IA-87-807, Final Response to FOIA Request for Documents,Including Johnson Ltr to NRC Transmitting Rev 1 to LER 85-005.Forwards App B Document.App a & B Documents Also in Pdr.Nrc Not in Possession of Item 2 of Request14 December 1987Final Response to FOIA Request for Documents,Including Johnson Ltr to NRC Transmitting Rev 1 to LER 85-005.Forwards App B Document.App a & B Documents Also in Pdr.Nrc Not in Possession of Item 2 of Request
IA-88-419, Final FOIA Request for Documents Re Radwaste Facilities at Plants.Forwards App B Document.App a & B Documents Available in PDR7 September 1988Final FOIA Request for Documents Re Radwaste Facilities at Plants.Forwards App B Document.App a & B Documents Available in PDR
IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)26 September 1989Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)
IA-91-440, Final Response to FOIA Request for Documents Re Shipment of Hazardous Waste from Two Nuclear Power Plants in Louisiana to Hazardous Waste Disposal Firms.App a Documents Available in Pdr.App B Documents Being Made Available in PDR29 November 1991Final Response to FOIA Request for Documents Re Shipment of Hazardous Waste from Two Nuclear Power Plants in Louisiana to Hazardous Waste Disposal Firms.App a Documents Available in Pdr.App B Documents Being Made Available in PDR
IA-96-376, Final Response to FOIA Request for Documents.Forwards App a Documents.Documents Also Available in PDR5 November 1996Final Response to FOIA Request for Documents.Forwards App a Documents.Documents Also Available in PDR
IR 05000029/198901431 August 1989Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted
IR 05000072/198800128 October 1988Ack Receipt of 880804 & 25 Ltrs Informing NRC of Steps Taken to Correct Violations & Deviations Noted in Insp Repts 50-072/88-01 & 50-407/88-01 & Order.Concludes That W/ Exception of Violation 5.c,violations Did Not Occur
IR 05000097/198900112 May 1989Forwards Safety Insp Repts 50-097/89-01 & 50-157/89-01 on 890425-26.Weakness Identified in Area of Documentation
IR 05000213/198600418 June 1987Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-245/86-06, 50-336/86-06 & 50-213/86-04.Progress & Established Milestones for Training Program Noted
IR 05000219/198601518 June 1986Forwards Safety Insp Repts 50-219/86-15 & 50-289/86-08 on 860430-0502.No Violations Noted
IR 05000219/198802714 October 1988Forwards Insp Repts 50-219/88-27 & 50-289/88-25 on 880913- 19.No Violations NotedBiofouling
IR 05000237/198401515 May 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-373/84-25, 50-374/84-32,50-237/84-15,50-249/84-14,50-254/84-15, 50-265/84-13,50-295/84-19 & 50-304/84-20Commercial Grade
IR 05000259/198600111 August 1986Confirmatory Action Ltr Re 860808 Telcon Concerning Encl Corrective Actions from Insp Repts 50-259/86-01, 50-260/86-01,50-296/86-01,50-327/86-01 & 50-328/86-01.Encl Withheld (Ref 10CFR2.790(d) & 73.21)
IR 05000264/19790035 December 1979Forwards Insp Rept 50-264/79-03 on 791022-24 & Notice of Violation
IR 05000277/19850989 December 1986Forwards SALP Repts 50-277/85-98 & 50-278/85-98 for Apr 1985 - Jan 1986 & 50-352/85-99 for Dec 1984 - Jan 1986. Improvement Needed in Limerick Security/Safeguards & Peach Bottom Surveillance,Maint,Licensing & Security/SafeguardsSafe Shutdown
Half scram
Ultimate heat sink
Fire Barrier
Stroke time
Tornado Missile
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
Missed surveillance
Local Leak Rate Testing
Scram Discharge Volume
Intergranular Stress Corrosion Cracking
Systematic Assessment of Licensee Performance
Excess Flow Check Valve
Integrated leak rate test
Continuous fire watch
Fire Watch
Grace period
Inattentive
Unidentified leak
Overexposure
Affidavit
Water hammer
Control Room Habitability
IR 05000293/198402529 November 1984Forwards Order Modifying License & Notices of Violation & Deviation from Insp Repts 50-293/84-25 & 50-293/84-29 on 840806-10 & 840824
IR 05000324/197600823 April 1976Forwards IE Insp Rept 50-324/76-08 on 760322-26 & 0330-0402. Violations Noted.Supporting Documentation Encl
IR 05000336/198301712 June 1986Ack Receipt of Informing NRC of Steps Taken to Correct Unresolved Item Noted in Insp Rept 50-336/83-17
IR 05000336/198502514 August 1985Forwards Insp Rept 50-336/85-25 for Consideration.Design Change Problem Identified in Rept Detail 2.f Considered to Have Potential Applicability to Work of Plant Design Change Task Group.W/O Encl
IR 05000338/19840394 April 1985Ack Receipt of Informing NRC of Steps Taken to Correct Deviation Noted in Insp Repts 50-338/84-39 & 50-339/84-39
IR 05000352/198404810 June 1985Forwards Insp Rept 50-352/84-48 on 840827-30 at Bechtel Corp in San Francisco,Ca Re Allegations Concerning Structural & Piping Design Activities at Hope Creek,Limerick & Susquehanna.No Allegations Re Hope Creek SubstantiatedEarthquake
