Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20140G826 | 28 May 1982 | Forwards Project Status Rept for ACRS Subcommittee on Midland Plan 820602 Meeting in Washington,Dc to Review Application for Ol.Related Info Encl | |
ML20140G835 | 15 April 1970 | Submits Agenda for ACRS Subcommittee on Midland Plant 700424 Meeting in Chicago,Il to Discuss Radioactive Matl in Process Steam,Potential for Subsidence,Seismic Design Criteria, Emergency Plans & Flood Protection Level | |
ML20140G840 | 19 March 1970 | Forwards Summary of 700312 Meeting W/Util & Jt Wilson in Bethesda,Md Re Subsidence Problem Under Site.General Subsidence Could Occur,But Not Abrupt Offset.Abrupt Offset or Scarping Could Not Be Tolerated | |
ML20140G846 | 18 March 1970 | Submits Agenda for ACRS Subcommittee on Midland Plant 700324 Meeting in Washington,Dc to Discuss Items,Including Emergency Plans,Adequacy of ESF & Protection Sys,Control Room Design & ECCS Initiation Signals | |
ML20140G850 | 12 February 1970 | Submits Agenda for ACRS Subcommittee on Midland Plant 700424 Meeting in Washington,Dc to Discuss Emergency Plans,Adequacy of ESF & Protection Sys,Containment Design,Silting of ECCS Reservoir & Steam Purity & Monitoring | |
ML20140G862 | 29 January 1969 | Submits Schedule & Agenda for ACRS Subcommittee on Midland Plant 690204 Meeting to Discuss Meteorology,Dose Calculations,Containment Leakage Rates,Containment Iodine Removing Sys & Evacuation Procedures.Related Info Encl | Coatings |
ML20140G878 | 7 April 1982 | Forwards Draft Fr Notice Re ACRS Subcommittee 820429 Meeting.Portions of Meeting May Be Closed | |
ML20140G886 | 1 December 1976 | Forwards ACRS 761118 Supplemental Rept & Attached Matl for in Camera Review by ASLB & Parties to Midland Hearing,Per 761130 Request | |
ML20140G901 | 28 April 1970 | Forwards 10CFR30-36 & 150,for Info in Connection W/Review of Midland.W/O Encls | |
ML20140G912 | 14 April 1982 | Forwards Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues | |
ML20140G928 | 9 April 1982 | Forwards,For Review,Seismic site-specific Spectra Info,Per Telcon & Request by D Okrent.Comments Will Determine Discussion Topics at ACRS Subcommittee on Midland 820520-21 Meetings | Earthquake |
ML20140G938 | 7 April 1982 | Discusses 820407 Telcon Re ACRS Subcommittee 840429 Meeting on Soils Matters.Discussion Will Focus on Remedy Rather than Cause of Soil Problem | |
ML20140G942 | 30 September 1985 | Forwards SER Input.Outstanding Issues Listed,Including Flood Protection of Settled Structures & Adequacy of Dewatering Sys.Related Info Encl | Safe Shutdown Boric Acid Ultimate heat sink Tornado Missile Hydrostatic Earthquake Power-Operated Valves |
ML20140G947 | 1 May 1976 | Notification of 760521 Meeting W/Util in Bethesda,Md to Discuss Criteria to Be Used for Analysis of High Energy Line Breaks.Related Info Encl | |
ML20140G968 | 18 November 1970 | Advises That ACRS Concurred W/Proposed Staff Position Re Diverse Reactor Trip Signal During 127th Meeting | |
ML20140G973 | 13 July 1970 | Forwards Summary of Info from Category B Repts.Acrs Action Unwarranted | |
ML20140G978 | 28 August 1970 | Notifies of ACRS Subcommittee on Midland Plant 700914 Meeting in Washington,Dc to Discuss Containment Design Pressure Change,Tertiary Steam Sys & Teriary Steam Generator Design.Related Info Encl | |
