ML20055A694

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-409/82-08 on 820524-28.No Noncompliance Noted
ML20055A694
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 07/01/1982
From: John Miller
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20055A695 List:
References
NUDOCS 8207190341
Download: ML20055A694 (2)


See also: IR 05000409/1982008

Text

____

IE HQ FILE COP 3

Ei'!

I ?Qi2

Docket No. 50-409

Dairyland Power Cooperative

ATIN:

Mr. F. W. Linder

General Manager

2615 East Avenue - South

La Crosse, WI 54601

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. A. Paul of

this office on May 24-28, 1982, of activities at the Lacrosse Boiling Water

Reactor authorized by NRC Operating License No. DPR-45 and to the discussion

of our findings with Mr. Shimshak and other members of your staff at the

conclusion of the inspection.

The inspection was an examination of activities conducted under your license

as they relate to radiation safety and to compliance with the Commission's

rules and regulations and with the conditions of your license. The inspec-

tion consisted of a selective examination of procedures and representative

records, observations, independent measurements, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished.

Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

,

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

4

8207190341 820701

DNO

DR ADOCK 05000

-

.

Dairyland Power Cooperative

2

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/s /

,o Q f J1%

J. R. Fliller, Chief

Technical Inspection Branch

Enclosure:

Inspection Report

No. 50-409/82-08

cc w/ enc 1:

R. E. Shimshak, Plant

Superintendent

DFIB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Stanley York, Chairman

Public Service Commission

4

i

i

{

kIj

RIII

FI

RI

m

,

u

ger

$Ciegut

ki

r

6/23/82

6 fj

s 6f3f

41/

.

l

!