e Ndd
""P" f""1 "d- ("""'" 156)' **'"'d CT 63"5 p &clearEnergy snuaone Neaeor Power station Nordics,st Nucl.ar Energy Cornpany P.O. Hos 128 Waterford, CT 00385 0128 (860) 447-1791 Fax (860) 444-4277 The Northeast Utilities Systern February 28,1997 Docket No. 50-245 B16270 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No.1 1
Annual Reoort J
Pursuant to the provisions of Section 6.9.1.4 and 6.9.1.5 of Appendix A to Facility l
Operating License DPR-21, Northeast Nuclear Energy Company (NNECO) is reporting on operations for the period January 1,1996, to December 31,1996. During 1996, the j
specific activity of the primary coolant did not exceed the limits of Technical Specification 3.6.C.1.
Further, there were no challenges to the relief / safety valves i
which fulfills our commitment") to provide an annual report. A tabulation of station, utility, and other personnel receiving exposures greater than 100 mrom/yr is provided in There are no commitments contained within this letter. If the NRC Staff should have any questions or comments on this report, please contact R. W. Walpole at (860) 440-2191.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY
@l/\\ d Q 30$8$$ N o$$b45 P. D. Hinnenk m R
PDR Director-Unit No.1 Operations Enclosure cc:
H. J. Miller, Region i Administrator S. Dembek, NRC Project Manager, Millstone Unit No.1 i
T. A. Eastick, Senior Resident inspector, Millstone Unit No.1 0{ %g W. D. Travers, Dr., Director, Special Projects 05001S Director, Office of Nuclear Regulatory Research Y
U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention: REIRS Project Manager 1
")
W. G. Counsil letter to D. G. Eisenhut, "Five Additional TMI-2 Related 1 equirements to Operating Reactors," dated June 10,1980.
mes av.12
@.IlE55.EN.E5!
l l
4 Docket No. 50-245 4
B16270 i
i Millstone Nuclear Power Station, Unit No.1 Regulatury Guide 1.16 Report 1996 i
i i
February 1997
PEWPDD20
- MILLSTONE NUCLEAR POWER STATION 27.Jan-1997 REG. GUIDE 1.16 REPORT e s tanop].
3 j
Reporting Year : 1996 Unit : 1 j
- 8 Of Personnel > 100 mrem-...-. -. Tot al Man mrem-......
Work & Job Function Station Utility contract Station Utility Contract i
Inservice inspection Engineering Staff 0
0 0
0 0
0 Health Physics and Lab 0
0 0
0 0
0 Maint and construction 0
0 0
0 0
0 Operations 0
0 0
0 0
0 Supy and office Staff 0
0 0
0 0
0 R: fueling operations
)
l Engineering Staff 1
1 3
2 7
2 Health Physics and Lab 6
0 9
107 0
232
]
Maint and Construction 26 8
32 311 16 2327 operations 3
0 0
40 0
0 Supv and Office Staff 0
0 0
0 0
0 j
Routine oper and Sury Engineering Staff 5
4 6
16 28 6
Health Physics and Lab 39 2
39 4361 525 5914 Maint and construction 25 8
119 1295 34 1815 operations 46 0
10 6809 0
931 Supy and Office Staff 0
0 1
0 0
0 Routine Plant Maint Engineering Staff 11 8
41 160 186 727 Health Physics and Lab 16 0
33 582 0
1577 Maint and construction 63 37 400 2965 411 13340 Operations 6
0 4
19 0
10 Supv and Office Staff 0
0 5
0 0
107 1
Special Plant Maint i
Engineering Staff 13 11 59 1796 2333 29945 Health Physics and Lab
~36 1
46 5461 85 16064 Maint and Construction-53 37 481 10061 5357 263476 operations 24 0
11 1620 0
1708 Supv and Office Staff 0
0 5
0 0
2023 Weste Processing 1
Engineering Staff 6
1 12 0
1 2
Health Physics and Lab 25 0
31 882 0
1329 Maint and construction 63 26 268 2468 61 3966 Operations 20 0
11 0
0 520 Supy and Office Staff 0
0 2
0 0
0 Job Totals Engineering Staff 36 25 121 1974 2555 30682 Health Physics and Lab 122 3
158 11393 610 25116 i
Maint and Construction 230 116 1300 17100 5879 284924 operations 99 0
36 8488 0
3169 0
13 0
0 2130 e**.Supv and Office Staff.. n..n.. n..... w..n n..n e......w.....
0
. n.
.n..n...
.n......n.nn....n.................n......on U.ni t 1.un.a l.....un n.n.
..n....w.......n.n....nw.
nn n.
.........w.2 816.....w.95 538.. n....
9044..n.. 346021 Tot 487 144 e.....
nun.
Note Report contains unofficial dose only Dose of persons with.100 mrem ]$ NOT INCLUDED J