B13325, Inservice Insp Rept | 31 July 1989 | Inservice Insp Rept | Hydrostatic Liquid penetrant Dissimilar Metal Weld |
B13530, Rev 13 to QA Program | 29 August 1990 | Rev 13 to QA Program | |
B13620, Part 21 Rept Re Substantial Safety Hazard Involving GE Custom 8000 Horizontal Induction Motor.Pump Motor Failure Identified Due to Loud Noise During Operation.Caused by Loosening of Clamps of Air Deflector.Damaged Motor Removed | 27 August 1990 | Part 21 Rept Re Substantial Safety Hazard Involving GE Custom 8000 Horizontal Induction Motor.Pump Motor Failure Identified Due to Loud Noise During Operation.Caused by Loosening of Clamps of Air Deflector.Damaged Motor Removed | |
B13621, Part 21 Rept Re Substantial Safety Hazard Involving Westinghouse Veritrek Transmitters.Large Shift in Output Observed While Attempting to Calibr Two Transmitters. Internal Review Performed & Defective Transmitters Replaced | 27 August 1990 | Part 21 Rept Re Substantial Safety Hazard Involving Westinghouse Veritrek Transmitters.Large Shift in Output Observed While Attempting to Calibr Two Transmitters. Internal Review Performed & Defective Transmitters Replaced | |
B13678, Boron Dilution Analysis,Cycle 4 | 31 December 1990 | Boron Dilution Analysis,Cycle 4 | Boric Acid Shutdown Margin |
B13734, ISI for Millstone Nuclear Power Station,Unit 2 for 890414- 901104 | 28 February 1991 | ISI for Millstone Nuclear Power Station,Unit 2 for 890414- 901104 | Hydrostatic Liquid penetrant Dissimilar Metal Weld |
B13840, RO Re Potential Failure of LPSI Sys Piping.Evaluation Involving Estimate of LPSI Piping Stress Upstream of LPSI Injection MOVs Performed.Reverse Flow Testing of LPSI Injection Check Valves Will Be Conducted by 1992 Outage | 18 July 1991 | RO Re Potential Failure of LPSI Sys Piping.Evaluation Involving Estimate of LPSI Piping Stress Upstream of LPSI Injection MOVs Performed.Reverse Flow Testing of LPSI Injection Check Valves Will Be Conducted by 1992 Outage | Probabilistic Risk Assessment |
B14005, SDC Auto-Closure Interlock Removal at Millstone Unit 2 | 31 December 1991 | SDC Auto-Closure Interlock Removal at Millstone Unit 2 | Probabilistic Risk Assessment |
B14192, Special Rept:On 920601,Millstone Unit 2 Entered TS 3.3.3.3 When Seismic Monitoring Sys Removed from Service to Support SG Replacement Outage.Operations Personnel Instructed on Appropriate Actions Re Response to Monitor Alarm | 9 July 1992 | Special Rept:On 920601,Millstone Unit 2 Entered TS 3.3.3.3 When Seismic Monitoring Sys Removed from Service to Support SG Replacement Outage.Operations Personnel Instructed on Appropriate Actions Re Response to Monitor Alarm | Earthquake |
B14544, Update to 900827 Rept of Substantial Safety Hazard Re GE Custom 8000 Horizontal Induction Motors,Reported Per 10CFR21 for Unit 3.Util Has Determined,As Part of Review of in 91-007 That Subj GE Motors Also Used at Units 1 & 2 | 11 August 1993 | Update to 900827 Rept of Substantial Safety Hazard Re GE Custom 8000 Horizontal Induction Motors,Reported Per 10CFR21 for Unit 3.Util Has Determined,As Part of Review of in 91-007 That Subj GE Motors Also Used at Units 1 & 2 | |
B14680, Part 21 Rept Re Substantial Safety Hazard Evaluation of RCP Turning Vane Cap Screws.Util Increased head-to Shank Fillet Radius to Reduce Stress Concentration & Reduced Thread Engagement to Reduce Axial & Bending Stiffness | 22 November 1993 | Part 21 Rept Re Substantial Safety Hazard Evaluation of RCP Turning Vane Cap Screws.Util Increased head-to Shank Fillet Radius to Reduce Stress Concentration & Reduced Thread Engagement to Reduce Axial & Bending Stiffness | Liquid penetrant |
B15772, Addendum to Mnps,Units 1,2 & 3 Annual Rept for 1995 Millstone Unit 2 Section | 31 December 1995 | Addendum to Mnps,Units 1,2 & 3 Annual Rept for 1995 Millstone Unit 2 Section | |
