IR 05000272/2005201 | 18 October 2005 | Force-on-Force Inspection Report 05000272-05-201, 05000311-05-201 & 05000354-05-201, Salem Hope Creek, Cover Letter Only | Affidavit |
IR 05000272/2006002 | 24 April 2006 | IR 05000272-06-002, 05000311-06-002; 01/01/2006 - 03/31/2006; Salem Nuclear Generating Station Units 1 and 2; Maintenance Effectiveness | Safe Shutdown Boric Acid High Radiation Area Fire Barrier Temporary Modification Significance Determination Process Large early release frequency Operability Determination Earthquake Maintenance Rule Program Downpower |
IR 05000272/2006003 | 19 July 2006 | IR 05000272-06-003, 05000311-06-003; 04/01/2006 - 06/30/2006; Salem Nuclear Generating Station Units 1 and 2; Routine Integrated Report | Safe Shutdown Boric Acid High Radiation Area Fire Barrier Internal Flooding Past operability Operability Determination Maintenance Rule Program Substantial potential for overexposure Overexposure |
IR 05000272/2006004 | 8 November 2006 | IR 05000272-06-004, 05000311-06-004; Public Service Enterprise Group Nuclear Inc.; 07/01/2006 - 09/30/2006; Salem Nuclear Generating Station Units 1 and 2; Maintenance Effectiveness, Event Followup | Boric Acid Fire Barrier Temporary Modification Significance Determination Process Operability Determination Pressure Boundary Leakage Through-Wall Leak Through-Wall Leakage Operability Assessment |
IR 05000272/2006005 | 1 February 2007 | IR 05000272-06-005, 05000311-06-005; 10/01/2006 - 12/31/2006; Salem Generating Station Units 1 and 2; Equipment Alignment, Inservice Inspection, Refueling and Outage | Unanalyzed Condition Boric Acid High Radiation Area Mission time Fire Barrier Internal Flooding Past operability Nondestructive Examination Temporary Modification Significance Determination Process Foreign Material Exclusion Operability Determination Maintenance Rule Program Fuel cladding Through-Wall Leak Scaffolding Substantial potential for overexposure Power change Unidentified leakage Overexposure |
IR 05000272/2006006 | 3 April 2006 | IR 05000272-06-006; 05000311-06-006; on 01/09/2006 - 02/17/2006; Salem Nuclear Generating Station, Units 1 and 2; Component Design Bases Inspection | Safe Shutdown Ultimate heat sink Stroke time Tornado Missile Internal Flooding Probabilistic Risk Assessment Significance Determination Process Operability Determination Time Critical Operator Action Battery sizing |
IR 05000272/2006007 | 23 May 2006 | IR 05000272-06-007, 05000311-06-007 on 03/13 - 31/2006, Salem Nuclear Generating Station, Units 1 and 2; Triennial Fire Protection Team Inspection, Fire Protection | Hot Short Safe Shutdown Fire Barrier Operator Manual Action Emergency Lighting Condition Adverse to Quality Significance Determination Process Fire Protection Program |
IR 05000272/2006011 | 25 April 2006 | IR 05000272-06-011, IR 05000311-06-011, IR 05000354-06-009; 03/21/2006-03/23/2006; Salem Units 1 and 2 and Hope Creek; Emergency Preparedness Exercise; Emergency Preparedness Performance Indicators | |
IR 05000272/2006012 | 31 July 2006 | IR 05000272-06-012; 05000311-06-012; 05000354-06-011; 06/12/2006 - 06/28/2006; Salem and Hope Creek Nuclear Generating Stations; Special Inspection | |
IR 05000272/2006014 | 17 August 2006 | IR 05000272-06-014 and 05000311-06-014; Salem Nuclear Generating Station, Units 1 and 2; Ti 2515/168 | Affidavit |
IR 05000272/2006201 | 4 October 2006 | Ltr to W. Levis - Salem Generating Station- NRC Material Control and Accounting Program Inspection - Report 05000272/2006201 and 05000311/2006201 | |
IR 05000272/2006301 | 29 January 2007 | Senior Reactor Operator Initial Examination Report No. 05000272-06-301 and 05000311-06-301 | Job Performance Measure |
IR 05000272/2007001 | 2 March 2007 | Annual Assessment Letter EOC 2006 - Salem Generating Station (Report 05000272-07-001, 05000311-07-001) | Enforcement Discretion |