ML20140G985 | 14 May 1970 | Notifies of ACRS Subcommittee on Midland Plant 700610 Meeting in Washington,Dc to Discuss Atws,Design Approaches, Addl Primary Sys Safety Valve Capacity & Process Steam Purity & Monitoring | |
ML20140G990 | 20 May 1970 | Forwards Summary of Info in Category B Repts.Acrs Action Unwarranted.Related Info Encl | Turbine Missile Backfit |
ML20140G996 | 17 June 1970 | Documents Conclusions Reached During ACRS 122nd Meeting Re Midland Plant Units 1 & 2 Request for Exemption to Allow Certain Const & ESF Instrumentation for Indian Point 2 | |
ML20140H020 | 25 May 1982 | Forwards Written Statement of C Anderson,Mp Sinclair & B Stamiris Submitted for ACRS Subcommittee 820520-21 Meetings.C Anderson Statement Includes Addenda 1 & 2 | |
ML20140H024 | 25 May 1982 | Forwards Tentative Schedule for ACRS Subcommittee on Midland Plant 820602 Meeting to Continue Review of Application for Ol.Topics Include Fire Protection,Control Room Habitability & Items from 820520-21 Meetings | |
ML20140H028 | 21 August 1982 | Forwards Proposed Summary for ACRS Subcommittee on Midland Plant 820520-21 Meetings to Review Application for Ol.List of Attendees & Meeting Highlights,Agreements & Requests Included | Probabilistic Risk Assessment Earthquake Turbine Missile |
ML20140H035 | 17 May 1982 | Forwards Project Status Rept for ACRS Subcommittee on Midland 820520-21 Meetings to Review Application for Ol.Rept Summarizes ACRS Review to Date,Open Items,Acrs Actions Required & Requests for Public Participation | Safe Shutdown Ultimate heat sink Earthquake Offsite Circuit |
ML20140H040 | 12 May 1982 | Forwards Tentative Schedule for ACRS Subcommittee on Midland 820520-21 Meetings to Review Application for Ol.Discussion Topics Include Quality of Design & Const,Alternate Shutdown, Seismic Criteria & PRA Mgt | Safe Shutdown Probabilistic Risk Assessment Earthquake |
ML20140H052 | 11 August 1982 | Forwards Proposed Summary of ACRS Subcommittee on Midland 820602 Meeting Review of Application for Ol,For Review & Comment.Corrections & Additions Will Be Included in Minutes of Meeting | Turbine Missile Fire Protection Program |
ML20140H057 | 10 November 1976 | Forwards Midland Hearing Board Request for Further Elaboration of 700618 Committee Rept Re LWR Problems. Comments on Behalf of Util Arguing That Other Problems Should Be Considered as Items of Rept Encl | |
ML20140H064 | 6 August 1976 | Provides Info Re Necessity of Further Explication of ACRS Rept Concerning catch-all Paragraph on Problems About Lwrs.Related Info Encl | |
ML20140H077 | 4 May 1982 | Forwards M Sinclair Statement for ACRS Subcommittee on Midland 820429 Meeting | |
ML20140H084 | 21 April 1982 | Forwards Project Status Rept for ACRS Subcommittee on Midland 820429 Meeting in Washington,Dc to Discuss Util Remedial Action on Soils & Structural Settlement Issues | Safe Shutdown Ultimate heat sink Earthquake Fuel cladding Offsite Circuit |
ML20140H088 | 26 April 1982 | Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl | |
ML20140H102 | 27 April 1982 | Forwards Proposed Fr Notice of ACRS Subcommittee on Midland 820520 & 21 Meetings in Midland,Mi.Portions of Meeting May Be Closed for Reasons Stated in Attachment.Requests That Notice Be Published by 820504.Related Info Encl | |
ML20148B080 | 10 April 1978 | Forwards Preliminary Chart on Results of Land Use Survey Completed Last Year Re Bldg & Housing Trends in Midland County 1969-1977 | |
