Forwards IE Insp Repts 50-295/82-12 & 50-304/82-10 on 820401-0514 & Notice of Violation
ML20054H926
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/10/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20054H927 List:
References
NUDOCS 8206250210
Download: ML20054H926 (2)


See also: IR 05000295/1982012

Text

,

.

.

JUN 1 0 082

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

J. R. Waters, B. L. Burgess,.K. A. Connaughton, L. G. McGregor, and

J. M. Hinds of this office on April 1 through May 14, 1982, of activities

at Zion Nuclear Power Station, Units 1 & 2, authorized by NRC Operating

Licenses No. DPR-39 and DPR-48 and to the discussion of our findings with

Mr. K. L. Graesser at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

/hO!

B206250210 820610

L

PDR ADOCK 05000295

G

PDR

/

-

!

i

'l

.

Commonwealth Edison Company

2

June 10, 1982

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed'in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

h'e will gladly discuss any questions you have concerning this inspection.

Sincerely,

R. L. Spessard, Director

Division of Project and

Resident Programs

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report

No. 50-295/82-12(DPRP);

No. 50-304/82-10(DPRP)

cc w/encls:

Louis 0. De1 George, Director

of Nuclear Licensing

K. L.~Graesser, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Karen Borgstadt, Office of

Assistant Attorney General

Mayor John B. Spencer

' City of Zion

RI

!

RIII

RIII

'yHay s/jp

&

<

,

Knop

Spess rd

Md m c/*

f

6l7/82

.

(g, y

~)_

( y' p 2