IR 05000272/2007002 | 11 May 2007 | IR 05000272-07-002, 05000311/2007002; 01/01/2007 - 03/31/2007; Salem Nuclear Generating Station Units 1 and 2; Maintenance Effectiveness | Safe Shutdown Boric Acid High winds High Radiation Area Fire Barrier Internal Flooding Significance Determination Process Operability Determination Maintenance Rule Program Through-Wall Leakage Scaffolding |
IR 05000272/2007004 | 9 November 2007 | IR 05000272-07-004, 05000311-07-004; PSEG Nuclear LLC; on 07/01/2007 - 09/30/2007; Salem Nuclear Generating Station, Units 1 and 2, Integrated Inspection Report | High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Internal Flooding Hydrostatic Past operability Temporary Modification Operability Determination Maintenance Rule Program |
IR 05000272/2007005 | 7 February 2008 | IR 05000272-07-005, 05000311-07-005, on 10/01/2007 - 12/31/2007, Salem Nuclear Generating Station Units 1 and 2; Maintenance Effectiveness | Safe Shutdown Boric Acid Mission time Fire Barrier Internal Flooding Probabilistic Risk Assessment Significance Determination Process Job Performance Measure Process Control Program Large early release frequency Operability Determination Earthquake Maintenance Rule Program |
IR 05000272/2007006 | 3 May 2007 | IR 0500272-07-006, 05000311-07-006, and 05000354-07-007, on 03/05/2007 - 03/23/2007; Salem Nuclear Generating Station Units 1 and 2 and Hope Creek; Biennial Baseline Inspection of the Identification and Resolution of Problems (Pi&R) | Fitness for Duty High Radiation Area Past operability Condition Adverse to Quality Significance Determination Process Operability Determination Scaffolding |
IR 05000272/2007402 | 16 July 2007 | IR 05000272-07-402, IR 05000311-07-402, IR 05000354-07-402, on 06/11/2007 - 06/15/2007, Salem and Hope Creek Generating Stations, NRC Physical Security Baseline Inspection | Affidavit |
IR 05000272/2007403 | 19 December 2007 | IR 05000272-07-403, 05000311-07-403 and 05000354-07-403, on 11/5/2007-11/9/2007, Salem and Hope Creek Generating Stations, Security Training; Physical Protection | Significance Determination Process Affidavit |
IR 05000272/2008001 | 3 March 2008 | Annual Assessment Letter EOC 2007 ROP8 - Salem Station (05000272-08-001, 05000311-08-001) | B.5.b |
IR 05000272/2008002 | 15 May 2008 | IR 05000272-08-002, 05000311-08-002, on 01/01/2008 - 03/31/2008, Salem Nuclear Generating Station Units 1 and 2, Maintenance Effectiveness, Operability Evaluations | Fire Barrier Internal Flooding Temporary Modification Significance Determination Process Operability Determination Maintenance Rule Program Coast down Unidentified leak |
IR 05000272/2008003 | 5 August 2008 | IR 05000272-08-003, 05000311-08-003, on 04/01/2008 - 06/30/2008, Salem Nuclear Generating Station Units 1 and 2, Maintenance Risk Assessment and Emergent Work Control, Operability Evaluations, Surveillance Testing | Boric Acid Reactor Vessel Water Level High Radiation Area Non-Destructive Examination Fire Barrier Stroke time Hydrostatic Nondestructive Examination Significance Determination Process Foreign Material Exclusion Operability Determination Maintenance Rule Program Biofouling Power change Unidentified leakage |
IR 05000272/2008004 | 12 November 2008 | IR 05000272-08-004 & 05000311-08-004; on 07/01/2008 - 09/30/2008; Salem Nuclear Generating Station Unit Nos. 1 and 2; Routine Integrated Report | High Radiation Area Fire Barrier Internal Flooding Nondestructive Examination Operability Determination Maintenance Rule Program Fire Protection Program Dissimilar Metal Weld Substantial potential for overexposure Overexposure |
IR 05000272/2008005 | 9 February 2009 | IR 05000272-08-005, 05000311-08-005, on 10/01/2008 - 12/31/2008, Salem Unit 1 & 2, Fire Protection, Maintenance Effectiveness, Maintenance Risk Assessment & Emergent Work Control, Post-Maintenance Testing, Refueling & Other Outage Activitie | Boric Acid High Radiation Area Fire Barrier Internal Flooding Past operability Nondestructive Examination Temporary Modification Missed surveillance Significance Determination Process Foreign Material Exclusion Operability Determination Maintenance Rule Program Fire Protection Program Dissimilar Metal Weld Unidentified leakage |
