2CAN070802, Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19) | 1 July 2008 | Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19) | Weld Overlay |
2CAN072001, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27) | 8 July 2020 | Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27) | Dissimilar Metal Weld |
2CAN081404, Steam Generator Tube Inspection Report - 2R23 | 18 August 2014 | Steam Generator Tube Inspection Report - 2R23 | Nondestructive Examination |
2CAN081406, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23) | 21 August 2014 | Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23) | |
2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan | 31 August 2021 | Unit 2 - Fifth 10-Year Interval Snubber Program Plan | Safe Shutdown Anchor Darling |
2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) | 10 August 2023 | Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) | |
2CAN091901, Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program | 3 September 2019 | Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program | |
2CAN101701, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25) | 6 October 2017 | Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25) | Moisture barrier Through-Wall Leak |
2CAN112005, Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval | 24 November 2020 | Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval | Safe Shutdown Boric Acid Stroke time Incorporated by reference Cold shutdown justification Power Operated Valves |
2CAN120901, Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20) | 7 December 2009 | Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20) | |
2CAN121204, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22) | 13 December 2012 | Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22) | Through-Wall Leak |
2CAN122001, Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection | 4 December 2020 | Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection | |
CNRO-2003-00009, Entergy Operations, Referenced Paper for Request to Use ASME Code Case N-663 | 14 March 2003 | Entergy Operations, Referenced Paper for Request to Use ASME Code Case N-663 | |
CNRO-2004-00016, Request for Alternative ANO2-R&R-002, Rev. 1 - Use of Mechanical Nozzle Seal Assemblies | 11 March 2004 | Request for Alternative ANO2-R&R-002, Rev. 1 - Use of Mechanical Nozzle Seal Assemblies | Boric Acid Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake VT-2 Finite Element Analysis |
CNRO-2004-00026, Request for Alternative ANO1-R&R-006 - Proposed Alternative to ASME Weld Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles | 4 May 2004 | Request for Alternative ANO1-R&R-006 - Proposed Alternative to ASME Weld Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles | Non-Destructive Examination Incorporated by reference Finite Element Analysis |
CNRO-2007-00009, Arkansas One, Unit 1 - Request for Alternative ANO1-ISI-008, Request to Extend the Current ASME Inservice Inspection Interval in Accordance with NRC Information Notice 98-44 | 8 March 2007 | Arkansas One, Unit 1 - Request for Alternative ANO1-ISI-008, Request to Extend the Current ASME Inservice Inspection Interval in Accordance with NRC Information Notice 98-44 | Probabilistic Risk Assessment |
CNRO-2007-00033, Request ISI-2007-1, Use of Later ASME Section XI Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non-Destructive Examination Activities | 22 August 2007 | Request ISI-2007-1, Use of Later ASME Section XI Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non-Destructive Examination Activities | Non-Destructive Examination |
CNRO-2007-00042, Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals | 29 November 2007 | Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals | Safe Shutdown Ultimate heat sink |
CNRO-2007-00044, Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan | 30 November 2007 | Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan | Safe Shutdown Boric Acid High Radiation Area Ultimate heat sink Stroke time Abnormal operational transient Cold shutdown justification Power-Operated Valves Power Operated Valves Scaffolding Unidentified leakage |
CNRO-2008-00016, Relief Requests for Third 120 Month Inservice Testing Interval | 20 May 2008 | Relief Requests for Third 120 Month Inservice Testing Interval | Hydrostatic Nondestructive Examination VT-2 Scaffolding |
CNRO-2009-00002, Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval | 4 March 2009 | Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval | |
GNRO-2003/00022, Boiling Water Reactor (BWR) Feedwater Nozzle Inservice Inspection Report for Grand Gulf Nuclear Station | 2 April 2003 | Boiling Water Reactor (BWR) Feedwater Nozzle Inservice Inspection Report for Grand Gulf Nuclear Station | |
