B16581, Monthly Operating Rept for Oct 1997 for Mnps,Unit 3

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1997 for Mnps,Unit 3
ML20199B087
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/31/1997
From: Emmons K, Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B16581, NUDOCS 9711180207
Download: ML20199B087 (8)


Text

-- - - - -- - . . . - . -. . . . . . . - . . _. ~ . ~

l

  • t .

g Rope Ferry Rd. (Route 156), Weserford, Cr 06385 Nuclear Energy

- uiii. ooc Nuci,,, power si. tion

- Northemt Nuclear Energy cnagiany .

. P.O But 128 Waterford, Cr 06385-0128 (860) 447 !?91 Fax (860) 444-4277 -

%e Nortlicaat Utihties Sy iem NOV I O 19J/

Docket No. 50423 B16581 US Nuclear Regulatory Commission Attention: Document Control Desk -

Washington, D.C. 20555 Millstone Nuclear Power Station Unit No. 3 Facility Operating License Number NPF-49 Monthly Operatina Reoort for October 1997 >

In' accordance with the reporting requirements of Technical Specification 6.9.1.5 for Millstone Unit No. 3, enclosed in Attachment 2 is the Monthly Operating Report for the month of October 1997.

Should you have any questions regarding this submittal, please contact Mr. David Smith at (860) 437-5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY r

a

. D. Hicks #

Director - Millstone Unit No. 3 l

Attachments (2) cc: H. J. Miller, Region 1 Administrator W. D. Travers, Ph.D, Director Special Projects

[<C f A. C. Ceme, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 g

tawn $ REV.12-95 r -- = m ~ -y --m w w<w

L 1 -

Docket No. 50-423 B16581

?

Attachment 1 -

Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments 1

l 4-November 1997 l

J l

U.S. Nuclear Regulatory Commission B16581%ttachment 1\Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Please notify the Manager - Regulatory Compliance at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Committed Date or Commitment Outage NONE N/A

. Docket No. 50-423 -

B16581 i

Attachment 2 Millstone Nuclear Power Station, Unit No. 3 Facility Operating License No. NPF-49 October 1997 Monthly Operatina Report 1

November 1997 a'

l.

U.S. Nuclear Regulatory Commission B16581Wtachment 2Page 1 REFUELING INFORMATION REQUEST October 1997

1. Name of the facility: Millstcne Unit 3 _
2. - Scheduled date for next refueling outage: To be determined
3. Scheduled date for restart following refueling: To be determined
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

NHL

5. Scheduled date(s) for submitting licensing action and supporting information:

None.

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Ncne.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

In Core: (a) 193 In Spent Fuel Pool: (b) ilf

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present storace caoacity: 756.

No increase reauested.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming present license capacity:

End of Cvele 7.

U.S. Nuclear Regulatory Commission B16581%ttachment 2Page 2 DOCKET NO.: -50423

  • UNIT: Mille.one Unit 3 '

DATE: 11/1/97 COMPLETED BY: K. W. Emmons TELEPHONE: (860)447-1791 Ext. 6572 - ,

}

MONTH: Oct-97 DAY AVO. DAILY POWER LEVEL DAY AVG. DAIL POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 i.9 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 .>

8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16- 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

I w i - i .- ..

U.S. Nuclear Regulatory Commission B16581%ttaement 2Page 3 UNIT NAME: Millstone Unit 3

. DATE: 11/01/97.

.- COMPLETED BY: K. W. Emmons TELEPHONE: (860)447 1791 Ext 6572 OPERATING STATUS

1. Docitet Number 50-423 2.' Reporting Period Oct.97 Notes:
3. Utility Contact K. W. Emmons
4. Uconced Thermal Power (MWt): 3411
5. Nameplate Rating (Gross MWe): 1253
6. Design Electrical Rating (Ne' MWe): 1153.6
7. Maximum Dependable Capacity (Gross MWe): 1184.20
8. Maximum Dependable Capacity (Net MWe): 1137.00
9. If Changes Occur in Ccpacity Ratings (items Number 4 Through 8) Since Lsst Report, Give Reasc,ns:

N/A

10. Power Level To WNch Hestricted, if any (Nat MWe): 0
11. Reasons For Restrictions, if Any: NRC Category til Facility: NRC Confirmatory Order requiring implementation of an ndependent corrective action verification program; NRC Order requiring a third-party review of the employee concerns program at Millstone Station; design basis verification response pursuant to 10CFR50.54(fl.

