Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20101U332 | 28 January 1985 | Proposed Tech Specs Eliminating Cable Spreading Areas from Pressure Boundary & Discontinuing Ventilation of Lower Cable Spreading Rooms by Control Room HVAC Sys | |
ML20105D419 | 29 January 1985 | Proposed Revised Tech Spec 3/4.8.1.1 Re Limiting Condition of Operation for Ac Sources | Offsite Circuit |
ML20106A582 | 4 February 1985 | Proposed Tech Specs,Revising Figure 3.5-1 to Extend Certain MAPLHGR Curves & Adding Two Curves for Fuel Types | |
ML20106A638 | 30 January 1985 | Proposed Tech Specs Re Radiation Monitoring Instrumentation for Startup Test Program | |
ML20108F235 | 29 April 1996 | Proposed Tech Specs 3.7-2 Revising Table 3.7-2 to Increase as-found MSSV Lift Setpoint,Ts 3.7.1.1,Action A.,To Require Unit in Hot SD for Consistency W/Rev 1 of NUREG-1431 & Max Allowable Pr Nf High Trip Setpoints in Table 3.7-1 | Ultimate heat sink |
ML20113H631 | 27 July 1992 | Proposed TS 3/4.7.6 Re Heater Dissipation Rate & 3/4.7.7 Re Nonaccessible Area Exhaust Filter Plenum Sys | |
ML20113H779 | 28 July 1992 | Proposed Tech Specs Revising Current Boron Dilution Analyses | Boric Acid Shutdown Margin |
ML20114B802 | 18 January 1985 | Proposed Tech Specs Revising Pages 3/4 6-21,3/4 6-22, 3/4 6-23 & 3/4 6-24 Re Footnote to Permit Certain Containment Isolation Valves to Be Opened on Intermittent Basis Under Administrative Control | |
ML20116F093 | 2 August 1996 | Proposed Tech Specs Re Elimination of Corrosion Testing Requirement for SG Tube Sleeving | Safe Shutdown Earthquake Fire Protection Program |
ML20117D173 | 23 August 1996 | Proposed Tech Specs 3/4.7.7 Re non-accessible Area Exhaust Filter Plenum Ventilation Sys | Earthquake |
ML20117J058 | 19 August 1996 | Proposed Tech Specs,Renewing 3.0 Volt Bobbin Coil Probe,Sg TSP Interim Plugging Criteria Limit for Outside Diameter Stress Corrosion Cracking Indications at locked-tube Model TSP Intersections Approved NRC in Amends 69 & 77 | Non-Destructive Examination Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination |
ML20117K112 | 7 May 1985 | Proposed Tech Spec,Requiring Ice Condenser Doors to Remain Closed & Be Capable of Opening Automatically | |
ML20118A709 | 16 September 1992 | Proposed,Revised TS Page 6-6 Re Unit Staff Qualifications & Training & Replacement Training for Unit Staff | |
ML20125B411 | 7 June 1985 | Proposed Correction to Tech Spec Page 110,adding Section 6.5.2.2,inadvertently Omitted from 850130 Change Request | |
ML20125D427 | 31 May 1985 | Proposed Tech Specs Eliminating App B to Licenses by Incorporating 10CFR50,App I Requirements | Boric Acid Shutdown Margin Packing leak High Radiation Area Grab sample Offsite Dose Calculation Manual Fire Barrier Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Pressure Boundary Leakage Fire Protection Program Power change |
ML20126F310 | 22 December 1992 | Proposed Tech Specs Revising TS 3/4.7.4,3/4.7.4.1 & 3/4.7.4.2 for Byron & 3/4.7.4,3/4.7.4.1 & 3/4.7.4.2 for Braidwood,To Address Concerns of Generic Ltr 91-13 Re Esws Failures at multi-unit Sites | Ultimate heat sink |
ML20127K211 | 23 November 1992 | Proposed Tech Specs Revising TS 2.2.1,Table 2.2-1,3.3.2, Table 3.3-4 & Associated Bases,Providing Changes That Have Resulted from Setpoint Reconciliation Program | |
