Category:Inservice/Preservice Inspection and Test Report
MONTHYEARW3F1-2024-0019, (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 252024-07-22022 July 2024 (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2022-0037, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242022-08-0808 August 2022 Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 ML22034A8992022-02-0303 February 2022 Steam Generator Tube Inspection Reports in Support of TSTF-577 W3F1-2021-0007, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 23 / Refuel 232021-01-29029 January 2021 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 23 / Refuel 23 W3F1-2019-0041, Submittal of Owner'S Activity Report Form for Lnservice Inspection Performed During Operating Cycle 22 / Refuel 222019-06-13013 June 2019 Submittal of Owner'S Activity Report Form for Lnservice Inspection Performed During Operating Cycle 22 / Refuel 22 W3F1-2019-0009, Proposed Inservice Inspection Program Alternative WF3-RR-19-1 for Application of Dissimilar Metal Weld Full Structural Weld Overlay - Reactor Coolant System Cold Leg Drain Nozzles2019-01-28028 January 2019 Proposed Inservice Inspection Program Alternative WF3-RR-19-1 for Application of Dissimilar Metal Weld Full Structural Weld Overlay - Reactor Coolant System Cold Leg Drain Nozzles W3F1-2017-0075, Submittal of the Inservice Testing Plan for the Fourth 10-Year Interval2017-12-0404 December 2017 Submittal of the Inservice Testing Plan for the Fourth 10-Year Interval W3F1-2017-0082, Submittal of the Inservice Inspection Plan and Containment Inservice Inspection Plan for the Fourth 10-Year Interval2017-12-0404 December 2017 Submittal of the Inservice Inspection Plan and Containment Inservice Inspection Plan for the Fourth 10-Year Interval ML17325B7622017-11-21021 November 2017 180 Day Steam Generator Tube Inspection Report for the 21St Refueling Outage for Waterford Steam Electric Station, Unit 3 ML17242A2372017-08-30030 August 2017 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 21 / Refuel 21 W3F1-2016-0017, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 20 / Refuel 202016-03-15015 March 2016 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 20 / Refuel 20 W3F1-2014-0041, 180 Day Steam Generator Tube Inspection Report for the 19TH Refueling Outage2014-11-0606 November 2014 180 Day Steam Generator Tube Inspection Report for the 19TH Refueling Outage ML14224A2792014-08-12012 August 2014 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 19/Refuel 19 W3F1-2013-0018, Request for Relief from American Society of Mechanical Engineers (ASME) Code, Section XI for the Third 10-year Interval - Inservice Inspection Request for Relief W3-ISI-0222013-08-27027 August 2013 Request for Relief from American Society of Mechanical Engineers (ASME) Code, Section XI for the Third 10-year Interval - Inservice Inspection Request for Relief W3-ISI-022 W3F1-2012-0099, Request for Alternative W3-1SI-021, ASME Code Case N-770-1 Baseline Examination Request for Alternative2012-11-30030 November 2012 Request for Alternative W3-1SI-021, ASME Code Case N-770-1 Baseline Examination Request for Alternative W3F1-2011-0072, Day Steam Generator Tube Inspection Report for the 17th Refueling Outage2011-11-0303 November 2011 Day Steam Generator Tube Inspection Report for the 17th Refueling Outage W3F1-2011-0013, Request for Alternative W3-ISI-018, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During the Third Ten-Year Inservice Inspection Interval2011-02-16016 February 2011 Request for Alternative W3-ISI-018, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During the Third Ten-Year Inservice Inspection Interval W3F1-2010-0023, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 16/Refuel 162010-03-0404 March 2010 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 16/Refuel 16 W3F1-2009-0062, Response to NRC Request for Additional Information for Alternative W3-ISI-016, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During Third Ten-Year Inservice Inspection Interval2009-11-0202 November 2009 Response to NRC Request for Additional Information for Alternative W3-ISI-016, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During Third Ten-Year Inservice Inspection Interval W3F1-2009-0059, Response to NRC Request for Additional Information Regarding Request for Alternative W3-ISI-015, Inspection of Reactor Vessel Head In-Core Instrument Nozzles During Third Ten-Year Inservice Inspection Interval2009-11-0202 November 2009 Response to NRC Request for Additional Information Regarding Request for Alternative W3-ISI-015, Inspection of Reactor Vessel Head In-Core Instrument Nozzles During Third Ten-Year Inservice Inspection Interval CNRO-2009-00002, Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval2009-03-0404 March 2009 Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval ML0815607262008-05-21021 May 2008 CEP-ISI-104, Rev. 0, ASME Section XI, Division 1, Inservice Inspection Program. CNRO-2008-00016, Relief Requests for Third 120 Month Inservice Testing Interval2008-05-20020 May 2008 Relief Requests for Third 120 Month Inservice Testing Interval 1CAN030804, Revised Relief Request for 10 Year Update to the 120 