IR 05000456/1986002 | 20 March 1986 | Insp Repts 50-456/86-02,50-457/86-02 & 70-3000/86-01 on 851031-1101 & 860224-27 & 0304-05.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Radiation Protection & Radwaste Programs & NUREG-0737 Items | Grab sample |
IR 05000456/1986004 | 21 February 1986 | Preoperational Physical Protection Insp Rept 50-456/86-04 on 860127-28.No Violations Noted.Major Areas Inspected:Physical Security Program Required Prior to Fuel Load Licensing. Details Withheld (Ref 10CFR73.21) | |
IR 05000456/1986005 | 18 February 1986 | Insp Repts 50-456/86-05 & 50-457/86-04 on 860128-0204.No Violations or Deviations Noted.Major Areas Inspected: 10CFR50.55(e) Repts,Part 21 Notifications & Bulletins & Actions on Previous Insp Findings | Post Accident Monitoring |
IR 05000456/1986006 | 16 April 1986 | Safety Insp Repts 50-457/86-07 & 50-456/86-06 on 860202-0329.Violation Noted:Mispositioned Valves & Improperly Applied Caution Tags Identified During Unit 1 Cold Hydrostatic Test | Hydrostatic |
IR 05000456/1986008 | 26 February 1986 | Insp Rept 50-456/86-08 & 50-457/86-07 on 850808-860218.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings Re Engineering Evaluation of Corroded Small Bore Piping & Control of Matls | |
IR 05000456/1986010 | 1 May 1986 | Insp Rept 50-456/86-10 on 860224-0417.No Violation or Deviation Noted.Major Areas Inspected:Preoperational Test Program Implementation,Procedures Review & Verification & Performances | |
IR 05000456/1986012 | 7 May 1986 | Insp Repts 50-456/86-12 & 50-457/86-10 on 860317-21,0418 & 24.No Violation or Deviation Noted.Major Areas Inspected: Licensee Action on Previous Insp Findings | |
IR 05000456/1986013 | 2 June 1986 | Insp Repts 50-456/86-13 & 50-457/86-11 on 860312-0508.No Violations or Deviations Identified.Major Areas Inspected: Resolution of Previous Insp findings,10CFR50.55(e) Deficiency Repts & Followup on Allegations | Liquid penetrant |
IR 05000456/1986014 | 7 April 1986 | Insp Repts 50-456/86-14 & 50-457/86-12 on 860319-0402.No Violations or Deviations Noted.Major Areas Inspected: Previously Identified Items & SER Review & Followup.Four of Five Previously Identified Items Closed | Fire Barrier |
IR 05000456/1986015 | 2 May 1986 | Insp Repts 50-456/86-15 & 560-457/86-13 on 860305-21. Violation Noted:Configuration of Electrical Wiring of Limit Switch 14-14C of Valve 1CS001A Not in Conformance W/Drawings | |
IR 05000456/1986016 | 1 July 1986 | Safety Insp Repts 50-456/86-16 & 50-457/86-14 on 860330- 0531.No Violation or Deviation Noted.Major Areas Inspected: Meetings,Training & Other Activities.One Area of Concern Re Quality of Release to Operations Process Identified | Coatings |
IR 05000456/1986017 | 12 May 1986 | Insp Repts 50-456/86-17 & 50-457/86-15 on 860422-25.No Violation of Deviation Noted.Major Areas Inspected: Radiological Environ Monitoring Program,Including Implementation & Results & Licensee Internal Audits | Grab sample |
IR 05000456/1986019 | 10 June 1986 | Insp Repts 50-456/86-19 & 50-457/86-17 on 860519-22.No Violation or Deviation Noted.Major Areas Inspected: Preoperational Radiation Protection & Radwaste Program, Including Organizational & Mgt Control | |
IR 05000456/1986020 | 13 May 1986 | Partially Withheld Insp Repts 50-456/86-20 & 50-457/86-18 on 851008-860425 (Ref 10CFR2.790).No Violation or Deviation Noted.Major Areas Inspected:Review of Concrete Patching & General Condition of Structural Concrete | |
IR 05000456/1986021 | 22 July 1986 | Preoperational Emergency Preparedness Insp Repts 50-456/86-21 & 50-457/86-19 on 860529-0613.No Noncompliance or Deviations Noted.Major Areas Inspected:Administration of Emergency Preparedness Program | |
IR 05000456/1986022 | 5 June 1986 | Safety Insp Rept 50-456/86-22 on 860514,22 & 0602.No Violation or Deviation Noted.Major Areas Inspected: Structural Integrity Test of Unit 1 Containment Structure | |
IR 05000456/1986023 | 13 February 1987 | Insp Rept 50-456/86-23 on 860525-870129.Violations Noted: Fuel Transfer Tube Bellows Not Type B Tested During Preoperation Testing Program & Periodic Tests & Schedules for Test Bellows Not Developed | Exemption Request |
IR 05000456/1986024 | 18 July 1986 | Insp Repts 50-456/86-24 & 50-457/86-20 on 860625-26,0701 & 0710.No Violation or Deviation Noted.Major Areas Inspected: SER Open Items,Ie Insp Procedures 92701B,92702B & 92719 & Previously Identified Items | |
