Monthly Operating Rept for Jul 1997 for Millstone Nuclear Power Station Unit 3
ML20217N481
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/31/1997
From: Emmons K, Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B16578, NUDOCS 9708260190
Download: ML20217N481 (8)


Text

- _ _ - - _

, eii, Nortiu a:t 'i"I'd '"'r "d - ( ""'" ' 5")' ' "'*"'d "8 ""3#>

Niu lt'ar Issierin- uai.,on, sm ira, isoa,, siatie.

Nordicant Nui tra,1;,wsp Coni liany l'O llos 12ft Wmierforii , Cr (ki3fl5 01211 (tW 0) 447 1791 l'at (1160) 444 4277 nr Nortlicant Ilititics Symicin AUG I 51997 Docket No. 50-423 B16578 US Nuclear Regulatory Commission l - Attention: Document Control Desk L Washington, D.C. 20555 l

l Millstone Nuclear Power Station Unit No. 3 i

Facility Operating License Number NPF-49 Monthlv Operatina Recor' for July 1997 in accordance with the reporting requirements of Technical Specification 6.9.1.5 for Millstone Unit No. 3, enclosed in Attachment 2 is the Monthly Operating Report for the month of July,1997.

Should you have any questions regarding this submittal, please contact Mr.

David Smith at (860) 437 5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

/

G. . icks irector - Millstone Unit No. 3 I

\'

Attachments (2) cc: H. J. Miller, Region 1 Administator / h ,M.- t '

l

\

W. D. Travers, Dr., Director Special Projects "

A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3

. n i , 05 9700260190 970731 P" " * ?!!' 1[IER)(RE,IR. 4

. , t.

-4 .  !

Docket No. 50-423 B16578 l i

i i

l Attachment 1 -

Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments P

l a

r 4

4

-t J

$ August 1997 J

Y

- . - - , . , . , . , . - . - , , -. ,-,n. .e,., - , , . - ..-,a.n,, -, .n.,.,n--., , ,, . . . - - , , + , , , , - . ,,nn-,-w.-

U.S. Nucl:ar Regulttory Commission B16578%ttechment 1\ Pegs 1 Enclosure {

List of Regtlatory Commitments document. Please notify the ManagerThe following table iden

- Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this docum any associated regulatory commitments.

l Commitment

! Committed Date or NONE Outage N/A i

i i

Q2GhtLNg. 50-423 B16578

)

Attachment 2 Millstone Nuclear Power Station, Unit No. 3 Facility Operating License No. NPF-49 July 1997 Monthly Oooratina Roood August 1997

o .' ,'

U.S. Nuclear Regulatory Commission B16578\ Attachment 2Page 1 REFUELING INFORMATION REQUESI July 1997

1. Name of the facility: Millstone Unit 3
2. Scheduled date for next refueling outage: To be determlood 3 Scheduled date for restart following refueling: To be determined
4. Wdi refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Ulbu

5. Scheduled date(s) for submitting licensing action and supporting information:

None.

6. Important lic.ensing considerations associated with refueling, e.g., new or different l fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

89R

7. The number of fuel assemblies (a) in the core and (b) in the spont fuel storage pool:

In Core: (a) . lR In Spent Fuel Pool: (b) 416

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present storace capacity: 756.

No increase reouettest

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming present license capacity:

End of Cvele 7.

4

- U.s. Nuclear Regulatory Commission B16578%ttachmerd 2Page 2 DOCKET No.: 50-423 UNIT: Melistone Unit 3 DATE: 4/1/97 COMPLETED BY; K. W. Emmons TELEPHONE: (860)447 1791 Ext. 6572 MONTH: Jul 97 l

DAY AVO, DAILY POWER LEVEL DAY AVG, DAILY POWER LEVEL (MWe Net) (MWe Net) 1 0 17 0 2 0 18 0 3- 0 19 0 4 0 20 0-5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 _0 25 --

0-10 0 26 0 11 0 27 0 12 0 28- 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 INSTRUCTIONS

- On this format, list the avera0e daily unit power leval in MWe-Net for each day in the reposting monthi Compute to the nearest whole megawatt.

