Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000272/200520118 October 2005Force-on-Force Inspection Report 05000272-05-201, 05000311-05-201 & 05000354-05-201, Salem Hope Creek, Cover Letter OnlyAffidavit
IR 05000272/200600224 April 2006IR 05000272-06-002, 05000311-06-002; 01/01/2006 - 03/31/2006; Salem Nuclear Generating Station Units 1 and 2; Maintenance EffectivenessSafe Shutdown
Boric Acid
High Radiation Area
Fire Barrier
Temporary Modification
Significance Determination Process
Large early release frequency
Operability Determination
Earthquake
Maintenance Rule Program
Downpower
IR 05000272/200600319 July 2006IR 05000272-06-003, 05000311-06-003; 04/01/2006 - 06/30/2006; Salem Nuclear Generating Station Units 1 and 2; Routine Integrated ReportSafe Shutdown
Boric Acid
High Radiation Area
Fire Barrier
Internal Flooding
Past operability
Operability Determination
Maintenance Rule Program
Substantial potential for overexposure
Overexposure
IR 05000272/20060048 November 2006IR 05000272-06-004, 05000311-06-004; Public Service Enterprise Group Nuclear Inc.; 07/01/2006 - 09/30/2006; Salem Nuclear Generating Station Units 1 and 2; Maintenance Effectiveness, Event FollowupBoric Acid
Fire Barrier
Temporary Modification
Significance Determination Process
Operability Determination
Pressure Boundary Leakage
Through-Wall Leak
Through-Wall Leakage
Operability Assessment
IR 05000272/20060051 February 2007IR 05000272-06-005, 05000311-06-005; 10/01/2006 - 12/31/2006; Salem Generating Station Units 1 and 2; Equipment Alignment, Inservice Inspection, Refueling and OutageUnanalyzed Condition
Boric Acid
High Radiation Area
Mission time
Fire Barrier
Internal Flooding
Past operability
Nondestructive Examination
Temporary Modification
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Maintenance Rule Program
Fuel cladding
Through-Wall Leak
Scaffolding
Substantial potential for overexposure
Power change
Unidentified leakage
Overexposure
IR 05000272/20060063 April 2006IR 05000272-06-006; 05000311-06-006; on 01/09/2006 - 02/17/2006; Salem Nuclear Generating Station, Units 1 and 2; Component Design Bases InspectionSafe Shutdown
Ultimate heat sink
Stroke time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Significance Determination Process
Operability Determination
Time Critical Operator Action
Battery sizing
IR 05000272/200600723 May 2006IR 05000272-06-007, 05000311-06-007 on 03/13 - 31/2006, Salem Nuclear Generating Station, Units 1 and 2; Triennial Fire Protection Team Inspection, Fire ProtectionHot Short
Safe Shutdown
Fire Barrier
Operator Manual Action
Emergency Lighting
Condition Adverse to Quality
Significance Determination Process
Fire Protection Program
IR 05000272/200601125 April 2006IR 05000272-06-011, IR 05000311-06-011, IR 05000354-06-009; 03/21/2006-03/23/2006; Salem Units 1 and 2 and Hope Creek; Emergency Preparedness Exercise; Emergency Preparedness Performance Indicators
IR 05000272/200601231 July 2006IR 05000272-06-012; 05000311-06-012; 05000354-06-011; 06/12/2006 - 06/28/2006; Salem and Hope Creek Nuclear Generating Stations; Special Inspection
IR 05000272/200601417 August 2006IR 05000272-06-014 and 05000311-06-014; Salem Nuclear Generating Station, Units 1 and 2; Ti 2515/168Affidavit
IR 05000272/20062014 October 2006Ltr to W. Levis - Salem Generating Station- NRC Material Control and Accounting Program Inspection - Report 05000272/2006201 and 05000311/2006201
IR 05000272/200630129 January 2007Senior Reactor Operator Initial Examination Report No. 05000272-06-301 and 05000311-06-301Job Performance Measure
IR 05000272/20070012 March 2007Annual Assessment Letter EOC 2006 - Salem Generating Station (Report 05000272-07-001, 05000311-07-001)Enforcement Discretion
IR 05000272/200700211 May 2007IR 05000272-07-002, 05000311/2007002; 01/01/2007 - 03/31/2007; Salem Nuclear Generating Station Units 1 and 2; Maintenance EffectivenessSafe Shutdown
