Issue date | Title | Topic | |
---|---|---|---|
05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util | 16 September 1999 | Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util | |
05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I | 17 September 1999 | Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I | Missed surveillance |
ML17352A337 | 10 December 1993 | Forwards Info Westinghouse Recently Transmitted to Util Customers on Info Notice 93-082 Re Fuel & Core Performance Issues | |
ML19207B693 | 25 July 1979 | FOIA Request for All Documents Re Request from NRC to Army Corps of Engineers Concerning Concrete Used in Base Mat at Facility | |
ML19208A673 | 11 September 1979 | Forwards Response to Questions 1-20 Re Application for Amend of CPPR-147 Filed on 790730 | |
ML19208B346 | 30 July 1979 | Responds to IE Bulletin 79-03.No ASME SA-312 Type 304 Fusion Welded Stainless Steel Pipe Spools Mfg by Youngstown Welding & Engineering Co Have Been Purchased | |
ML19208B498 | 27 July 1979 | Describes Alleged Incidents Re Use of Iron at Facility & Possible Delivery of Reject Iron to Callaway Plant from Wolf Creek Plant.Requests Confirmation | |
ML19208D492 | 28 February 1979 | Forwards Reactor Basement Concrete Second Testing Program, Prepared by Const Technology Labs of Portland Cement Association | |
ML19208D826 | 22 August 1979 | Expresses Concern at NRC Delay in Making Decision Re Base Mat.Also Expresses Lack of Faith in NRC Decisions | |
ML19209A394 | 10 September 1979 | Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies, Re safety-related Application,Mfg & Overall Dimensions | |
ML19209A516 | 28 September 1979 | Forwards First Deficiency Rept Re Qualification of Control Sys.Next Rept Will Be Submitted in Approx Three Months | |
ML19209B318 | 12 June 1979 | Provides Basis for Interpretation That Length of Time to Conduct User Test of Cement Samples Did Not Violate ASTM C-150.Ltrs Confirming Test Findings Encl | |
ML19209B963 | 5 October 1979 | Forwards Addl Financial Info Requested 790827 Re Amend to CPPR-147.Certificate of Svc Encl | |
ML19209C004 | 2 October 1979 | Forwards Snupps 791002 Ltr,Which Forwarded FSAR to Be Incorporated Into License Application.W/O Encl.Balance of Documentation Will Be Filed in Jan 1980 | |
ML19209C220 | 2 October 1979 | Forwards Snupps FSAR to Be Incorporated Into Applications for OLs | |
ML19211A424 | 1 November 1979 | Submits Generic Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Seismic Analysis Input Info Conforms to Actual as-built Configuration of safety-related Sys | |
ML19211D275 | 14 January 1980 | Discusses NRC Delay in Review of FSAR & OL Application. Review Schedule Should Be Established Promptly | |
ML19224C636 | 20 May 1979 | Endorses Revocation of CP | |
ML19224C727 | 15 May 1979 | Forwards Ks Bldg & Const Trades Council Request for Order to Show Cause Why CP Should Not Be Revoked | |
ML19224D120 | 18 May 1979 | Opposes Facility Const | |
ML19224D356 | 17 May 1979 | Confirms 790629 Deadline for Response to IE Bulletins 78-12,78-12A & 78-12B | |
ML19225A186 | 13 July 1979 | Forwards Interim Significant Deficiency Rept on Flood Damage | |
ML19225B036 | 8 June 1979 | Responds to NRC 790426 Ltr Re Violation Noted in IE Insp Rept 50-482/79-01.Corrective Actions:When Only One Placement Being Made,Truck Following Text Load Will Be Held at Point of Placement | |
ML19225B247 | 18 July 1979 | Requests Substitution of Hh Voigt for Ae Upton on NRC 790713 Distribution List | |
ML19225B820 | 29 May 1979 | Responds to IE Bulletins 79-04 & 79-07.Correct Velan Valve Weights Used in Piping Analyses.All Computer Codes Used in Seismic Stress Analysis of safety-related Piping Verified | |
ML19225C341 | 18 June 1979 | Responds to NRC 790517 Ltr Re Violations Noted in IE Insp Rept 50-482/79-08.Corrective Actions:Area Supervisors Directed to Perform Addl Training of Personnel | Ultimate heat sink |
ML19225C528 | 30 July 1979 | Forwards Util Application for Amend of CPPR-147 to Include Ks Electric Power Cooperative as co-owner of Facility | |
ML19241A714 | 29 June 1979 | Reaffirms 790119 Request to Suspend Facility CP for Inadequate QC of Containment Bldg Basemat.New Info Re Seismic Disturbances Should Also Be Considered | Safe Shutdown Safe Shutdown Earthquake Earthquake |
