B16518, Monthly Operating Rept for May 1997 for Millstone Nuclear Power Station,Unit 3
ML20141A566 | |
Person / Time | |
---|---|
Site: | Millstone ![]() |
Issue date: | 05/31/1997 |
From: | Emmons K, Hicks G NORTHEAST NUCLEAR ENERGY CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
B16518, NUDOCS 9706230091 | |
Download: ML20141A566 (8) | |
Text
-. - .- - . .- - _ _ _ _ - . . . -
- Roge Fury Rd. (Route Wih Watnfont, G W2385 8} Norihcast p Nuclear Energy susi,me weiear n,wer station Mrtheast % clear Energy Company l P.O. Ilos 128 l Waterford, CT 06385-0128 I 1
i (860) 447-1791 Fax (860) 444-4277 The %rtheast Utilitin System j JUN I 219W Docket No. 50-423 j B16518 l
l l
' US Nuclear Regulatory Commission .
Attention: Document Control Desk l Washington, D C. 20555 Millstone Nuclear Power Station Unit 3 Facility Operating License Num' oar NPF-49 Monthly Operatina Report for May 1997 l In accordance with the reporting requirements of Technical Specification 6.9.1.5 i for Millstone UnR No. 3, enclosed in Attachment 2 is the Monthly Operating l Report for the month of May,1997. I l
l Should you have any questions regarding this submittal, please contact Mr.
! David Smith at (860) 437-5840.
I Very truly yours, f
NORTHEAST NUCLEAR ENERGY COMPANY
/
1 h
! N
~
. Hicks Unit Director - Millstone Unit 3 l Attachments (2) cc: H. J. Miller, Region 1 Administator W. D. Travers, Dr., Director Special Projecta A.C. Cerne, Senior Resident inspector, Millstone Unit No. 3 i
J. W. Andersen, NRC Project Manag. , Millstone Unit No. 3
^AD0RO ""
9706230091 970531
!! ll !!!!,b!,l!
. . . . . .. _. -- .. - . . - . . -- - .- ~..- ._- . _ . - . . - -
f Docket No. 50-423 B16518 l
{
l i Attachment 1 1
Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments June 1997 l
I
. i U.S. Nucl=r Regul:: tory Commission B16518%ttachmerit 1\Page 1
- Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this 4
document. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or !
- any associated regulatory commitments.
Commitment Committed Date or Outage I d
NONE N/A i
1 W
t i ;
\
i i
4 Docket No. 50-423 '
l B16518 1
l Attachment 2 Millstone Nuclear Power Station, Unit No. 3 Facility Operating License No. NPF-49 ;
May 1997 Monthly Operatina Report 1
l l
June 1997
U.S. Nucirr R gulttory Commission B16518\ Attachment 2\Page 1 REFUELING INFORMATION REQUEST May1997
- 1. Name of the facility: Millstone Unit 3 l 2. Scheduled date for next refueling outage: To be determined
- 3. Scheduled date for restart following refueling: To be determined
( 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
1 l 5. Scheduled date(s) for submitting licensing action and supporting information:
None.
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None, i
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage
- pool
In Core: (a) 193 In Spent Fuel Pool: (b) _416 l
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in t
number of fuel assemblies:
- Present storaae caoacitv
- 756.
No increase reauested.
- 9. The projected date of the last refueling that can be discharged to the spent i
fuel pool assuming present license capacity:
l End of Cvele 7.
l i
l I
I
U.S. Nucle r Regulatory Commission B16518\ Attachment 2\Page 2 DOCKET NO. 50-423 i UNIT Millstone Unit 3 DATE 06/03/97 COMPLETED BY K. W. Emmons TELEPHONE (860)447-1791 Ext. 6572 MONTH: May-97 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 >
2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 r 15 0 31 0 i 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. l
l U.S. NuCirr Regul: tory Commission B16518\ Attachment 2\Page 3 l UNIT NAME Millstone Unit 3 DATE 06/03/97 COMPLETED BY K. W. Emmons TELEPHONE (860)447-1791 Ext 6572 l OPERATING STATUS 1
l 1. Docket Number _ 50423 l l 2. Reporting Period May-97 Notes:
- 3. Utility Contact K. W. Emmons '
( 4. Licensed Thermal Power (MWt): 3411
! 5. Nameplate Rating (Gross MWe): 1253 l
- 6. Design Electrical Rating (Not MWe): 1153.6 l
- 7. Maximum Dependable Capacity (Gross MWe): 1184.20
- 8. Maximum Dependable Capacity (Not MWe): 1137.00 I
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, l Give Reasons:
N/A
- 10. Power Level To Which Restricted, If any (Not MWe): 0 j
- 11. Reasons For Restrictions, if Any: NRC Category lli Facility; NRC Confirmatory Order requiring !
implementation of an indopendent corrective action verification program; NRC Order requiring a third-party review I of the employee concerns program at Millstone Station; design basis verification response pursuant to 10CFR50.54(f).
l l
This Menth Yr.-To-Date Cumulative l
- 12. Hours in Reporting Period 744.0 3623.0' 97367.0 13 Number Of Hours Reactor Was Critical 0.0 0.0 67080.1
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 6525.8
- 15. Hours Generator On-Line 0.0 0.0 65912.4 -
- 16. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 17. Gross Thermal Energy Generated (MWH) 0.0 0.0 216937728.1
- 18. Gross Electrical Energy Generated (MWH) 0.0 0.0 74905103.1
- 19. Not Electrical Energy Generated (MWH) -4864.1 -23899.6 71272819.9
- 20. Unit Service Factor 0.0 0.0 67.7
' 21. Unit Availability Factor 0.0 00 67.7
- 22. Unit Capacity Factor (Using MDC Net) 0.0 0.0 64.3
- 23. Unit Capacity Factor (Using DER Net) 0.0 0.0 63.5
- 24. Unit Forced Outage Rate 100.0 100.0 23.8
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Shutdown at time of this report.
- 26. If Unit Shutdown At End of Report Period Estimated Date of Startup: To be determined.
- 27. Units in Test Status (Prior to Commercial Operat;on):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
t l
U.S. Nucl:ar Regulatory Commission .
816518%ttachment 2\Page 4 .
UNIT SHUTDOWNS AND POWER REDUCTIONS I
DOCKET NO. 50-423 UNIT NAM 5 Millstone Unit 3 DATE 06-03-97 COMPLETED BY K. W. Emmges .
TELEPHONE (860) 447-1791 X 6572 i
REPORT MONTH: May 1997 No. Date Type' Duration Reason: Method of License System Component Cause & Corrective -
(Hours) Shutting Event Code' Code' Action to Down Reactor
- Report # Prevent Recurrence 96-01 03-30-96 F 744 8/D 4 96-006-00 BA ISV Valves inoperable due to original design deficiencies, in that an improper valve design did not meet GDC 57. Corrective action is to install vendor kit to modify ,
i valve disk to meet GDC 57. !
Continued shutdown: NRC Category 111 facility; NRC Confirmatory Order requiring independent corrective action venfication:
NRC Order requmng third-party review of Millstone Station employee concems program; design basis verification for response to NRC pursuant to ,
- 'F
- Forced
- Reason
- Method lEEE Standard 805-1984, !
A - Equipment Failure (Explain) 1 - Manual
- Recommended Practices S: Scheduled B - Maintenance or Test 2 - Manual Scram for System Identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and .
D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) ;
'IEEE Standard 803A-1983, F - Administrative 6 - Other (Explain)
G - Operational Error (Explain) " Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related 1 Facilities - Component Function identifiers" ;
}
i