Boric Acid
High winds
High Radiation Area
Fire Barrier
Internal Flooding
Significance Determination Process
Operability Determination
Maintenance Rule Program
Through-Wall Leakage
Scaffolding
IR 05000272/20070049 November 2007IR 05000272-07-004, 05000311-07-004; PSEG Nuclear LLC; on 07/01/2007 - 09/30/2007; Salem Nuclear Generating Station, Units 1 and 2, Integrated Inspection ReportHigh Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Internal Flooding
Hydrostatic
Past operability
Temporary Modification
Operability Determination
Maintenance Rule Program
IR 05000272/20070057 February 2008IR 05000272-07-005, 05000311-07-005, on 10/01/2007 - 12/31/2007, Salem Nuclear Generating Station Units 1 and 2; Maintenance EffectivenessSafe Shutdown
Boric Acid
Mission time
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
Process Control Program
Large early release frequency
Operability Determination
Earthquake
Maintenance Rule Program
IR 05000272/20070063 May 2007IR 0500272-07-006, 05000311-07-006, and 05000354-07-007, on 03/05/2007 - 03/23/2007; Salem Nuclear Generating Station Units 1 and 2 and Hope Creek; Biennial Baseline Inspection of the Identification and Resolution of Problems (Pi&R)Fitness for Duty
High Radiation Area
Past operability
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Scaffolding
IR 05000272/200740216 July 2007IR 05000272-07-402, IR 05000311-07-402, IR 05000354-07-402, on 06/11/2007 - 06/15/2007, Salem and Hope Creek Generating Stations, NRC Physical Security Baseline InspectionAffidavit
IR 05000272/200740319 December 2007IR 05000272-07-403, 05000311-07-403 and 05000354-07-403, on 11/5/2007-11/9/2007, Salem and Hope Creek Generating Stations, Security Training; Physical ProtectionSignificance Determination Process
Affidavit
IR 05000272/20080013 March 2008Annual Assessment Letter EOC 2007 ROP8 - Salem Station (05000272-08-001, 05000311-08-001)B.5.b
IR 05000272/200800215 May 2008IR 05000272-08-002, 05000311-08-002, on 01/01/2008 - 03/31/2008, Salem Nuclear Generating Station Units 1 and 2, Maintenance Effectiveness, Operability EvaluationsFire Barrier
Internal Flooding
Temporary Modification
Significance Determination Process
Operability Determination
Maintenance Rule Program
Coast down
Unidentified leak
IR 05000272/20080035 August 2008IR 05000272-08-003, 05000311-08-003, on 04/01/2008 - 06/30/2008, Salem Nuclear Generating Station Units 1 and 2, Maintenance Risk Assessment and Emergent Work Control, Operability Evaluations, Surveillance TestingBoric Acid
Reactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Fire Barrier
Stroke time
Hydrostatic
Nondestructive Examination
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Maintenance Rule Program
Biofouling
Power change
Unidentified leakage
IR 05000272/200800412 November 2008IR 05000272-08-004 & 05000311-08-004; on 07/01/2008 - 09/30/2008; Salem Nuclear Generating Station Unit Nos. 1 and 2; Routine Integrated ReportHigh Radiation Area
Fire Barrier
Internal Flooding
Nondestructive Examination
Operability Determination
Maintenance Rule Program
Fire Protection Program
Dissimilar Metal Weld
Substantial potential for overexposure
Overexposure
IR 05000272/20080059 February 2009IR 05000272-08-005, 05000311-08-005, on 10/01/2008 - 12/31/2008, Salem Unit 1 & 2, Fire Protection, Maintenance Effectiveness, Maintenance Risk Assessment & Emergent Work Control, Post-Maintenance Testing, Refueling & Other Outage ActivitieBoric Acid
High Radiation Area
Fire Barrier
Internal Flooding
Past operability
Nondestructive Examination
Temporary Modification
Missed surveillance
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Maintenance Rule Program
Fire Protection Program
Dissimilar Metal Weld
Unidentified leakage
