pdr,Including Control of Heavy Loads at Indian Point Unit 2 & VEPCO Re IE Bulletin 80-11Control of Heavy Loads
ML20112H8105 April 1984FOIA Request for Repts Resulting from Listed Environ Qualification of Equipment Site Audits to Be Placed in Pdr. Access to Any Repts Resulting from Audits Held Since Oct 1982 Also Requested
ML20112J3492 February 1984Forwards Review Detailing Results of 831219 & 20 Audits Performed on Environ Qualification Program Documentation at Facility.Adequate Technical Basis for Claimed Qualification Indicated
ML20125A87625 October 1984FOIA Request for 1983 Annual Rept for Safety Relief Valve Challenges of Listed Plants & Annual Plant Mod,Tests & Experiments Rept for 1983 Per 10CFR50.59
ML20126E19028 December 1984FOIA Request for Info Re Initial Operator Written Exam Results on Number of post-TMI-2 Plants.Info Provided in Did Pertain to Initial Exam Results.Table Listing Dates of Initial Licensing Encl
ML20126F98229 October 1984FOIA Request for Seven Specified Documents & Encls
ML20127F7789 April 1985FOIA Request for Rancho Seco SALP Rept for 790415-800415, Dtd Aug 1980 & Trojan SALP Rept for Sept 1979 - Aug 1980,dtd Oct 1980
ML20129A86818 December 1984FOIA Request for Four Categories of Documents Including Info Re Exemption of Snubbers from Surveillance Requirements & OL Amends
ML20129A98631 January 1985FOIA Request for Encls to Gulf State Utils 840820 Deficiency Rept Re ITE-Gould Type 2150 Overload Relays & Encls to NRC to VEPCO Re Request for Addl Info on SPDS to Be Placed in PDR
ML20132F57513 August 1985FOIA Request for Power Plant Exam Results Summary Sheets for Listed Plants
ML20133C59623 May 1985FOIA Request for Section 55.25 Exam Summary Sheets Prepared by Operator Licensing Branch for Operator Candidates & Monthly & Quarterly Repts on Senior Operator Performance on Exams
ML20133H08710 October 1985Requests Ltr Stating That Listed Facilities Do Not Have Fuel Element Transfer Tubes.Documentation Needed for IE Bulletin 78-08 Closeout Rept
ML20133M5233 January 1980Submits Info Re Other Facilities Affected by 790313 Order to Show Cause Concerning Use of Pipe Supports on 2 1/2 to 6 Inch Piping Designed for Loads Derived from Shock 2 Computer Calculations.Supporting Documentation EnclDesign basis earthquake
Earthquake
ML20133M72221 June 1971Forwards Review of Seismic Analysis & Design for Maine Yankee Atomic Power Station. Review Concerned Primarily Engineering Factors Pertinent to Seismic Analysis & Design of Class I Items & Foundations
ML20134L50119 June 1985FOIA Request for Operator Exam Results Summary Sheets for Listed Nuclear Plants
ML20135G6886 August 1985FOIA Request for Reactor Operator/Senior Reactor Operator Exam Questions & Answer Key for Listed Facility Exam Repts Administered in 1984
ML20136B29312 March 1982Notifies That Ninth Progress Rept on Seismic Verification Program Will Be Issued on 820315
ML20136B29812 March 1982Forwards Rf Reedy,Inc QA Rept on PG&E & to Denton