Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19273B69830 May 1979Confirms Plan to Discuss & Resolve Matters Re Fuel Rod Bowing Effects in Snupps FSAR
ML19291B11225 August 1979Requests Antitrust Investigation in Connection W/Facility Const Be Reopened.Special Attention Should Be Paid to Activities of Niagara Mohawk Power Corp
ML19291C3063 January 1980Responds to IE Bulletin 79-02,Revision 2.Initial Response Satisfies Requirements of Revision 1.Facility Does Not Use Concrete Expansion Anchor Bolts to Support Seismic Category I Piping
ML19294B14522 February 1980Disagrees W/Nrc Plans Re ATWS Issue.New Plans May Not Serve Best Interests of Public Health & Safety.Nrc Should Not Impose Requirements Before Thorough Review of Mass of Technical Info Supplied Last Year
ML19294B18930 January 1980Notifies That Ny State Board on Electric Generation Siting & Environ Voted on 800123 to Rescind Approval of Plant Const & Operation.No Decision Can Be Made Re Continuation of NRC Proceedings Until Util Has Received Formal Opinion
ML19294B86614 February 1980Forwards Ny State Board on Electric Generation Siting & Environ 800211 Opinion & Order Vacating Previously Granted Certificate.Denies Application & Closes Proceeding
ML19296B98018 January 1980Forwards RO Pohl Testimony on Radon Emissions from U Mill Tailings Piles
ML19296C57119 February 1980Responds to NRC 800204 Ltr Received 800213 Re NRC 800208 Meeting W/Snupps Representatives to Discuss Snupps QA Program.Requests NRC Reschedule Meeting & Provide State Public Svc Commission Sufficient Time to Participate
ML19296D7053 January 1980Responds to IE Bulletin 79-02,Revision 1.Initial 790705 Response Resolves NRC Concerns Re Use of Concrete Expansion Anchor Bolts for Pipe Support Base Plates.Util Does Not Use Expansion Anchors in Concrete or Structural Steel Members
ML19296D9961 February 1980Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches for Snupps Facilities Not Complete.Investigation Results & Corrective Actions Will Be Submitted in 3-4 Wks
ML19305B9597 November 1979Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Failure of P-4 Permissive Circuit in Both Redundant Protection Trains Could Result in Failure of Sys to Automatically Initiate Protective Function.Details Encl
ML19305C37220 March 1980Informs That Snupps Utils Are Investigating Hardware Changes to Preclude Need for Tests to Correct Deficiency in Engineered Safety Features Actuation Sys.Tests Will Be Made Part of Plant Procedures If Changes Are Not Feasible
ML19305C37520 March 1980Informs That C-E 791026 Amend to Rept on IE Bulletin 78-12, Atypical Weld Matl in Reactor Pressure Vessel Welds, Should Be Considered Part of Util Bulletin Response
ML19305D51120 March 1980Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Utils Are Investigating Hardware Changes That May Preclude Further Testing,Provided That Changes Are Feasible.Otherwise,Tests Will Continue
ML19308C99818 January 1980Responds to IE Bulletin 79-25.Westinghouse Bfd/Nbfd Relays Are Not Included in safety-related Portions of Design
ML19309B5495 February 1980Forwards Supplemental Rept on Potential Deficiency Re Qualification of Control Sys Discussed in Util 790928 Ltr.No Unresolved Safety Concerns Re Pressure Controllers & Main Steam Line Atmospheric Relief Valve
ML19309D3456 March 1980Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches,Identification in Snupps Design & Development of Plans for Corrective Action Requires More Time than Anticipated.Will Forward Response Later
ML19309G08220 March 1980Responds to IE Bulletin 80-03 Re Charcoal Tray Adsorber Cells.Design & Manufacturer of Adsorber Cells Planned to Be Used Are Different than Type Described in Bulletin
ML19318C1862 June 1980Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Top Cover Gaskets on Switches W/Applicable Date Codes Will Be Replaced on Valves Listed in Encl
