Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARB17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20209J0661999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20211A6631999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With B17807, Monthly Operating Rept for May 1999 for Mnps,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 1.With B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 2.With B17777, Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with B17782, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With B17775, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With B17748, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station Unit 3.With B17735, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 2.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 2.With B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With B17693, Monthly Operating Rept for Feb 1999 for Mnps,Unit 2.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Mnps,Unit 2.With B17694, Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 1.With B17701, Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 3.With B17627, Monthly Operating Rept for Dec 1998 for Millstone Nuclear Power Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Nuclear Power Station,Unit 1.With B17617, Monthly Operating Rept for Dec 1998 for Millstone Unit 2. with1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Unit 2. with B17461, Monthly Operating Rept for Dec 1998 for Millstone Nuclear Plant,Unit 3.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Nuclear Plant,Unit 3.With B17460, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 3.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 3.With B17576, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 2.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 2.With B17579, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 1.With ML20195E1871998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Mnps,Unit 2 B17545, Monthly Operating Rept for Oct 1998 for Mnps,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Mnps,Unit 1.With ML20195F9821998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Millstone,Unit 3 B17497, Monthly Operating Rept for Sept 1998 for Millstone Nuclear Power Station,Unit 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Millstone Nuclear Power Station,Unit 2.With ML20195F9871998-09-30030 September 1998 Corrected Page to MOR for Sept 1998 for Millstone,Unit 3 B17493, Monthly Operating Rept for Sept 1998 for Mnps,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Mnps,Unit 1.With B17458, Monthly Operating Rept for Sept 1998 for Mnps,Unit 3.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Mnps,Unit 3.With B17437, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 21998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 2 ML20195E2061998-08-31031 August 1998 Revised Monthly Operating Rept for Aug 1998 for Mnps,Unit 2 B17441, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 1.With B17450, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 3.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 3.With B17410, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 31998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 3 B17406, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 1 B17404, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 21998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 2 B17365, Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 21998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 2 B17366, Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 31998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 3 B17369, Monthly Operating Rept for June 1998 for Mnps,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Mnps,Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P5391999-10-25025 October 1999 Rev 0,Change 1 to Millstone Unit 1 Northeast Utils QA Program ML20217C8721999-10-0606 October 1999 Rev 21,change 3 to MP-02-OST-BAP01, Nuqap Topical Rept, App F & G Only B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With B17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216J4341999-09-24024 September 1999 Mnps Unit 3 ISI Summary Rept,Cycle 6 ML20211N8401999-09-0202 September 1999 Rev 21,change 1 to Northeast Utils QA TR, Including Changes Incorporated Into Rev 20,changes 9 & 10 B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With ML20211G9631999-08-30030 August 1999 SER Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20210J0311999-07-21021 July 1999 Rev 20,Change 10 to QAP 1.0, Organization ML20210E5931999-07-19019 July 1999 Revised Page 16 of 21,to App F of Northeast Util QA Program Plan ML20210C5911999-07-15015 July 1999 Revised Rev 20,change 10 to Northeast Util QA Program TR, Replacing Summary of Changes ML20210A0411999-07-15015 July 1999 Rev 20,change 10 to Northeast Util QA Program Tr B17814, Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start1999-07-12012 July 1999 Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start ML20209D1881999-07-0101 July 1999 Rev 20,change 9 to Northeast Util QA Program Tr ML20196J2191999-06-30030 June 1999 SER Concluding That Licensee USI A-46 Implementation Program,In General,Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20196A8451999-06-30030 June 1999 Post Shutdown Decommissioning Activities Rept ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20196K1791999-06-30030 June 1999 Addendum 6 to Millstone Unit 2 Annual Rept, ML20196J1821999-06-30030 June 1999 Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) Tr B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With ML20195H1011999-06-11011 June 1999 Rev 20,change 8 to Northeast Utilities QAP (Nuqap) TR ML20207G6411999-06-0303 June 1999 Safety Evaluation Supporting Amends 105,235 & 171 to Licenses DPR-21,DPR-65 & NPF-49,respectively ML20211A6631999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With ML20211B7351999-05-31031 May 1999 Cycle 7 Colr B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 2.With B17807, Monthly Operating Rept for May 1999 for Mnps,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 1.With ML20209J0661999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20206M4631999-05-11011 May 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Perform Ultrasonic Exam on Inner Surface of Nozzle to safe-end Weld ML20206J8351999-05-0707 May 1999 Rev 20,Change 7 to QAP-1.0, Northeast Utls QA Program (Nuqap) Tr ML20206G6221999-05-0404 May 1999 SER Accepting Util Request to Apply leak-before-break Status to Pressurizer Surge Line Piping for Millstone Nuclear Power Station,Unit 2 B17782, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With ML20205R3531999-04-30030 April 1999 Addendum 4 to Annual Rept, B17775, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With ML20205K6141999-04-30030 April 1999 Non-proprietary Version of Rev 2 to Holtec Rept HI-971843, Licensing Rept for Reclassification of Discharge in Millstone Unit 3 Spent Fuel Pool ML20206E2971999-04-30030 April 1999 Rev 1 to Millstone Nuclear Power Station,Unit 2 COLR - Cycle 13 B17777, Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with ML20205Q5891999-04-0909 April 1999 Rev 20,change 6 to QAP-1.0,Northeast Utils QA Program TR ML20205R8751999-04-0909 April 1999 Provides Commission with Staff Assessment of Issues Related to Restart of Millstone Unit 2 & Staff Recommendations Re Restart Authorization for Millstone Unit 2 ML20206T3991999-03-31031 March 1999 First Quarter 1999 Performance Rept, Dtd May 1999 B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With 1999-09-30
[Table view] |
Text
- _ _ - - _
, eii, Nortiu a:t 'i"I'd '"'r "d - ( ""'" ' 5")' ' "'*"'d "8 ""3#>
Niu lt'ar Issierin- uai.,on, sm ira, isoa,, siatie.
