Proposed Tech Specs,Revising TS Surveillance Requirement Re ECCS Pump Casings & Discharge Piping High Points Outside of ContainmentML20140D008 |
Person / Time |
---|
Site: |
Byron ![Constellation icon.png](/w/images/b/be/Constellation_icon.png) |
---|
Issue date: |
05/31/1997 |
---|
From: |
COMMONWEALTH EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20140D005 |
List: |
---|
References |
---|
NUDOCS 9706100186 |
Download: ML20140D008 (4) |
|
Similar Documents at Byron |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20209B7411999-06-30030 June 1999 Proposed Tech Specs Section 3.8.5, DC Sources - Shutdown, Correcting LCO & Braidwood TS Section 3.8, Electrical Power Systems, Deleting Various References to At&T Batteries ML20204H9781999-03-23023 March 1999 Proposed Tech Specs,Revising Sections 3.7.15,3.7.16,4.3.1 & 4.3.3 to Support Installation of New Boral high-density SFP Storage Racks at Byron & Braidwood Stations ML20204H4291999-03-22022 March 1999 Proposed Tech Specs 3.9.3,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6 ML20198N2041998-12-29029 December 1998 Revised Tech Specs Change,Page 3/4 3-54,providing Early Implementation of Containment Floor Drain Sump Water Level Instrumentation Requirements ML20198N3471998-12-29029 December 1998 Proposed ITS Tables 3.3.1-1 & 3.3.2-1,revising Twelve Allowable Values ML20198A0811998-12-14014 December 1998 Proposed Rev T to Improved Tech Specs Section 3.4, Reactor Coolant Sys ML20196G6611998-11-30030 November 1998 Proposed Rev to Improved Tech Specs Section 3.1 ML20155J2051998-11-0505 November 1998 Proposed TS Converting to Its,Rev R ML20155J0041998-10-30030 October 1998 Proposed Tech Specs Section 5.6.2, Fuel Storage Drainage, to Identify Sf Pool Level Sufficient to Ensure SRP Acceptance Criteria ML20154S5011998-10-18018 October 1998 Proposed Rev N to Improved TS Section 3.7 ML20154M5281998-10-15015 October 1998 Revisions K,O & P of 961213 ITS Submittal ML20154A8881998-10-0202 October 1998 Proposed Rev L to Improved Tech Specs Section 3.8 Closeout ML20153G4331998-09-25025 September 1998 Revs J & M to Tech Specs Sections 3.6 & 5.0,converting to Improved Tech Specs (Its),Final Closeout Package ML20236W5851998-07-31031 July 1998 Proposed Rev G to Sections 3.1 & 3.2 of Improved Tech Specs ML20237B6391998-07-30030 July 1998 Proposed Rev H to Section 3.5 of Improved Tech Specs ML20237E9971998-07-21021 July 1998 Rev I to Proposed Improved Tss,Section 3.9 Re Final Closeout ML20237B7021998-07-0909 July 1998 Proposed Improved TS (ITS) Section 3.3 Issued as Result of Removing Generic Change Traveler TSTF-135,Rev E from ITS Submittal ML20236H6531998-07-0202 July 1998 Rev F to 961213 Improved TS Submittal,Containing Final Package Closeout for Improved TS Sections 1.0,2.0 & 3.0 ML20248M1491998-06-0101 June 1998 Proposed Tech Specs Bases Page B 3.8-58b,converting to Improved Tech Specs ML20248C5511998-05-29029 May 1998 Proposed Tech Specs Bases Section 3/4.4.4, Relief Valves, Specifically Crediting Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS at Power Accident ML20216D9431998-04-0909 April 1998 Modified Proposed TS Pages Re 980324 Request for Amends to Licenses NPF-37 & NPF-66 ML20217E1891998-03-24024 March 1998 Proposed Tech Specs Surveillance Sections & Bases Allowing Util to Defer 10CFR50,App J,Type a Testing of Byron Unit 2 Containment Until Next Refuel Outage in 1999 ML20217B2681998-02-14014 February 1998 Proposed Rev D to ITS ML20198C3181997-12-30030 December 1997 Proposed Tech Specs 3.7.1.3 Re Condensate Storage Tank ML20203M5921997-12-17017 