- - - . - ---- -- _ _= _ _

U.S. Nuclear Regulatory Commission ,

C16578%ttachment 2Page 3 .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCMET NOz 50423 UNIT NMIEE . htAutone Unt 3 DATE: 084147 COMPLETED BY: K. W. Emmons TELEPHONE. (8801 447-1791 X 9572 REPORT MONTit Juhr 1997 No. Date Type' Durobon Reseon' Method of bconee System Comp'onent Cause & Corveeve (Hours) Shuthng Event Code' Code Acton to Down Reecid Report 8 Provent Recurrence 01 '03-30-96 F 744 B/D 4 96-006 00 BA ISV Vehes inoperoMe due to anynel desegn deGosenoes, in that en improper volve design did not most GDC

57. Conectrwe amon is to instes vendor Idt to mosNy volve dielt to most GDC 57.

Contnwed shutdouwr NRC Category ill facety; NRC Confirr story Order regumng independent correeve odon venAcaben; NRC Onter regumng thchierty rowsour of Mestone Stuben employee concerns program; doesgn basis venticebon for response to NRC pursuant to 10CFR50.54(f).

2 ' Method *EEE

. Stenderd 805-1984,

'F: Forced Resson

" S: Sct.eduled A- Equipment Foilee (Emplem) 1 - Manuel

  • Recommended Prochces B - Maintenance or Test 2- Manuel Scram for System idenblicebon in C- Refueling 3 - Automebc Scram NN Power Plants and D- Regulatory Restnchon 4 - Contmoed from Previous Month Related Facihbes*

E - Operator Trenung & lxense Examinobon 5 - Power Recuchon (Durobon = 0)

F- Admmistrebve 6 - Other (Expiesn} 'IEEE Standard 803A-1963 G- Operobonel Error (Explain) " Recommended Preeces H - Other (Expiem) for Uruque identficebon in Power Plants and Reisted Facdbes - Component Funcbon identefters*

. ' 'U[S. Nuclear Regulatory Commisakm 816578%ttachment 2Page 4 -

UNIT NAME' Millstone Unit 3 DATE: 04/01/97 COMPLETED SY: KW. Emmons TELEPHONE: (860) 447 1791 Ext 6572 OPERATING STATUS

1. Docket Number 50-423
2. Reporting Period Jul-97 Notes:

l 3. Utility Contact K W. Emmons 4.- Ucensed Thermal Power (MWt): 3411

6. 1,'le Rating (Gross WWe): 1253
6. Design Electrical Met 6ng (Not WWe): 1153.6
7. -- Maximum C:; z f M': Capacity (Gross MWe): 1184.20 8 Maximum C:; 21 Cepecity(Not MWe): _1137.00
9. - if Changes Occur in Cepecity Ratings (items Number 4 Through 8) Since Leet Report, No Renons:

N/A

10. Power Level To Which Restricted, if any (Not MWe): 0
11. Reasons For Restrictions, if Any: NRC Category lil Facility; NRC Confirmatory Order requiring implementation of en ir.f:;:W4 corrective action verification proprem; NRC Order requiring a third-party review of the employee concerne program et Milletone Station; des!pn basis verification response pursuant to 10CFR50.54(f).

This Month Yr..To-Date Cumulative j 12. Hours in Reporting Period 744.0 5087.0 98831.0 13 Number Of Hours Reedor Was Critical 0.0 0.0 67080.1

14. Reactor Reserve Shutdown Houra 0,0 0.0 6525.8
15. Hours Generator On-Line 0.0 0.0 65912.4

' 16. Unit Reserve Shutdown Hours 0.0 0.0 0.0

17. Gross Thermal Energy Generated (MWH) 0.0 0.0 216937728.1
18. Gross Electrical Energy Generated (MWH) 0.0 0.0 74905103.1
19. Net Electrical Energy Generated (MWH) 5261.9 34212.2 71262507.3
20. Unit Service Factor 0.0 0.0 86.7 21; Unit Aveliability Factor _ _ 0.0 0.0 66.7
22. Unit Cepecity Factor (Using MDC Net) 0.0 0.0 63.3
23. Unit Capacity Factor (Using DER Net) 0.0 0.0 62.5
24. Unit Forced Outage Rete 100.0 100.0 25.1
26. Shuhlewns Scheduled Over Neat 6 Months (Type, Dele, and Duration of Each):

- Shutdown et 16me of this report.

26. If Ur 4 Shutdown At End of Report Period, Estimated Date of Startup: To be determined.

- 27, Units in Test Status (Prior to Commercial Operation):

Foreceet - Achieved -

INITIAL CRITICAUTY N/A N/A INITIAL ELECTRICITY - N/A N/A COMMERCIAL OPERATION N/A N/A