ML20054K499
| ML20054K499 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 06/16/1982 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20054K500 | List: |
| References | |
| NUDOCS 8207020257 | |
| Download: ML20054K499 (2) | |
See also: IR 05000295/1982010
Text
_ _ _ _
_ _ _ _ _ -_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ .
.
.
- JUN 1 6 SS2
Docket No. 50-295
Docket No. 50-304
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special safety inspection conducted by Messrs. M. A. Ring
and K. A. Connaughton of this office on March 4, 5, 8-10, April 7, 14, 15,
May 17 and 27, 1982, of activities at the Zion Nuclear Power Station, Units
1 and 2, authorized by NRC Operating Licenses No. DPR-39 and No. DPR-48 and
to the discussion of our findings with Mr. K. Graesser at the conclusion
of the inspection.
The enclosed copy of our inspection reperc identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you
(or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within ten (10) days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
,
lished. Consistent with Section 2.790(b)(1), any such application must
8207020257 820616
]])Eol
PDR ADOCK 05000295
G
F
.
.
Commonwealth Edison Company
2
kJUN 16 062
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
S 5 /J 1.$bL
W. S. Little, Chief
Engineering Inspection Branch
Enclosure:
Inspection
Report No. 50-295/82-10
and No. 50-304/82-08
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
K. L. Graesser, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
Mayor John B. Spencer
City of Zion
!
f
l
l
'
RIII
RIII
RIII,
RIII
RII-
-
' N)h'
0??5f
////
fraye/k
fL
!
)
j
i
Ring /jp
Connaughton
9fckiw
s
Little
'
6/11/82
1
I
[