IR 05000366/19830236 January 1984Forwards Corrected Page 2 to 831227 Proposed Imposition of Civil Penalties Based on Violations Noted in Insp Rept 50-366/83-23 Re Improper Shutdown.Correction Due to Administrative OversightFire Barrier
Liquid penetrant
IR 05000382/198200323 July 1982Ack Receipt of 820420 & 0625 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-382/82-03
IR 05000382/19820079 June 1982Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-382/82-07
IR 05000382/198404227 October 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-382/84-42, 50-382/85-01 & 50-382/85-04.Addl Info Re Reestablishment of Acceptability of safety-related Items Requested
IR 05000382/198500217 July 1985Advises That Insp Rept 50-382/85-02 Canceled.No Insp Rept Will Be Issued for Rept Number
IR 05000382/198500418 December 1985Ack Receipt of 851108 Request for Extension of Response Date for Violations Noted in Insp Repts 50-382/85-04 & 50-382/85-27.New Response Date Will Be as Required in Insp Rept 50-382/85-27
IR 05000382/198501317 July 1985Advises That Insp Rept 50-382/85-13 Canceled.No Insp Rept Will Be Issued for Rept Number
IR 05000382/198501616 October 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/85-16
IR 05000382/19850178 August 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/85-17
IR 05000382/198502031 October 1985Informs That Violation Noted in Insp Rept 50-382/85-20 Re Procedure OP-03-014, Control Room Heating & Ventilating, Valid Due to Listed Reasons.Sys Should Be Evaluated to Determine When Safety Reviews Should Be Conducted
IR 05000382/198502215 August 1985Advises That Insp 50-382/85-22 Canceled.No Insp Rept Will Be Issued for Rept Number
IR 05000382/198502319 February 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/85-23.Two Shift & Control Room Supervisors Inadequately Trained to Perform Emergency Response Duties.Violation Remains Valid
IR 05000382/198502619 February 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/85-26.Revs to Procedure RW-2-200 Understood to Not Result in Decreased Controls Re Processing/Packaging of Radwaste
IR 05000382/19850276 October 1986Ack Receipt of 860214 & 0314 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/85-27
IR 05000382/198502819 March 1986Ack Receipt of 860131 & 0221 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-382/85-28 & 50-382/85-33,respectively.Violation 8528-01 Due to Confusing Condition Identification Work Authorization Sys
IR 05000382/19850318 October 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/85-31.Ltr Forwarded to Div of Qa,Vendor & Technical Ctr Programs for Review of 10CFR21 Applicability
IR 05000382/198600118 September 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/86-01.Addl Info Re Listed Security Violations Requested within 30 Days of Ltr Date
IR 05000382/198600216 April 1986Discusses Insp 50-382/86-02 on 860101-31 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.LER 382/85-22 Did Not Precisely Describe Plant Conditions
IR 05000382/19860052 September 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/86-05.Ref to NRC Corrected to NRC
IR 05000382/19860103 February 1987Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/86-10.Request for one-time Exemption to 12-month Requirement for Security Program Audit Responsive to Concerns
IR 05000382/198601116 July 1986Forwards App to Insp Rept 50-382/86-11 on 860501-31.No Violations or Deviations Noted
IR 05000382/198601312 September 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/86-13
IR 05000382/198601510 October 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/86-15
IR 05000382/19860262 March 1987Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/86-26
IR 05000382/19860282 July 1987Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/86-28.Ack That Rev 3 to Procedure UNT-5-004 May Be Limited in Scope to Installed Equipment & Not Specifically ViolatedTemporary Modification
IR 05000382/198603021 November 1986Discusses Insp Rept 50-382/86-30 Conducted on 841203- 860807 & Forwards NRC Investigation Rept Approval Sheet & Synopsis for Case 4-84-051.No Violations or Deviations Noted.Major Areas Investigated:Cracking of Basemat
IR 05000382/19860344 August 1987Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/86-34Local Leak Rate Testing
Integrated leak rate test
IR 05000382/19870031 June 1987Forwards Slide Presentation & Summary of 870521 Meeting W/ Util in New Orleans,La to Discuss SALP Rept 50-382/87-03Fire Barrier
Fire impairment
Systematic Assessment of Licensee Performance
IR 05000382/198700615 June 1987Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/87-06