Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000220/LER-1988-009, FOIA Request for LER 88-09,NRC Enforcement Conference W/Util on 880711,Insp Rept 50-220/88-15 & NRC Notice of Violation Ltr to Util15 May 1989FOIA Request for LER 88-09,NRC Enforcement Conference W/Util on 880711,Insp Rept 50-220/88-15 & NRC Notice of Violation Ltr to Util
ML17285A2346 January 1989Discusses Issues Highlighted at BWR/6 Alternate Ac Task Force Meeting on 881115,including Need for Capability of Div III Sys to Maintain Plant in Safe Shutdown Condition (Hot Shutdown) for Min of 4 HSafe Shutdown
ML17285A2356 February 1989Forwards Proprietary Draft Conformance of HPCS Div to NUMARC 87-00 App B Aac Criteria, for 890214 Meeting
ML17309A27728 June 1982Repts Under Purchase Order DR-82-0961 Re Review of Two Draft SEP Integrated Assessments for Facilities.Ltr Comprises Rept on Ginna SEP (Draft NUREG-0821)High winds
Probabilistic Risk Assessment
Backfit
ML17341B64423 February 1982Advises That Project Has Escalated to Approx 60 to 70% of Current Billings
ML17342A77413 July 1987Forwards Technical Evaluation of Rept, Retran Code: Transient Analysis Model Qualification, Dtd Jul 1985. Criteria for Use of Single & Two Loop Plant Models Listed. NRC Audit of Util QA Procedure Recommended
ML18038A0037 March 1985Forwards Rev 1 to Vol 1, Summary & Conclusions, to Final Rept of Independent Review of Nine Mile 2 Related NRC Const Assessment Team Insps & SALP Rept & Niagara Mohawk Identified Deficiencies, Per 841114 Presentation
ML18052B19117 June 1987Forwards EGG-NTA-7720, Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28,Reactor Trip Sys Vendor Interface:Calvert Cliffs-1 & -2,Millstone-2 & Palisades, Final Informal Rept. Plants Conform to Generic Ltr Item
ML18114A4286 April 1979Forwards Computer Programs & Info Related to Shock 1,2 & 3 Pstress & NUPIPE-SW.Requests Info Be Withheld (Ref 10CFR2.790).Forwards Affidavit & Supporting Documentation
ML18114A44413 April 1979Forwards Update Rept on Plan for Verification of Dynamic Analysis Codes Dtd 790406Earthquake
ML18114A4456 April 1979Forwards Plan for Verification of Dynamic Analysis Codes, for Listed Dockets in Response to NRC 790402 Ltr
ML18114A45913 April 1979Forwards Affidavit of Tj Pashos of Nuclear Svcs Corp Re Application for Withholding Proprietary Info from Public Disclosure
ML18114A51727 April 1979Forwards Status Rept on 790427 Plan for Verification of Dynamic Analysis Codes.Earthquake
ML18114A5588 May 1979Forwards Proprietary Documents Requested During 790501-04 Special Insp
ML18114A5604 May 1979Requests Withholding Technical Guideline EMTG-22-0 & Technical Rept EMTR-612 (Ref 10CFR2.790).Affidavit Encl
ML18114A5619 May 1979Confirms 790504 Telcon W/Wt Russell Re Computer Deck Associated W/Shock 0 Program
ML18114A56911 May 1979Notifies That Review of Computer Deck Is Completed.Shock 0 Program Still Unrecovered.Piping Sys Conservatively Designed & Will Perform Intended Function
ML18114A57514 May 1979Forwards Shock 1 Computer Program Listing.Supersedes Submittal of 790406.Program Listing Withheld (Ref 10CFR2.790)
ML18114A61218 May 1979Summarizes Procedures & Calculational Techniques Used in Reanalysis of Piping Sys Designed W/Shock II Computer Program.Reanalysis Will Satisfy 790313 Order to Show CauseEarthquake
ML18136A3788 January 1980Supplements 800103 Ltr Re SHOCK-II Computer Calculations Performed on Piping of Six Inches or Less.Surry & Me Yankee re-examined as Part of Show Cause Reanalysis Effort.One Piping Problem Remains at Fitzpatrick
ML18136A4248 January 1980Ack Receipt of NRC 791206 Ltr Re Wj Kennedy Request for Withholding Computer Programs W/Proprietary Info Concerning Pipe Stress Analysis.Will Notify When No Longer Necessary to Classify Info as Proprietary
ML18139A32612 June 1980Resubmitts Rept on Reanalysis of Safety-Related Sys,Surry Power Station,Unit 2, Revision 1.Original Submittal Contained Errors
ML18150A11714 April 1987Forwards Final rept,EGG-NTA-7625, Conformance to Item 2.1 (Part 2) Generic Ltr 83-28,Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2.
