Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util16 September 1999Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util
05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I17 September 1999Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment IMissed surveillance
ML17352A33710 December 1993Forwards Info Westinghouse Recently Transmitted to Util Customers on Info Notice 93-082 Re Fuel & Core Performance Issues
ML19207B69325 July 1979FOIA Request for All Documents Re Request from NRC to Army Corps of Engineers Concerning Concrete Used in Base Mat at Facility
ML19208A67311 September 1979Forwards Response to Questions 1-20 Re Application for Amend of CPPR-147 Filed on 790730
ML19208B34630 July 1979Responds to IE Bulletin 79-03.No ASME SA-312 Type 304 Fusion Welded Stainless Steel Pipe Spools Mfg by Youngstown Welding & Engineering Co Have Been Purchased
ML19208B49827 July 1979Describes Alleged Incidents Re Use of Iron at Facility & Possible Delivery of Reject Iron to Callaway Plant from Wolf Creek Plant.Requests Confirmation
ML19208D49228 February 1979Forwards Reactor Basement Concrete Second Testing Program, Prepared by Const Technology Labs of Portland Cement Association
ML19208D82622 August 1979Expresses Concern at NRC Delay in Making Decision Re Base Mat.Also Expresses Lack of Faith in NRC Decisions
ML19209A39410 September 1979Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies, Re safety-related Application,Mfg & Overall Dimensions
ML19209A51628 September 1979Forwards First Deficiency Rept Re Qualification of Control Sys.Next Rept Will Be Submitted in Approx Three Months
ML19209B31812 June 1979Provides Basis for Interpretation That Length of Time to Conduct User Test of Cement Samples Did Not Violate ASTM C-150.Ltrs Confirming Test Findings Encl
ML19209B9635 October 1979Forwards Addl Financial Info Requested 790827 Re Amend to CPPR-147.Certificate of Svc Encl
ML19209C0042 October 1979Forwards Snupps 791002 Ltr,Which Forwarded FSAR to Be Incorporated Into License Application.W/O Encl.Balance of Documentation Will Be Filed in Jan 1980
ML19209C2202 October 1979Forwards Snupps FSAR to Be Incorporated Into Applications for OLs
ML19211A4241 November 1979Submits Generic Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Seismic Analysis Input Info Conforms to Actual as-built Configuration of safety-related Sys
ML19211D27514 January 1980Discusses NRC Delay in Review of FSAR & OL Application. Review Schedule Should Be Established Promptly
ML19224C63620 May 1979Endorses Revocation of CP
ML19224C72715 May 1979Forwards Ks Bldg & Const Trades Council Request for Order to Show Cause Why CP Should Not Be Revoked
ML19224D12018 May 1979Opposes Facility Const
ML19224D35617 May 1979Confirms 790629 Deadline for Response to IE Bulletins 78-12,78-12A & 78-12B
ML19225A18613 July 1979Forwards Interim Significant Deficiency Rept on Flood Damage
ML19225B0368 June 1979Responds to NRC 790426 Ltr Re Violation Noted in IE Insp Rept 50-482/79-01.Corrective Actions:When Only One Placement Being Made,Truck Following Text Load Will Be Held at Point of Placement
ML19225B24718 July 1979Requests Substitution of Hh Voigt for Ae Upton on NRC 790713 Distribution List
ML19225B82029 May 1979Responds to IE Bulletins 79-04 & 79-07.Correct Velan Valve Weights Used in Piping Analyses.All Computer Codes Used in Seismic Stress Analysis of safety-related Piping Verified
ML19225C34118 June 1979Responds to NRC 790517 Ltr Re Violations Noted in IE Insp Rept 50-482/79-08.Corrective Actions:Area Supervisors Directed to Perform Addl Training of PersonnelUltimate heat sink
ML19225C52830 July 1979Forwards Util Application for Amend of CPPR-147 to Include Ks Electric Power Cooperative as co-owner of Facility
ML19241A71429 June 1979Reaffirms 790119 Request to Suspend Facility CP for Inadequate QC of Containment Bldg Basemat.New Info Re Seismic Disturbances Should Also Be ConsideredSafe Shutdown
Safe Shutdown Earthquake
Earthquake