ML20128K634 | 31 July 1985 | Proposed Revs to Tech Specs,Changing Definition of Reportable Events & Changing Reporting Requirements in Response to Revs to 10CFR50.72 & 73 Re Immediate Notification Requirements | Shutdown Margin High Radiation Area Fire Barrier Pressure Boundary Leakage Continuous fire watch Fire Watch |
ML20128P449 | 22 July 1985 | Proposed Tech Specs Relaxing Reactor Trip Sys Requirements | Shutdown Margin Missed surveillance |
ML20129A841 | 26 June 1985 | Proposed Tech Spec Rev to Page 6-24,adding Continuous Surveillance by Qualified Individual as Alternative to Routine Radiation Work Permit Procedure in High Radiation Area | High Radiation Area |
ML20129K073 | 4 November 1996 | Proposed Tech Spec 3.6.1.6,allowing one-time Exemption to Requirements of SR 4.6.1.6.1.e.1 | |
ML20132F561 | 9 July 1985 | Proposed Tech Spec Changes,Providing Administrative Procedures to Develop & Implement Limited Working Hours for Staff Performing safety-related Functions,Per Generic Ltr 82-12 | Safe Shutdown |
ML20134A155 | 21 January 1997 | Proposed Tech Specs 3/4.7.1.1 to Clarify That Values Calculated from New Equation for Reactor Trip Setpoint Reductions Were Adjusted | |
ML20134D052 | 20 January 1997 | Proposed Tech Specs Section 3.6.3 Containment Isolation Valves, Being Revised to Support Replacement of Byron & Braidwood Unit 1 Original W Model D4 SGs W/Babcock & Wilcox Intl SGs | |
ML20134D324 | 31 August 1985 | Proposed Revs to Tech Spec Section 6.5 Re Fire Protection & Loss Prevention Program Audits & Clarification of Term Outside Firm for Performance of Outside Audits | Fire Protection Program |
ML20134E866 | 30 January 1997 | Proposed Tech Specs Revising TS 1.0, Definitions, 3/4.6.1, Primary Containment & Associated Bases & 5.4.2, Reactor Coolant Sys Volume, for Bs & Bs to Support SG Replacement | Loop seal Offsite Dose Calculation Manual Pressure Boundary Leakage |
ML20134F384 | 31 January 1997 | Proposed Tech Specs 3/4.4.8 Re Reactor Coolant Sys Specific Activity | Power change |
ML20134N778 | 5 November 1996 | Proposed Tech Specs Revising TS 3.9.11,5.6.1.1 & 6.9.1.10 to Allow Util to Take Credit for Soluble Boron in Spent Fuel Storage Pool Water in Maintaining Acceptable Margin of Subcriticality | |
ML20134N848 | 18 February 1997 | Proposed Tech Specs Table 2.2-1 & Table 3.3-4 Re Sys Instrumentation Trip Setpoints,Ts 3.4.1.2 Re Reactor Coolant Sys & TS 4.4.1.2.1 Re Surveillance Requirements | |
ML20135E685 | 28 February 1997 | Proposed Tech Specs,Replacing Original W D4 SG at Byron & Braidwood W/B&W International SGs | Operating Basis Earthquake Nondestructive Examination Power change |
ML20136G146 | 24 February 1997 | Proposed Tech Specs,Reflecting Conversion to Improved TS to Be Consistent w/NUREG-1431 | |
ML20137C638 | 14 March 1997 | Proposed Tech Specs,Reducing Allowable Unit 1 RCS Dose Equivalent I-131 from 0.35 Uci/Gram to 0.20 Uci/Gram for Remainder of Cycle 8 | Power change |
ML20137C799 | 14 March 1997 | Proposed Tech Specs Deleting 12 License Conditions from Unit 1 Operating License & Two License Conditions from Unit 2 Operating License | Safe Shutdown Fire Barrier Earthquake Turbine Missile Fire Protection Program |
