ML20093J111

From kanterella
Jump to navigation Jump to search
Forwards Assessment Program Phase III Interim Repts.Rept Incomplete & Covers Only 169 of 216 Items Included in Program Scope.Total Results of Phase III Will Be Included in Final Rept.W/O Encl
ML20093J111
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/21/1984
From: Norris J
MANAGEMENT ANALYSIS CO.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
8066H4L1, NUDOCS 8410160509
Download: ML20093J111 (1)


Text

MANAGEMENT ANALYSIS COMPANY I1095 TORREYANA ROAD. SAN DIEGO. CAUFORNM 92121 619/452-5000 MAIL P.O. BOX 85404, SAN DIEGO. CAUFORNM 92138 September 21,1984 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Attn: Mr. R. W. Starostecki Subj: MAC Unit 2 Assessment Program Phase III Interim Report

Dear Mr. Starostecki:

Enclosed please find four Phase Ill Interim Reports for the Unit 2 Assessment Program being conducted by Management Analysis Company. This is not a complete report as not all of the identified deficiencies are closed by NMPC. As a result, this report only covers 169 of the 216 items included in this scope. The total results of Phase III will be included in the fl ial report.

Copies of this report are being transmitted simultaneously to Niagara Mohawk Power Corporation.

Sincerely, d

Jack M. Norris Vice President JMN/ cgm Enclosures 8066h4L1 8410160509 84o921

{DRADOCK 05000410 PDR g REGIONAL OFFICES: 1775 THE EXCHANGE, SUITE 450. ATLANTA, GEOPGIA 30339 404/952-7011 323 E. EISENHOWER PAPKWAY. SUITE 206. ANN ARBOR. MICHtGAN 48104 313/996-1000