ML14169A030
| ML14169A030 | |
| Person / Time | |
|---|---|
| Site: | Harris, Saint Lucie, Hope Creek, Susquehanna, San Onofre, 05200006, 99901431 |
| Issue date: | 06/15/2014 |
| From: | Martin B, Rider M Pentair Valves And Controls |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 20140615, IR-13-201 | |
| Download: ML14169A030 (6) | |
Text
PENTAIR Brian Martin Quality Assurance Manager PENTAIR VALVES & CONTROLS 508-594-4463 (direct) 508-594-4249 (fax) 508-298-4603 (mobile)
Brian.Martin@Pentair.com Mansfield, MA 02048 www.pentair.com June 15, 2014 VIA REGULAR MAIL:
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 VIA OVERNIGHT DELIVERY:
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2746
Subject:
Update to Interim Report-10CFR 21 Evaluation regarding potential deficiencies in Seismic Qualifications for PV-62 Reference Pentair Interim Report 20140615.
The purpose of this letter is to provide updated information as of the current date to the NRC in regards to the subject line and the requirements of 10CFR 21 Part 21.21 (a)(2).
This report is a result of NRC Inspection Report No. 99901431/2013-201 dated 20 August 2013 and Pentair Corrective Action Report (CAR 673). In general CAR 673 determined that required seismic testing was improperly performed and delivered to the customer. The subject valve (PV-62) of CAR 673 was returned to Pentair and successfully retested. The customer did not have an active reactor.
The original attached report was to inform the NRC of the potential 10CFR 21 evaluation.
Pentair Valves and Controls US LP, dba Anderson Greenwood Crosby notified the NRC of this potential and the affected licensees of the results of the 10CFR 21 evaluation.
The purpose of this letter is to update the status of the evaluations for the identified customers and product from the previous report and follow on actions.
Required information as per 10CFR Part 21.21 (d)(4) follows:
(i)
Name and Address of the individual or individuals informing the Commission:
Brian L. Martin Quality Assurance Manager Pentair Valves and Controls US LP, dba Anderson Greenwood Crosby 1
qPENTAIR 55 Cabot Blvd Mansfield, MA 02048 (ii)
Identification of the facility, the activity, or basic component supplied for such facility or such activity within the Unites States which fails to comply or contains a defect.
Pentair previously identified 93 test reports that have potential deficiencies in the seismic requirements. We have identified 83 assemblies, from the 93 test reports, and we have completed the process of identifying the potential additional affected valve assemblies.
The following valves have been evaluated and determined to not be a Part 21 reportable issue and are considered to be closed. Pentair Engineering has determined that all requirements have been met and none of the delivered product are of indeterminate quality.
Test Report 5560 5527 5520 5528 3832 3984 3718 3719 4159 5472 5487 5488 5488 5529 5530 5558 5570 5570 5572 5572 5591 5591 5510 4050 3807 Assembly Number N900132 N900010 N900009 N900011 N60582 N61106 N58737 N58737 N66285 N99890 N99965 N99965 N99890 N900048 N900048 N900044 N900091 N900106 N900091 N900106 N900091 N900106 N900044 N62569 N59180 Customer Korea Hydro Shin Kori Korea Hydro Shin Wolsong Korea Hydro Shin Kori Korea Hydro Shin Wolsong WPPS Units 3 & 5 Mill Power Cherokee & Perkins Bechtel San Onofre Units 2 & 3 Bechtel San Onofre Units 2 & 3 Bechtel Korea Nuclear Units 7 & 8 Korea Hydro Yonggwang Units 5 &6 Korea Hydro Kori Unit 1 Korea Hydro Kori Unit 1 Korea Hydro Yonggwang Units S &6 Korea Hydro Kori Units 3 & 4 Korea Hydro Kori Units 3 & 4 Westinghouse (AP1000)
State Nuclear Sanmen State Nuclear Haiyang NPP Unit 2 State Nuclear Sanmen State Nuclear Haiyang NPP Unit 2 State Nuclear Sanmen State Nuclear Haiyang NPP Unit 2 Westinghouse (APlO00)
Georgia Power Bechtel Under Review 2
PENTAIR 4175 5030 5556 5509 5419 5518 5498 5498 3748 3750 3754 3899 4051 5244 5400 5497 5515 4506 4506 4508 4049 3892 4533 3841 3860 4048 3850 3875 3749 3798 N59149 3819 3839 3860 3893 3895 3896 3898 4509 3747 3900 4190 3723 3840 N66089 N82749 N900028 N900028 N97793 N99825 N99824 N97793 N59283 N59283 B59283 N59283 N59283 Under Review Under Review N99751 N99798 N73760 N73762 N73763 N61187 N59276 N73776 N61843 N44417 N61190 N61843 Under Review N59277 N59148 N60908 N44417 N59280 N59286 N60067 N59277 N73464 N59284 N59284 N67438 N60239 N59150 Ontario Hydro Darlington Generating Station A Korea Electric Ulchin Units 3 & 4 Westinghouse (AP1000)
Westinghouse (APlO00)
Korea Electric Ulchin Units 5 & 6 Korea Hydro Shin Wolsong Units 1 & 2 Korea Hydro Shin Kori Units 1 & 2, Korea Electric Ulchin Units 5 & 6 Korea Hydro Shin Kori Units 1 & 2, Korea Electric Ulchin Units 5 & 6 Taiwan Power Kyosheng Plant Units 1 & 2 Taiwan Power Kyosheng Plant Units 1 & 2 Taiwan Power Kyosheng Plant Units 1 & 2 Taiwan Power Kyosheng Plant Units 1 & 2 Taiwan Power Kyosheng Plant Units 1 & 2 Under Review Under Review Korea Hydro Shin Kori Units 1 & 2 Korea Hydro Shin Wolsong Units 1 & 2 PWRPP PWRPP PWRPP Bechtel Public Service Hope Creek Units 1 & 2 Taiwan Power Kyosheng Plant Units 1 & 2 Weir Pump, Sizewell B Power Station Carolina Power and Light, Shearon Harris Station Under Review Bechtel Public Service Hope Creek Units 1 & 2 Carolina Power and Light, Shearon Harris Station Under Review Taiwan Power Kyosheng Plant Units 1 & 2 Ebasco Florida Power & Light St. Lucie Unit 2 Ebasco Florida Power & Light St. Lucie Unit 2 Bechtel Public Service Hope Creek Units 1 & 2 Carolina Power and Light, Shearon Harris Station Taiwan Power Kyosheng Plant Units 1 & 2 Taiwan Power Kyosheng Plant Units 1 & 2 Taiwan Power Kyosheng Plant Units 1 & 2 Taiwan Power Kyosheng Plant Units 1 & 2 PWRPP, Sizewell B Power Station Taiwan Power Kyosheng Plant Units 1 & 2 Taiwan Power Kyosheng Plant Units 1 & 2 Bechtel Public Service Hope Creek Units 1 & 2 Southern California Edison San Onofre Units 2 & 3 Ebasco Florida Power & Light St. Lucie Unit 2 3
PENTAIR 3874 5244 3842 3894 3897 4510 3879 3904 3922 4507 5489 5490 5588 5605 5607 5611 5612 5615 5618 3887 3887 3901 3902 4179 4200 4201 4271 N60905 Under Review N60912 N59281 N59287 N73765 N61188 N63185 N64023 N73761 Under Review Under Review Under Review Under Review Under Review Under Review Under Review Under Review Under Review N62933 N62934 N59288 N60518 N60901 N67795 N66295 N65602 Bechtel Public Service Hope Creek Units 1 & 2 Under Review Bechtel Public Service Hope Creek Units 1 & 2 Taiwan Power Kyosheng Plant Units 1 & 2 Taiwan Power Kyosheng Plant Units 1 & 2 PWRPP, Sizewell B Power Station Bechtel Public Service Hope Creek Units 1 & 2 Ebasco Florida Power & Light St. Lucie Unit 2 Ebasco Florida Power & Light St. Lucie Unit 2 PWRPP, Sizewell B Power Station Under Review Under Review Under Review Under Review Under Review Under Review Under Review Under Review Under Review Pennsylvania Power and Light Susquehanna Units 1 & 2 Pennsylvania Power and Light Susquehanna Units 1 & 2 Taiwan Power Kyosheng Plant Units 1 & 2 Taiwan Power Kyosheng Plant Units 1 & 2 Bechtel Public Service Hope Creek Units 1 & 2 Pennsylvania Power and Light Susquehanna Bechtel Korea Electric Korea Nuclear Units 7 & 8 Peerless, Washington Public Power, Unit 1 The following valves have been evaluated and determined that Pentair Engineering cannot determine if the quality requirements have been met. Pentair has determined that while there is little risk to the valve not performing as designed, there is not positive documentation that the valves were tested correctly. Pentair has determined that the only correct method to determine the quality is to test the valve in both directions, thereby eliminating the uncertainty of testing in the weakest axis.
To this end, Pentair has ordered a test valve and will test the valve using the correct procedure. The test is scheduled to be completed by the end of August 2014.
4
4PENTAIR The valves affected are listed below:
N98342-00-0001 through -0009 (Hanjung-Shin Ulchin 5&6)
N900008-00-0001 through -0008 (Doosan - Shin Kori 1&2)
N900010-00-0001 through -0008(Doosan - Shin Wolson 1&2)
Pentair Mansfield formally requests an extension to complete the above mentioned testing until August 31, 2014.
(iii)
Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.
Pentair Valves and Controls US LP, dba Anderson Greenwood Crosby Mansfield Operations 55 Cabot Blvd Mansfield, MA 02048 (iv)
Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.
In evaluating Pentair Correction Action Report (CAR 673) an extent of conditions required an evaluation of all test reports that required a static seismic load test in the least rigid axis.
The testing of valves in the incorrect axis has the potential for indeterminate functionality of the valves during a seismic event.
Pentair Mansfield has completed the review of the total population. As a result of the review, 25 valves (same model) shipped to three customers as listed in section (ii) have indeterminate quality. Pentair will be assembling and testing an identical valve to determine whether the valves delivered are reportable. The anticipated completion date is 31 August 2014.
(v)
The date on which the information of such defect or failure to comply was obtained.
20 August 2013 (vi)
In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured or being manufactured for one or more facilities or activities subject to the regulations in this Part.
To date Pentair has identified all affected valves. See section (ii) 5
PENTAIR (vii)
The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action and the length of time that has been or will be taken to complete the action.
Pentair Mansfield has completed the investigation. As a result, with the exception of the noted valves, Pentair has determined that while there is little risk to the valves not performing as designed, there is not positive documentation that the valves were tested correctly. Pentair has determined that the only correct method to determine the quality is to test the valve in both directions, thereby eliminating the uncertainty of testing in the weakest axis.
To this end, Pentair has ordered a test valve and will test the valve using the correct procedure. The test is scheduled to be completed by 31 August 2014.
N98342-00-0001 through -0009 (Hanjung-Shin Ulchin 5&6)
N900008-00-0001 through -0008 (Doosan - Shin Kori 1&2)
N900010-00-0001 through -0008(Doosan - Shin Wolson 1&2)
(viii)
Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
None at this time.
(ix)
In the case of an early site permit, the entities to whom an early site permit was transferred.
Not applicable.
If you have any questions or wish to discuss this matter or this report, please feel free to contact me.
Sincerely, Brian L. Martin Michael J. Rider Quality Assurance Manager Engineering Manager 6