IR 05000456/1986026 | 13 August 1986 | Insp Repts 50-456/86-26 & 50-457/86-21 on 860721-25.No Violation or Deviation Noted.Major Areas Inspected: Preoperational Radiation Protection Program Re Status of Certain TMI Action Plan & HVAC Open & Unresolved Items | Grab sample |
IR 05000456/1986027 | 18 August 1986 | Safety Insp Rept 50-456/86-27 on 860602-0807.No Violation or Deviation Noted.Major Areas Inspected:Actions on Previous Insp Items,Preoperational Test Program Preimplementation & Preoperational Test Procedures Review | |
IR 05000456/1986028 | 29 August 1986 | Safety Insp Repts 50-456/86-28 & 50-457/86-22 on 860604-0814.No Violations or Deviations Noted.Major Areas Inspected:Resolution of Previous Insp Findings,Followup on Allegation & Insp of Steam Generator Tube Shot Peening | |
IR 05000456/1986029 | 3 July 1986 | Partially Withheld Insp Rept 50-456/86-29 on 860605-17 (Ref 10CFR73.21).No Violations or Deviation Noted.Major Areas Inspected:Physical Security Program.Potential Concern Identified Re Security Door Status | |
IR 05000456/1986030 | 26 June 1986 | Safety Insp Repts 50-456/86-30 & 50-457/86-23 on 860610-13. No Violation or Deviation Noted.Major Areas Inspected: Previous Insp findings,10CF50.55(e) Items,Ie Bulletin & Spent Fuel Storage Racks | Hydrostatic Nondestructive Examination VT-2 |
IR 05000456/1986031 | 20 August 1986 | Safety Insp Repts 50-456/86-31 & 50-457/86-24 on 860601- 0802.No Violation or Deviation Noted.Major Areas Inspected: Plant Procedures,Headquarters & Regional Requests, NUREG-0737,Tech Spec Review & Plant Tours | Shutdown Margin Loop seal Ultimate heat sink Chernobyl Biofouling Pressure Boundary Leakage Unidentified leakage |
IR 05000456/1986032 | 14 August 1986 | Insp Rept 50-456/86-32 on 860612-0806.No Violation or Deviation Noted.Major Areas Inspected:Implementation of IE Bulletin 79-14 & Testing of safety-related Pipe Support & Restraint Sys | Safe Shutdown |
IR 05000456/1986033 | 21 July 1986 | Insp Repts 50-456/86-33 & 50-457/86-25 on 860624-26 & 0714. No Violation or Deviation Noted.Major Areas Inspected: Licensee Actions on Previous Insp Findings & Review of Surveillance Results on Rev/Work Request Implementation | |
IR 05000456/1986034 | 18 July 1986 | Insp Repts 50-456/86-34 & 50-457/86-26 on 860626 & 0707-09. No Violation or Deviation Noted.Major Areas Inspected: Previous Insp Findings,Nde Activities & Meeting Re Ultrasonic Exam of Cast Stainless Steel Component Welds | |
IR 05000456/1986035 | 25 July 1986 | Safety Insp Repts 50-456/86-35 & 50-457/86-27 on 860701-03 & 08-11.No Violations or Deviations Noted.Major Areas Inspected:Allegations Re Design of Structural Steel Columns. Allegations Unsubstantiated | |
IR 05000456/1986036 | 26 November 1986 | Insp Repts 50-456/86-36 & 50-457/86-28 on 860711-1114. Violation Noted:Failure to Promptly Document Nonconforming Condition in Cable Spreading Room | |
IR 05000456/1986037 | 21 August 1986 | Insp Repts 50-456/86-37 & 50-457/86-29 on 860728-0807.No Violations or Deviations Noted.Major Areas Inspected: Chemistry/Radiochemistry Program,Including Water Chemistry Control,Procedures,Facilities & Mgt Control | Chernobyl |
IR 05000456/1986038 | 17 October 1986 | Insp Rept 50-456/86-38 on 860818-0918.No Violation or Deviation Noted.Major Areas Inspected:Plant Operations Program Procedures for Document Control & Receipt,Storage & Handling of Equipment | Stolen |
IR 05000456/1986039 | 17 October 1986 | Insp Repts 50-456/86-39 & 50-457/86-30 on 860803-1008.No Violations or Deviations Noted.Major Areas Inspected:Const Worker Concerns,Allegations,Headquarters Request,Plant procedures,NUREG-0737 & Implementation of Strike Plans | Shutdown Margin Anticipated operational occurrence Tornado Missile Hydrostatic Tornado Generated Missile |
IR 05000456/1986041 | 13 April 1987 | Insp Repts 50-456/86-41 & 50-457/86-31 on 860729-870326.No Violations Noted.Major Areas Inspected:Activities Re Allegations,Qa Implementing Procedures & Quality Records | |
IR 05000456/1986042 | 12 September 1986 | Partially Withheld Safeguards Insp Rept 50-456/86-42 on 860825 (Ref 10CFR73.21).Major Areas Inspected:Review of Audit Findings Re Security Sys Reliability & Guard Force, from Visit on 860818-22.Corrective Actions Initiated | |
