Text
--
0 0
D DA/RYLAND h
[k COOPERAT/VE
- PO BOX 817
- 2615 EAST AV SOUTH
- LA CROSSE. WISCONSIN S4601 (608) 788-4000 July 2, 1982 In reply, please refer to LAC-8382 DOCKET NO. 50-409 Director of Nuclear Reactor Regulation ATTN:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing U. S.
Nuclear Regulatory Commission Washington, D.
C.
20555
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE NO. DPR-45 SEP TOPIC III-l - CLASSIFICATION OF STRUCTURES, SYSTEMS AND COMPONENTS
Reference:
(1)
NRC Letter, Crutchfield to Linder, dated June 7, 1982.
Gentlemen:
As requested by Reference (1), an examination of facts contained in of Reference (1) was conducted with the following errors noted:
TABLE 4 Classification of Structures, Systems, and Components, La Crosse Boiling Water Reactor (LACBWR), Structures, Systems and Components.
Error Noted Boron Inject (Pg. 9) 1)
The Boron Inject System is Class 1, 2 and 3 at LACBWR and not Class 2 only.
2)
LACBWR does not have a chemical mixing tank.
High Pressure Core 1)
The High Pressure Core Spray Spray (Pg. 10) at LACBWR contains both Class I and 2 Components Alternate Core Spray 1)
The Alternate Core Spray contains (Pg. 10)
Class 1 and 3 components. 8207140200 920702 0
PDR ADOCK 05000409 P
+
s Mr. Dennis M. Crutchfield, Chief July 2, 1982 Operating Reactors Branch #5 LAC-8382 Error Noted High Pressure Core 1)
The High Pressure Core Spray at Spray (Pg. 10)
LACBWR contains both Class I and 2 components.
Alternate Core Spray 1)
The Alternate Core Spray contains (Pg. 10)
Class 1 and 3 components.
Building Spray System 1)
LACBWR does not take credit for (Pg. 10) this system as an emergency system.
This system is classified as a Class D system.
Manual Depressurization 1)
This system contains both Class 1 System (Pg. 11) and 2 components.
Containment Penetrations 1)
These penetrations contain values Valves and Piping and piping that are Class 1, 2 (Pg. 12) and 3.
Control Rod Drive 1)
This system contains both Class 1 System (Pg. 12) and 2 components.
Purification System 1)
This system is Class 2.
(Pg. 13)
Decay Heat System 1)
This system contains Class 1, 2
(Pg. 13) and 3 components.
Water Purification 1)
LACBWR does not have a Water System (Pg. 14)
Purification System.
2)
LACBWR does not utilize a Liquid Waste Domineralizer Pump.
3)
LACBWR does not utilize an ASME Spent Resin Tank.
Crib House (Pg. 16) 1)
The Crib House and associated underground piping has been determined to not be seismic Category I.
As stated in Reference (1) and Enclosure 1 of Reference (1), the schedule and need for providing remaining information can and will be determined during the integrated plant safety assessment.
4
'I Mr. Dennis M. Crutchfield, Chief July 2, 1982 Operating Reactors Branch 45 LAC-8382 If you have any questions regarding this matter, please contact us very truly.yours, j
DAIRYLAND POWER COOPERATIVE kd h
Frank Linder, General Manager FL:RRW:af cc:
J. G.
Keppler, Reg. Adm., NRC-DRO III NRC Resident Inspector 1