Nordicant Nui tra,1;,wsp Coni liany l'O llos 12ft Wmierforii , Cr (ki3fl5 01211 (tW 0) 447 1791 l'at (1160) 444 4277 nr Nortlicant Ilititics Symicin AUG I 51997 Docket No. 50-423 B16578 US Nuclear Regulatory Commission l - Attention: Document Control Desk L Washington, D.C. 20555 l
l Millstone Nuclear Power Station Unit No. 3 i
Facility Operating License Number NPF-49 Monthlv Operatina Recor' for July 1997 in accordance with the reporting requirements of Technical Specification 6.9.1.5 for Millstone Unit No. 3, enclosed in Attachment 2 is the Monthly Operating Report for the month of July,1997.
Should you have any questions regarding this submittal, please contact Mr.
David Smith at (860) 437 5840.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY
/
G. . icks irector - Millstone Unit No. 3 I
\'
Attachments (2) cc: H. J. Miller, Region 1 Administator / h ,M.- t '
l
\
W. D. Travers, Dr., Director Special Projects "
A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3
. n i , 05 9700260190 970731 P" " * ?!!' 1[IER)(RE,IR. 4
. , t.
-4 . !
Docket No. 50-423 B16578 l i
i i
l Attachment 1 -
Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments P
l a
r 4
4
-t J
$ August 1997 J
Y
- . - - , . , . , . , . - . - , , -. ,-,n. .e,., - , , . - ..-,a.n,, -, .n.,.,n--., , ,, . . . - - , , + , , , , - . ,,nn-,-w.-
U.S. Nucl:ar Regulttory Commission B16578%ttechment 1\ Pegs 1 Enclosure {
List of Regtlatory Commitments document. Please notify the ManagerThe following table iden
- Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this docum any associated regulatory commitments.
l Commitment
! Committed Date or NONE Outage N/A i
i i
Q2GhtLNg. 50-423 B16578
)
Attachment 2 Millstone Nuclear Power Station, Unit No. 3 Facility Operating License No. NPF-49 July 1997 Monthly Oooratina Roood August 1997
o .' ,'
U.S. Nuclear Regulatory Commission B16578\ Attachment 2Page 1 REFUELING INFORMATION REQUESI July 1997
- 1. Name of the facility: Millstone Unit 3
- 2. Scheduled date for next refueling outage: To be determlood 3 Scheduled date for restart following refueling: To be determined
- 4. Wdi refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Ulbu
- 5. Scheduled date(s) for submitting licensing action and supporting information:
None.
- 6. Important lic.ensing considerations associated with refueling, e.g., new or different l fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
89R
- 7. The number of fuel assemblies (a) in the core and (b) in the spont fuel storage pool:
In Core: (a) . lR In Spent Fuel Pool: (b) 416
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present storace capacity: 756.
No increase reouettest
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming present license capacity:
End of Cvele 7.
4
- U.s. Nuclear Regulatory Commission B16578%ttachmerd 2Page 2 DOCKET No.: 50-423 UNIT: Melistone Unit 3 DATE: 4/1/97 COMPLETED BY; K. W. Emmons TELEPHONE: (860)447 1791 Ext. 6572 MONTH: Jul 97 l
DAY AVO, DAILY POWER LEVEL DAY AVG, DAILY POWER LEVEL (MWe Net) (MWe Net) 1 0 17 0 2 0 18 0 3- 0 19 0 4 0 20 0-5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 _0 25 --
0-10 0 26 0 11 0 27 0 12 0 28- 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 INSTRUCTIONS
- On this format, list the avera0e daily unit power leval in MWe-Net for each day in the reposting monthi Compute to the nearest whole megawatt.
