Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML11255A306 | 1 April 2010 | Email from R. Guzman, NRR/DORL/LPL1-1 to J. Yerokun, Res/Dsa/Spb, Et. Al., Subject: Soarca Documents for Review by Peach Bottom Atomic Power Station | |
ML11255A307 | 1 April 2010 | Email from R. Guzman, NRR/DORL/LPL1-1 to J. Yerokun, Res/Dsa/Spb, Et. Al., Subject: Soarca Documents for Review by Peach Bottom Atomic Power Station | |
ML11255A308 | 12 April 2010 | Email from R. Guzman, NRR/DORL/LPL1-1 to J. Yerokun, Res/Dsa/Spb, Et. Al, Subject: FW: Soarca Documents for Review by Peach Bottom Atomic Power Station | |
ML11255A314 | 4 May 2010 | Email from R. Guzman, NRR/DORL/LPL1-1 to S. Elkins, Res/Dsa/Rsab, and J. Hughey NRR/DORL/LPL1-2, Subject: Peach Bottom SRV Drawings and Specs | |
ML11255A315 | 6 May 2010 | Email from R. Guzman, NRR/DORL/LPL1-1 to S. Elkins, Res/Dsa/Rsab, and J. Hughey NRR/DORL/LPL1-2, Subject: Peach Bottom SRV Drawings and Specs | |
ML11255A316 | 8 June 2010 | Email from R. Guzman, NRR/DORL/LPL1-1 to S. Elkins, Res/Dsa/Rsab, Et. Al., Subject: Communication Plan - Rev 5 - Dse (1) | |
ML11255A346 | 13 January 2011 | Email from R. Guzman, NRR/DORL/LPLI-1 to R. Chang, Res/Dsa/Spb, and K. Cotton, NRO/DORL/LPL2-1 Subject: Re Trip to Surry | |
ML11256A283 | 18 March 2010 | Email from R. Guzman, NRR/DORL/LPL1-1 to S. Elkins, Res/Dsa/Rsab, Subject: Soarca Team Meeting - Agenda and Other Attachments | |
ML11256A284 | 23 March 2010 | Email from R. Guzman, NRR/DORULPL1-1 to S. Elkins, Res/Dsa/Rsab, Subject: Soarca Plant Calls | |
ML11256A290 | 12 August 2010 | Email from R. Guzman, NRR/DORL/LPL1-1 to J. Barr, Res/Dsa/Spb, Subject: FW: Soarca Weekly Team Meeting | |
ML11256A292 | 8 June 2010 | Email from R. Guzman, NRR to S. Elkins, RES; Subject: Peach Bottom Soarca Site Visit | B.5.b Mitigating Strategies |
ML113400338 | 6 December 2011 | Supplemental Information Required for Peach Bottom November 3, 2011, Submittal (TAC Nos. ME7538 & ME7539) | |
ML113410054 | 2 December 2011 | EPU Public Meeting Slides (Exelon) | |
ML12011A119 | 5 January 2012 | NRR E-mail Capture - Preliminary Request for Additional Information Regarding Proposed Alternative to Utilize ASME Code Case N-789 - ME7303 - ME7319 | |
ML12024A518 | 5 August 2010 | E-mail from R. Bavol, Secy to J. Giessner, Region III; Subject: Response: Possible Future Commission Meetings | |
ML12033A188 | 3 June 2010 | E-mail from R. Prato, Region I to R. Powell, Region I; Subject: Peach Bottom Soarca Site Visit | |
ML12033A189 | 3 June 2010 | E-mail from R. Powell, Region I to R. Prato, Region I; Subject: Peach Bottom Soarca Site Visit | |
ML12033A190 | 4 June 2010 | E-mail from F. Bower, Region I to R. Powell, Region I; Subject: Peach Bottom Soarca Site Visit | |
ML12033A192 | 4 June 2010 | E-mail from C. Cahil, Region I to J. Rogge, Region I; Subject: FW: Peach Bottom Soarca Site Visit | |
ML12033A193 | 4 June 2010 | E-mail from C. Cahil, Region I to G. Replogle, Region IV; Subject: FW: Peach Bottom Soarca Site Visit | |
ML12033A194 | 9 June 2010 | E-mail from F. Bower, Region I to C. Tinkler, RES; Subject: Peach Bottom Soarca Site Visit | |
ML12033A195 | 3 June 2010 | E-mail from R. Powell, Region I to R. Prato, Region I; Subject: Peach Bottom Soarca Site Visit | |
ML12033A196 | 4 June 2010 | E-mail from F. Bower, Region I to R. Powell, Region I; Subject: Peach Bottom Soarca Site Visit | |
ML12033A232 | 4 June 2010 | E-mail from F. Bower, Region I to R. Powell, Region I; Subject: Peach Bottom Soarca Site Visit | |
