IR 05000272/2006014
| ML062350547 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/17/2006 |
| From: | Mel Gray Reactor Projects Branch 3 |
| To: | Levis W Public Service Enterprise Group |
| References | |
| IR-06-014 IR-06-014 | |
| Download: ML062350547 (3) | |
Text
August 17, 2006
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000272/2006014 and 05000311/2006014
Dear Mr. Levis:
On July 18, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Salem Nuclear Generating Station, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on July 24, 2006 with Mr. Tom Joyce.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Warning: Violation of Section 147 of the Atomic Energy Act, Safeguards Information, is subject to civil and criminal penalties. DETERMINATION MADE BY:
NAME/TITLE: Barry C. Westreich, Chief ORGANIZATION: NSIR/DNS/SOS BASIS: 2/25/02 NRC Order SIGNATURE: RA Date: 5/12/06 W. Lewis-2-In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Sincerely,
/RA/
Mel Gray, Chief Projects Branch 3 Division of Reactor Projects Docket No.
50-272; 50-311 License No.
DPR-70; DPR-75 Enclosure: NRC Inspection Report 05000272/2006014 and 05000311/2006014 ( )
cc w/o encl:
S. Mannon - Salem Regulatory Assurance Manager C. J. Fricker, Salem Plant Manager cc w/encl; w/SGI:
M. Bruecks - Emergency Services/Security Manager J. Lipoti, Director, Division of Environment, Safety, and Health, State of New Jersey H Otto, Ph.D., State Liaison Officer, State of Delaware