IR 05000272/2008006 | 3 November 2008 | IR 05000272-08-006, IR 05000311-08-006, & IR 05000354-08-006, on 09/19/2008, Salem and Hope Creek Generating Stations (Letter Only) | B.5.b Mitigating Strategies |
IR 05000272/2008007 | 22 September 2008 | IR 05000272-08-007, 05000311-08-007; on 07/14/2008 - 08/08/2008; Salem Nuclear Generating Station Units 1 and 2; Component Design Bases Inspection | Stroke time Probabilistic Risk Assessment Significance Determination Process Reasonable doubt of operability Operability Assessment |
IR 05000272/2008008 | 11 December 2008 | IR 05000272-08-008, on 09/29/2008 - 10/27/2008; Salem Nuclear Generating Station Unit 1; Supplemental Inspection 95002 for Degraded Mitigating System Cornerstone | Probabilistic Risk Assessment Significance Determination Process |
IR 05000272/2008009 | 20 January 2009 | IR 05000272-08-009, on 10/21/2008-12/12/2008, Salem Nuclear Generating Station Unit No. 1, Special Inspection Report, Procedures, Operator Performance, Corrective Action | Reactor Vessel Water Level Time to boil Significance Determination Process |
IR 05000272/2008301 | 24 October 2008 | IR 05000272-08-301, 05000311-08-301, on 08/25/08 - 09/04/08; Salem, Units 1 and 2; Initial Operator Licensing Examination Report | |
IR 05000272/2008402 | 22 May 2008 | IR 05000272-08-402, IR 05000311-08-402, and IR 05000354-08-402, on 01/09/2008 - 04/18/2008, for Salem and Hope Creek, Physical Security Problem Identification & Resolution Sample | Significance Determination Process Affidavit |
IR 05000272/2008403 | 11 July 2008 | IR 05000272-08-403, IR 05000311-08-403, and IR 05000354-08-403, on 06/02/2008 - 06/19/2008, for Salem and Hope Creek | Significance Determination Process Affidavit |
IR 05000272/2008404 | 4 November 2008 | IR 05000272-08-404, 05000311-08-404 & 05000354-08-404; on 08/25/2008-09/26/2008; PSEG Nuclear LLC; Salem and Hope Creek Generating Stations, Problem Identification and Resolution Inspection | Significance Determination Process Affidavit |
IR 05000272/2008502 | 20 June 2008 | IR 05000272-08-502, 05000311-08-502, 05000354-08-502 on 05/19/2008 - 5/22/2008 for Hope Creek and Salem; Exercise Evaluation; Emergency Action Level and Emergency Plan Changes; Emergency Preparedness Performance Indicators | |
IR 05000272/2009001 | 4 March 2009 | Annual Assessment Letter - Salem Nuclear Generating Station, Units 1 and 2 (05000272-09-001 and 05000311-09-001) | |
IR 05000272/2009002 | 29 April 2009 | IR 05000272-09-002, 05000311-09-00: on 01/01/09 - 03/31/09, Salem, Units 1 and 2, Routine Integrated Inspection Report | High Radiation Area Fire Barrier Internal Flooding Hydrostatic Temporary Modification Operability Determination Maintenance Rule Program Biofouling Unidentified leak |
IR 05000272/2009003 | 12 August 2009 | IR 05000272-09-003, 05000311-09-003 on 04/01/09 - 06/30/09 for Salem, Units 1 and 2, Maintenance Effectiveness, Operability Evaluations | Boric Acid Mission time Fire Barrier Internal Flooding Significance Determination Process Operability Determination Maintenance Rule Program Power change Downpower |
IR 05000272/2009004 | 4 November 2009 | IR 05000272-09-004, 05000311-09-004 on 07-01-09 - 09-30-09 for Salem, Units 1 and 2 - Integrated Inspection | Offsite Dose Calculation Manual Fire Barrier Temporary Modification Significance Determination Process Job Performance Measure Operability Determination Maintenance Rule Program |
IR 05000272/2009005 | 9 February 2010 | IR 05000272-09-005, 05000311-09-005; 10/01/2009 - 12/31/2009; Salem Nuclear Generating Station Unit Nos. 1 and 2; Maintenance Effectiveness | Boric Acid High Radiation Area Fire Barrier Time to boil Past operability Nondestructive Examination Temporary Modification VT-2 Significance Determination Process Foreign Material Exclusion Process Control Program Operability Determination Maintenance Rule Program Biofouling Dissimilar Metal Weld DM weld Loctite Unidentified leakage |