ML12033A233 | 4 June 2010 | E-mail from F. Bower, Region I to R. Prato, Region I; Subject: Peach Bottom Soarca Site Visit | |
ML12033A234 | 4 June 2010 | E-mail from F. Bower, Region I to R. Prato, Region I; Subject: Peach Bottom Soarca Site Visit | |
ML12041A402 | 23 August 2011 | E-mail from G. Kulesa, NRR to P. Boyle, NRR Earthquake in Yorl, PA at 13.53 Hr | Earthquake |
ML120550537 | 24 February 2012 | Draft RAIs for SFP Rack Insert LAR (ME7538/ME7539) | |
ML121500038 | 29 May 2012 | Acceptance Review for TACs ME8535 and ME8536 - Peach Bottom Units 2 and 3 - Relocation of P-T Limits to PTLR | Pressure and Temperature Limits Report |
ML121660040 | 12 June 2012 | 2.206 Request | |
ML122220352 | 9 August 2012 | Acceptance Review for TACs ME9085 and ME9086 - Peach Bottom Units 2 and 3 - Normal Heat Sink Operability Requirements | |
ML12223A325 | 7 January 2011 | Email to: Kyle Wayne Ross, (Kwross@Sandia.Qov), from: Jason Schaperow, (Res/Dsa), Subject: RES Management | |
ML122290347 | 16 August 2012 | Request for Additional Information Regarding July 13, 2012 Security Plan Submittal | |
ML122480071 | 4 September 2012 | Acceptance Review for TACs ME9443 and ME9444 - Peach Bottom Units 2 and 3 - License Amendment Request to Add LCO 3.0.8 | |
ML122610529 | 17 September 2012 | E-mail Regarding Acceptance Review for License Amendment Request to Add RHR Drywell Spray TS | |
ML12262A507 | 21 June 2012 | Region I Quarterly Inspection Report Feeders_2QCY12 | |
ML12296A653 | 13 October 2012 | G20120819 - Michael Mulligan E-mail 2.206 on Not Quailified Componets in Containment with VY and Peach Bottom | |
ML12321A086 | 8 November 2012 | Supplement - 2.206 Petition from Michael Mulligan Peach Bottom 2 and 3 - 2.206 Petition on SRV | |
ML12348A409 | 13 December 2012 | NRR E-mail Capture - Clarification of Request for Additional Information Related to Exelon Physical Security Plan Submittals (Correction) | |
ML13177A404 | 26 June 2013 | E-mail from J. Davis (NRC) to J. Schrage (Exelon) Peach Bottom Request for Exemption - Acceptance | Exemption Request |
ML13199A414 | 18 July 2013 | Acceptance Review for TACs MF1970 and MF1971 - Peach Bottom Units 2 and 3 - License Amendment Request to Increase the Safety Relief Valve/Safety Valve Setpoint Tolerance | |
ML13204A248 | 19 July 2013 | Decommissioning Funding Status Report RAIs for Hope Creek and Peach Bottom | |
ML13231A029 | 19 August 2013 | Acceptance Review for TACs MF2509 and MF2510 - Peach Bottom Units 2 and 3 - Relief Request 01A-VRR-3 | |
ML13242A000 | 23 August 2013 | NRR E-mail Capture - Acceptance Review for License Amendment Request to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs | Shutdown Margin |
ML13268A509 | 25 September 2013 | NRR E-mail Capture - Seismic Walkdown Delayed Items | |
ML13269A025 | 6 September 2013 | 9/6/2013, E-Mail from J. Nguyen to Mr. Janiti Draft Peach Bottom EA for Your Review | Exemption Request |
ML13269A059 | 9 September 2013 | 9/09/2013, E-mail from B. A. Fuller to John-Chau Nguyen PA DEP Comments on Draft EA | Exemption Request |
ML13269A127 | 19 September 2013 | 9/19/2013, E-Mail from J. Nguyen to T. Levering Draft - Peach Bottom ISFSI EA for Your Review | Exemption Request |
ML13290A561 | 9 October 2013 | NRR E-mail Capture - Acceptance Review for Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | |
ML13290A564 | 9 October 2013 | NRR E-mail Capture - Acceptance Review for Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 1 |