IR 05000456/1986043 | 22 September 1986 | Insp Repts 50-456/86-43 & 50-457/86-38 on 860811-0912.No Violations or Deviations Noted.Major Areas Inspected: Previous Insp Items,Preoperational Test Procedures, Verification & Results & Startup Test Procedures | Reactor Vessel Water Level |
IR 05000456/1986044 | 9 September 1986 | Insp Repts 50-456/86-44 & 50-457/86-32 on 860818-22 & 27-28. No Violation or Deviation Noted.Major Areas Inspected: Radiation Protection & Radwaste Programs,Ie Info Notice 86-022 & Status of Certain TMI Action Plan Items | Grab sample |
IR 05000456/1986045 | 7 November 1986 | Insp Repts 50-456/86-45 & 50-457/86-33 on 860818-1022.No Violation or Deviation Noted.Major Areas Inspected:Facility post-fire Safe Shutdown Methods & Review of Licensee Routine Fire Protection Program | Safe Shutdown Fire Barrier Hydrostatic Emergency Lighting Fire Protection Program |
IR 05000456/1986046 | 7 October 1986 | Insp Repts 50-456/86-46 & 50-457/86-34 on 860915-19.Major Areas Inspected:Open & Improvement Items Identified During 860529-0613 Emergency Preparedness Implementation Appraisal | Emergency Lighting |
IR 05000456/1986047 | 24 October 1986 | Insp Repts 50-456/86-47 & 50-457/86-35 on 860827-1016.No Violation or Deviation Noted.Major Areas Inspected: Resolution of Previous Insp Findings,Followup on Allegation, Deficiency Repts & QC Weld Insp Practice | Flow Induced Vibration |
IR 05000456/1986048 | 28 October 1986 | Partially Withheld Preoperational Physical Protection Insp Rept 50-456/86-48 on 860902-05,15-19 & 22 (Ref 10CFR73.21). Major Areas Inspected:Implementation of Physical Security Program Required Prior to Fuel Load Licensing | Safeguards Contingency Plan |
IR 05000456/1986049 | 9 October 1986 | Insp Repts 50-456/86-49 & 50-457/86-36 on 860902-15.No Violations or Deviations Noted.Major Areas Inspected: Allegations & Followup on Previous Insp Items | Scaffolding |
IR 05000456/1986050 | 20 November 1986 | Insp Repts 50-456/86-50 & 50-457/86-37 on 860831-1101.No Violations or Deviations Noted.Major Areas Inspected:Const Worker Concern,Allegations,Temporary License Request, NUREG-0737 & Operational Staffing | Boric Acid Shutdown Margin Packing leak Ultimate heat sink Hydrostatic Siren Affidavit |
IR 05000456/1986051 | 9 October 1986 | Insp Repts 50-456/86-51 & 50-457/86-39 on 860917-19 & 22-23. No Violations or Deviations Noted.Major Areas Inspected: Chemistry/Radiochemistry Program,Including Water Chemistry Control, Procedures,Facilities & Mgt Control | Boric Acid Grab sample |
IR 05000456/1986052 | 12 November 1986 | Insp Repts 50-456/86-52 & 50-457/86-40 on 860915-1023. Violation Noted:Inadequate Corrective Action for Deficiency Re Lack of Documentation to Support Review of EF-11-12 | Loop seal |
IR 05000456/1986053 | 28 October 1986 | Partially Withheld Safeguards Insp Rept 50-456/86-53 on 860929-30,1001-03,07-09 & 14 (Ref 10CFR73.21).Security Program Adequately Implemented.Major Areas Inspected: Security Program,Including Mgt Efectiveness | |
IR 05000456/1986054 | 27 October 1986 | Insp Repts 50-456/86-54 & 50-457/86-41 on 861006-08.No Violation or Deviation Noted.Major Areas Inspected: Preoperational Radiation Protection Program,Including Training & Qualifications & Status of TMI Action Items | Grab sample |
IR 05000456/1986055 | 23 October 1986 | Insp Repts 50-456/86-55 & 50-457/86-42 on 861007-08 & 14.No Violations Noted.Major Areas Inspected:Open Items Identified During June 1986 Emergency Preparedness Implementation Appraisal | Emergency Lighting Siren |
IR 05000456/1986056 | 13 November 1986 | Safety Insp Rept 50-456/86-56 on 861007-09,14-16 & 21-23. No Violation or Deviation Noted.Major Areas Inspected: Previous Insp Findings,Preoperations Review of Plant Operations Program Procedure for Design Change & Mod | |
IR 05000456/1986057 | 19 December 1986 | Insp Repts 50-456/86-57 & 50-457/86-47 on 861007-1124. Violation Noted:Failure to Implement Procedure Requirements Re Submittal of Approval for Design & Installation Records Into Lk Comstock,Inc Quality Records Vault | |
IR 05000456/1986058 | 17 October 1986 | Partially Withheld Preoperational Matl Control & Accountability Insp Rept 50-456/86-58 on 861008-09 (Ref 10CFR2.790).No Noncompliance Noted.Major Areas Inspected: SNM Control & Accounting |