GNRO-2004/00019, Transmittal of Inservice Inspection Summary Reports | 8 March 2004 | Transmittal of Inservice Inspection Summary Reports | Hydrostatic VT-2 |
GNRO-2006/00002, Lnservice Inspection Summary Report for Grand Gulf Nuclear Station Unit 1 | 13 January 2006 | Lnservice Inspection Summary Report for Grand Gulf Nuclear Station Unit 1 | |
GNRO-2006/00044, Corrections to Inservice Inspection Summary Report | 10 August 2006 | Corrections to Inservice Inspection Summary Report | |
GNRO-2007/00046, Inservice Inspection Summary Report | 10 July 2007 | Inservice Inspection Summary Report | |
GNRO-2008/00057, Transmittal of Inservice Inspection Program Third 10-Year Interval, Revision 0 | 31 July 2008 | Transmittal of Inservice Inspection Program Third 10-Year Interval, Revision 0 | |
GNRO-2008/00071, Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 0 | 29 October 2008 | Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 0 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Aging Management Large early release frequency Scaffolding |
GNRO-2009/00004, Inservice Inspection Summary Report | 19 January 2009 | Inservice Inspection Summary Report | |
GNRO-2009/00070, Supplement to Request to Use Portion of Later Edition to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants for Main Steam Safety Relief Valve Inservice Testing | 14 December 2009 | Supplement to Request to Use Portion of Later Edition to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants for Main Steam Safety Relief Valve Inservice Testing | Incorporated by reference |
GNRO-2012/00110, Submittal of Inservice Inspection Summary Report | 11 September 2012 | Submittal of Inservice Inspection Summary Report | Weld Overlay Finite Element Analysis |
GNRO-2014/00043, Inservice Inspection Summary Report | 12 June 2014 | Inservice Inspection Summary Report | |
GNRO-2016/00033, Submittal of 2016 Inservice Inspection Summary Report | 20 June 2016 | Submittal of 2016 Inservice Inspection Summary Report | Squib FLEX |
GNRO-2017/00039, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages | 30 June 2017 | Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages | |
GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report | 16 October 2018 | Submittal of 2018 Inservice Inspection Summary Report | |
GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval | 30 November 2018 | Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval | Nondestructive Examination VT-2 Liquid penetrant Pressure Boundary Leakage |
GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval | 13 March 2019 | Snubber Testing Program for Fourth Inspection Interval | |
GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency | 1 June 2021 | Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency | Missed surveillance Power-Operated Valves |
ML040490179 | 18 December 2003 | to CEP-IST-2, Inservice Testing Plan, Entergy Nuclear South Central Engineering Programs | |
ML043220259 | 15 November 2004 | 12-Month Special Report SR-04-001-00 on the 12th Refueling Steam Generator Tube Inservice Inspection | |
ML051520070 | 31 May 2005 | E-Mail on Followup RAI: ANO-1 SG ISI Report for 1R18 | |
ML071150108 | 17 April 2007 | Request for Alternative ANO2-R&R-004, Revision 1, Request to Use Risk-Informed Safety Classification and Treatment for Repair/Replacement Activities in Class 2 and 3 Moderate Energy Systems | Safe Shutdown Probabilistic Risk Assessment |
ML081560726 | 21 May 2008 | CEP-ISI-104, Rev. 0, ASME Section XI, Division 1, Inservice Inspection Program. | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Aging Management Scaffolding |
ML081570002 | 27 June 2008 | Relief Request GGNS-ISI-004 to Extend 2nd 10-Year Inservice Inspection Interval 4 Months Beyond 1-year Extension Allowed by ASME Code | Incorporated by reference Dissimilar Metal Weld DM weld |
ML102250418 | 29 July 2010 | Steam Generator Tube Inspection Report - 1R22 | Nondestructive Examination |
ML103630579 | 29 December 2010 | Notification of Inspection (NRC Inspection Report 050-368/2011002) and Request for Information | Boric Acid Nondestructive Examination VT-2 |
ML14224A279 | 12 August 2014 | Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 19/Refuel 19 | Condition Adverse to Quality |
ML17242A237 | 30 August 2017 | Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 21 / Refuel 21 | |
ML17325B762 | 21 November 2017 | 180 Day Steam Generator Tube Inspection Report for the 21St Refueling Outage for Waterford Steam Electric Station, Unit 3 | Nondestructive Examination |
ML22034A899 | 3 February 2022 | Steam Generator Tube Inspection Reports in Support of TSTF-577 | Nondestructive Examination |