ML20148P150 | 14 November 1978 | Notification of 781203-04 Meetings W/Cpc in Midland,Mi Re Settlement of Diesel Generator Bldg & Other Structures. Agenda Encl | |
ML20150F806 | 14 June 1979 | Discusses Matters to Be Addressed Prior to 790702 Evidentiary Hearing.Nrc Prepared to Assist ASLB in Appropriate Manner.Conference Scheduled for 790615 to Discuss Record,Discovery by Deposition & Transcripts | |
ML20151B345 | 6 October 1980 | Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings | Earthquake |
ML20151C503 | 6 January 1981 | Submits IE 810105 Daily Staff Notes Re Proposed Imposition of Civil Penalties Against Midland,Malfunction of Target Rack Safety Relief Valve at Dresden & Malfunction of Main Steam Hot Reheat Valves at Fort St.Vrain | |
ML20151H487 | 4 May 1983 | Board Notification 83-057:forwards Differing Prof Opinions Re Sys Interaction & Safety Classification.Info Relates to Board Notifications 83-17 & 83-44 Re Unresolved Safety Issue A-17 | Probabilistic Risk Assessment |
ML20151L241 | 22 October 1985 | Board Notification 85-088:forwards CE Norelius 851005 Memo Advising That Licensee Does Not Intend to Pursue Issue of Exceeded freeze-wall Heave Due to Discontinuation of Const at Facility.No Further Reporting on Issue Planned | |
ML20155D659 | 14 April 1986 | Provides New Info & Relevant Matl to Ol/Om Proceeding Re Util 860407 Notification of Petition to PSC of Mi for Conversion of Nuclear Plants to Natural Gas | |
ML20198A714 | 5 October 1985 | Advises That Licensee Does Not Intend to Pursue Issue of Facility Settlement Exceeding freeze-wall Heave Due to Discontinuation of Const.Issue Will Not Be Pursued Until Project Reactivated | |
ML20199F523 | 2 April 1986 | Board Notification 86-012:forwards Interim Rept of Investigation Conducted by Ofc of Investigations at Plant in Midland,Mi for in Camera Consideration.W/O Rept | |
ML20203P158 | 24 April 1986 | Forwards CPC Notifying ASLB of Intent to Convert Facility to Combined Cycle gas-fired Plant,In Response to 860414 Memo.Board Notification by Staff Unnecessary | |
ML20204F046 | 12 April 1983 | Board Notification 83-42:forwards Info Re Unanalyzed Reactor Vessel Thermal Stress During Cooldown.B&W Informed NRC of Preliminary Safety Concern Evolving from Further Consideration of 800610 St Lucie Upper Head Voiding Event | |
ML20209B290 | 11 March 1982 | Notification of 820318 Meeting W/Util & Bechtel in Bethesda, MD to Resolve SER Open Item Re Section 9.5.3 | |
ML20209B331 | 11 March 1982 | Summary of 820308 Telcon W/Util & Bechtel Re Soil Spring Stiffness for Auxiliary Bldg Underpinning & Phase II Const | |
ML20209B517 | 9 July 1982 | Requests Written Answers to M Sinclair 820618 Interrogatories.Responsible Branches Marked Next to Relevant Questions | Safe Shutdown Earthquake Turbine Missile |
ML20209H818 | 12 September 1986 | Advises That Time for Commission to Review ALAB-842 Expired. Commission Declined Review.Decision Became Final Agency Action on 860910.Served on 860912 | |
ML20210S451 | 8 September 1983 | Forwards Background Info on Kerr-McGee & Major Issues of Emergency Preparedness at Nuclear Power Plants in Region Iii.State Activities & Highlights for Nuclear Power Plants in Region III Also Encl.Supporting Documentation Encl | |
ML20210S469 | 13 March 1984 | Advises Not to Do Any Housecleaning of Paperwork Re Zack,Due to Interrogatories & Document Production Pending |