B15777, Special Rept:On 960528,Train B Emergency Diesel Generator Failed.Caused by Low Lube Oil Pressure.Instituted Procedural Changes Re Low Lube Oil Pressure During Strainer Swaps | 27 June 1996 | Special Rept:On 960528,Train B Emergency Diesel Generator Failed.Caused by Low Lube Oil Pressure.Instituted Procedural Changes Re Low Lube Oil Pressure During Strainer Swaps | |
B15944, Monthly Operating Repts for Sept 1996 for Millstone Nuclear Power Station Units 1,2 & 3 | 30 September 1996 | Monthly Operating Repts for Sept 1996 for Millstone Nuclear Power Station Units 1,2 & 3 | |
B16006, Monthly Operating Repts for Oct 1996 for Mnps,Units 1,2 & 3 | 31 October 1996 | Monthly Operating Repts for Oct 1996 for Mnps,Units 1,2 & 3 | |
B16030, Part 21 Rept Re Stocked safety-related Fuses Issued from Storeroom for Installation Which Had Cracked Ferrules in Longitudinal Direction on 960911.Procurement & Warehouse Groups Completed Inspecting Fuses in Warehouse | 13 December 1996 | Part 21 Rept Re Stocked safety-related Fuses Issued from Storeroom for Installation Which Had Cracked Ferrules in Longitudinal Direction on 960911.Procurement & Warehouse Groups Completed Inspecting Fuses in Warehouse | |
B16086, Monthly Operating Rept for Nov 1996 for Millstone Nuclear Power Station Unit 3 | 30 November 1996 | Monthly Operating Rept for Nov 1996 for Millstone Nuclear Power Station Unit 3 | |
B16141, Special Rept:On 961224,delayed Submittal of License Amend Request for Section 6.0, Administrative Controls, Occurred.Caused by Inadequate Communication.On 970122 Issued Expectations for Implementing Future Organizational Changes | 22 January 1997 | Special Rept:On 961224,delayed Submittal of License Amend Request for Section 6.0, Administrative Controls, Occurred.Caused by Inadequate Communication.On 970122 Issued Expectations for Implementing Future Organizational Changes | |
B16145, Monthly Operating Rept for Dec 1996 for Millstone Nuclear Power Station,Unit 2 | 31 December 1996 | Monthly Operating Rept for Dec 1996 for Millstone Nuclear Power Station,Unit 2 | |
B16149, Part 21 Rept Re Cracked Fuse Ferrule Defects Due to Administrative Error in Ltr Detailing Commitments Re Issue. Corrected Copy of Commitments Associated W/Ltr Provided | 14 January 1997 | Part 21 Rept Re Cracked Fuse Ferrule Defects Due to Administrative Error in Ltr Detailing Commitments Re Issue. Corrected Copy of Commitments Associated W/Ltr Provided | |
B16150, Monthly Operating Rept for Dec 1996 for Millstone Nuclear Power Station Unit 1 | 31 December 1996 | Monthly Operating Rept for Dec 1996 for Millstone Nuclear Power Station Unit 1 | |
B16151, Monthly Operating Rept for Dec 1996 for Millstone Nuclear Power Station Unit 3 | 31 December 1996 | Monthly Operating Rept for Dec 1996 for Millstone Nuclear Power Station Unit 3 | |
B16241, Monthly Operating Rept for Jan 1997 for Millstone Nuclear Power Station Unit 2 | 31 January 1997 | Monthly Operating Rept for Jan 1997 for Millstone Nuclear Power Station Unit 2 | |
B16242, Monthly Operating Rept for Jan 1997 for Millstone Nuclear Power Station,Unit 3 | 31 January 1997 | Monthly Operating Rept for Jan 1997 for Millstone Nuclear Power Station,Unit 3 | |
B16248, Monthly Operating Rept for Jan 1997 for Millstone Nuclear Power Station Unit 1 | 31 January 1997 | Monthly Operating Rept for Jan 1997 for Millstone Nuclear Power Station Unit 1 | |
B16270, Annual Operating Rept for 1996 | 31 December 1996 | Annual Operating Rept for 1996 | |
B16293, Annual Rept Jan-Dec 1996 | 31 December 1996 | Annual Rept Jan-Dec 1996 | Boric Acid Nondestructive Examination Power Operated Valves Liquid penetrant |
B16297, Annual Rept,Jan-Dec 1996 | 31 December 1996 | Annual Rept,Jan-Dec 1996 | Safe Shutdown Boric Acid Shutdown Margin Fire Barrier Stroke time Met Tower Temporary Modification Continuous fire watch Fire Watch Downpower |
B16320, Revised Monthly Operating Rept for Jan 1997 for Millstone Nuclear Power Station,Unit 2 | 31 January 1997 | Revised Monthly Operating Rept for Jan 1997 for Millstone Nuclear Power Station,Unit 2 | |