IR 05000272/20080063 November 2008IR 05000272-08-006, IR 05000311-08-006, & IR 05000354-08-006, on 09/19/2008, Salem and Hope Creek Generating Stations (Letter Only)B.5.b Mitigating Strategies
IR 05000272/200800722 September 2008IR 05000272-08-007, 05000311-08-007; on 07/14/2008 - 08/08/2008; Salem Nuclear Generating Station Units 1 and 2; Component Design Bases InspectionStroke time
Probabilistic Risk Assessment
Significance Determination Process
Reasonable doubt of operability
Operability Assessment
IR 05000272/200800811 December 2008IR 05000272-08-008, on 09/29/2008 - 10/27/2008; Salem Nuclear Generating Station Unit 1; Supplemental Inspection 95002 for Degraded Mitigating System CornerstoneProbabilistic Risk Assessment
Significance Determination Process
IR 05000272/200800920 January 2009IR 05000272-08-009, on 10/21/2008-12/12/2008, Salem Nuclear Generating Station Unit No. 1, Special Inspection Report, Procedures, Operator Performance, Corrective ActionReactor Vessel Water Level
Time to boil
Significance Determination Process
IR 05000272/200830124 October 2008IR 05000272-08-301, 05000311-08-301, on 08/25/08 - 09/04/08; Salem, Units 1 and 2; Initial Operator Licensing Examination Report
IR 05000272/200840222 May 2008IR 05000272-08-402, IR 05000311-08-402, and IR 05000354-08-402, on 01/09/2008 - 04/18/2008, for Salem and Hope Creek, Physical Security Problem Identification & Resolution SampleSignificance Determination Process
Affidavit
IR 05000272/200840311 July 2008IR 05000272-08-403, IR 05000311-08-403, and IR 05000354-08-403, on 06/02/2008 - 06/19/2008, for Salem and Hope CreekSignificance Determination Process
Affidavit
IR 05000272/20084044 November 2008IR 05000272-08-404, 05000311-08-404 & 05000354-08-404; on 08/25/2008-09/26/2008; PSEG Nuclear LLC; Salem and Hope Creek Generating Stations, Problem Identification and Resolution InspectionSignificance Determination Process
Affidavit
IR 05000272/200850220 June 2008IR 05000272-08-502, 05000311-08-502, 05000354-08-502 on 05/19/2008 - 5/22/2008 for Hope Creek and Salem; Exercise Evaluation; Emergency Action Level and Emergency Plan Changes; Emergency Preparedness Performance Indicators
IR 05000272/20090014 March 2009Annual Assessment Letter - Salem Nuclear Generating Station, Units 1 and 2 (05000272-09-001 and 05000311-09-001)
IR 05000272/200900229 April 2009IR 05000272-09-002, 05000311-09-00: on 01/01/09 - 03/31/09, Salem, Units 1 and 2, Routine Integrated Inspection ReportHigh Radiation Area
Fire Barrier
Internal Flooding
Hydrostatic
Temporary Modification
Operability Determination
Maintenance Rule Program
Biofouling
Unidentified leak
IR 05000272/200900312 August 2009IR 05000272-09-003, 05000311-09-003 on 04/01/09 - 06/30/09 for Salem, Units 1 and 2, Maintenance Effectiveness, Operability EvaluationsBoric Acid
Mission time
Fire Barrier
Internal Flooding
Significance Determination Process
Operability Determination
Maintenance Rule Program
Power change
Downpower
IR 05000272/20090044 November 2009IR 05000272-09-004, 05000311-09-004 on 07-01-09 - 09-30-09 for Salem, Units 1 and 2 - Integrated InspectionOffsite Dose Calculation Manual
Fire Barrier
Temporary Modification
Significance Determination Process
Job Performance Measure
Operability Determination
Maintenance Rule Program
IR 05000272/20090059 February 2010IR 05000272-09-005, 05000311-09-005; 10/01/2009 - 12/31/2009; Salem Nuclear Generating Station Unit Nos. 1 and 2; Maintenance EffectivenessBoric Acid
High Radiation Area
Fire Barrier
Time to boil
Past operability
Nondestructive Examination
Temporary Modification
VT-2
Significance Determination Process
Foreign Material Exclusion
Process Control Program
Operability Determination
Maintenance Rule Program
Biofouling
Dissimilar Metal Weld
DM weld
Loctite
Unidentified leakage
