ML20054L021
| ML20054L021 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 06/22/1982 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20054L022 | List: |
| References | |
| NUDOCS 8207070077 | |
| Download: ML20054L021 (2) | |
See also: IR 05000304/1982011
Text
~
.
,JUN 2 2 GGB.
Docket No. 50-304
Commonwealth Edison Company
A'ITN:
Mr. Cordell Reed
Vice President
Post Office Box 767
-
Chicago, IL 60690
Gentlemen:
This refers to the routine safey inspection conducted by Mr. D. L. Robinson
of this of fice on May 12-14, 1982, of activities at the Zion Nuclear Power
Station, Unit 2, authorized by NRC Operating License No. DPR-48 and to the
discussion of our findings with Mr. K. L. Graesser and others at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
dolcyed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the-
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the af fidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
8207070077 820622
PDR ADOCK 05000304
T gIi
G
.
_ _ _ .
.
Commonwealth Edison Company
2
22 0;aj
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
4 / /w w ) &
W. S. Little, Chief
Engineering Inspection Branch
.
Enclosure:
Inspection Report
No. 50-304/82-11(DETP)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
K. L. Graesser, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
j
Karen Borgstadt, Office of
Assistant Attorney General
Mayor John B. Spencer
City of Zion
!
i
i
!
.?
!
,
RIII
RIII
RIII
RI
,
l
Ro inson/dm
w
Hayes
L
e
6/2/82
.
. , , , - - +
-
,
.,-
-.
- - .
-
, ~ - - - ,