B16006, Monthly Operating Repts for Oct 1996 for Mnps,Units 1,2 & 3

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1996 for Mnps,Units 1,2 & 3
ML20129K339
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 10/31/1996
From: Hudson I, Newburgh G, Stark S
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20129K336 List:
References
B16006, NUDOCS 9611210024
Download: ML20129K339 (15)


Text

}

Docket No. 50-245 B16006 1

1 l

l l

l I

l l

Attachment 1 Millstone Unit No. 1 Facility Operating License No. DPR-21 Monthly Operating Report November 1996 9611210024 961115 PDR ADOCK 05000245 R PDR

I l i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-245 UNIT: Millstone Unit No.1 DATE: 11/12/96 COMPLETED BY: G. Newburgh TELEPHONE: (860) 444-5730 l

i MONTH: October 1996 l

DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

REFUELING INFORMATION REQUEST 1

1. Name of the facility: Millstone Unit No.1
2. Scheduled date for next refueling outage: To be determined l
3. Scheduled date for restart following refueling: To be determined i 4. Will refueling or resumption of operation thereafter require a technical specification

. change or other license amendment?

Yes i . 5. Scheduled date(s) for submitting licensing action and supporting information:

To be determined

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

< 184 GE-11 fuel assemblies j 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

l

In Core
(a) Q In Spent Fuel Pool: (b) 3068 Unconsolidated
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of j fuel assemblies:

-i Present Canacitv: Maximum 3229 fuel assembly locations

' 9. The projected date of the last refueling that can be discharged to the spent fuel i

pool assuming present license capacity:

1999/2000. soent fuel cool full. core offload caoacity is reached l

)

i I

1

- . . . .- - - . ... - - ~. ~ . - - . . . - - . -. . .. . -

.'. OPERATING DATA REPORT 1 e

/l UNIT NAME Millstone Unit 1 DATE 11/12/96 COMPLETED BY G. Newburgh l TELEPHONE (860) 444-5730 l 1

OPERATING STATUS

1. Docket Number 50-245
2. Reporting Period October 1996 Notes
3. Utility Contact G. Newburgh , "' EDT to EST 4 Licensed Thermal Power (MWt): 2011
  • Millstone Unit No.1 is redefining the 3 5. Nameplate Rating (Gross MWe): 662 nature of its extended shutdown.
6. Design Electrical Rating (Net MWe): 660

'"" ' " ' lated fn"d s it

7. Maximum Dependable Capacity (Gross MWe): n no onth's 670 operating report. i

' 8. . Maximum Dependable Capacity (Net MWe): 641 2

9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, l Give Reasons:

'N/A T

\

10. Power Level To Which Restricted, if any (Net MWe):

d 0 l l 11. Reasons For Restrictions, if Any: NRC Category lli Facility: NRC Confirmatory Order requiring  !

i implementation of an independent corrective action verification program: NRC Order requiring a third-party review j i

of the employee concerns program at Millstone Station; design basis verification response pursuant to 10CFR50.54(f).  ;

l This Month Yr.-To Date Cumulative

13. Hours In Reporting Period W 745.0 7320.0 226536.0
13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9 j 14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3 l 15. Hours Generator On-Line 0.0 0.0 166560.7
16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0 i- 18. Gross Electrica! Energy Generated (MWH) 0.0 0.0 105938737.0
19. Net Electrical Energy Generated (MWH) -

1943.0 -22056.0 101047895.0 5

30. Unit Service Factor 0.0 0.0 73.5
21. Unit Availability Factor 0.0 0.0 73.6

. 23. Unit Capacity Factor (Using MDC Net) -0.4 -0.4 68.2

} 23. Unit Capacity Factor (Using DER Net) -0.4 -0.5 67 5

34. Unit Forced Outage Rate 100.0 Note (2) Note (2)
25. Shutdowns Scheduled Over Next 6 Months (Type.. Oate, and Duration of Each):

~

Shutdown at time of this report

]

36. If Unit Shutdown At End Of Report Period, Estimated Date of Startup: To be determined

, 27. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved

, INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 4

i 4

,r _ s ~#.._ _ . , _ ,

UNIT SHUTDOWNS AND POWER REDUCTIONS

i DOCKET NO 50-245 UNIT NAME Millstone Unit 1 ,

DATE 11/12/96* .,

COMPLETED BY G. Newbumh TELEPHONE (203b444-5730 REPORT MONTH: October 1996 z

No. Date Type' Duration Reason Method of License System Component Cause & Corrective (Hours) Shutting Event Code

  • Code
  • Action to Down Reactor' Report # Prevent Recurrence 95-09K 951104 S/F 745 C/D 4 N/A N/A N/A Scheduled : RFO15.