IR 05000272/2009006 | 24 March 2009 | IR 05000272-09-006; 05000311-09-006; on 01/26/2009 - 02/13/2009; PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit Nos. 1 and 2; Triennial Fire Protection Team Inspection; Fire Protection | Hot Short Safe Shutdown Fire Barrier Operator Manual Action Emergency Lighting Significance Determination Process Fire Protection Program Operability Assessment |
IR 05000272/2009007 | 19 August 2009 | IR 05000272-09-007 & 05000311-09-007, on 06/22/2009 - 07/09/2009, Salem Nuclear, Units 1 & 2, Biennial Baseline Inspection of Identification & Resolution of Problems. the Inspectors Identified One Finding in Area of Corrective Actions | Significance Determination Process Operability Determination Maintenance Rule Program |
IR 05000272/2009402 | 25 June 2009 | Revision to Salem and Hope Creek Generating Stations - NRC Security Inspection Report 05000272-09-402, 05000311-09-402 and 05000354-09-402 | |
IR 05000272/2009403 | 29 December 2009 | IR 05000272-09-403, 05000311-09-403 and 05000354-09-403, on 11/03/2009 - 11/19/2009, Salem and Hope Creek Generating Stations, Access Control, Protective Strategy | Significance Determination Process Affidavit |
IR 05000272/2010001 | 4 March 2011 | Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2, EOC-11 (Report 05000272/2010001 and 05000311/2010001) | |
IR 05000272/2010002 | 12 May 2010 | IR 05000272-10-002 and 05000311-10-002; on 01/01/10 - 03/31/10; Salem Nuclear Generating Station, Units 1 and 2; Event Follow-up, NRC Integrated Inspection Report | Ultimate heat sink Fire Barrier Internal Flooding Past operability Significance Determination Process Annual Radiological Environmental Operating Report Operability Determination Annual Radiological Effluent Release Report Maintenance Rule Program Unidentified leak |
IR 05000272/2010003 | 10 August 2010 | Letter from Arthur Burritt to Thomas Joyce, Salem Nuclear Generating Station, Unit Nos. 1 and 2 - NRC Integrated Inspection Report 05000272-10-003 and 05000311-10-003 | Boric Acid High Radiation Area Non-Destructive Examination Fire Barrier Time to boil Past operability Nondestructive Examination Temporary Modification VT-2 Finite Element Analysis Significance Determination Process Foreign Material Exclusion Operability Determination License Renewal Maintenance Rule Program Biofouling Fatigue Rule Dissimilar Metal Weld Power change Unidentified leakage |
IR 05000272/2010004 | 25 October 2010 | IR 05000272-10-004, 05000311-10-004, on 07-31-10 - 09-30-10, Salem Nuclear Generating Station, Units 1 and 2, Integrated Inspection Report | Time of Discovery High Radiation Area Ultimate heat sink Fire Barrier Internal Flooding Temporary Modification Arc flash Aging Management Operability Determination Maintenance Rule Program Unidentified leakage |
IR 05000272/2010005 | 8 February 2011 | IR 05000272-10-005, 05000311-10-005, on 10-01-10 - 12-31-10; Salem Nuclear Generating Station Units 1 and 2, NRC Integrated Inspection Report | Safe Shutdown High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Past operability Nondestructive Examination Temporary Modification Multiple Spurious Operation Significance Determination Process Operability Determination Maintenance Rule Program Biofouling Substantial potential for overexposure Overexposure |
IR 05000272/2010006 | 14 October 2010 | IR 05000272-10-006, 05000311-10-006, 05000354-10-006 on 6/7/10 - 06/10/10, 06/21/10 - 06/24/10 & 8/9/10 - 08/12/10 for Salem Nuclear Generating Station, Units 1 & 2, and Hope Creek Generating Station; License Renewal Inspection Report - Err | Aging Management License Renewal |
IR 05000272/2010008 | 8 April 2010 | IR 05000272-10-008 and 05000311-10-008, on 02/08-02/25/2010, for Salem Nuclear Generating Station Unit Nos. 1 and 2; Engineering Specialist Plant Modifications Inspection | Stroke time |