ML19320A58316 June 1980Responds to IE Bulletin 80-09, Hydramotor Actuator Deficiencies. Two safety-related Uses of Itt General Controls Models AH-90 & NH-90 Series Hydramotor Actuators Have Been Identified.Itt Is Testing Actuators
ML19323C4276 March 1980Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Identification of Switches Has Required More Time than Anticipated.Util Will Respond as Soon as Possible
ML19323D24520 March 1980Responds to IE Bulletins 78-12,12A & 12B, Atypical Weld Matl in Reactor Pressure Vessel Welds. Util 790629 Ltr & C-E 791026 Ltr to NRC Constitutes Response to Bulletin
ML19323H2796 June 1980Responds to IE Bulletin 80-05 Re Vacuum Condition Resulting in Damage to Chemical Vol Control Sys Holdup Tanks.Tank Damage Due to Vacuum Conditions Precluded by Design Provisions or Suitable Vent Connections
ML19338C46011 August 1980Requests Info Re Basis for Denial of Certificate for Facility
ML20003G26722 April 1981Forwards Second Draft Safety Evaluation of Snupps 10.1,10.2, 10.3,10.4.1 & 10.4.4, Steam & Power Conversion Sys.Safe Shutdown
ML20003H96018 April 1980Advises That Licensee Considers 800320 Deficiency Rept Final.No Addl Action Planned Unless Required by New Info
ML20011A53513 February 1978Requests NRC Confirm Design Requirements for Util Containment Structures as Soon as Possible Because of Impact on Const
ML20011A5503 May 1978Requests Mod of Max Depth Requirement for Snupps Containment Structures for Areas Adjacent to Two Electrical Penetration Banks Located in Reactor Bldg,Third Through Sixth Lifts Adjacent to Auxiliary Bldg
ML20062A64229 September 1978Forwards IE Bulletin 78-12 Atypical Weld Matl in Reactor Pressure Vessel Welds Requesting Action in 60 Days.List of Bulletins Issued in 1978 Encl
ML20062D7026 November 1978Forwards IE Circular 78-18,UL Fire Test.W/Encl ANO: 7811150002Fire Barrier
Fire Protection Program
ML20062E42121 November 1978Notice of Seminar on 781208 on New Model Radiological Effluent Tech Specs for Nuc Pwr Plants.Requests Advance Submission of Seminar Specific Questions.W/Encl Seminar Info Sheet,Proposed Agenda & MapsProcess Control Program
ML20062F13524 November 1978Forwards IE Bulletin 78-12A,suppl to IE Bulletin 78-12. W/Encl ANO:7811300055
ML20062G15415 December 1978Discusses Snupps Fsar.Advises That Snupps Utils Plan to Submit Standardized Portion of FSAR in Oct 1979.Most Significant Changes from Design Described in PSAR Are Associated W/Fire Protec
ML20062G16312 December 1978Ack Ltr of 781207 Forwarding Petition for Review of Decision ALAB-507.Ltr & Petition Are Being Forwarded by Aslab to Comm for Latter'S Consideration
ML20062G1737 December 1978Forwards Petition for Review of Decision ALAB-507
ML20062G18812 December 1978Requests That Petition for Review,Timely Filed on 781207 But Mistakenly W/Wrong Div of Nrc,Be Considered as Properly Filed
ML20062G2057 December 1978Forwards Memos Discussing Problems Found in Pipe Support Base Plant Design.These Problems Are Applicable to Subj Facil.Dss Is Now Reviewing Piping Design Analysis
ML20062G55915 November 1978Forwards IE Inspec Rept 50-485/78-01 on 781023-25 During Which No Items of Noncompliance Were Noted
ML20062H09219 March 1979Forwards IE Bulletin 78-12B, Atypical Weld Matl in Reactor Pressure Vessel Welds
ML20125B30418 October 1979Forwards Request for Addl Info Re QA Aspects of Fire Protection Sys for Snupps Portion of FacilitiesSafe Shutdown
Fire Protection Program
ML20136B1045 June 1979Notifies of Typographical Errors in Licensee Joint Motion for Summary Disposition of Radon Issues.Certificate of Svc Encl
ML20148G14630 October 1978Forwards 780929 & 780927 NRC Memos Re Recent Underwriters Lab Fire Protec Test to Demonstrate Effectiveness of Area Sprinklers & Mineral Wool Blanket Cable Tray Fire Barriers. (See ANO:7811050359 & 7811050373.)Fire Barrier
ML20202D48612 February 1998Ack Receipt of & Check in Amount of $55,000 in Payment for Civil Penalty Proposed by NRC in . Corrective Actions Will Be Examined During Future Insps