05000397/LER-1985-003, Forwards LERs 85-003 & 85-004 Submitted on 850131 W/O Appropriate Signatures.W/O LER 85-003 | 14 February 1985 | Forwards LERs 85-003 & 85-004 Submitted on 850131 W/O Appropriate Signatures.W/O LER 85-003 | |
05000397/LER-1987-031, Forwards LER 87-031,per 10CFR50.73 | 21 December 1987 | Forwards LER 87-031,per 10CFR50.73 | |
05000397/LER-1992-042, Forwards Public Version of LER 92-042,Rev 0.Root Cause Is Inadequate Policy Re Free Release of Potentially Contaminated Liquids.Conclusions of Ongoing Mort Analysis Will Be in Suppl to LER | 11 December 1992 | Forwards Public Version of LER 92-042,Rev 0.Root Cause Is Inadequate Policy Re Free Release of Potentially Contaminated Liquids.Conclusions of Ongoing Mort Analysis Will Be in Suppl to LER | |
CLI-77-24, Ack & States That the 3 Requested Decisions, CLI-77-24,ALAB-473,& ALAB-489 Were Forwarded on 781107 | 13 November 1978 | Ack & States That the 3 Requested Decisions, CLI-77-24,ALAB-473,& ALAB-489 Were Forwarded on 781107 | |
GO2-78-267, Forwards Data Tape Numbers 3030 & 3048,mailed Separately, Containing Onsite Meteorological Data for April 1974 Thru March 1975 & April 1975 Thru March 1976,respectivley.Tapes Have Been Reformatted Per NRC Ltr of 780815 | 8 December 1978 | Forwards Data Tape Numbers 3030 & 3048,mailed Separately, Containing Onsite Meteorological Data for April 1974 Thru March 1975 & April 1975 Thru March 1976,respectivley.Tapes Have Been Reformatted Per NRC Ltr of 780815 | |
GO2-80-209, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/80-08.Corrective Actions:Memo Issued to Clearly Establish & Reaffirm Qa/Qc Independence from Const | 19 September 1980 | Responds to NRC Re Violations Noted in IE Insp Rept 50-397/80-08.Corrective Actions:Memo Issued to Clearly Establish & Reaffirm Qa/Qc Independence from Const | |
GO2-82-380, Forwards Final Response to NRC IE Bulletin 79-02,Revision 2 | 14 April 1982 | Forwards Final Response to NRC IE Bulletin 79-02,Revision 2 | |
GO2-82-412, Forwards Final Deficiency Rept Re Cracks in Welds at Corner Joints | 21 April 1982 | Forwards Final Deficiency Rept Re Cracks in Welds at Corner Joints | |
GO2-82-521, Forwards Wc Bibb Resume Per FSAR Chapter 13 Requirements | 10 June 1982 | Forwards Wc Bibb Resume Per FSAR Chapter 13 Requirements | |
GO2-82-554, Forwards Interim Rept Per IE Bulletin 82-01,Revision 1 Re Radiographs of Welds in Piping Subassemblies.Rept Describes Findings & Corrective Actions Taken.Final Rept Will Be Submitted Upon Completion of All Corrective Actions | 22 June 1982 | Forwards Interim Rept Per IE Bulletin 82-01,Revision 1 Re Radiographs of Welds in Piping Subassemblies.Rept Describes Findings & Corrective Actions Taken.Final Rept Will Be Submitted Upon Completion of All Corrective Actions | |
GO2-82-615, Advises That Amend to License Condition 14 for License NPF-21 Initiated by Working W/Nrr to Obtain SER on Fire Protection Program.Util Expects to Submit Final Response to NRC Question During Wk of 860630 | 1 July 1986 | Advises That Amend to License Condition 14 for License NPF-21 Initiated by Working W/Nrr to Obtain SER on Fire Protection Program.Util Expects to Submit Final Response to NRC Question During Wk of 860630 | Fire Protection Program |
GO2-82-723, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/82-14.Corrective Actions:Bechtel Procedures Reviewed to Ensure That Ae Approvals Obtained & QC Administrative Instruction 15 Issued | 31 August 1982 | Responds to NRC Re Violations Noted in IE Insp Rept 50-397/82-14.Corrective Actions:Bechtel Procedures Reviewed to Ensure That Ae Approvals Obtained & QC Administrative Instruction 15 Issued | |
