Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000409/LER-1979-019, Forwards LER 79-019/01T-026 December 1979Forwards LER 79-019/01T-0
05000409/LER-1982-007, Forwards LER 82-007/03L-0.Detailed Event Analysis Submitted14 June 1982Forwards LER 82-007/03L-0.Detailed Event Analysis Submitted
05000409/LER-1982-008, Forwards LER 82-008/03L-0.Detailed Event Analysis Submitted16 June 1982Forwards LER 82-008/03L-0.Detailed Event Analysis Submitted
05000409/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis Submitted18 June 1982Forwards LER 82-012/03L-0.Detailed Event Analysis Submitted
05000409/LER-1982-013, Forwards LER 82-013/03L-0.Detailed Event Analysis Submitted1 July 1982Forwards LER 82-013/03L-0.Detailed Event Analysis Submitted
05000409/LER-1982-014, Forwards LER 82-014/01T-0.Detailed Event Analysis Submitted9 June 1982Forwards LER 82-014/01T-0.Detailed Event Analysis Submitted
05000409/LER-1982-015, Forwards LER 82-015/01T-0.Detailed Event Analysis Submitted17 June 1982Forwards LER 82-015/01T-0.Detailed Event Analysis Submitted
05000409/LER-1982-016, Forwards LER 82-016/03L-0.Detailed Event Analysis Encl29 July 1982Forwards LER 82-016/03L-0.Detailed Event Analysis Encl
05000409/LER-1983-001, Forwards LER 83-001/03L-0 & Updated LER 82-020/03X-1. Detailed Event Analysis Encl21 April 1983Forwards LER 83-001/03L-0 & Updated LER 82-020/03X-1. Detailed Event Analysis Encl
IA-84-478, Forwards Press Release 84-69 Re NRC Reduction of Fine for 1983 Violation.Pressure Sensing Device Capped.Fine Reduced Due to Short Duration of Violation,Small Size of Reactor & Comparable Enforcement Actions1 June 1984Forwards Press Release 84-69 Re NRC Reduction of Fine for 1983 Violation.Pressure Sensing Device Capped.Fine Reduced Due to Short Duration of Violation,Small Size of Reactor & Comparable Enforcement Actions
IA-85-513, Responds to FOIA Request for 24 Specified Documents & Related Info Re Transportation of Spent Nuclear Reactor Fuel.Forwards App a Documents.App a & B Documents Available in PDR6 August 1985Responds to FOIA Request for 24 Specified Documents & Related Info Re Transportation of Spent Nuclear Reactor Fuel.Forwards App a Documents.App a & B Documents Available in PDR
IA-86-827, Final Response to FOIA Request for Documents.App a Documents Consisting of La Crosse & Big Rock Point Semiannual Effluent Repts & App B Documents Consisting of Encl Turkey Point & St Lucie SALP Repts Available in Pdr.W/O Stated Encls16 December 1986Final Response to FOIA Request for Documents.App a Documents Consisting of La Crosse & Big Rock Point Semiannual Effluent Repts & App B Documents Consisting of Encl Turkey Point & St Lucie SALP Repts Available in Pdr.W/O Stated EnclsSafe Shutdown
Fitness for Duty
High Radiation Area
Fire Barrier
Temporary Modification
Locked High Radiation Area
Missed surveillance
Systematic Assessment of Licensee Performance
Operability Determination
Exemption Request
Control of Heavy Loads
Fuel cladding
Fire Protection Program
Hourly Fire Watch
Substantial potential for overexposure
Overexposure
IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)26 September 1989Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)
IR 05000409/19860168 January 1987Forwards Safety Insp Rept 50-409/86-16 on 861208-12,15 & 16. No Violations Noted
IR 05000409/198700218 May 1987Discusses Deficiency Identified in Insp Rept 50-409/87-02 Re Implementation of Environ Qualification Program.Based on Review,Encl Notice of Violation Issued
IR 05000409/198701329 September 1987Forwards SNM Control & Accountability Insp Rept 50-409/87-13 on 870908-11.No Violations Noted.Rept Withheld (Ref 10CFR2.790)
IR 05000409/199800217 September 1998Discusses Predecisional Enforcement Conference Held on 980630 Re Insp Rept 50-409/98-02 & Exercise of Enforcement Discretion.Two Apparent Violations,Involving Failure to Implement Key Aspects of Maintenace Rule,IdentifiedEnforcement Discretion
IR 05000409/200503116 July 1985Forwards Notice of Violation Issued to Util Based on 850409-0531 InspFire Watch
ML17194A94925 February 1981Forwards LER 81-001/02L-0
ML18023A04713 August 1985Notifies That State of Mn & Local Emergency Plans Adequate. FEMA Verification of Public Alerting & Notification Sys Conditional on FEMA Verification of Sys Per NUREG-0654/ FEMA-REP-1,Rev 1,App 3 & FEMA-43
