ML20140H088

From kanterella
Jump to navigation Jump to search
Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl
ML20140H088
Person / Time
Site: Midland, 05000000
Issue date: 04/26/1982
From: Fischer D
NRC
To: Seiss C
Advisory Committee on Reactor Safeguards
Shared Package
ML19255C661 List: ... further results
References
FOIA-85-602 NUDOCS 8510080441
Download: ML20140H088 (4)


Text

.

(

f. L AMR '

April 26, 1982 i

MEMORANDlN FOR:

C. Siess, Acting Chainnan, ACRS Subcommittee on Midland Plant thits 1 & 2 FROM:

D. C. Fischer, Reactor Engineer

SUBJECT:

REVISED TENTATIVE SCHEDULE FOR THE ACRS SUBC0fEITTEE REEThiG Oh MIDLAND PLANT UNITS 1 & 2 - APRIL 29,1982 -

WASHINGTON, DC Attached is a revised tentative schedule for the subject meeting. The purpose of the meeting is to discuss remedial action being taken by Consumers Power Company regarding the Midland soils and structural settlement issues.

The meeting will begin at 8:30 a.m. and will be held in Room 1046 at 1717 H Street, PM, Washington, DC. Attendance by the following ACRS members and consultants is anticipated and hotel. reservations have been made for the night and hotels indicated below.

If you are unable to make the meeting, please call us or the hotel and cancel your res-ervations so that we are not billed.

C. Siess Park Central (202-393-4700) 28th W. Mathis Anny-Navy Club (202-628-8400) 28th J. Osterberg None R. Scavuzzo None Z. Zudans None By copy of this memo, members of the NRC Staff and other participants who will be making presentations to the Subcomittee are reminded of the Subcomittee's need for twenty hard copies of all slides, training aids, and papers presented to the Subcomittee.

85100s0441 850930 PDR FOIA h /4 "88 ~& O 2"

Attachment:

BRUNNER85-602 PDR Revised Tentative Schedule 0 Ma cc: ACRS Members E. Goodwin, NRR i

R. Fraley, ACRS R. DeYoung, IE M. Gaske. ACRS R. Minogue, RES g.WQ l H. Libarkin, ACRS D. Eisenhut, NRR f4g

)

T. McCreless ACRS R. Vollmer, NRR J. McKinley, ACRS J. Keppler, NRR G. Qui 1.tschreiber, ACR5 R

Tedesco, NRll

~~~~--E

- Adenseer NRR-~~~~~~-

- - - ~ ~ ~

  • OFFICE)............ g.,...W h.j qq.p. ACRS ~~~

j

--~~~ --

sunsue >...........lt..Va nd Ebo.l.t.... ACR.S

....................D..Ho o d....NRR....

H. Den".on, NRR R

Hernan, NRR i

mn)........" E'!"CW;"NRR"""" '""

'"""""""*"""U *T5f*@r;"NRR

" " " " " " " ~ " " "

" " " " " * " " ~ " " "

OFFIClAL RECORD COPY p pp g usom u-a.co NRC FORM 318 00-80) NRCM Ca0

'APkit26,1982

(

REVISED TENTAIVE SCHEDULE FOR THE l :

APRIL 29, 1982 ACRS SUBCOMMITTEE MEETING ON MIDLAND PLANT UNITS 1 & 2 ROOM 1046, 1717 H ST., NW, WASHINGTON, DC APPROXIMATE TIME SPEAKER 8:30 a.m.

I.

CHAIRMAN'S OPENING STATEMENT C. Siess A. Discussion of Schedule B. Meeting Goals 8:45 a.m.

II.

STAFF INTRODUCTION /0VERVIEW (NRR/DL)

A.

Why the ACRS Has Been Asked to Review E. Adensam These Issues at This Time B.

Brief Chronology Regarding Plant Fill D. Hood Deficiencies and Schedule of Future Events (Including ALSb Hearing Status)

C.

General Discussion of the Soils and Structural D. Hood Settlement Issues (Including Why No Problem 3

With Reactor Building) at Midland l

D.

Identification of the Safety Significance J. Kinght i

of These Issues E.

General Discussion of the Proposed and J. Knight Implemented Corrective Actions, including Relationship to Seimsic Site-Specific Spectra (Phased Program)

F.

Staff General Comments on the Proposed Fixes and Proposed Criteria G.

Discussion 9:45 a.m.

III.

CONStNERS POWER COMPANY OVERVIEW 0F SOILS AND STRUCTURAL SETTLEMENT ISSUES AT f11DLAND, INCLUDING THEIR EFFECT ON THE LICENSING SCHEDULE 10:15 a.m.

BREAK i

i IV.

TECHNICAL DISCUSSION A.

Auxiliary Building and Feedwater Isolation J

Valve Pit 10:30 a.m.

1.

NRC Staff (DE) a.

Statement of problems b.

Proposed solution (s) c.

Criteria used and basis for acceptability d.

Future NRC Staff actions j

11:30 a.m.

2.

Response by Consumers Power Company 12:00 noon LUNCH

,._._m_____

-. _ - ~ - -..

(

(

f REVISED

3 TENTATIVE SCHEDULE MIDLAND 4/26/82 APRIL 29, 1932 j

i i

APPROXfitATE TIME 4

B.

Service Water Pump Structure i

1:00 p.m.

1.

NRC Staff (DE) a.

Statement of problems b.

Proposed solution (s) c.

Criteria used and basis for acceptability d.

Future NRC Staff actions 1:30 p.m.

2.

Response by Consumers Power Company C.

Borated Water Storage Tank i

1:50 p.m.

1.

NRC Staff (DE) a.

Statement of problems b.

Proposed solution (s)

J i

c.

Criteria used and basis for acceptability d.

Future NRC Staff actions 2:10 p.m.

2.

Response by Consumers Power Company i

D.

Underground Utilities, Pipes, Etc.

2:25 p.m.

1.

NRC Staff (DE)

(

a.

Statement of problems b.

Proposed solution (s) c.

Criteria used and basis for acceptability i

d.

Future NRC Staff actions 3:10 p.m.

2.

Response by Consumers Power Company I

3:25 p.m.

BREAK 1

E.

Permanent Dewatering System 3:35 p.m.

1.

NRC Staff (DE) i a.

Statement of problems b.

Proposed solution (s) c.

Criteria used and basis for acceptability j

d.

Future NRC Staff actions i

3:55 p.m.

2.

Response by Consumers Power Company

(

(

i-hEVISED

' TENTATIVE SCHEDULE MIDLAND 4/26/82 APRIL 29, 1982 APPR0XIMATE TIME F.

Diesel Generator Building 4:15 p.m.

1.

NRC Staff (DE) a.

Statement of problems b.

Proposed solution (s) c.

Criteria used and basis for acceptability d.

Future NRC Staff actions 4:45 p.m.

2.

Response by Consumers Power Company 5:00 p.m.

V.

OPEN EXECl41VE SESSION / CHAIRMAN'S CLOSING REMARKS 5:30 p.m.

ADJ0 URN?iENT I