GO2-82-764, Forwards Interim Deficiency Repts 208 Re Remote Shutdown Panel & 209 Re Pump Discharge Pressure Switch | 8 September 1982 | Forwards Interim Deficiency Repts 208 Re Remote Shutdown Panel & 209 Re Pump Discharge Pressure Switch | |
GO2-82-830, Forwards Application for Ol,Consisting of Fsar,Environ Rept (Filed in PDR Category C),Emergency Preparedness Plan (Filed in Central Files),Fire Protection Sys Info (Filed in PDR Category F) & Antitrust Info (Filed in PDR Category M) | 20 August 1982 | Forwards Application for Ol,Consisting of Fsar,Environ Rept (Filed in PDR Category C),Emergency Preparedness Plan (Filed in Central Files),Fire Protection Sys Info (Filed in PDR Category F) & Antitrust Info (Filed in PDR Category M) | |
GO2-82-858, Submits Clarification to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. As-built Drawings Given Addl Piping & Support Checks by Contractor Field Engineers Rather than by Qa/Qc Inspectors | 19 October 1982 | Submits Clarification to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. As-built Drawings Given Addl Piping & Support Checks by Contractor Field Engineers Rather than by Qa/Qc Inspectors | |
GO2-82-905, Advises That IE Bulletin 82-01,Suppl 1 Re Itt Grinnell Supplied Matls,Is Not Applicable to Facility | 12 November 1982 | Advises That IE Bulletin 82-01,Suppl 1 Re Itt Grinnell Supplied Matls,Is Not Applicable to Facility | |
GO2-82-956, Confirms 821123 Telephone Request for Extension Until 821203 to Provide Response to IE Insp Rept 50-397/82-21 | 2 December 1982 | Confirms 821123 Telephone Request for Extension Until 821203 to Provide Response to IE Insp Rept 50-397/82-21 | |
GO2-82-958, Responds to NRC Re Violations & Deviations Noted in IE Insp Rept 50-397/82-21.Corrective Actions:Electrical Separation Project Engineering Directives Reviewed to Identify Cables Affected by 6-inch Separation Requirements | 2 December 1982 | Responds to NRC Re Violations & Deviations Noted in IE Insp Rept 50-397/82-21.Corrective Actions:Electrical Separation Project Engineering Directives Reviewed to Identify Cables Affected by 6-inch Separation Requirements | |
GO2-82-992, Forwards Final Rept on Onsite Review of Radiographs,Per IE Bulletin 82-01,Rev 1, Alterations of Radiographs of Welds in Piping Subassemblies. All Corrective Action Completed | 21 December 1982 | Forwards Final Rept on Onsite Review of Radiographs,Per IE Bulletin 82-01,Rev 1, Alterations of Radiographs of Welds in Piping Subassemblies. All Corrective Action Completed | |
GO2-83-104, Provides 120-day Response to IE Bulletin 83-06 Re Nonconforming Matls Supplied by Tube-Line Corp.Investigation Revealed No Usage of Tube-Line Supplied Matls in Const of Project | 11 November 1983 | Provides 120-day Response to IE Bulletin 83-06 Re Nonconforming Matls Supplied by Tube-Line Corp.Investigation Revealed No Usage of Tube-Line Supplied Matls in Const of Project | |
GO2-83-105, Responds to IE Bulletin 80-06, ESF Reset Controls. Preoperational Loss of Power Testing Identified Addl balance-of-plant Valves Not in Compliance W/Bulletin,Per .Reset Control Logic Will Be Modified | 15 November 1983 | Responds to IE Bulletin 80-06, ESF Reset Controls. Preoperational Loss of Power Testing Identified Addl balance-of-plant Valves Not in Compliance W/Bulletin,Per .Reset Control Logic Will Be Modified | |
GO2-83-108, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions:Sampling Plan Developed to Provide 95% Confidence Level That Less than 5% Defects Exist in Sample Lot | 21 November 1983 | Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions:Sampling Plan Developed to Provide 95% Confidence Level That Less than 5% Defects Exist in Sample Lot | |
