Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML0813706307 May 2008Slides from H. B. Robinson Meeting Re. Robinson Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - Cy 2007
ML08308000531 October 2008Meeting Slides, Progress Energy Public Meeting, NRC Region II VisitB.5.b
License Renewal
Dissimilar Metal Weld
Power change
Siren
Power Uprate
ML0912706526 May 2009Summary of Category 1 Public Meeting Discussed NRC Reactor Oversight Process Annual Assessment of H. B. Robinson, Unit 2
ML09132016512 May 2009Summary of Category 3 Public/Open House Meeting with Crystal River to Discuss Annual AssessmentOpen House
ML0921609634 August 2009Meeting Summary - Public Meeting Category 1 - Preliminary White Finding - Brunswick Steam Electric PlantLicense Renewal
Preliminary White Finding
ML09232108020 August 2009MELLLA Plus ImplementationMELLLA
Stress corrosion cracking
ML09302067122 October 2009Emergency Diesel Generators - Progress Energy
ML10015070414 January 2010Human Performance Slides
ML10015076315 January 2010Meeting Presentation Brunswick Nuclear Plant Human Performance
ML10075042513 October 2009Email W/Briefing on CR3 Containment Project Overview
ML10106034620 November 2009Unit #3 Containment Delamination UpdateTornado Missile
Finite Element Analysis
License Renewal
Earthquake
Power Uprate
ML10117033427 April 2010Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2
ML1011708193 December 2009Root Cause Analysis - PII Metrics as of Dec 3rd 2009
ML10118031319 March 2010E-Mail from Kuntz to Craver, Crystal River Containment Repair Plan UpdateTornado Missile
License Renewal
ML10139049412 May 2010Event Review for Robinson - Slides
ML10154041827 May 2010Meeting Summary - Public Meeting - Brunswick Steam Electric Plant Annual Assessment - Reactor Oversight Program 2009 Presentation Slides
ML1016705238 June 2010NRC Fire Protection Screening Criteria, Brunswick Nuclear PlantSafe Shutdown
Probabilistic Risk Assessment
Operator Manual Action
Emergency Lighting
Job Performance Measure
ML1019400938 October 2009Groundwater Well Samples Results, Updated 10/08/09
ML1019400958 October 2009Marsh, River, and Creek Tritium Results Updated 10/08/09
ML10194045321 May 2008Email from Grzeck, Lee to Heather Gepford, Austin, Joe, George Kuzo, England, Louise, Kemp, Daniel and Dale.Dusenbury@Ncmail.Net; Subject: Storm Drain Collection Basin and Storm Drain Stabilization.Pdf; Sampling Locations Data Updated 5-19-
ML1019405011 April 2008Annual Report Slides
ML10194052430 June 20102010 June 30 NRC Technical MeetingTornado Missile
Finite Element Analysis
ML10203046220 July 2010Groundwater Protection Status
ML1024402052 September 2010NRC Special Inspection Team Exit Meeting for Crystal River - September 2, 2010
ML1025810962 September 2010Unit #3 Containment Investigation and RepairTornado Missile
Finite Element Analysis
ML10259039615 September 2010Summary of Public Meeting - Special Inspection Results Crystal River Nuclear PlantTornado Missile
Finite Element Analysis
ML1028702746 February 20106.4 Rigid and Flexible SleevesHydrostatic
Liquid penetrant
ML1028710908 March 2010Mar 8 Pnsc De Tensioning Briefing
ML1028710913 March 2010Mar 3 Pnsc De Tensioning Briefing P1Tornado Missile
Finite Element Analysis
Earthquake
Thermal fatigue
ML10288045818 February 20107.8 Excessive Water Jet Pressure Part 3
ML1028804925 October 200910/6/09 Crystal River 3 Nuclear Safety Review Committee Handout Page
ML10291055412 November 2009Email - from Orf, Tracy to: Lake, Louis Dated Thursday, November 12, 2009 7:05 Am Subject: FW: CR3 Information Update
ML1029105776 November 2009Containment Unfolded Buttress 2 to 5
ML10291057928 December 2009Email - from: Thomas, George to: Lake, Louis Cc: Khanna, Meena; Franke, Mark; Farzam, Farhad; Carrion, Robert; Masters, Anthony; Nausdj@Ornl.Gov Dated Monday, December 28, 2009 6:15 PM Subject: CR-3 Schedule and Root Cause Failure Modes Upd
ML1029105905 November 20092009 Nov 5 - NRC Telecon Briefing.Pdf
ML1029105915 November 2009Unit #3 Containment Update by Garry Miller
ML1029105934 November 2009Email - Subject: CR3 Status Meeting
ML10291067130 October 20092009 Oct 30 - Root Cause Analysis Metrics.Pptx
ML10291067229 October 20092009 Oct 29_NRC Copy_Containment Delamination.PptxTornado Missile
ML10291072329 October 2009Condition Assessment (29Oct09).doc
ML10292007320 September 2010Containment 40 Undated Delamination Investigation Report
ML10292018819 October 2010Appendix Slides
ML10292050916 November 2009Presentation to Pnsc Containment Update & Discussion of Repair OptionsTornado Missile
License Renewal
ML10292051620 September 2010Photo
ML10293061716 November 20092009 Nov 16- Pnsc - Repair Update FinalTornado Missile
License Renewal
ML10293065212 November 20092009 Nov 12 - Containment Unfolded Graphics_Ir Mosaic.Pptx
ML10320061816 November 2010Public Meeting Summary - Category One - Regulatory and Enforcement Conference Meeting (Robinson)Enforcement Discretion
Condition Adverse to Quality
Preliminary White Finding
ML10348063416 December 2010Summary of Meeting with Florida Power Corporation Regarding Crystal River'S Proposed License Amendment Request to Support the Independent Spent Fuel Storage Facility ProjectTornado Missile
Safe Shutdown Earthquake
Earthquake
ML11089090730 March 2011Slides of Meeting Regarding H.B. Robinson Annual Assessment MeetingCondition Adverse to Quality
License Renewal
ML11102A00512 April 2011Progress Energy - Slides for NFPA 805 Pre-LAR Application Meeting April 12, 2011Safe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Hemyc
Fire Protection Program
Weak link
Power Uprate