Month Inservice Testing Interval, Arkansas Nuclear One, Unit 12008-03-13013 March 2008 Revised Relief Request for 10 Year Update to the 120 Month Inservice Testing Interval, Arkansas Nuclear One, Unit 1 CNRO-2007-00044, Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan2007-11-30030 November 2007 Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan CNRO-2007-00042, Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals2007-11-29029 November 2007 Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals W3F1-2007-0046, Request for Alternative W3-ISI-005, Request to Use ASME Code Case N-7162007-10-18018 October 2007 Request for Alternative W3-ISI-005, Request to Use ASME Code Case N-716 W3F1-2007-0014, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Refueling Outage 142007-03-27027 March 2007 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Refueling Outage 14 W3F1-2006-0024, 12-Month Special Report SR-06-001-00 on the 13th Refueling Steam Generator Tube Inservice Inspection, Waterford Unit 32006-05-17017 May 2006 12-Month Special Report SR-06-001-00 on the 13th Refueling Steam Generator Tube Inservice Inspection, Waterford Unit 3 W3F1-2005-0060, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Refueling Outage 13 Waterford Steam Electric Station, Unit 32005-09-22022 September 2005 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Refueling Outage 13 Waterford Steam Electric Station, Unit 3 ML0432202592004-11-15015 November 2004 12-Month Special Report SR-04-001-00 on the 12th Refueling Steam Generator Tube Inservice Inspection W3F1-2004-0010, Submittal of Owners Activity Report Forms for Inservice Inspection Performed During Refueling Outages 11 and 122004-02-17017 February 2004 Submittal of Owners Activity Report Forms for Inservice Inspection Performed During Refueling Outages 11 and 12 ML0404901792003-12-18018 December 2003 to CEP-IST-2, Inservice Testing Plan, Entergy Nuclear South Central Engineering Programs W3F1-2003-0021, 12-Month Special Report SR-03-001-00 on the 11th Refueling Steam Generator Tube Inservice Inspection2003-04-10010 April 2003 12-Month Special Report SR-03-001-00 on the 11th Refueling Steam Generator Tube Inservice Inspection CNRO-2003-00009, Entergy Operations, Referenced Paper for Request to Use ASME Code Case N-6632003-03-14014 March 2003 Entergy Operations, Referenced Paper for Request to Use ASME Code Case N-663 2024-07-22
[Table view] Category:Letter
MONTHYEARIR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 IR 05000382/20230042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24141A1012024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure2024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 05000382/LER-2023-004, Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement2024-02-14014 February 2024 Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 05000382/LER-2023-003, Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing2023-12-30030 December 2023 Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000382/20230032023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 2024-09-06
[Table view] |
Text
Entergy Operations, Inc.
1 7265 River Road Killona, LA 70057-3093 En tergy Tel 504-739-6685 Fax 504-739-6698 jjarrelentergy.com John P. Jarrell Regulatory Assurance Manager Waterford 3 W3FI -2014-0044 August 12, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 19 I Refuel 19 Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
Attached is the subject report which covers the Owners Activity Report Form, OAR-I for Waterford 3 Operating Cycle I 9 I Refuel I 9, enclosed as Attachment I This report is being submitted in accordance with ASME Code Case N-532-4, Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, which was adopted for use at Waterford 3 commencing with the new Ten-Year Inservice Inspection (151) interval on June I 2008.
The OAR-I form is prepared and certified upon completion of each refueling outage and submitted within 90 calendar days of the completion of the refueling outage. This OAR-I form provides: (I) a listing of items with flaws or relevant conditions that exceeded the acceptance criteria of Division I and that required evaluation to determine acceptability for continued service and (2) an abstract for repair/replacement activities that were required due to an item containing a flaw or relevant condition that exceeded Division I acceptance criteria. A copy of this letter and the attached report is also being submitted to the office of the Louisiana State Fire Marshall.
There are no new commitments contained in this submittal.
Please contact John P. Jarrell, Regulatory Assurance Manager at (504) 739-6685 should you have any questions regarding this submittal.
Si
Attachment:
I . Owners Activity Report for lnservice Inspection Performed During Operating Cycle 19 / Refuel 19
cc: Regional Administrator RidsRgn4MaiICenternrc.gov U. S. Nuclear Regulatory Commission Region IV NRC Senior Resident Inspector Frances.Ramireznrc.gov Waterford Steam Electric Station Unit 3 Chris.Speernrc.gov U. S. Nuclear Regulatory Commission Michael.Orenaknrc.gov Mr. H. Butch Browning, Jr.
Office of the State Fire Marshall 8181 Independence Blvd.