GO2-83-118, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-37.Corrective Actions:Matl,Equipment,Parts & Supplies Procurement Procedure Revised to Preclude Ordering Obsolete Spare Parts | 30 December 1983 | Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-37.Corrective Actions:Matl,Equipment,Parts & Supplies Procurement Procedure Revised to Preclude Ordering Obsolete Spare Parts | |
GO2-83-154, Forwards Final Deficiency Repts Re Skewed T Joints & Interim Deficiency Repts Re RHR Relief Valve Vents & LPCS & RHR Support Pin Receptacles | 18 February 1983 | Forwards Final Deficiency Repts Re Skewed T Joints & Interim Deficiency Repts Re RHR Relief Valve Vents & LPCS & RHR Support Pin Receptacles | |
GO2-83-178, Forwards Emergency Plan Implementing Procedures,W/Exception of EPIP 13.1.1, Classification of Emergency. EPIP 13.1.1 Will Be Submitted by 830315.W/o Encl | 1 March 1983 | Forwards Emergency Plan Implementing Procedures,W/Exception of EPIP 13.1.1, Classification of Emergency. EPIP 13.1.1 Will Be Submitted by 830315.W/o Encl | |
GO2-83-237, Forwards Emergency Classification Procedure PPM 13.1.1, Classifying Emergency, Per NUREG-0696.Use of Safety Parameters in symptom-based Methodology More Functional Approach than event-based Methodology | 15 March 1983 | Forwards Emergency Classification Procedure PPM 13.1.1, Classifying Emergency, Per NUREG-0696.Use of Safety Parameters in symptom-based Methodology More Functional Approach than event-based Methodology | |
GO2-83-241, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-03.Corrective Actions:Task Force Team Leaders Instructed to Review Letterbooks to Assure No Unanswered Quality Concerns Exist.Ir 3674 Addressed in Overall Review | 18 March 1983 | Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-03.Corrective Actions:Task Force Team Leaders Instructed to Review Letterbooks to Assure No Unanswered Quality Concerns Exist.Ir 3674 Addressed in Overall Review | Nondestructive Examination |
GO2-83-254, Notifies That Util Deferring Indefinitely,Plans to Install Continuous Nitrogen Supply Sys to Containment Electrical Penetrations,In Response to IE Bulletin 77-07,based on Industry Experience | 24 March 1983 | Notifies That Util Deferring Indefinitely,Plans to Install Continuous Nitrogen Supply Sys to Containment Electrical Penetrations,In Response to IE Bulletin 77-07,based on Industry Experience | |
GO2-83-295, Amends Response to NRC Re Violations Noted in IE Insp Rept 50-397/82-21.Corrective Actions:Fsar Rev & Rev 2 to Electrical Separation Practices Document Will Be Issued by 830415 | 31 March 1983 | Amends Response to NRC Re Violations Noted in IE Insp Rept 50-397/82-21.Corrective Actions:Fsar Rev & Rev 2 to Electrical Separation Practices Document Will Be Issued by 830415 | |
GO2-83-366, Forwards WNP-2 Project Review of Completed Safety-Related Work, Fourteenth Progress Rept for Jan-Mar 1983,per Util 800717 Commitments in Response to Notice of Violation & Addl Info in Accordance w/10CFR50.54(f) | 26 April 1983 | Forwards WNP-2 Project Review of Completed Safety-Related Work, Fourteenth Progress Rept for Jan-Mar 1983,per Util 800717 Commitments in Response to Notice of Violation & Addl Info in Accordance w/10CFR50.54(f) | Coatings |
GO2-83-409, Amended Response to NRC Re Violations Noted in IE Insp Rept 50-397/82-27.Corrective Actions:Reinsp of All Large & Small bore-type Bracket Installations Complete.No Addl Rework or Welding Required | 5 May 1983 | Amended Response to NRC Re Violations Noted in IE Insp Rept 50-397/82-27.Corrective Actions:Reinsp of All Large & Small bore-type Bracket Installations Complete.No Addl Rework or Welding Required | |