IR 05000272/200900624 March 2009IR 05000272-09-006; 05000311-09-006; on 01/26/2009 - 02/13/2009; PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit Nos. 1 and 2; Triennial Fire Protection Team Inspection; Fire ProtectionHot Short
Safe Shutdown
Fire Barrier
Operator Manual Action
Emergency Lighting
Significance Determination Process
Fire Protection Program
Operability Assessment
IR 05000272/200900719 August 2009IR 05000272-09-007 & 05000311-09-007, on 06/22/2009 - 07/09/2009, Salem Nuclear, Units 1 & 2, Biennial Baseline Inspection of Identification & Resolution of Problems. the Inspectors Identified One Finding in Area of Corrective ActionsSignificance Determination Process
Operability Determination
Maintenance Rule Program
IR 05000272/200940225 June 2009Revision to Salem and Hope Creek Generating Stations - NRC Security Inspection Report 05000272-09-402, 05000311-09-402 and 05000354-09-402
IR 05000272/200940329 December 2009IR 05000272-09-403, 05000311-09-403 and 05000354-09-403, on 11/03/2009 - 11/19/2009, Salem and Hope Creek Generating Stations, Access Control, Protective StrategySignificance Determination Process
Affidavit
IR 05000272/20100014 March 2011Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2, EOC-11 (Report 05000272/2010001 and 05000311/2010001)
IR 05000272/201000212 May 2010IR 05000272-10-002 and 05000311-10-002; on 01/01/10 - 03/31/10; Salem Nuclear Generating Station, Units 1 and 2; Event Follow-up, NRC Integrated Inspection ReportUltimate heat sink
Fire Barrier
Internal Flooding
Past operability
Significance Determination Process
Annual Radiological Environmental Operating Report
Operability Determination
Annual Radiological Effluent Release Report
Maintenance Rule Program
Unidentified leak
IR 05000272/201000310 August 2010Letter from Arthur Burritt to Thomas Joyce, Salem Nuclear Generating Station, Unit Nos. 1 and 2 - NRC Integrated Inspection Report 05000272-10-003 and 05000311-10-003Boric Acid
High Radiation Area
Non-Destructive Examination
Fire Barrier
Time to boil
Past operability
Nondestructive Examination
Temporary Modification
VT-2
Finite Element Analysis
Significance Determination Process
Foreign Material Exclusion
Operability Determination
License Renewal
Maintenance Rule Program
Biofouling
Fatigue Rule
Dissimilar Metal Weld
Power change
Unidentified leakage
IR 05000272/201000425 October 2010IR 05000272-10-004, 05000311-10-004, on 07-31-10 - 09-30-10, Salem Nuclear Generating Station, Units 1 and 2, Integrated Inspection ReportTime of Discovery
High Radiation Area
Ultimate heat sink
Fire Barrier
Internal Flooding
Temporary Modification
Arc flash
Aging Management
Operability Determination
Maintenance Rule Program
Unidentified leakage
IR 05000272/20100058 February 2011IR 05000272-10-005, 05000311-10-005, on 10-01-10 - 12-31-10; Salem Nuclear Generating Station Units 1 and 2, NRC Integrated Inspection ReportSafe Shutdown
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Past operability
Nondestructive Examination
Temporary Modification
Multiple Spurious Operation
Significance Determination Process
Operability Determination
Maintenance Rule Program
Biofouling
Substantial potential for overexposure
Overexposure
IR 05000272/201000614 October 2010IR 05000272-10-006, 05000311-10-006, 05000354-10-006 on 6/7/10 - 06/10/10, 06/21/10 - 06/24/10 & 8/9/10 - 08/12/10 for Salem Nuclear Generating Station, Units 1 & 2, and Hope Creek Generating Station; License Renewal Inspection Report - ErrAging Management
License Renewal
IR 05000272/20100088 April 2010IR 05000272-10-008 and 05000311-10-008, on 02/08-02/25/2010, for Salem Nuclear Generating Station Unit Nos. 1 and 2; Engineering Specialist Plant Modifications InspectionStroke time
IR 05000272/201020113 January 2011IR 05000272-10-201, IR 05000311-10-201, and IR 05000354-10-201, 11/29/2010 - 12/02/2010, Salem and Hope Creek Generating Stations, Target Set InspectionAffidavit