Forced : NRC Category til facility; NRC Confirmatory Order requiring independent corrective action verification- t NRC Order requiring third-party review of Millstone Station employee concems program; design basis venfication for response to NRC pursuant to 10CFR50.54(f).

2 8

' F: Forced Reason Method

  • IEEE Standard 805-1984, S: Scheduled A - Equipment Failure (Explain) 1 - Manual " Recommended Prachces  !

B - Mainteneance or Test 2 - Manual Scram for System idenuin;ation in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 -Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) 5 F - Administrative 6 - Other (Explain) IEEE Standard 803A-1983, G -Operational Error (Explain) " Recommended Prachces H - Other (Explain) for Unique identificabon in -  ;

Power Plants and Related }*

Facilities - Component Function identifiers" i

_m _mm _ _- . _ . _ _ _ _ . . _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ . _ _

Docket No. 50-336 B16006 Attachment 2 Millstone Unit No. 2 Facility Operatir. License No. DPR-65 Monthly Operating Report November 1996

2

.*.(.

, AVERAGE DAILY UNIT POWER LEVEL i- DOCKET NO. 50-336 I UNIT Millstone Unit No.2 l DATE 11/1/96 i

COMPLETED BY S. Stark

, TELEPHONE (860) 447-1791 l EXT 4419 i

MONTH: October 1996 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 i

j 3 0 19 0 i 4 0 20 0 4 5. O 21 0

6 0 22 0 -

7 0 23 0 8 0 24 0 9 0 25 0

10 0 26 0 l- 11 0 27 0 12 0 28 0  :

13 0 29 0 14 0 30 0 15 0 31 0 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

.' . l l

l REFUELING INFORMATION REQUEST l l

1. Name of the facility: Millstone Unit No. 2 i

i

2. Scheduled date for next refueling outage: To be determined .

, 1

3. Scheduled date for restart following refueling: To be determined
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

To be detemined l

5.' Scheduled date(s) for submitting licensing action and supporting information:

To be determined

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures

To be determined

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: i in Core: (a) 217 in Spent Fuel Pool: (b) 868 l

NOTE: These numbers reoresent the total Fuel Assemblies and Consolidated Fuel Storage Boxes (3 total containing the fuel rods from 6 fuel assemblies) in these two (2) Item Control Areas.

8. The present licensed spent fuel pool storage capacity and the size of any  !

increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present storage caoacitv: 1306 storage locations i-

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming present license capacity:

j 2000. Soent Fuel Pool Full. Core offload caoacitv is reached.

l 2004. Core Full. Soent Fuel Pool Full.

l'

l

. . OPERATING DATA REPORT UNIT NAME Millstone Unit 2 DATE 11/1/1996 COMPLETED BY S. Stark TELEPHONE (8601447-1791 EXT 4419 OPERATING STATUS

1. Docket Number 50-336 Notes
2. Reporting Period October 1996 "' EDT to EST
3. Utility Contact S. Stark Millstone Unit No. 2 is redefining the
4. Licensed Thermal Power (MWt): 2700 nature f its extended shutdown.
5. Nameplate Rating (Gross MWe): 909 submitted in next month's operating report.
6. Design Electrical Rating (Net MWe): 870 n' Cumulative weighted averages. Unit
7. Maximum Dependable Capacity (Gross MWe): 901.63 operated at 2560 MWTH prior to its
8. Maximum Dependable Capacity (Net MWe): _ 870.63 uprating to the current 2700 MWTH power
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, level.

Give Reasons:

N/A _

10. Power Level To Which Restricted, if any (Net MWe): 0
1. Reasons For Restrictions, if Any: NRC Category ll1 Facility: NRC Confirmatory Order requiring implementation of an independent corrective action verification program: NRC Order requiring a third-party review of the employee concerns program at Millstone Station; design basis verification response pursuant to 10CFR50.54(f).