ML18041A08211 June 1980Forwards Endorsement 35 to ANI Policy NF-217 Per Agreement B-62
ML18041A11613 April 1984Requests Signed Ack Forms for Encl Transmittal Ltrs Re Emergency Planning & Safeguards Info to Assist in Maintaining Accurate & Consistent Document Control Program
ML18041A21116 November 1989Responds to Generic Ltr 89-19 Re Request for Action Re Resolution of USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. Actions or Recommendations in Generic Ltr Will Not Be Performed
ML20054F09610 June 1982Requests Permission to Increase Primary Sys Temp Above 212 F,Predicated by 820605 Shutdown Due to Primary Coolant Alpha Activity in Excess of Tech Spec Limits
ML20054F1407 June 1982Forwards Table, Emergency Response Capabilities During Operational Conditions 1-3, as Alternative to Table B-1 of NUREG-0654.Exemptions from Min Staffing Requirements Requested
ML20054F1769 June 1982Forwards Monthly Operating Rept for May 1982
ML20054F1819 June 1982Forwards Response to Generic Ltr 82-10 Re NUREG-0737,Items I.A.1.3.1,I.A.1.3.2,I.C.1,I.D.1,I.D.2,II.B.1,II.B.2.3, II.D.1.2,II.D.1.3,II.F.2,II.K.3.18,II.K.3.30,II.K.3.31, III.A.1.2 & III.D.3.4
ML20054F7207 June 1982Forwards Draft Safety Evaluation of SEP Topic III-1, Quality Group Classification of Components & Sys
ML20054F96526 May 1982Forwards Small Scale Exercise, 811021,final Rept Evaluation.Deficiencies Noted in Exercise.Time Schedule of Corrections Should Be Available by End of May 1982 for Both State of Mn & Wi
ML20054G11315 June 1982Requests Exemption from NUREG-0654,Revision 1 Table B-1 Shift Augmentation Requirement.Exemption Justified by Small Size & Simplified Design of Plant.Tables Depicting Proposed Emergency Response Capabilities Encl
ML20054H16614 June 1982Forwards Addl Info Re RCPB Leakage Detector,Per 820317 Request & LACBWR Primary Piping & Reactor Vessel Leak Detection Sys Performance
ML20054H4454 June 1982Forwards Public Version of Issue 1 to Emergency Plan Implementing Procedure EPP-21, Prompt Public Notification Sys
ML20054H67514 June 1982Forwards Check in Response to Order Imposing Civil Monetary Penalty
ML20054J26922 June 1982Forwards IE Mgt Meeting Rept 50-409/81-24 on 811009.No Noncompliance Noted
ML20054J29714 June 1982Forwards Util Review of NRC Re SEP Topic VI-10.A Concerning Testing of Reactor Trip Sys & Esfs,Including Time Response Testing.Licensee Testing Program Meets Intent of Current Licensing Criteria
ML20054J49922 June 1982Confirms 820621 Telcon Re Schedule of 820709 Mgt Meeting W/Util in Glen Ellyn,Il to Discuss Regulatory Improvement Program
ML20054K85829 June 1982Forwards Potential Accident Consequence Assessment Atmospheric Dispersion Model Calculations, in Support of SEP Topic II.2.C Re Atmospheric Transport & Diffusion Characteristic for Accident Analysis
ML20054L51129 June 1982Requests Exemption from Requirement in 10CFR50.54(w) Re Onsite Property Damage Insurance for Facility.Existing Insurance Adequate to Fully Decontaminate & Clean Up Plant in Event of Major Accident
ML20054M60224 May 1982Notifies of Error in Re Fire Protection Rule (10CFR50.48) Requirements for Facility.Last Sentence in Second Paragraph Should Be Disregarded
ML20054M6706 July 1982Requests Current Info Re Unresolved Safety Issue Status. Items Per ALAB-444 Will Enable NRC to Expeditiously Review & Evaluate Issues Re Conversion of Provisional to full-term OL
ML20054M6782 July 1982Forwards Evaluation of SEP Topic III-1, Classification of Structures,Sys & Components, Per NRC 820607 Request.Errors Noted in Evaluation Listed
ML20055A6941 July 1982Forwards IE Insp Rept 50-409/82-08 on 820524-28.No Noncompliance Noted
ML20055A74913 July 1982Forwards Draft Evaluation of SEP Topics VI-2.D, Mass & Energy Release for Possible Pipe Break Inside Containment, & VI-3, Containment Pressure & Heat Removal Capability. Corrigenda for App A,Lll Technical Evaluation Encl
ML20055B40015 July 1982Clarifies NRC Position Re Procedures for Admitting NRC Personnel to Facility.Inspectors Listed on Encl 1 Require Permanent Nonemployee,No Escort Required Picture Badges. Personnel on Encl 2 to Be Treated as Nonregular Employees