ML18038A003
| ML18038A003 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/07/1985 |
| From: | Norris J MANAGEMENT ANALYSIS CO. |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML17054B453 | List: |
| References | |
| NUDOCS 8503110427 | |
| Download: ML18038A003 (2) | |
Text
0 NIAhVLCEIENEIITANALYSISCONIPAMY l267I HIGH BLUFF DRIVE, SAN DIEGO. CALIFORNIA92I30 619/48l-3100 MAIL:P.O. BOX 85404, SAN DIEGO, CAUFORNIA92I38 March 7, 1985 Dr. Thomas Murley United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406
Dear Dr. Murley:
In accordance with previous discussions with Niagara Mohawk Power Corporation (NMPC) and Region I of the Nuclear Regulatory Commis-sion (NRC), Management Analysis Company (MAC) is submitting a
revision to Volume I of the final report of the independent review of Nine Mile Point Unit 2 (NMP-2) related NRC CAT inspections, SALP report and NMPC identified deficiencies.
The purpose of this revision is to clarify the report and to report data in the same manner as presented orally to NMPC and the NRC on November 14, 1984 and in the written interim reports for Phase I, II and III.
The changes are consistent with detailed results of the review as shown in Volumes II and III of the report, which remain unchanged, and with supporting documentation in project records.
If there are any questions relating to these
- changes, please contact me.
I will be pleased to meet with the NRC and NMPC if necessary.
Sincerely, J.
M. Norris Vice President JMN:rmc enc.~~~~~
Docs osoo04i0 03110427 850307 PDR A
9 REGIONAI.OFFICES:
l775 THE EXCHANGE, SUITE 450, ATIANTA,GEORGIA 30339 404/952-70I I 323 E. EISENHOWER PARKWAY, SUITE 206, ANN ARBOR, MICHIGAN4B I04 313/996-I000 320 I "C" STREET, SUITE 290, ANCHORAGE, ALASKA99503 907/562-6005
/8-4/
~
L
"~~~+@-Roe(og ]
'" -~e lo: os t