Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
2CAN070802, Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19)1 July 2008Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19)Weld Overlay
2CAN072001, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27)8 July 2020Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27)Dissimilar Metal Weld
2CAN081404, Steam Generator Tube Inspection Report - 2R2318 August 2014Steam Generator Tube Inspection Report - 2R23Nondestructive Examination
2CAN081406, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23)21 August 2014Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23)
2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan31 August 2021Unit 2 - Fifth 10-Year Interval Snubber Program PlanSafe Shutdown
Anchor Darling
2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)10 August 2023Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)
2CAN091901, Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program3 September 2019Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program
2CAN101701, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25)6 October 2017Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25)Moisture barrier
Through-Wall Leak
2CAN112005, Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval24 November 2020Unit 2 - Inservice Testing Plan for the Fifth 10-Year IntervalSafe Shutdown
Boric Acid
Stroke time
Incorporated by reference
Cold shutdown justification
Power Operated Valves
2CAN120901, Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20)7 December 2009Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20)
2CAN121204, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22)13 December 2012Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22)Through-Wall Leak
2CAN122001, Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection4 December 2020Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection
CNRO-2003-00009, Entergy Operations, Referenced Paper for Request to Use ASME Code Case N-66314 March 2003Entergy Operations, Referenced Paper for Request to Use ASME Code Case N-663
CNRO-2004-00016, Request for Alternative ANO2-R&R-002, Rev. 1 - Use of Mechanical Nozzle Seal Assemblies11 March 2004Request for Alternative ANO2-R&R-002, Rev. 1 - Use of Mechanical Nozzle Seal AssembliesBoric Acid
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
VT-2
Finite Element Analysis
CNRO-2004-00026, Request for Alternative ANO1-R&R-006 - Proposed Alternative to ASME Weld Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles4 May 2004Request for Alternative ANO1-R&R-006 - Proposed Alternative to ASME Weld Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration NozzlesNon-Destructive Examination
Incorporated by reference
Finite Element Analysis
CNRO-2007-00009, Arkansas One, Unit 1 - Request for Alternative ANO1-ISI-008, Request to Extend the Current ASME Inservice Inspection Interval in Accordance with NRC Information Notice 98-448 March 2007Arkansas One, Unit 1 - Request for Alternative ANO1-ISI-008, Request to Extend the Current ASME Inservice Inspection Interval in Accordance with NRC Information Notice 98-44Probabilistic Risk Assessment
CNRO-2007-00033, Request ISI-2007-1, Use of Later ASME Section XI Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non-Destructive Examination Activities22 August 2007Request ISI-2007-1, Use of Later ASME Section XI Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non-Destructive Examination ActivitiesNon-Destructive Examination
CNRO-2007-00042, Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals29 November 2007Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing IntervalsSafe Shutdown
Ultimate heat sink
CNRO-2007-00044, Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan30 November 2007Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing PlanSafe Shutdown
Boric Acid
High Radiation Area
Ultimate heat sink
Stroke time
Abnormal operational transient
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Scaffolding
Unidentified leakage
CNRO-2008-00016, Relief Requests for Third 120 Month Inservice Testing Interval20 May 2008Relief Requests for Third 120 Month Inservice Testing IntervalHydrostatic
Nondestructive Examination
VT-2
Scaffolding
CNRO-2009-00002, Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval4 March 2009Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval
GNRO-2003/00022, Boiling Water Reactor (BWR) Feedwater Nozzle Inservice Inspection Report for Grand Gulf Nuclear Station2 April 2003Boiling Water Reactor (BWR) Feedwater Nozzle Inservice Inspection Report for Grand Gulf Nuclear Station
GNRO-2004/00019, Transmittal of Inservice Inspection Summary Reports8 March 2004Transmittal of Inservice Inspection Summary ReportsHydrostatic
VT-2
GNRO-2006/00002, Lnservice Inspection Summary Report for Grand Gulf Nuclear Station Unit 113 January 2006Lnservice Inspection Summary Report for Grand Gulf Nuclear Station Unit 1
GNRO-2006/00044, Corrections to Inservice Inspection Summary Report10 August 2006Corrections to Inservice Inspection Summary Report
GNRO-2007/00046, Inservice Inspection Summary Report10 July 2007Inservice Inspection Summary Report
GNRO-2008/00057, Transmittal of Inservice Inspection Program Third 10-Year Interval, Revision 031 July 2008Transmittal of Inservice Inspection Program Third 10-Year Interval, Revision 0
GNRO-2008/00071, Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 029 October 2008Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 0Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Aging Management
Large early release frequency
Scaffolding
GNRO-2009/00004, Inservice Inspection Summary Report19 January 2009Inservice Inspection Summary Report
GNRO-2009/00070, Supplement to Request to Use Portion of Later Edition to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants for Main Steam Safety Relief Valve Inservice Testing14 December 2009Supplement to Request to Use Portion of Later Edition to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants for Main Steam Safety Relief Valve Inservice TestingIncorporated by reference
GNRO-2012/00110, Submittal of Inservice Inspection Summary Report11 September 2012Submittal of Inservice Inspection Summary ReportWeld Overlay
Finite Element Analysis
GNRO-2014/00043, Inservice Inspection Summary Report12 June 2014Inservice Inspection Summary Report
GNRO-2016/00033, Submittal of 2016 Inservice Inspection Summary Report20 June 2016Submittal of 2016 Inservice Inspection Summary ReportSquib
FLEX
GNRO-2017/00039, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages30 June 2017Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages
GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report16 October 2018Submittal of 2018 Inservice Inspection Summary Report
GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval30 November 2018Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection IntervalNondestructive Examination
VT-2
Liquid penetrant
Pressure Boundary Leakage
GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval13 March 2019Snubber Testing Program for Fourth Inspection Interval
GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency1 June 2021Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing FrequencyMissed surveillance
Power-Operated Valves
ML04049017918 December 2003to CEP-IST-2, Inservice Testing Plan, Entergy Nuclear South Central Engineering Programs
ML04322025915 November 200412-Month Special Report SR-04-001-00 on the 12th Refueling Steam Generator Tube Inservice Inspection
ML05152007031 May 2005E-Mail on Followup RAI: ANO-1 SG ISI Report for 1R18
ML07115010817 April 2007Request for Alternative ANO2-R&R-004, Revision 1, Request to Use Risk-Informed Safety Classification and Treatment for Repair/Replacement Activities in Class 2 and 3 Moderate Energy SystemsSafe Shutdown
Probabilistic Risk Assessment
ML08156072621 May 2008CEP-ISI-104, Rev. 0, ASME Section XI, Division 1, Inservice Inspection Program.Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Aging Management
Scaffolding
ML08157000227 June 2008Relief Request GGNS-ISI-004 to Extend 2nd 10-Year Inservice Inspection Interval 4 Months Beyond 1-year Extension Allowed by ASME CodeIncorporated by reference
Dissimilar Metal Weld
DM weld
ML10225041829 July 2010Steam Generator Tube Inspection Report - 1R22Nondestructive Examination
ML10363057929 December 2010Notification of Inspection (NRC Inspection Report 050-368/2011002) and Request for InformationBoric Acid
Nondestructive Examination
VT-2
ML14224A27912 August 2014Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 19/Refuel 19Condition Adverse to Quality
ML17242A23730 August 2017Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 21 / Refuel 21
ML17325B76221 November 2017180 Day Steam Generator Tube Inspection Report for the 21St Refueling Outage for Waterford Steam Electric Station, Unit 3Nondestructive Examination
ML22034A8993 February 2022Steam Generator Tube Inspection Reports in Support of TSTF-577Nondestructive Examination