ML20137P008 | 24 March 1997 | Proposed Tech Specs Removing Values of cycle-specific Core Operating Limits from TS & Relocating Values to Operating Limits Rept | Shutdown Margin Annual Radiological Environmental Operating Report Fuel cladding |
ML20137S534 | 7 April 1997 | Proposed Tech Specs 3/4.8.2 Re D.C. Sources | |
ML20137T491 | 26 November 1985 | Proposed Tech Specs,Allowing Temporary Closing of Certain Valves in Safety Injection Sys During Surveillance of RCS Pressure Isolation Valves | |
ML20138N684 | 24 February 1997 | Proposed Tech Specs Changing TS from Current TS to Improved TS Consistent w/NUREG-1431,Rev 1, STS - W Plants, Dtd Apr 1995 | |
ML20138P619 | 13 December 1985 | Proposed Tech Spec Changes Re Reporting Requirements for Primary Coolant Iodine Spikes & Establishing Iodine Activity Limits | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
ML20139A324 | 27 September 1985 | Proposed Tech Spec Changes,Correcting Typos & Grammatical Errors Contained in Pages 3/4 3-15,3/4 6-7,3/4 7-44,3/4 8-5, 3/4 11-8 & 6-3 Re Fire Hose Stations.Significant Hazards Consideration Encl | Safe Shutdown Process Control Program |
ML20140D008 | 31 May 1997 | Proposed Tech Specs,Revising TS Surveillance Requirement Re ECCS Pump Casings & Discharge Piping High Points Outside of Containment | |
ML20141B778 | 17 June 1997 | Proposed Tech Specs Revising TS Sections 3/4.6.1.6,4.6.1.2, 6.8.4 & 6.9.1.11 to Support New Requirements in 10CFR50.55a, Which Requires Utils to Update Existing Containment Vessel Structural Integrity Programs | |
ML20141F308 | 24 June 1997 | Proposed Tech Specs,Changing TS for ECCS Venting | |
ML20141K001 | 21 May 1997 | Proposed Tech Specs Relocating Reactor Vessel Surveillance Program Capsule Withdrawal Schedules IAW GL 91-01 | Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report Pressure Boundary Leakage Power change |
ML20141K338 | 23 May 1997 | Proposed Tech Specs Requesting Enforcement Discretion from Compliance W/Ts 4.5.2.b.1 Requirements of Venting of Emergency Core Cooling Sys Pump Casings & Discharge Piping High Points Outside of Containment | Enforcement Discretion |
ML20141K899 | 24 May 1997 | Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b to Encompass non-operating ECCS Pumps & Discharge Piping Which Are Provided W/High Point Vent Valves | |
ML20147B726 | 11 January 1988 | Proposed Tech Specs,Incorporating Recommendations of NRC Generic Ltr 87-09 Re Sections 3.0 & 4.0 | Safe Shutdown Boric Acid Shutdown Margin Offsite Dose Calculation Manual Fire Barrier Hydrostatic Annual Radiological Environmental Operating Report Process Control Program Continuous fire watch Fire Watch Hourly Fire Watch Grace period |
ML20147E056 | 12 January 1988 | Proposed Tech Spec Tables 3.3-13 & 4.3-9,revising Separate Gaseous Waste Mgt Oxygen Analyzer Into Two Major Components | Grab sample |
ML20148A829 | 10 March 1988 | Proposed Tech Spec 6.2.3.2,reducing Onsite Nuclear Safety Group Min Staffing Requirement from Four to Three Engineers | |
ML20148B615 | 6 May 1997 | Proposed Tech Specs,Revising TS 3/4.7.5, Ultimate Heat Sink & Associated Bases to Support SG Replacement & Incorporate Recent UHS Design Evaluations | Ultimate heat sink |
ML20148J323 | 9 June 1997 | Proposed TS Reflecting Latest Rev of Waste Gas Decay Tank Rupture Accident Dose Calculation |