Issue date | Title | Topic | |
---|---|---|---|
ML081370630 | 7 May 2008 | Slides from H. B. Robinson Meeting Re. Robinson Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - Cy 2007 | |
ML083080005 | 31 October 2008 | Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit | B.5.b License Renewal Dissimilar Metal Weld Power change Siren Power Uprate |
ML091270652 | 6 May 2009 | Summary of Category 1 Public Meeting Discussed NRC Reactor Oversight Process Annual Assessment of H. B. Robinson, Unit 2 | |
ML091320165 | 12 May 2009 | Summary of Category 3 Public/Open House Meeting with Crystal River to Discuss Annual Assessment | Open House |
ML092160963 | 4 August 2009 | Meeting Summary - Public Meeting Category 1 - Preliminary White Finding - Brunswick Steam Electric Plant | License Renewal Preliminary White Finding |
ML092321080 | 20 August 2009 | MELLLA Plus Implementation | MELLLA Stress corrosion cracking |
ML093020671 | 22 October 2009 | Emergency Diesel Generators - Progress Energy | |
ML100150704 | 14 January 2010 | Human Performance Slides | |
ML100150763 | 15 January 2010 | Meeting Presentation Brunswick Nuclear Plant Human Performance | |
ML100750425 | 13 October 2009 | Email W/Briefing on CR3 Containment Project Overview | |
ML101060346 | 20 November 2009 | Unit #3 Containment Delamination Update | Tornado Missile Finite Element Analysis License Renewal Earthquake Power Uprate |
ML101170334 | 27 April 2010 | Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2 | |
ML101170819 | 3 December 2009 | Root Cause Analysis - PII Metrics as of Dec 3rd 2009 | |
ML101180313 | 19 March 2010 | E-Mail from Kuntz to Craver, Crystal River Containment Repair Plan Update | Tornado Missile License Renewal |
ML101390494 | 12 May 2010 | Event Review for Robinson - Slides | |
ML101540418 | 27 May 2010 | Meeting Summary - Public Meeting - Brunswick Steam Electric Plant Annual Assessment - Reactor Oversight Program 2009 Presentation Slides | |
ML101670523 | 8 June 2010 | NRC Fire Protection Screening Criteria, Brunswick Nuclear Plant | Safe Shutdown Probabilistic Risk Assessment Operator Manual Action Emergency Lighting Job Performance Measure |
ML101940093 | 8 October 2009 | Groundwater Well Samples Results, Updated 10/08/09 | |
ML101940095 | 8 October 2009 | Marsh, River, and Creek Tritium Results Updated 10/08/09 | |
ML101940453 | 21 May 2008 | Email from Grzeck, Lee to Heather Gepford, Austin, Joe, George Kuzo, England, Louise, Kemp, Daniel and Dale.Dusenbury@Ncmail.Net; Subject: Storm Drain Collection Basin and Storm Drain Stabilization.Pdf; Sampling Locations Data Updated 5-19- | |
ML101940501 | 1 April 2008 | Annual Report Slides | |
ML101940524 | 30 June 2010 | 2010 June 30 NRC Technical Meeting | Tornado Missile Finite Element Analysis |
ML102030462 | 20 July 2010 | Groundwater Protection Status | |
ML102440205 | 2 September 2010 | NRC Special Inspection Team Exit Meeting for Crystal River - September 2, 2010 | |
ML102581096 | 2 September 2010 | Unit #3 Containment Investigation and Repair | Tornado Missile Finite Element Analysis |
ML102590396 | 15 September 2010 | Summary of Public Meeting - Special Inspection Results Crystal River Nuclear Plant | Tornado Missile Finite Element Analysis |
ML102870274 | 6 February 2010 | 6.4 Rigid and Flexible Sleeves | Hydrostatic Liquid penetrant |
ML102871090 | 8 March 2010 | Mar 8 Pnsc De Tensioning Briefing | |
ML102871091 | 3 March 2010 | Mar 3 Pnsc De Tensioning Briefing P1 | Tornado Missile Finite Element Analysis Earthquake Thermal fatigue |
ML102880458 | 18 February 2010 | 7.8 Excessive Water Jet Pressure Part 3 | |
ML102880492 | 5 October 2009 | 10/6/09 Crystal River 3 Nuclear Safety Review Committee Handout Page | |
ML102910554 | 12 November 2009 | Email - from Orf, Tracy to: Lake, Louis Dated Thursday, November 12, 2009 7:05 Am Subject: FW: CR3 Information Update | |
ML102910577 | 6 November 2009 | Containment Unfolded Buttress 2 to 5 | |
ML102910579 | 28 December 2009 | Email - from: Thomas, George to: Lake, Louis Cc: Khanna, Meena; Franke, Mark; Farzam, Farhad; Carrion, Robert; Masters, Anthony; Nausdj@Ornl.Gov Dated Monday, December 28, 2009 6:15 PM Subject: CR-3 Schedule and Root Cause Failure Modes Upd | |
ML102910590 | 5 November 2009 | 2009 Nov 5 - NRC Telecon Briefing.Pdf | |
ML102910591 | 5 November 2009 | Unit #3 Containment Update by Garry Miller | |
ML102910593 | 4 November 2009 | Email - Subject: CR3 Status Meeting | |
ML102910671 | 30 October 2009 | 2009 Oct 30 - Root Cause Analysis Metrics.Pptx | |
ML102910672 | 29 October 2009 | 2009 Oct 29_NRC Copy_Containment Delamination.Pptx | Tornado Missile |
ML102910723 | 29 October 2009 | Condition Assessment (29Oct09).doc | |
ML102920073 | 20 September 2010 | Containment 40 Undated Delamination Investigation Report | |
ML102920188 | 19 October 2010 | Appendix Slides | |
ML102920509 | 16 November 2009 | Presentation to Pnsc Containment Update & Discussion of Repair Options | Tornado Missile License Renewal |
ML102920516 | 20 September 2010 | Photo | |
ML102930617 | 16 November 2009 | 2009 Nov 16- Pnsc - Repair Update Final | Tornado Missile License Renewal |
ML102930652 | 12 November 2009 | 2009 Nov 12 - Containment Unfolded Graphics_Ir Mosaic.Pptx | |
ML103200618 | 16 November 2010 | Public Meeting Summary - Category One - Regulatory and Enforcement Conference Meeting (Robinson) | Enforcement Discretion Condition Adverse to Quality Preliminary White Finding |
ML103480634 | 16 December 2010 | Summary of Meeting with Florida Power Corporation Regarding Crystal River'S Proposed License Amendment Request to Support the Independent Spent Fuel Storage Facility Project | Tornado Missile Safe Shutdown Earthquake Earthquake |
ML110890907 | 30 March 2011 | Slides of Meeting Regarding H.B. Robinson Annual Assessment Meeting | Condition Adverse to Quality License Renewal |
ML11102A005 | 12 April 2011 | Progress Energy - Slides for NFPA 805 Pre-LAR Application Meeting April 12, 2011 | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation Hemyc Fire Protection Program Weak link Power Uprate |