- - - . - ---- -- _ _= _ _
U.S. Nuclear Regulatory Commission ,
C16578%ttachment 2Page 3 .
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCMET NOz 50423 UNIT NMIEE . htAutone Unt 3 DATE: 084147 COMPLETED BY: K. W. Emmons TELEPHONE. (8801 447-1791 X 9572 REPORT MONTit Juhr 1997 No. Date Type' Durobon Reseon' Method of bconee System Comp'onent Cause & Corveeve (Hours) Shuthng Event Code' Code Acton to Down Reecid Report 8 Provent Recurrence 01 '03-30-96 F 744 B/D 4 96-006 00 BA ISV Vehes inoperoMe due to anynel desegn deGosenoes, in that en improper volve design did not most GDC
- 57. Conectrwe amon is to instes vendor Idt to mosNy volve dielt to most GDC 57.
Contnwed shutdouwr NRC Category ill facety; NRC Confirr story Order regumng independent correeve odon venAcaben; NRC Onter regumng thchierty rowsour of Mestone Stuben employee concerns program; doesgn basis venticebon for response to NRC pursuant to 10CFR50.54(f).
2 ' Method *EEE
. Stenderd 805-1984,
'F: Forced Resson
" S: Sct.eduled A- Equipment Foilee (Emplem) 1 - Manuel
- Recommended Prochces B - Maintenance or Test 2- Manuel Scram for System idenblicebon in C- Refueling 3 - Automebc Scram NN Power Plants and D- Regulatory Restnchon 4 - Contmoed from Previous Month Related Facihbes*
E - Operator Trenung & lxense Examinobon 5 - Power Recuchon (Durobon = 0)
F- Admmistrebve 6 - Other (Expiesn} 'IEEE Standard 803A-1963 G- Operobonel Error (Explain) " Recommended Preeces H - Other (Expiem) for Uruque identficebon in Power Plants and Reisted Facdbes - Component Funcbon identefters*
. ' 'U[S. Nuclear Regulatory Commisakm 816578%ttachment 2Page 4 -
UNIT NAME' Millstone Unit 3 DATE: 04/01/97 COMPLETED SY: KW. Emmons TELEPHONE: (860) 447 1791 Ext 6572 OPERATING STATUS
- 1. Docket Number 50-423
- 2. Reporting Period Jul-97 Notes:
l 3. Utility Contact K W. Emmons 4.- Ucensed Thermal Power (MWt): 3411
- 6. 1,'le Rating (Gross WWe): 1253
- 6. Design Electrical Met 6ng (Not WWe): 1153.6
- 7. -- Maximum C:; z f M': Capacity (Gross MWe): 1184.20 8 Maximum C:; 21 Cepecity(Not MWe): _1137.00
- 9. - if Changes Occur in Cepecity Ratings (items Number 4 Through 8) Since Leet Report, No Renons:
N/A
- 10. Power Level To Which Restricted, if any (Not MWe): 0
- 11. Reasons For Restrictions, if Any: NRC Category lil Facility; NRC Confirmatory Order requiring implementation of en ir.f:;:W4 corrective action verification proprem; NRC Order requiring a third-party review of the employee concerne program et Milletone Station; des!pn basis verification response pursuant to 10CFR50.54(f).
This Month Yr..To-Date Cumulative j 12. Hours in Reporting Period 744.0 5087.0 98831.0 13 Number Of Hours Reedor Was Critical 0.0 0.0 67080.1
- 14. Reactor Reserve Shutdown Houra 0,0 0.0 6525.8
- 15. Hours Generator On-Line 0.0 0.0 65912.4
' 16. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 17. Gross Thermal Energy Generated (MWH) 0.0 0.0 216937728.1
- 18. Gross Electrical Energy Generated (MWH) 0.0 0.0 74905103.1
- 19. Net Electrical Energy Generated (MWH) 5261.9 34212.2 71262507.3
- 20. Unit Service Factor 0.0 0.0 86.7 21; Unit Aveliability Factor _ _ 0.0 0.0 66.7
- 22. Unit Cepecity Factor (Using MDC Net) 0.0 0.0 63.3
- 23. Unit Capacity Factor (Using DER Net) 0.0 0.0 62.5
- 24. Unit Forced Outage Rete 100.0 100.0 25.1
- 26. Shuhlewns Scheduled Over Neat 6 Months (Type, Dele, and Duration of Each):
- Shutdown et 16me of this report.
- 26. If Ur 4 Shutdown At End of Report Period, Estimated Date of Startup: To be determined.
- 27, Units in Test Status (Prior to Commercial Operation):
Foreceet - Achieved -
INITIAL CRITICAUTY N/A N/A INITIAL ELECTRICITY - N/A N/A COMMERCIAL OPERATION N/A N/A