IR 05000295/1998005 | 20 May 1998 | Forwards Insp Repts 50-295/98-05 & 50-304/98-05 on 980314-0424.No Violations Noted.Staff Responded to Several Events Involving Configuration Control Deficiencies | |
IR 05000304/1985006 | 24 February 1986 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-304/85-06 | |
ML100320145 | 2 July 1980 | Forwards Request for Addl Info Re Backfitting of Severe Accident Mitigation Features.Response Requested within 30 Days | |
ML20054F842 | 15 June 1982 | Informs That,Due to Util Lack of Attempts to Satisfy 10CFR2.790 requirements,820414 Response to Control of Heavy Loads Technical Evaluation Rept Is Being Returned.Addl Info Required | Control of Heavy Loads |
ML20054H926 | 10 June 1982 | Forwards IE Insp Repts 50-295/82-12 & 50-304/82-10 on 820401-0514 & Notice of Violation | |
ML20054J637 | 22 June 1982 | Confirms 820617 & 18 Telcons W/Util.Actions Delineated in 820526 & 0622 Confirmatory Action Ltrs Are Acceptable. Startup & Operation of Zion Unit 1 May Proceed | |
ML20054J669 | 22 June 1982 | Confirmatory Action Ltr Re Missing Piece from Reactor Coolant Pump Loop a Cold Leg Stop Valve Disc,Discussed During 820616 & 17 Telcons.Util Will Conduct Two Addl Tests to Evaluate Potential Presence of Missing Part | |
ML20054K387 | 24 June 1982 | Forwards Safety Evaluation & Eg&G Technical Evaluation Rept of Degraded Grid Protection for Class IE Power Sys. Electrical Sys Design Mod & Draft Tech Specs Contained in Util Acceptable | |
ML20054K440 | 18 June 1982 | Forwards IE Insp Rept 50-295/82-08 in Mar,Apr & May 1982 & Notice of Violation.W/O Notice of Violation | |
ML20054K499 | 16 June 1982 | Forwards IE Insp Repts 50-295/82-10 & 50-304/82-08 in Mar, Apr & May 1982.No Noncompliance Noted | |
ML20054L021 | 22 June 1982 | Forwards IE Insp Rept 50-304/82-11 on 820512-14.No Noncompliance Noted | |
ML20054L461 | 18 June 1982 | Forwards Amend 74 to License DPR-39,safety Evaluation & Notice of Issuance & Availability.Amend Changes Tech Specs for Total Peaking & Normalization Factors for Core Height | |
ML20054M345 | 25 June 1982 | Informs That Item B.2 in 800229 Confirmatory Order Is Complete & Satisfies Requirements Re TMI Action Item III.D.3.4, Control Room Habitability | |
ML20054M510 | 18 June 1982 | Forwards IE Insp Repts 50-295/82-13 & 50-304/82-12 on 820604.No Noncompliance Noted | |
ML20054M619 | 28 June 1982 | Confirms 820626 Telephone Authorization for Change in Tech Specs,Allowing Plant Operation W/One Safety Injection Pump Inoperable If Both Centrifugal Charging Pump Sys & RHR Sys Operable | |
ML20055A034 | 2 July 1982 | Forwards IE Safeguards Insp Rept 50-295/82-15 on 820615-18. No Noncompliance Noted | |
ML20055B396 | 15 July 1982 | Clarifies NRC Position Re Procedures for Admitting NRC Personnel to Facility.Inspectors Listed on Encl 1 Require Permanent Nonemployee,No Escort Required Picture Badges. Personnel on Encl 2 to Be Treated as Nonregular Employees | |
ML20055B453 | 15 July 1982 | Confirms Plans for 820721 Meeting in Region 3 Ofc to Discuss 820628 Startup of Unit 2 W/Degraded Safety Sys | |
ML20055D243 | 22 June 1990 | Forwards Safety Insp Repts 50-295/90-07 & 50-304/90-07 on 900414-0602.No Violations Noted | |