This Month Yr.-To-Date Cumulative

12. H6urs in Reporting Period 745.0 7296.0 101040.0 13 Number Of Hours Reactor Was Critical 0.0 0.0 67080.1
14. Reactor Reserve Shutdown Hours 0.0 0.0 6525.8
15. Hours Generstor On-Line 0.0 0.0 65912.4
16. Unit Reserve Shutdown Hours 0.0 0.0 0.0
17. Gross Thermal Energy Generated (MWil) 0.0 0.0 216937728.1
18. Grnas Electrical Energy Generated (MWH1 0.0 0.0 74905103.1
19. Net Electrical Energy Generated (MWH) -4661.5 -48809.0 71:'47910.5
20. Unit Service Factor 0.0 0.0 65.2
21. Unit Availability Factor 0.0 0.0 65.2
22. Unit Capacity Factor (Using MDC Net) 0.0 0.0 61.9
23. Unit Capacity Factor (Using DER Net) 0.0 0.0 61.1
24. Unit Forced Outage Rate 100.0 100.0 26.9
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Shutdown ht time of this report.

26. If Unit Shutdown At End Of Report Feriod, Estimated Date of Startup: To be determined.
27. Units in Test Status (Prior to Commercial Operatior.):

Forecast - Achieved INITIAL CRITICAUTY N/A N/A

. INITIAt. ELECTRICITY N/A N/A COMMERCIAL OPERATION N.'A N/A t . .

' u.s. Nucieer Reguistory Commission B16581%ttachment 2Page 4 UNIT SHUTDOWNS AND POWER REDUCTIONS

  • [

e 1

DOCKET NO.: 50423 UNIT NAME: Batmanna that 3 DATE: 1141-97 .

COMPLETED BY: K. W. Emmons  !

TELEPHONE: 13001447-1721 X8572 4 FCPORT MONTH = October 1997 No. Date . Type' Duration Reason

  • Method of Ucense System : Component Cause & C..-c; (Hours) . Shuttmg Event Code' Code' Accon to .,

Down Reactor' Report # Prevent Recurrence 96-01 03-30-96 F 745. B/D 4 96-006-00 BA ISV Valves inoperatde due to onomet desen deficeneses, in that c,i [

! smproper valvs dessen did not  ;

meet GDC 57. Corrective accon -

is to instar vendor kit to moddy valve disk to meet GDC 57.

Conenued shutdown:NRC l Category le facility; NRC -

  • Corwirmetury Order regumne

! independent correcove accon ,

i venhcanon: NRC Order regumns third 14rty review of Mdistone i Stocon employee concoms

, program; deogn beeis venficsson for response to NRC pursuant to ,

10CFM50.54(fl.

'F: Forced Reason ' Method 'IEEE Standard 805-1984, S: Scheduled A - Equipment Failure (Explain) 1 - Manuel

  • Recommended Pracaces t

, B - Mstenance or Test 2 - Manuel Scram for System idoneficecon in

< C - Re.Neling 3 - Automatic Scam Nucteer Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related FacArtees*

E - Operator Training & Ucense Examination 5 - Power Reduction (Duration = 0)

F- Administrative 6 - Other (Explain) "IEEE Standard 903A-1983, G - Operational Error (Explain) *Recommendec8 Practices i H - Ot'w (Explain) for Uneque edentificacon in Pbwer Plents and Reis*.ad Facitsies - Component

! Funecen _ ., .

_ _ _ _ _ _ . - _ _ _ _ _ _ _ _ _ . _ _ v4 ____m _ -.m - -r- e t-+-- _. w. - + . _ -___,,__,m -

_ , - _ _ _ _ 2_. _ _ _ _