B16321, Monthly Operating Rept for Feb 1997 for Millstone Nuclear Power Station,Unit 1 | 28 February 1997 | Monthly Operating Rept for Feb 1997 for Millstone Nuclear Power Station,Unit 1 | |
B16327, Monthly Operating Rept for Feb 1997 for Millstone Nuclear Power Station Unit 3 | 28 February 1997 | Monthly Operating Rept for Feb 1997 for Millstone Nuclear Power Station Unit 3 | |
B16376, Monthly Operating Rept for Mar 1997 for Mnps,Unit 2 | 31 March 1997 | Monthly Operating Rept for Mar 1997 for Mnps,Unit 2 | Ultimate heat sink |
B16384, Monthly Operating Rept for March 1997 for Mnps | 31 March 1997 | Monthly Operating Rept for March 1997 for Mnps | |
B16386, Monthly Operating Rept for Mar 1997 for Millstone Nuclear Power Station Unit 3 | 31 March 1997 | Monthly Operating Rept for Mar 1997 for Millstone Nuclear Power Station Unit 3 | |
B16464, Monthly Operating Rept for Apr 1997 for Millstone,Unit 2 | 30 April 1997 | Monthly Operating Rept for Apr 1997 for Millstone,Unit 2 | Ultimate heat sink |
B16469, Monthly Operating Rept for Apr 1997 for Millstone Nuclear Power Station,Unit 1 | 30 April 1997 | Monthly Operating Rept for Apr 1997 for Millstone Nuclear Power Station,Unit 1 | |
B16517, CFR50.59 Annual Rept,960101-1231 | 31 December 1996 | CFR50.59 Annual Rept,960101-1231 | Unanalyzed Condition Hydrostatic Temporary Modification Scram Discharge Volume Fuel cladding |
B16518, Monthly Operating Rept for May 1997 for Millstone Nuclear Power Station,Unit 3 | 31 May 1997 | Monthly Operating Rept for May 1997 for Millstone Nuclear Power Station,Unit 3 | |
B16519, Monthly Operating Rept for May 1997 for Millstone Nuclear Power Station,Unit 2 | 31 May 1997 | Monthly Operating Rept for May 1997 for Millstone Nuclear Power Station,Unit 2 | Ultimate heat sink |
B16527, Monthly Operating Rept for May 1997 for Millstone Nuclear Power Station Unit 1 | 31 May 1997 | Monthly Operating Rept for May 1997 for Millstone Nuclear Power Station Unit 1 | |
B16531, Part 21 Rept Re GE Commercial Grade Dedication Program Being Determined to Be Inadequate in Ability to Demonstrate Seismic Capability of Specific Relay.Returned Relays to GE Facility for Repair | 3 July 1997 | Part 21 Rept Re GE Commercial Grade Dedication Program Being Determined to Be Inadequate in Ability to Demonstrate Seismic Capability of Specific Relay.Returned Relays to GE Facility for Repair | Time of Discovery Commercial Grade Dedication Design basis earthquake |
B16546, Special Rept:On 970615,Train B EDG Failed.Event Review Team Was Formed to Investigate & Evaluate Potential Cause of Oscillations | 14 July 1997 | Special Rept:On 970615,Train B EDG Failed.Event Review Team Was Formed to Investigate & Evaluate Potential Cause of Oscillations | |
B16577, Monthly Operating Rept for June 1997 for Mnps,Unit 3 | 30 June 1997 | Monthly Operating Rept for June 1997 for Mnps,Unit 3 | |
B16578, Monthly Operating Rept for Jul 1997 for Millstone Nuclear Power Station Unit 3 | 31 July 1997 | Monthly Operating Rept for Jul 1997 for Millstone Nuclear Power Station Unit 3 | |
B16579, Monthly Operating Rept for Aug 1997 for Millstone,Unit 3 | 31 August 1997 | Monthly Operating Rept for Aug 1997 for Millstone,Unit 3 | |
B16580, Monthly Operating Rept for Sept 1997 for Millstone Nuclear Power Station,Unit 3 | 30 September 1997 | Monthly Operating Rept for Sept 1997 for Millstone Nuclear Power Station,Unit 3 | |
B16581, Monthly Operating Rept for Oct 1997 for Mnps,Unit 3 | 31 October 1997 | Monthly Operating Rept for Oct 1997 for Mnps,Unit 3 | |
B16582, Monthly Operating Rept for Nov 1997 for Mnps,Unit 3 | 30 November 1997 | Monthly Operating Rept for Nov 1997 for Mnps,Unit 3 | |
B16583, Monthly Operating Rept for Dec 1997 for Mnps,Unit 3 | 31 December 1997 | Monthly Operating Rept for Dec 1997 for Mnps,Unit 3 | |
B16615, Monthly Operating Rept for June 1997 for Mnps | 30 June 1997 | Monthly Operating Rept for June 1997 for Mnps | |