Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13078A252 | 19 March 2013 | 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 6 | |
ML13078A253 | 19 March 2013 | 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 8 | |
ML13078A254 | 19 March 2013 | 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 9 | Fire Protection Program |
ML13078A255 | 19 March 2013 | 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 10 | Thermoset |
ML13079A150 | 20 March 2013 | Summary of Public Meeting with Joseph M. Farley | Moisture barrier |
ML13120A172 | 29 April 2013 | Summary of Public Meeting to Discuss the Annual Assessment of Vogtle Electric Generating Plant for the Period of January 1, 2012 - December 31, 2012 | |
ML14057A420 | 27 February 2014 | Public Meeting 2/27/2014 VCS Construction Update | |
ML14108A005 | 23 April 2014 | April 23, 2014, Public Meeting Presentation Slides, Southern Nuclear Company, SNC Degraded Grid Design Criteria. | |
ML14115A405 | 25 April 2014 | 2013 End of Cycle Farley Public Meeting Summary Memo | |
ML14120A112 | 30 April 2014 | End of Cycle Public Meeting Summary Memo | |
ML14120A225 | 23 April 2014 | April 23, 2014, Category 1 Public Meeting, J.M. Farley Presentation Slides, Residual Heat Removal Autoclosure Interlock Deletion. | |
ML14135A173 | 26 February 2014 | May 16, 2014, J.M. Farley Category 1 Meeting Handout, Duration for Completion of the Flood Hazard Re-evaluation. | |
ML14196A414 | 7 July 2014 | TSTF Handout from 7/10/14 Meeting TSTF Concerns with TSTF-505 RAIs | Safe Shutdown Mission time Fire Barrier Internal Flooding Probabilistic Risk Assessment Functionality Assessment Surveillance Frequency Control Program |
ML14219A476 | 7 August 2014 | Operating Experience on Initial Test Program | Safe Shutdown |
ML14304A622 | 23 October 2014 | Email: Licensee Presentation Slides for November 6, 2014 Meeting on Vogtle GSI-191 | Boric Acid Fire Barrier Coatings Scaffolding |
ML15106A204 | 22 April 2015 | April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation | |
ML15126A256 | 6 May 2015 | GSI-191 Program Chemical Effects Testing Strainer Headloss Testing NRC Public Meeting - November 6, 2014 | Boric Acid Fire Barrier Coatings Scaffolding |
ML15128A002 | 8 May 2015 | May 12, 2015, Meeting with Southern Nuclear Company, Draft Emergency Response Organization Augmentation Plan for the Vogtle Electric Generating Plant | High Radiation Area Minimum staff |
ML15128A003 | 8 May 2015 | May 12, 2015, Meeting with Southern Nuclear Company, Draft Vogtle Electric Generating Plant, Units 1 & 2, On-Shift and Augmented Emergency Response Organization Summary | |
ML15128A006 | 8 May 2015 | May 12, 2015, Meeting with Southern Nuclear Company, Draft Table B-1, Vogtle Electric Generating Plant, Units 1 and 2, Site On-Shift Table Comparison | |
ML15139A508 | 21 May 2015 | May 21, 2015, Public Meeting with Vogtle Regarding GSI-191 Resolution Plan and Current Status | Boric Acid Ultimate heat sink Fire Barrier Coatings Large early release frequency |
ML15308A031 | 5 November 2015 | NRC Public Meeting on November 5, 2015 Regarding GSI-191 Resolution Plan and Current Status | Boric Acid Fire Barrier Probabilistic Risk Assessment Coatings Large early release frequency |
ML15322A223 | 18 November 2015 | Construction Update Presentation for CIP Meeting November 18, 2015 | |
ML15356A249 | 18 December 2015 | Southern Nuclear: NRC Public Meeting on VEGP Draft Rais: December 8, 2015 | Mission time Functionality Assessment |
ML16056A412 | 2 March 2016 | GSI-191 Resolution Plan: Follow-Up on Chemical Effects | Boric Acid |