ML19241B10811 May 1979Responds to IE Bulletin 79-03 Re ASME SA-312 Type 304 Stainless Steel Pipe Spools.Interim Rept Re Use or Potential Use to Be Sent by 790810
ML19241C09720 June 1979Forwards Addl Info to 790425 Ltr Re Preassembly Welds. Observed Condition Was Documented in Nonconformance Rept 1SN0863M.Problem Caused by Interior Diameter Counter Bore Ridge.Parts Were Replaced
ML19242B11429 June 1979Responds to IE Bulletins 78-12,12A & 12B.C-E Submitted Rept Containing Info Requested Re Atypical Weld Matl in Reactor Pressure Vessel Welds.Westinghouse Will Inventory Archive Surveillance Weldment Matl to Be Used for Verification
ML19242C54111 May 1979Responds to NRC 790411 Ltr Re Violation Noted in IE Insp Rept 50-482/79-04.Corrective Actions:Qc Personnel in Concrete Lab Curing Room Have Been Instructed Re Temp Deficiency Rept Initiation
ML19242D1249 August 1979Forwards Explanation for & Correction of Errors in 790427 Rept Re Reactor Basemat Concrete Rept Forwarded on 790503
ML19242D48229 June 1979Renews 790119 Request for CP Suspension Due to QC Problems Re Reactor Containment Bldg Base Mat.Discusses Seismic Character of Area.Reanalysis of Concrete Strength Does Not Consider Normal DeteriorationSafe Shutdown
Safe Shutdown Earthquake
Earthquake
ML19242D7495 July 1979Forwards Project Examination of Concrete Samples from Reactor Containment Bldg Base Mat Ks, Performed by Army Corps of Engineers
ML19247A10029 May 1979Revises Status of Deficiency Rept Re Essential Svc Water Pump Anchor Bolts.Investigation Revealed Bolts,As Presently Specified,Are of Sufficient Length to Provide Safe Design
ML19247B2965 July 1979Forwards Rept on Pipe-Support Base Plate Designs Using Concrete Expansion Anchor Bolts, in Response to IE Bulletin 79-02.Response Is Result of Review Design & Installation Practices & Procedures for Anchor Bolts
ML19248C83329 June 1979Advises of New Determinations Re Seismic Character of Area & Renews Request for Partial Suspension of CP
ML19248D3469 August 1979Advises That Util Intends to Replace Criteria Specified in Fes W/Limitations Set Forth in NPDES Permit,Effective 790831.Change Will Resolve Conflicts & Inconsistencies
ML19249A06524 July 1979Responds to IE Bulletin 79-11.No Westinghouse Type DB-50 or 75 Circuit Breakers Included in Any safety-related Applications
ML19249C75211 September 1979Ack Receipt of NRC 790827 Ltr Requesting Addl Financial Info.Response Date Will Be Forwarded within Several Days
ML19249D9768 August 1979Forwards Ks Bldg & Const Trades Council 790730 Ltr to Eb Staats Re Problem W/Concrete in Base Mat of Facility
ML19249E12021 June 1979Responds to NRC 790517 Ltr Re Deviation Noted in IE Insp Rept 50-482/79-08.Corrective Actions:Radiographic Examination Shall Be Performed in Accordance with Article 3 of Section V of ASME Code,1974 Edition
ML19249E80525 September 1979Responds to 790911 Request for Addl Financial Info Re Util. Plans to Submit Info by 791005
ML19249E87816 July 1979Requests Revocation of Approval of Lowered Stds for Concrete Base Mats & Enlistment of Unbiased Private Specialist to Analyze Mats
ML19250A64528 September 1979Notifies That Licensee Informed NRC on 790830 of Potential Deficiency Re Qualification of Control Sys Which Was Later Subj of IE Info Notice 79-22.Suppl Rept Will Be Issued in About 90 Days
ML19253B25928 September 1979Confirms Telcons W/Nrc Re NRC Fuel Load Forecast Visit to Site.Plans to Submit Completed OL Application Documents in Jan 1980 Are Unchanged
ML19253B3919 October 1979Responds to 790921 Memo Re 791129-30 Meeting W/Util to Discuss Facility Const Schedule.Submits Names of Mo Public Svc Commission Members at Meeting
ML19253C59626 October 1979Responds to IE Bulletin 79-23 Re Potential Failure of Emergency Diesel Generator Field Exciter Transformer.Problem Not Applicable to Snupps Diesel Generators
ML19253C60111 September 1979Discusses Investigation of Use of Albi Duraspray Fireproofing Matl.No Damage Caused by Duraspray Matl. Tests & Analyses of Duraspray & Potential Alternate Matl Will Continue