Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13078A25219 March 201303/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 6
ML13078A25319 March 201303/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 8
ML13078A25419 March 201303/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 9Fire Protection Program
ML13078A25519 March 201303/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 10Thermoset
ML13079A15020 March 2013Summary of Public Meeting with Joseph M. FarleyMoisture barrier
ML13120A17229 April 2013Summary of Public Meeting to Discuss the Annual Assessment of Vogtle Electric Generating Plant for the Period of January 1, 2012 - December 31, 2012
ML14057A42027 February 2014Public Meeting 2/27/2014 VCS Construction Update
ML14108A00523 April 2014April 23, 2014, Public Meeting Presentation Slides, Southern Nuclear Company, SNC Degraded Grid Design Criteria.
ML14115A40525 April 20142013 End of Cycle Farley Public Meeting Summary Memo
ML14120A11230 April 2014End of Cycle Public Meeting Summary Memo
ML14120A22523 April 2014April 23, 2014, Category 1 Public Meeting, J.M. Farley Presentation Slides, Residual Heat Removal Autoclosure Interlock Deletion.
ML14135A17326 February 2014May 16, 2014, J.M. Farley Category 1 Meeting Handout, Duration for Completion of the Flood Hazard Re-evaluation.
ML14196A4147 July 2014TSTF Handout from 7/10/14 Meeting TSTF Concerns with TSTF-505 RAIsSafe Shutdown
Mission time
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Functionality Assessment
Surveillance Frequency Control Program
ML14219A4767 August 2014Operating Experience on Initial Test ProgramSafe Shutdown
ML14304A62223 October 2014Email: Licensee Presentation Slides for November 6, 2014 Meeting on Vogtle GSI-191Boric Acid
Fire Barrier
Coatings
Scaffolding
ML15106A20422 April 2015April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation
ML15126A2566 May 2015GSI-191 Program Chemical Effects Testing Strainer Headloss Testing NRC Public Meeting - November 6, 2014Boric Acid
Fire Barrier
Coatings
Scaffolding
ML15128A0028 May 2015May 12, 2015, Meeting with Southern Nuclear Company, Draft Emergency Response Organization Augmentation Plan for the Vogtle Electric Generating PlantHigh Radiation Area
Minimum staff
ML15128A0038 May 2015May 12, 2015, Meeting with Southern Nuclear Company, Draft Vogtle Electric Generating Plant, Units 1 & 2, On-Shift and Augmented Emergency Response Organization Summary
ML15128A0068 May 2015May 12, 2015, Meeting with Southern Nuclear Company, Draft Table B-1, Vogtle Electric Generating Plant, Units 1 and 2, Site On-Shift Table Comparison
ML15139A50821 May 2015May 21, 2015, Public Meeting with Vogtle Regarding GSI-191 Resolution Plan and Current StatusBoric Acid
Ultimate heat sink
Fire Barrier
Coatings
Large early release frequency
ML15308A0315 November 2015NRC Public Meeting on November 5, 2015 Regarding GSI-191 Resolution Plan and Current StatusBoric Acid
Fire Barrier
Probabilistic Risk Assessment
Coatings
Large early release frequency
ML15322A22318 November 2015Construction Update Presentation for CIP Meeting November 18, 2015
ML15356A24918 December 2015Southern Nuclear: NRC Public Meeting on VEGP Draft Rais: December 8, 2015Mission time
Functionality Assessment
ML16056A4122 March 2016GSI-191 Resolution Plan: Follow-Up on Chemical EffectsBoric Acid
ML16217A0843 August 2016BADGER Size Increment and Orientation White Paper (Rev 1)
ML16217A08511 August 2016Narwhal Audit - Follow-Up on Open IssuesFLEX
ML16217A0863 August 2016Strainer Mid-Point Elevation Flashing Analysis, Revision 2
ML16217A08722 July 2016Degb Vs Continuum Break White Paper (Rev 0)
ML16217A0893 August 2016White Paper: Vogtle Evaluation of Timing for Random Pump Failure Timing (Revision 1)Probabilistic Risk Assessment
ML16260A11622 September 2016September 22, 2016, Public Meeting Presentation Slides
ML17004A0494 January 2017Southern Nuclear - Vogtle 50.69 Enhancement Submittal Public Meeting SlidesHigh winds
ML17004A0584 January 2017SPRA for 5069 -Basis for ChangeSafe Shutdown
High winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Earthquake
ML17079A10123 March 2017NRC Pre-Submittal Meeting: Vogtle Electric Generating Plant - Units 1 and 2 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.1.3 - March 23, 2017
ML17250B24030 August 2017TMRE LAR Pre-Submittal Meeting with NRCHigh winds
Ultimate heat sink
Tornado Missile
Enforcement Discretion
Tornado Generated Missile
Tornado Missile Protection
Tornado Missile Risk Evaluator
Earthquake
ML17311A9948 November 2017NEI Slides for November 8, 2017, Teleconference Concerning Tornado Missile Risk Evaluator Pilot SubmittalsTornado Missile Risk Evaluator
ML18051A59920 February 2018Predecisional Enforcement Conference SummaryFire Watch
ML18065A02012 March 2018March 12, 2018, Public Meeting PresentationInternal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
ML18065A0226 March 2018March 12, 2018, Public Meeting - Draft 4b ApplicationStroke time
Probabilistic Risk Assessment
Offsite Circuit
ML18065A0256 March 2018Joseph M Farley March 12, 2018, Public Meeting - Draft 4b Application EnclosuresHot Short
Safe Shutdown
High winds
Ultimate heat sink
Mission time
Fire Barrier
Stroke time
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Temporary Modification
Zebra Mussel
FLEX
Tornado Missile Protection
Large early release frequency
Earthquake
Turbine Missile
Offsite Circuit
Fire Protection Program
GOTHIC
ML18100A20712 April 2018CIP Public Meeting April 2018 - Vrg
ML18136A89016 May 2018May 21, 2018 Slides for Public Teleconference Regarding Changes to Hatch, Farley, and Vogtle TS 5.2.2.gMinimum staff
ML18234A47123 August 2018NRC-Pre Submittal Meeting TSTF-51 for Hatch and TSTF-51 and -471 for Farley - August 23, 2018
ML18270A1471 October 2018Vrg Update for CIP Public Meeting (October 1, 2018)
ML18271A2161 October 2018Readiness Group (Vrg) Update (Presentation)
ML18290B09416 October 2018October 16, 2018, Public Meeting Presentation Slides Related to July 27, 2018, License Amendment Request to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b.
ML18311A1827 November 2018November 13, 2018, Joseph M. Farley Nuclear Power Plant, Public Meeting Slides Regarding Spent Fuel Pool Criticality Analyses and Measurement Uncertainty Recovery (Mur) Pre-Application Meeting
ML19025A02425 January 2019SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and AugmentationMinimum staff
ML19057A4767 March 2019Presentation Slides Related to Pre-Application Public Meeting Regarding to Technical Specification 3.3.1 and 3.3.2 (L-2019-LRM-0010)
ML19123A3562 May 2019Public Meeting Summary - Vogtle Electric Generating Plant, Docket Nos. 50-424 and 50-425