GO2-83-442, Forwards Final Response to IE Bulletin 79-02,Rev 2 Re Reliability of Pipe Support Base Plates Using Concrete Expansion Anchor Bolts in Seismic Category I Piping Sys. Approx 10,000 Seismic Category I Supports Utilized | 19 May 1983 | Forwards Final Response to IE Bulletin 79-02,Rev 2 Re Reliability of Pipe Support Base Plates Using Concrete Expansion Anchor Bolts in Seismic Category I Piping Sys. Approx 10,000 Seismic Category I Supports Utilized | High Radiation Area Finite Element Analysis |
GO2-83-573, Forwards Deficiency Repts Re Condition 240,loss of ESF Loads on Undervoltage Trip & Condition 258,RHR HX Installation | 24 June 1983 | Forwards Deficiency Repts Re Condition 240,loss of ESF Loads on Undervoltage Trip & Condition 258,RHR HX Installation | |
GO2-83-592, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions:Review of Nonconformance Repts Identifying Locations of Honeycombs or Voids Repaired by Contract 6426 Will Be Conducted | 1 July 1983 | Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions:Review of Nonconformance Repts Identifying Locations of Honeycombs or Voids Repaired by Contract 6426 Will Be Conducted | |
GO2-83-622, Forwards Info Re as-built Seismic Category I Quality Class II Hangers,Spec Requirement & Documentation Relative to hold-down Bolts for Reactor Vessel to Assist in Resolution of Issues Raised by Const Assessment Team | 15 July 1983 | Forwards Info Re as-built Seismic Category I Quality Class II Hangers,Spec Requirement & Documentation Relative to hold-down Bolts for Reactor Vessel to Assist in Resolution of Issues Raised by Const Assessment Team | Non-Destructive Examination Safe Shutdown Earthquake |
GO2-83-652, Revised Final Deficiency Rept for Condition 212 Re 8-H Rayproof Doors & Interim Deficiency Rept for Condition 262 Re Installation of Unapproved Power Piping Brackets.Next Rept Expected by 831021 | 22 July 1983 | Revised Final Deficiency Rept for Condition 212 Re 8-H Rayproof Doors & Interim Deficiency Rept for Condition 262 Re Installation of Unapproved Power Piping Brackets.Next Rept Expected by 831021 | |
GO2-83-665, Submits Updated Response to IE Bulletin 77-02 Re Failures of Westinghouse AR Relays W/Certain Latch Attachment or seal-in Feature.Ar Relays W/O Latch Attachments Acceptable. Relays W/Attachments Blacklisted | 3 August 1983 | Submits Updated Response to IE Bulletin 77-02 Re Failures of Westinghouse AR Relays W/Certain Latch Attachment or seal-in Feature.Ar Relays W/O Latch Attachments Acceptable. Relays W/Attachments Blacklisted | |
GO2-83-678, Forwards Final Response to Notice of Violation from IE Insp Rept 50-397/83-14.Corrective Actions:Review of Quality Documentation & Receiving Records Performed to Assess Potential for Inadvertent Substitution of Reinforcing Steel | 29 July 1983 | Forwards Final Response to Notice of Violation from IE Insp Rept 50-397/83-14.Corrective Actions:Review of Quality Documentation & Receiving Records Performed to Assess Potential for Inadvertent Substitution of Reinforcing Steel | Safe Shutdown |
GO2-83-680, Ack Receipt of IE Insp Rept 50-397/83-29.No Proprietary Info | 1 August 1983 | Ack Receipt of IE Insp Rept 50-397/83-29.No Proprietary Info | |
GO2-83-701, Responds to NRC Re Deviations Noted in IE Insp Rept 50-397/83-22.No Corrective Actions Planned Re Aisc/Nf Boundary.Clarification of FSAR Paragraph 3.2.3 Will Be Submitted by 830901 | 5 August 1983 | Responds to NRC Re Deviations Noted in IE Insp Rept 50-397/83-22.No Corrective Actions Planned Re Aisc/Nf Boundary.Clarification of FSAR Paragraph 3.2.3 Will Be Submitted by 830901 | Non-Destructive Examination |