Baton Rouge, LA 70806
Attachment I To W3FI -2014-0044 Owners Activity Report for Inservice Inspection Performed During Operating Cycle 19 I Refuel 19 3
CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-I OWNERS ACTIVITY REPORT ReportNumber CycIel9/ Refuel 19 Plant Waterford Steam Electric Station, 17265 River Road, Killona, La. 70057 Unit No. 3 Commercial service date 09/24/1985 Refueling outage no. 19 (If applicable)
Current inspection interval 3rd sd 1
n 2 t rd 4 3 th
( other)
Current inspection period 2nd
( 1st,2, 3rd)
Edition and Addenda of Section Xl applicable to the inspection plans 2001 Edition, Through 2003 Addenda Date and revision of inspection plans 3/12/14 Revision 002 SEP-lSl-104 Edition and Addenda of Section Xl applicable to repairlreplacement activities, if different than the inspection plans Same as above.
Code Cases used: N-532-4 (If applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repairlreplacement activities and evaluations supporting the completion of Refuel 19 (refueling outage number) conform to the requirements of Section Xl.
Signed Date Owner or Owners Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Louisiana and employed by HSB Global Standards of Hartford, CT have inspected the items described in this Owners Activity Report and state that, to the best of my knowledgeand belief, the Owner has performed all activities represented by this report in Accordance with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair!
replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
7
,4ti:/7 Commissions LA 1184 (A, N, I)
Inspectors Signature National Board, State, Province, and Endorsements Date 4
CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE I ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None None None 5
CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Description of Date Repair/Replacement Code Class Item Description Work Completed Plan Number RFRMCHL000I B Replace corroded 3 (ESSENTIAL CHILLER 06/18/2013 13-RR-003 piping B)
RFRMCHL000I C Replace corroded 3 (ESSENTIAL CH ILLER 08/1 4/201 3 1 3-RR-004 piping C)
RFRMCHL000I A Replace corroded 3 (ESSENTIAL CHILLER 10/08/2013 13-RR-005 piping A)
SI MVAAA5I2 B (REACTOR COOLANT LOOP 2 HOT LEG Replace Valve 04/28/2014 13-RR-18 INJECTION CHECK VALVE) 3CCI 1/2-35 (REACTOR COOLANT Replace corroded 3 PUMP2B 04/26/2014 13-RR-019 piping SEALCOOLER INLET FAIL_SAFE_TUBING)
FW MVAAAI 861 (FEEDWATER TO SG 2 INSIDE 2 Modify drain valve 05/21/2014 13-RR-020 CONTAINMENT UPSTREAM DRAIN ISOLATION_VALVE)
FW MVAAAI85 A (FEEDWATER TO SG 2 1 INSIDE Modifyventvalve 05/02/2014 13-RR-021 CONTAINMENT VENT ISOLATION_VALVE)
FW MVAAAI85 B (FEEDWATERTO SG 2 2 INSIDE Modify vent valve 04/28/2014 13-RR-022 CONTAINMENT VENT ISOLATION_VALVE)
FW MVAAAI88 A (FEEDWATER TO SG I INSIDE CONT 2 Modify drain valve 05/03/2014 13-RR-023 DOWN STREAM DRAIN ISOLATION VALVE) 6
TABLE 2 (Continued)
ABSTRACT OF REPAIRIREPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Description of Date RepairlReplacement Code Class Item Description Work Completed Plan Number FW MVAAAI88 B (FEEDWATER TO SG 2 INSIDE 2 CONTAINMENT Modify drain valve 04/28/2014 13-RR-024 DOWN STREAM DRAIN ISOLATION VALVE)
FW MVAAAI86I A (FEEDWATER TO SG I INSIDE 2 Modify drain valve 05/21/2014 13-RR-025 CONTAINMENT UP STREAM DRAIN ISOLATION)
MS MVAAAI24 B Rework leak at vent 2 (MAIN STEAM 05/04/2014 13-RR-027 plug ISOLATION VALVE 2)
FWRR-6021 (FEEDWATER RIGID RESTRAI NT)
& Install new pipe 3 07/24/201 3 1 3-RR-035 FWSR-345 restraints (FEEDWATER HYDRAULIC SNUBBER)
CCRR-1 I 83 (COMPONENT Replace corroded 3 05/04/201 4 1 3-RR-039 COOLING WATER base plate support RIGID_RESTRAINT)
SG MSG0002 (STEAM Plugged 4 Steam 05/02/2014 14-RR-004 GENERATOR 2) Generator tubes FWSH-1 6 2 (FEEDWATER Replace eye-rod See Note I 14-RR-006 SPRING_HANGER)
FWSR-8 A Repairweld and 2 (FEEDWATER 05/08/201 4 1 4-RR-O1 0 modify support.
SNUBBER)
Note I .) Work was completed 5/8/1 4, but material traceability was not estabhshed in accordance with Entergys processes, and therefore an NIS-2A could not be signed. CR-WF3-2014-4114 documents this issue and will resolve the condition adverse to quality.
7