This Month Yr.-To-Date Cumulative

12. Hours in Reporting Period W 745.0 7320.0 182784.0
13. Number Of Hours Reactor Was Critical 0.0 1223.6 121911.7
14. Reactur Reserve Shutdown Hours 0.0 0.0 2205.5
15. Hours G;nerator On-Line 0.0 1222.1 116611.9
16. Unit Reserve Shutdown Hours 0.0 0.0 468.2
17. Gross Thermal Energy Generated (MWH) 0.0 3240377.0 300862506.4
18. Gross Electrical Energy Generated (MWH) 0.0 1085422.5 98709460.0
19. Net Electrical Energy Generated (MWH) -2243.6 1026147.0 94645593.1
20. Unit Service Factor 0.0 16.7 63.8
21. Unit Availability Factor 0.0 16.7 64.1
22. Unit Capacity Factor (Using MDC Net) 0.0 (3) 16.1 (3) 60.5
23. Unit Capacity Factor (Using DER Net) 0.0 (3) 16.1 (3) 59.6
24. Unit Forced Outage Rate 100.0 Note (2) Note (2)
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, arid Duration of Each):

Shutdown at time of this report

26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup: To be determined
27. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTR;0lTY N/A N/A COMMERCIAL OPERATION N/A N/A

_ - , _ . ~ . ~ . __.---~..- - . - . . - . - . . . - - - ------ - ~ . _ - - . -- ..-- - ~ .. -

4 UNIT SHUTDOWNS AND POWER REDUCTION 0

~

DOCKET NO. 50-336 _ .-

UNIT NAMtE Millstone Unit 2 . .

DATE 11/1/96 COMPLETED BY S. Stark TELEPHONE (860) 447-1791_

EXT 4419 REPORT MONYH: October 1996 No. Date Typo' Duration Reason' Method of License System Component Cause & Corrective (Hours) Shutting Event Code' Code' Action to i Down Reactor Report # Prevent Recurrence 96-03 960226 S/F 745 B/D 4 N/A N/A N/A Scheduled : Continued mid cycle surveillance testing outage from previous month.

Forced : NRC Category ill f facility; NRC Confirmatory Order requiring independent corrective action verification; NRC Order requiring third-party review of Millstone Station employee concems program; design basis verification for response to NRC pursuant to ,

10CFR50.54(f).

2 'IEEE Standard 805-1984,

'F: Forced Reason Method S: Scheduled A - Equipment Failure (Explain) 1 - Manual " Recommended Practices B - Maintenance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)

F - Administrative 6 - Other (Explain) 'iEEE Standard 803A-1983, G - Operational Error (Explain) " Recommended Practices H - Other (Explain) for Unique identification in  ;

Power Plants and Related [

Facilities - Component Function Identifiers' I

I Docket No. 50-473 l B16006 I

l 1

i Attachment 3 4

Millstone Unit No. 3 a

Facility Operating License No. NPF-49 4

Monthly operating Report 4

f i

1 November 1996

i i

., AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-423 UNIT Millstone Unit 3. .

DATE 11/01/96 l COMPLETED BY 1. R. Hudson l

~ TELEPHONE (860) 444-5400 1

l i

MONTH: October 199u -

a

~

~

DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL l

(MWe-Net) (MWe-Net)
1 0 '17 0 j 2 0 18 0 3 0 19 0 j 4 0 20 C -l 5 0 21 0 6 0 22 0 j 7' O 23 0 l 8 0 24 0 l 9- 0 25 O.

! 10 0 26 0 l 11 0 27 0 12 0 28 0  ;

i 13 0 29 0

14 0 30 0
15 0 31 0

, 16 0 3

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

{

4 d

REFUELING INFORMATION REQUEST October 1996

1. Name of the' facility: Millstone Unit No. 3 4
2. Scheduled date for next refuel:ng outage: To be determined
3. Scheduled date for restart following refueling
To be determined i 4. Will refueling or resumption of operation thereafter require a technical

, specification change or other license amendment?