ML20055J206 | 24 July 1990 | Confirms Plans for Mgt Meeting W/Util in Region III Ofc on 900725 to Discuss Diagnostic Evaluation Team Findings at Plant Re motor-operated Valve Issues & Svc Water Operability | |
ML20055J441 | 27 July 1990 | Confirms Mgt Meeting on 900731 in Zion,Il to Discuss Performance Improvement Plan Progress Update Which Should Include Det Findings | |
ML20056A040 | 31 July 1990 | Forwards AEOD/T925A, Evaluation of Safety Equipment Outages for Significance at Zion (Revised) | |
ML20056A696 | 3 August 1990 | Forwards Safety Insp Repts 50-295/90-12 & 50-304/90-14 on 900717-19.No Violations Noted.One Exercise Weakness Identified.Util Should Address Actions Taken or to Be Taken to Improve Performance in Emergency Preparedness Area | |
ML20056B245 | 14 August 1990 | Confirms 900821 Mgt Meeting in Zion,Il to Discuss Performance Improvement Progress Update & Recent Findings | |
ML20056B566 | 22 August 1969 | Requests Summary Rept on Programs Carried Out in Response to Recommendations by Fish & Wildlife Svcs Including Results of Studies or Surveys | |
ML20056C047 | 9 June 1992 | Forwards Amends 138 & 127 to Licenses DPR-39 & DPR-48, Respectively & Safety Evaluation.Amends Revise TS Definitions Section | |
ML20056C449 | 10 March 1993 | Final Response to FOIA Request for Documents.App C Records Already Available in Pdr.Forwards Documents Listed in App D, Which Are Being Made Available in Pdr.App E Records Partially Withheld (Ref FOIA Exemption 5) | |
ML20056E878 | 18 August 1993 | Forwards Exam Rept 50-295/OL-93-02 for Wks of 930712 & 19 | |
ML20056H296 | 16 July 1993 | Forwards SER Approving Eagle 21 Digital I&C Sys Retrofit for Zion Nuclear Power Station,Per Request During 930623 Meeting.Nrc Markup & Comments on NUMARC, Guideline for Licensing Digital I&C Upgrades Also Encl | |
ML20056H492 | 27 August 1993 | Forwards Safety Evaluation on Util 810318 & 921222 Submittals of Addl Info on Administrative Control of combustibles,pre-fire Strategies & Actions to Be Taken by Individual Discovering Fire.Responses Acceptable | |
ML20057A203 | 31 August 1993 | Forwards SE Denying Addl Exemption from Fire Protection Requirements of 10CFR50,App R.Current Plant Configuration Still within Acceptable Parameters of Existing Fire Protection in Each Area,Previous Conclusions Remain Valid | |
ML20057B122 | 8 September 1993 | Ltr Contract,Mod 1 to Task Order 18,providing Incremental Funding in Listed Amount,To IPE Review,Internal Events- Human Reliabilty Analysis Only | |
ML20057B124 | 8 September 1993 | Ltr Contract,Mod 1 to Task Order 17,providing Incremental Funding in Listed Amount to IPE Reviews,Internal Events- Front-End Only | |
ML20057B163 | 24 March 1993 | Forwards SE Re Relief Requests for Second Ten Yr Interval IST Plan for Pumps & Valves.Recommends Relief Be Granted | |
ML20057B832 | 14 September 1993 | Forwards Insp Repts 50-295/93-15 & 50-304/93-15 on 930721-0901.No Violations Noted | |
ML20057F478 | 12 October 1993 | Requests Addl Info Re Response to GL 92-01,rev 1, Reactor Vessel Structural Integrity,10CFR50.54(f), for Plants | |
ML20057F826 | 13 October 1993 | Forwards Amends 148 & 136 to Licenses DPR-39 & DPR-48, Respectively & Safety Evaluation.Amends Relocate Fire Protection TS to Fire Protection Program,Per GLs 86-10 & 88-12 | Fire Protection Program |