GO2-83-731, Forwards Interim Deficiency Repts for Condition 216 Re RHR Relief Valve Vents & Condition 270 Re Indeterminate Grade Matl on ECCS Pumps | 11 August 1983 | Forwards Interim Deficiency Repts for Condition 216 Re RHR Relief Valve Vents & Condition 270 Re Indeterminate Grade Matl on ECCS Pumps | |
GO2-83-823, Submits Interim Response to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions: Quality Class I & II Peds Undergoing Reevaluation.Sample Program Expected to Be Completed by 830930 | 12 September 1983 | Submits Interim Response to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions: Quality Class I & II Peds Undergoing Reevaluation.Sample Program Expected to Be Completed by 830930 | |
GO2-83-839, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:Honeycombed Areas in Beams 2B11 & 2B25 Excavated to Sound Concrete & Will Be Repaired.Destructive Exam & Documentation Review Conducted | 16 September 1983 | Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:Honeycombed Areas in Beams 2B11 & 2B25 Excavated to Sound Concrete & Will Be Repaired.Destructive Exam & Documentation Review Conducted | Earthquake |
GO2-83-847, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:All Weldolets on Six Separate Tree Risers Inspected & Found Fully Welded Out.No Deficiencies Encountered | 19 September 1983 | Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:All Weldolets on Six Separate Tree Risers Inspected & Found Fully Welded Out.No Deficiencies Encountered | |
GO2-83-862, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-37.Corrective Actions:Procedure 13 Revised to Specify Use of Controlled Bill of Matls When Reviewing Purchase Requisitions | 23 September 1983 | Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-37.Corrective Actions:Procedure 13 Revised to Specify Use of Controlled Bill of Matls When Reviewing Purchase Requisitions | |
GO2-83-870, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:Deficiencies Reviewed Against Required Hanger Function.Hangers Determined Adequate | 26 September 1983 | Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:Deficiencies Reviewed Against Required Hanger Function.Hangers Determined Adequate | Non-Destructive Examination Safe Shutdown Earthquake Earthquake |
GO2-83-874, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:Specific Deficiency Noted in Item D of Notice of Violation Placed in Project Tracking Sys.Deficiency Will Be Corrected by 831101 | 29 September 1983 | Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:Specific Deficiency Noted in Item D of Notice of Violation Placed in Project Tracking Sys.Deficiency Will Be Corrected by 831101 | |
GO2-83-959, Forwards Updated Const Status Repts as of 830930.One Oversize Figure Encl.Aperture Card Available in PDR | 23 October 1983 | Forwards Updated Const Status Repts as of 830930.One Oversize Figure Encl.Aperture Card Available in PDR | Hydrostatic Coatings |
GO2-83-973, Forwards Responses to NRC 831014 Request for Info Re Notice of Violation Transmitted W/Ie Insp Rept 50-397/83-38, Including Info Concerning Quality Class I as-built Program, Calculations & third-party Assessment of Pipe Supports | 26 October 1983 | Forwards Responses to NRC 831014 Request for Info Re Notice of Violation Transmitted W/Ie Insp Rept 50-397/83-38, Including Info Concerning Quality Class I as-built Program, Calculations & third-party Assessment of Pipe Supports | |
GO2-83-996, Amplifies 830916 Response to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions: Discrepancies from Design Requirements Evaluated.Structural Members Adequate for All Loads | 31 October 1983 | Amplifies 830916 Response to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions: Discrepancies from Design Requirements Evaluated.Structural Members Adequate for All Loads | |