ML18150A12017 April 1987Forwards EGG-NTA-7378, Conformance to Generic Ltr 83-28, Item 2.2.1 - Equipment Classification for All Other Safety- Related Components:Surry 1 & 2, Final Informal Rept.Plant Conforms to Generic Ltr Item
ML18150A12423 March 1987Forwards EGG-NTA-7633, Technical Evaluation Rept TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing, Surry Units 1 & 2. Util Submittals Reconfirm That GDC 14,15 & 30 Met
ML18150A1861 May 1987Forwards EGG-NTA-7612, Conformance to Generic Ltr 83-28, Item 2.2.2 - Vendor Interface Programs for All Other Safety- Related Components,North Anna Units 1 & 2 & Surry Units 1 & 2, Final Informal Rept
ML19261B00911 January 1978Forwards First Progress Rept Re Evaluation of Buckling Design Criteria for Steel Containment Shells.Study of Static & Dynamic Loading Conditions to Which Containment Shell Is Subjected Will Be Completed Shortly
ML19327A8697 September 1989Submits Info Re Alchemie & Anderson County Bank Financing Transaction
ML19332F21710 July 1989FOIA Request for Documents Re Communications Between Ofcs of Edo,Deputy Edo,Ofc of Director,Regional Administrators & Commissioners Ofcs Re Plants During period,890301-0615
ML19347D1586 March 1981Forwards for Review & Approval Sweco 8101, Models Used in Loctvs Computer Code to Determine Pressure & Temp Response of Vapor Suppression Containments Following Loca.
ML20023D03124 July 1982Repts Allegation Re Zack Co Falsified Documents Concerning HVAC Activities at Facilities Per Nbc Nightly News Broadcast
ML20023D03826 July 1982Repts Investigation Re Possible Flawed Equipment at Facilities,Per Eyewitness News Broadcast
ML20041E1554 March 1982Responds to Generic Ltr 82-01,new Application Survey.Info Requests Re Crbr Should Be Submitted to DOE & to Wa Public Supply Sys Re Hanford.Application Will Be Submitted Under 10CFR50 During 1982-83
ML20042C54329 March 1982Forwards Responses to Comments Received on Geology & Geotechnical Engineering at 820317 Meeting.Formal Responses Will Be Submitted on 820419 W/Amend 24 to PSARUltimate heat sink
Earthquake
ML20052B51828 April 1982Responds to 820112 Generic Ltr 82-01 Re Plans for Submittal of Application & Requests for Review Prior to 841231.Early 1983 Application Planned to Extend 810209 Preliminary Design Authorization Request
ML20054C08614 April 1982Part 21 Rept Re Airlock Door Seals Presenting Potential Safety Problem.Seals Should Not Be Used After Startup W/O Recertification.Seals Will Be Replace If Approved Test & Insp Program Cannot Be Developed
ML20054D84621 April 1982Forwards Paleomagnetic Investigation of Pre-Missoula Gravels,Pasco Basin & Vicinity,Wa, Per 820317 Meeting
ML20064J55713 January 1983Clarifies Request for Addl Info Re IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety-Related Sys Components by Asiatic Clams & MusselsBiofouling
ML20076K2097 June 1983FOIA Request for SECY-83-98B & SECY-83-98D Re Salem 1 ATWS Events & Four Documents Concerning TMI-1 Restart
ML20078A1601 June 1983FOIA Request for 821021 Document Re Palisades 820204 Cooling Tower Pump Trip & 821117 Document Re San Onofre 2 Auxiliary Feedwater Pump Vent Failure
ML20079Q97717 June 1983Forwards Matl Presented at Anderson,Greenwood & Co (Agco) Vacuum Breaker Test Program Owners Group 830607 Meeting W/ NRC Re Dynamic Testing & Analysis of Agco Vacuum Breaker Valve AssembliesSafe Shutdown
Operating Basis Earthquake
Finite Element Analysis
Liquid penetrant
ML20083E82821 September 1983FOIA Request for Listed LERs
ML20084C05322 March 1969Forwards Metallurgical Exam & Review of Casting Defects in Stainless Steel Valves Bodies .., Evaluation of Welding & Insp Techniques... & Rept of Participation in Intensive QA Audit by Region Iii,Div of Compliance... W/O Repts
ML20084C76116 November 1967Clarifies Participation at ANS Chicago,Il Meeting.No Employees or Consultants Registered Nor Attended Any Formal Sessions Sponsored by ANS or Aif.Not Responsible for Disclosure of Info
ML20084N2193 March 1973Summarizes Incident Rept,Turkey Point Unit 3,Valve Headers. Rept DC-94A Being Written by Parameter,Inc Re Header Failure Investigation
ML20084Q6559 April 1970Answers Questions Raised at 700426 Meeting,Outlining Alternative Procedures to Repair safe-ends & Future Actions to Minimize Possibility of Unexpected Stress CorrosionWeld Overlay
ML20084R35231 October 1969Forwards Rept of Review of Stress Analysis of Steam Line Flow Restrictor Attachment Weld Affected by High Rate Stress Relief. W/O Encl
ML20084R65224 February 1984FOIA Request for Computer Printout from Sept 1980 to Present of Civil Penalty Info on 27 Listed Nuclear Facilities.Sample Format Encl
ML20091G17724 May 1984Forwards Part 21 Rept Re Bug in Computer Code Affecting Calculation of Tech Specs for Nuclear Enthalpy Rise Peaking Factor.Bug Corrected
ML20093J11121 September 1984Forwards Assessment Program Phase III Interim Repts.Rept Incomplete & Covers Only 169 of 216 Items Included in Program Scope.Total Results of Phase III Will Be Included in Final Rept.W/O Encl