N/A.

j 5. Scheduled date(s) for submitting licensing action and supporting information:

None. r j

) 6. Important licensing considerations associated with refueling, e.g., new or i different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

  • l None.
7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: I In Core: (a) 193 in Spent Fuel Pool: (b) 416
8. The present licensed spent fuct pool storage capacity and the size of any I increase in licensed storage capacity that has been reauested or is planned, in number of fuel assemblies: l Present storace cacacitv: 756. j No increase reauestei
9. The projected date of the last refueling that can be discharged to the spent  ;

fuel pool assuming present license capacity: '

End of Cvele 7.

. - . _ . . . . _ , ~ _ _ . . _ _ _ - . . _ _ - - _ .m . . _ _ . . . . . - _ . _ . _ . _ _

.i . .

. . .+ o OPERATING DATA REPORT - >i 2

i UNIT NAME Iviill stone Unit 3 )

{ DATE .11/01/96 L

COMPLETED BY 1. R. Hudson

. TELEPHONE (860) 444-5400 i i

. OPERATING STATUS

} 1. Docket Number 50-423 Notes

2. : Reporting Period October 1996 - m EDT to EST
3. Utility Contact 1. R. Hudson
4. Licensed Thermal Power (MWt): 3411
5. Nameplate Rating (Gross MWe): 1253

- 6. Design Electrical Rating (Net MWe): 1153.6 i i 7. Maximum Dependable Capacity (Gross MWe): 1184.20 j

8. Maximum Dependable Capacity (Net MWe): 1137.00 l
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, )

' Give Reasons:  !

N/A I

-10. Power Level To Which Restricted, if any (Net MWe): ~~ 0

- 11. Reasons For Restrictions, if Any: NRC Category 111 Facility: NRC Confirmatory Order requiring implementation of an independent corrective action verification program: NRC Order requiring a third-party review of the employee concerns program at Millstone Station: design basis verification response pursuant to 10CFR50.54(fl.

This Month Yr. To-Date - Cumulative

12. Hours in Reporting Period *745 7320.0 92280.0 13 Number Of Hours Reactor Was Critical 0.0 2158.8 67080.1
14. Reactor Reserve Shutdown Hours 0.0 0.0 6525.8
15. Hours Generator On-Line 0.0 2156.7- 65912.4

- 16. Unit Reserve Shutdown Hours 0.0 0.0 0.0

17. Gross Thermal Energy Generated (MWH) 0.0 7317189.0 216937728.1
18. Gross Electr' cal Energy Generated (MWH) 0.0 2577448.5 74905103.1
19. Net Electrical Energy Generated (MWH) 5850.7 2436080.7 71306505.9
20. Unit Service Factor 0.0 29.5 71.4
31. Unit Availability Factor 0.0 29.5 71.4
23. Unit Capacity Factor (Using MDC Net) 0.0 29.3- 67.9
23. Unit Capacity Factor (Using DER Net) 0.0 28.8 67.0
34. Unit Forced Outage Rate 100.0 70.5 19.0
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Shutdown at time of this report.

26.' If Unit Shutdown At End Of Report Period, Estimated Date of Startup: To be determined

-27. Units In Test Status (Prior to Commercial Operation):

Forecast - Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A C

UNIT SHUTDOWNS AND POWER REDUCTIONS j .

DOCKET NO. 50-423 UNIT NAME Millstone Units DATE 11-01-96 -

COMPLETED BY Irene R Hudson TELEPHONE (8601 444-5400 REPORT MONTH: October 1996 2

No. Date Type' Duration Reason Method of License System Component Cause & Corrective (Hours) Shutting Event Code' Code

  • Action to Down Reactor' Report # Prevent Recurrence 96-01 960330 F 745 B/D 4 96-006-00 BA ISV Valves inoperable due to original design defiecencies, in that an improper valve design did not meet GDC 57. Corrective action is to install vendor kit to modify valve disk to meet GDC 57.

Continued shutdown : NRC Category ill facility; NRC Confirmatory Order requiring independent corrective action verification; NRC Order requiring third-party review of Millstone Station employee concems program; design basis verification for response to NRC pursuant to 10CFR50.54(f).

'F: Forced ' Reason ' Method "lEEE Standard 805-1984, S: Scheduled A - Equipment Failure (Explain) 1 - Manual " Recommended Practices B - Maintenance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) 5 F - Administrative 6 - Other (Explain) tEEE Standard 803A-1983, G - Operational Error (Explain) " Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function Identifiers"