ML20054M510
| ML20054M510 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 06/18/1982 |
| From: | Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20054M511 | List: |
| References | |
| NUDOCS 8207130530 | |
| Download: ML20054M510 (2) | |
See also: IR 05000295/1982013
Text
.
.
June 18, 1982
i
Docket No. 50-295
Docket No. 50-304
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special follow-up inspection conducted by
Mr. J. P. Patterson of this office on June 4, 1982, of the prompt
public notification / warning system for the Zion Nuclear Generating
Station, Units 1 & 2, and to the discussion of our findings with
Mr. George Plim1, Assistant Station Superintendent, at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
82071305G0 B20618
'~
PDR ADOCK 05000295
gg/
G
,
-
.
.
Commonwealth Edison Company
2
June 18, 1982
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the: reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withhcid shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
c
I
C.
ae ello, Chief
Program Support Branch
Enclosure:
Inspection Report
No. 50-295/82-13(DEPOS);
No. 50-304/82-12(DEPOS)
cc w/ enc 1:
Louis 0. DelGeorge Director
of Nuclear Licensing
K. L. Graesser, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
Mayor John B. Spencer
City of Zion
RIII
RIJ
RIII
RIII
,
Patt son /jp
A Idan
P
i
~11o
ayes
6/14/82
g
gge