ML19241B108 | 11 May 1979 | Responds to IE Bulletin 79-03 Re ASME SA-312 Type 304 Stainless Steel Pipe Spools.Interim Rept Re Use or Potential Use to Be Sent by 790810 | |
ML19241C097 | 20 June 1979 | Forwards Addl Info to 790425 Ltr Re Preassembly Welds. Observed Condition Was Documented in Nonconformance Rept 1SN0863M.Problem Caused by Interior Diameter Counter Bore Ridge.Parts Were Replaced | |
ML19242B114 | 29 June 1979 | Responds to IE Bulletins 78-12,12A & 12B.C-E Submitted Rept Containing Info Requested Re Atypical Weld Matl in Reactor Pressure Vessel Welds.Westinghouse Will Inventory Archive Surveillance Weldment Matl to Be Used for Verification | |
ML19242C541 | 11 May 1979 | Responds to NRC 790411 Ltr Re Violation Noted in IE Insp Rept 50-482/79-04.Corrective Actions:Qc Personnel in Concrete Lab Curing Room Have Been Instructed Re Temp Deficiency Rept Initiation | |
ML19242D124 | 9 August 1979 | Forwards Explanation for & Correction of Errors in 790427 Rept Re Reactor Basemat Concrete Rept Forwarded on 790503 | |
ML19242D482 | 29 June 1979 | Renews 790119 Request for CP Suspension Due to QC Problems Re Reactor Containment Bldg Base Mat.Discusses Seismic Character of Area.Reanalysis of Concrete Strength Does Not Consider Normal Deterioration | Safe Shutdown Safe Shutdown Earthquake Earthquake |
ML19242D749 | 5 July 1979 | Forwards Project Examination of Concrete Samples from Reactor Containment Bldg Base Mat Ks, Performed by Army Corps of Engineers | |
ML19247A100 | 29 May 1979 | Revises Status of Deficiency Rept Re Essential Svc Water Pump Anchor Bolts.Investigation Revealed Bolts,As Presently Specified,Are of Sufficient Length to Provide Safe Design | |
ML19247B296 | 5 July 1979 | Forwards Rept on Pipe-Support Base Plate Designs Using Concrete Expansion Anchor Bolts, in Response to IE Bulletin 79-02.Response Is Result of Review Design & Installation Practices & Procedures for Anchor Bolts | |
ML19248C833 | 29 June 1979 | Advises of New Determinations Re Seismic Character of Area & Renews Request for Partial Suspension of CP | |
ML19248D346 | 9 August 1979 | Advises That Util Intends to Replace Criteria Specified in Fes W/Limitations Set Forth in NPDES Permit,Effective 790831.Change Will Resolve Conflicts & Inconsistencies | |
ML19249A065 | 24 July 1979 | Responds to IE Bulletin 79-11.No Westinghouse Type DB-50 or 75 Circuit Breakers Included in Any safety-related Applications | |
ML19249C752 | 11 September 1979 | Ack Receipt of NRC 790827 Ltr Requesting Addl Financial Info.Response Date Will Be Forwarded within Several Days | |
ML19249D976 | 8 August 1979 | Forwards Ks Bldg & Const Trades Council 790730 Ltr to Eb Staats Re Problem W/Concrete in Base Mat of Facility | |
ML19249E120 | 21 June 1979 | Responds to NRC 790517 Ltr Re Deviation Noted in IE Insp Rept 50-482/79-08.Corrective Actions:Radiographic Examination Shall Be Performed in Accordance with Article 3 of Section V of ASME Code,1974 Edition | |
ML19249E805 | 25 September 1979 | Responds to 790911 Request for Addl Financial Info Re Util. Plans to Submit Info by 791005 | |
ML19249E878 | 16 July 1979 | Requests Revocation of Approval of Lowered Stds for Concrete Base Mats & Enlistment of Unbiased Private Specialist to Analyze Mats | |
ML19250A645 | 28 September 1979 | Notifies That Licensee Informed NRC on 790830 of Potential Deficiency Re Qualification of Control Sys Which Was Later Subj of IE Info Notice 79-22.Suppl Rept Will Be Issued in About 90 Days | |
ML19253B259 | 28 September 1979 | Confirms Telcons W/Nrc Re NRC Fuel Load Forecast Visit to Site.Plans to Submit Completed OL Application Documents in Jan 1980 Are Unchanged | |
ML19253B391 | 9 October 1979 | Responds to 790921 Memo Re 791129-30 Meeting W/Util to Discuss Facility Const Schedule.Submits Names of Mo Public Svc Commission Members at Meeting | |
ML19253C596 | 26 October 1979 | Responds to IE Bulletin 79-23 Re Potential Failure of Emergency Diesel Generator Field Exciter Transformer.Problem Not Applicable to Snupps Diesel Generators | |
ML19253C601 | 11 September 1979 | Discusses Investigation of Use of Albi Duraspray Fireproofing Matl.No Damage Caused by Duraspray Matl. Tests & Analyses of Duraspray & Potential Alternate Matl Will Continue |