ML16217A084 | 3 August 2016 | BADGER Size Increment and Orientation White Paper (Rev 1) | |
ML16217A085 | 11 August 2016 | Narwhal Audit - Follow-Up on Open Issues | FLEX |
ML16217A086 | 3 August 2016 | Strainer Mid-Point Elevation Flashing Analysis, Revision 2 | |
ML16217A087 | 22 July 2016 | Degb Vs Continuum Break White Paper (Rev 0) | |
ML16217A089 | 3 August 2016 | White Paper: Vogtle Evaluation of Timing for Random Pump Failure Timing (Revision 1) | Probabilistic Risk Assessment |
ML16260A116 | 22 September 2016 | September 22, 2016, Public Meeting Presentation Slides | |
ML17004A049 | 4 January 2017 | Southern Nuclear - Vogtle 50.69 Enhancement Submittal Public Meeting Slides | High winds |
ML17004A058 | 4 January 2017 | SPRA for 5069 -Basis for Change | Safe Shutdown High winds Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Large early release frequency Earthquake |
ML17079A101 | 23 March 2017 | NRC Pre-Submittal Meeting: Vogtle Electric Generating Plant - Units 1 and 2 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.1.3 - March 23, 2017 | |
ML17250B240 | 30 August 2017 | TMRE LAR Pre-Submittal Meeting with NRC | High winds Ultimate heat sink Tornado Missile Enforcement Discretion Tornado Generated Missile Tornado Missile Protection Tornado Missile Risk Evaluator Earthquake |
ML17311A994 | 8 November 2017 | NEI Slides for November 8, 2017, Teleconference Concerning Tornado Missile Risk Evaluator Pilot Submittals | Tornado Missile Risk Evaluator |
ML18051A599 | 20 February 2018 | Predecisional Enforcement Conference Summary | Fire Watch |
ML18065A020 | 12 March 2018 | March 12, 2018, Public Meeting Presentation | Internal Flooding Probabilistic Risk Assessment Surveillance Frequency Control Program |
ML18065A022 | 6 March 2018 | March 12, 2018, Public Meeting - Draft 4b Application | Stroke time Probabilistic Risk Assessment Offsite Circuit |
ML18065A025 | 6 March 2018 | Joseph M Farley March 12, 2018, Public Meeting - Draft 4b Application Enclosures | Hot Short Safe Shutdown High winds Ultimate heat sink Mission time Fire Barrier Stroke time Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Temporary Modification Zebra Mussel FLEX Tornado Missile Protection Large early release frequency Earthquake Turbine Missile Offsite Circuit Fire Protection Program GOTHIC |
ML18100A207 | 12 April 2018 | CIP Public Meeting April 2018 - Vrg | |
ML18136A890 | 16 May 2018 | May 21, 2018 Slides for Public Teleconference Regarding Changes to Hatch, Farley, and Vogtle TS 5.2.2.g | Minimum staff |
ML18234A471 | 23 August 2018 | NRC-Pre Submittal Meeting TSTF-51 for Hatch and TSTF-51 and -471 for Farley - August 23, 2018 | |
ML18270A147 | 1 October 2018 | Vrg Update for CIP Public Meeting (October 1, 2018) | |
ML18271A216 | 1 October 2018 | Readiness Group (Vrg) Update (Presentation) | |
ML18290B094 | 16 October 2018 | October 16, 2018, Public Meeting Presentation Slides Related to July 27, 2018, License Amendment Request to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b. | |
ML18311A182 | 7 November 2018 | November 13, 2018, Joseph M. Farley Nuclear Power Plant, Public Meeting Slides Regarding Spent Fuel Pool Criticality Analyses and Measurement Uncertainty Recovery (Mur) Pre-Application Meeting | |
ML19025A024 | 25 January 2019 | SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation | Minimum staff |
ML19057A476 | 7 March 2019 | Presentation Slides Related to Pre-Application Public Meeting Regarding to Technical Specification 3.3.1 and 3.3.2 (L-2019-LRM-0010) | |
ML19123A356 | 2 May 2019 | Public Meeting Summary - Vogtle Electric Generating Plant, Docket Nos. 50-424 and 50-425 |