ML14071A477 | 26 February 2014 | Report of Potential Defect Per 1OCFR Part 21 Primary Disconnect Assembly | |
ML14079A028 | 13 March 2014 | Part 21 - Allen Bradley Type 700RTC Relay Spuriously De-Energizing | Unanalyzed Condition |
ML14101A342 | 10 April 2014 | Notification of Part 21 - Potential Defect in General Electric SB1 Switches and Hea Relays | |
ML14101A467 | 11 April 2014 | (Waterford 3)- Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation | |
ML14169A030 | 15 June 2014 | Update to Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 | |
ML14170A013 | 9 June 2014 | Part 21 (Event 50025) - Barton Model 288A and 289A Differential Pressure Switch Defect | |
ML14171A356 | 12 June 2014 | Masoneilan Actuators Discovered to Fail-Closed Instead of the Required Fail-Open Configuration | Unanalyzed Condition Fitness for Duty |
ML14237A121 | 15 August 2014 | Notification of Potential Part 21 Re Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch | |
ML14261A150 | 17 September 2014 | Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing | |
ML14265A049 | 12 September 2014 | Amendment to Part 21 Report from Abb, Inc Re Deviation of K-Line Circuit Secondary Close Latch (Event #50371) | |
ML14274A052 | 22 September 2014 | Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities | |
ML15022A650 | 20 January 2015 | Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification | |
ML15049A458 | 6 February 2015 | Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance | Shutdown Margin |
ML15089A436 | 21 March 2015 | Part-21 Report - Valve Seat Leakage Defect | |
ML15103A485 | 7 April 2015 | Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing | |
ML15134A016 | 1 May 2015 | Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays | |
ML15159A568 | 30 April 2015 | Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC | |
ML15303A004 | 23 October 2015 | Part 21 Report Regarding Westinghouse Type KIR-60 Current Transformer, Per Waterford, Unit 3 | Safe Shutdown |
ML16111A420 | 8 April 2016 | Part 21 Report No. P21-04302015, Rev. 1 Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays, Per Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project | |
ML16139A832 | 13 May 2016 | Part 21 - Initial Notification of Masterpact Breaker Fail to Close | |
ML16139A833 | 13 May 2016 | Part 21 - Initial Notification of Masterpact Breaker Fail to Close | |
ML16139A834 | 10 May 2016 | Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 | |
ML16154A207 | 26 May 2016 | Part 21, Azz/Nli Nuclear Logistics, Inc., Potentially Unqualified Component in Certain Allen Bradley Timing Relays Model 700RTC | |
ML16188A376 | 21 June 2016 | Part 21 Interim Evaluation of Deviation - Contractor Failure | |
ML16194A199 | 25 May 2016 | Azz/Nli - Update - Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC | |
ML16209A050 | 13 July 2016 | Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B | |
ML16232A604 | 15 August 2016 | Potentially Unqualified Component in Certain Allen Bradley Timing Relays | |
ML16238A186 | 15 August 2016 | Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016 | |
ML16243A472 | 25 August 2016 | Part 21 Reporting of Defects and Noncompliance | |
ML16243A474 | 26 August 2016 | Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays | |
ML16252A274 | 29 August 2016 | Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay | |
ML16278A471 | 22 September 2016 | Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close | |
ML16281A270 | 22 September 2016 | Part 21 - Initial Notification of Masterpact Breaker Fail to Close | |
ML16294A264 | 18 October 2016 | Part 21 Report - Defective Current to Pressure Transducers | |
ML16321A451 | 21 October 2016 | Part 21 Reporting of Defects and Noncompliance | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17194A825 | 11 July 2017 | Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections | Anchor Darling |
ML17324A979 | 17 November 2017 | Part 21 Report Re Fisher Type 461 Valve Plug Machining | |
ML17325B022 | 17 November 2017 | Fisher Controls International LLC Information Notice (FIN) 2017-05 | |
ML18081A119 | 15 March 2018 | Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1154 and Model 1154 Serles H Pressure Transmitters and 01154-0153-0002 Amplifier Circuit Card Assemblies | |
ML18110A744 | 19 February 1976 | Letter Enclosing a Final Report Concerning the Improper Quality Group Designation of a Number of the Containment Boundary Penetrations | Nondestructive Examination Liquid penetrant |
ML18110A785 | 5 January 1976 | Letter Attaching a Final Report Concerning Charging Pump 1C Restart Failure | |
ML18241A029 | 23 August 2018 | Hex Inverter Chip on Westinghouse 7300 Process Analog Control System Circuit Cards | Ultimate heat sink |
ML18354A742 | 4 December 2018 | Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts | |
ML19053A500 | 1 February 2019 | Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block | |
ML19080A059 | 8 March 2019 | Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors | |
ML19120A106 | 17 April 2019 | Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors | |
ML19253A053 | 29 August 2019 | Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors | |
ML19317D093 | 25 October 2019 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing |