Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19273B698 | 30 May 1979 | Confirms Plan to Discuss & Resolve Matters Re Fuel Rod Bowing Effects in Snupps FSAR | |
ML19291B112 | 25 August 1979 | Requests Antitrust Investigation in Connection W/Facility Const Be Reopened.Special Attention Should Be Paid to Activities of Niagara Mohawk Power Corp | |
ML19291C306 | 3 January 1980 | Responds to IE Bulletin 79-02,Revision 2.Initial Response Satisfies Requirements of Revision 1.Facility Does Not Use Concrete Expansion Anchor Bolts to Support Seismic Category I Piping | |
ML19294B145 | 22 February 1980 | Disagrees W/Nrc Plans Re ATWS Issue.New Plans May Not Serve Best Interests of Public Health & Safety.Nrc Should Not Impose Requirements Before Thorough Review of Mass of Technical Info Supplied Last Year | |
ML19294B189 | 30 January 1980 | Notifies That Ny State Board on Electric Generation Siting & Environ Voted on 800123 to Rescind Approval of Plant Const & Operation.No Decision Can Be Made Re Continuation of NRC Proceedings Until Util Has Received Formal Opinion | |
ML19294B866 | 14 February 1980 | Forwards Ny State Board on Electric Generation Siting & Environ 800211 Opinion & Order Vacating Previously Granted Certificate.Denies Application & Closes Proceeding | |
ML19296B980 | 18 January 1980 | Forwards RO Pohl Testimony on Radon Emissions from U Mill Tailings Piles | |
ML19296C571 | 19 February 1980 | Responds to NRC 800204 Ltr Received 800213 Re NRC 800208 Meeting W/Snupps Representatives to Discuss Snupps QA Program.Requests NRC Reschedule Meeting & Provide State Public Svc Commission Sufficient Time to Participate | |
ML19296D705 | 3 January 1980 | Responds to IE Bulletin 79-02,Revision 1.Initial 790705 Response Resolves NRC Concerns Re Use of Concrete Expansion Anchor Bolts for Pipe Support Base Plates.Util Does Not Use Expansion Anchors in Concrete or Structural Steel Members | |
ML19296D996 | 1 February 1980 | Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches for Snupps Facilities Not Complete.Investigation Results & Corrective Actions Will Be Submitted in 3-4 Wks | |
ML19305B959 | 7 November 1979 | Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Failure of P-4 Permissive Circuit in Both Redundant Protection Trains Could Result in Failure of Sys to Automatically Initiate Protective Function.Details Encl | |
ML19305C372 | 20 March 1980 | Informs That Snupps Utils Are Investigating Hardware Changes to Preclude Need for Tests to Correct Deficiency in Engineered Safety Features Actuation Sys.Tests Will Be Made Part of Plant Procedures If Changes Are Not Feasible | |
ML19305C375 | 20 March 1980 | Informs That C-E 791026 Amend to Rept on IE Bulletin 78-12, Atypical Weld Matl in Reactor Pressure Vessel Welds, Should Be Considered Part of Util Bulletin Response | |
ML19305D511 | 20 March 1980 | Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Utils Are Investigating Hardware Changes That May Preclude Further Testing,Provided That Changes Are Feasible.Otherwise,Tests Will Continue | |
ML19308C998 | 18 January 1980 | Responds to IE Bulletin 79-25.Westinghouse Bfd/Nbfd Relays Are Not Included in safety-related Portions of Design | |
ML19309B549 | 5 February 1980 | Forwards Supplemental Rept on Potential Deficiency Re Qualification of Control Sys Discussed in Util 790928 Ltr.No Unresolved Safety Concerns Re Pressure Controllers & Main Steam Line Atmospheric Relief Valve | |
ML19309D345 | 6 March 1980 | Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches,Identification in Snupps Design & Development of Plans for Corrective Action Requires More Time than Anticipated.Will Forward Response Later | |
ML19309G082 | 20 March 1980 | Responds to IE Bulletin 80-03 Re Charcoal Tray Adsorber Cells.Design & Manufacturer of Adsorber Cells Planned to Be Used Are Different than Type Described in Bulletin | |
ML19318C186 | 2 June 1980 | Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Top Cover Gaskets on Switches W/Applicable Date Codes Will Be Replaced on Valves Listed in Encl | |
ML19320A583 | 16 June 1980 | Responds to IE Bulletin 80-09, Hydramotor Actuator Deficiencies. Two safety-related Uses of Itt General Controls Models AH-90 & NH-90 Series Hydramotor Actuators Have Been Identified.Itt Is Testing Actuators | |
ML19323C427 | 6 March 1980 | Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Identification of Switches Has Required More Time than Anticipated.Util Will Respond as Soon as Possible | |
ML19323D245 | 20 March 1980 | Responds to IE Bulletins 78-12,12A & 12B, Atypical Weld Matl in Reactor Pressure Vessel Welds. Util 790629 Ltr & C-E 791026 Ltr to NRC Constitutes Response to Bulletin | |
ML19323H279 | 6 June 1980 | Responds to IE Bulletin 80-05 Re Vacuum Condition Resulting in Damage to Chemical Vol Control Sys Holdup Tanks.Tank Damage Due to Vacuum Conditions Precluded by Design Provisions or Suitable Vent Connections | |
ML19338C460 | 11 August 1980 | Requests Info Re Basis for Denial of Certificate for Facility | |
ML20003G267 | 22 April 1981 | Forwards Second Draft Safety Evaluation of Snupps 10.1,10.2, 10.3,10.4.1 & 10.4.4, Steam & Power Conversion Sys. | Safe Shutdown |
ML20003H960 | 18 April 1980 | Advises That Licensee Considers 800320 Deficiency Rept Final.No Addl Action Planned Unless Required by New Info | |
ML20011A535 | 13 February 1978 | Requests NRC Confirm Design Requirements for Util Containment Structures as Soon as Possible Because of Impact on Const | |
ML20011A550 | 3 May 1978 | Requests Mod of Max Depth Requirement for Snupps Containment Structures for Areas Adjacent to Two Electrical Penetration Banks Located in Reactor Bldg,Third Through Sixth Lifts Adjacent to Auxiliary Bldg | |
ML20062A642 | 29 September 1978 | Forwards IE Bulletin 78-12 Atypical Weld Matl in Reactor Pressure Vessel Welds Requesting Action in 60 Days.List of Bulletins Issued in 1978 Encl | |
ML20062D702 | 6 November 1978 | Forwards IE Circular 78-18,UL Fire Test.W/Encl ANO: 7811150002 | Fire Barrier Fire Protection Program |
ML20062E421 | 21 November 1978 | Notice of Seminar on 781208 on New Model Radiological Effluent Tech Specs for Nuc Pwr Plants.Requests Advance Submission of Seminar Specific Questions.W/Encl Seminar Info Sheet,Proposed Agenda & Maps | Process Control Program |
ML20062F135 | 24 November 1978 | Forwards IE Bulletin 78-12A,suppl to IE Bulletin 78-12. W/Encl ANO:7811300055 | |
ML20062G154 | 15 December 1978 | Discusses Snupps Fsar.Advises That Snupps Utils Plan to Submit Standardized Portion of FSAR in Oct 1979.Most Significant Changes from Design Described in PSAR Are Associated W/Fire Protec | |
ML20062G163 | 12 December 1978 | Ack Ltr of 781207 Forwarding Petition for Review of Decision ALAB-507.Ltr & Petition Are Being Forwarded by Aslab to Comm for Latter'S Consideration | |
ML20062G173 | 7 December 1978 | Forwards Petition for Review of Decision ALAB-507 | |
ML20062G188 | 12 December 1978 | Requests That Petition for Review,Timely Filed on 781207 But Mistakenly W/Wrong Div of Nrc,Be Considered as Properly Filed | |
ML20062G205 | 7 December 1978 | Forwards Memos Discussing Problems Found in Pipe Support Base Plant Design.These Problems Are Applicable to Subj Facil.Dss Is Now Reviewing Piping Design Analysis | |
ML20062G559 | 15 November 1978 | Forwards IE Inspec Rept 50-485/78-01 on 781023-25 During Which No Items of Noncompliance Were Noted | |
ML20062H092 | 19 March 1979 | Forwards IE Bulletin 78-12B, Atypical Weld Matl in Reactor Pressure Vessel Welds | |
ML20125B304 | 18 October 1979 | Forwards Request for Addl Info Re QA Aspects of Fire Protection Sys for Snupps Portion of Facilities | Safe Shutdown Fire Protection Program |
ML20136B104 | 5 June 1979 | Notifies of Typographical Errors in Licensee Joint Motion for Summary Disposition of Radon Issues.Certificate of Svc Encl | |
ML20148G146 | 30 October 1978 | Forwards 780929 & 780927 NRC Memos Re Recent Underwriters Lab Fire Protec Test to Demonstrate Effectiveness of Area Sprinklers & Mineral Wool Blanket Cable Tray Fire Barriers. (See ANO:7811050359 & 7811050373.) | Fire Barrier |
ML20202D486 | 12 February 1998 | Ack Receipt of & Check in Amount of $55,000 in Payment for Civil Penalty Proposed by NRC in . Corrective Actions Will Be Examined During Future Insps |