December 1997 Proposed Tech Specs,Rev C Changes Improved TSs 3.0,3.3,3.7, 3.8 & 5.0 as Result of Removing Generic Change Traveler TSTF-115 from Improved TS Submittal ML20203D0361997-12-0909 December 1997 Proposed Tech Specs Pages Correcting Errors Discovered in Current TS W/Regards to Total RCS Volume & Correction to Increase in RCS Volume Associated W/Unit 1 Replacement SGs Accounting for Hot Conditions ML20199A4751997-11-0707 November 1997 Proposed Tech Specs Pages Revising TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.c & Bases to Allow Performance of 10CFR50 App J,Type a Testing ML20217K4461997-10-21021 October 1997 Proposed Tech Specs Re Boron Credit in SFP ML20202F4561997-10-10010 October 1997 Proposed Tech Specs,Deleting Lower Flow Rate Requirement Associated W/Nonaccessible Area Exhaust Filter Plenum & Fuel Handling Bldg Ventilation Sys ML20211D9421997-09-24024 September 1997 Proposed Tech Specs Revising Allowable Time Interval for Performing Turbine Throttle Valve & Turbine Valve SRs Requirements from Monthly to Quarterly ML20216G8541997-09-0808 September 1997 Proposed Tech Specs Change to TS 4.5.2.b & Associated Bases Bringing Byron Unit 1 & Braidwood Unit 1 Requirement in Conformance W/Unit 2 Requirements Approved by NRC in ML20217H6071997-08-0707 August 1997 Proposed Tech Specs Pages,Revising Bases for Proposed Improved TS SR 3.8.6.1 & 3.8.6.3,to Indicate That Correction for Level Is Not Required When Battery Charging Current Is Less than 2 Amps for Gould & Less than 3 Amps for C&D ML20148P7721997-06-30030 June 1997 Proposed Tech Specs,Revising TS 3.9.11,5.6.1.1 & 6.9.10 to Allow Util to Permanently Take Credit for Soluble B in Spent Fuel Storage Pool Water to Maintain Acceptable Margin of Subcriticality ML20141F3081997-06-24024 June 1997 Proposed Tech Specs,Changing TS for ECCS Venting ML20141B7781997-06-17017 June 1997 Proposed Tech Specs Revising TS Sections 3/4.6.1.6,4.6.1.2, 6.8.4 & 6.9.1.11 to Support New Requirements in 10CFR50.55a, Which Requires Utils to Update Existing Containment Vessel Structural Integrity Programs ML20148J3231997-06-0909 June 1997 Proposed TS Reflecting Latest Rev of Waste Gas Decay Tank Rupture Accident Dose Calculation ML20140D0081997-05-31031 May 1997 Proposed Tech Specs,Revising TS Surveillance Requirement Re ECCS Pump Casings & Discharge Piping High Points Outside of Containment ML20141K8991997-05-24024 May 1997 Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b to Encompass non-operating ECCS Pumps & Discharge Piping Which Are Provided W/High Point Vent Valves ML20141K3381997-05-23023 May 1997 Proposed Tech Specs Requesting Enforcement Discretion from Compliance W/Ts 4.5.2.b.1 Requirements of Venting of Emergency Core Cooling Sys Pump Casings & Discharge Piping High Points Outside of Containment ML20141K0011997-05-21021 May 1997 Proposed Tech Specs Relocating Reactor Vessel Surveillance Program Capsule Withdrawal Schedules IAW GL 91-01 ML20148B6151997-05-0606 May 1997 Proposed Tech Specs,Revising TS 3/4.7.5, Ultimate Heat Sink & Associated Bases to Support SG Replacement & Incorporate Recent UHS Design Evaluations ML20196G0501997-04-25025 April 1997 Proposed Tech Specs Revising Primary Containment & Reactor Coolant Sys Volume Associated W/Unit 1 Steam Generator Replacement ML20137S5341997-04-0707 April 1997 Proposed Tech Specs 3/4.8.2 Re D.C. Sources ML20137P0081997-03-24024 March 1997 Proposed Tech Specs Removing Values of cycle-specific Core Operating Limits from TS & Relocating Values to Operating Limits Rept ML20137C6381997-03-14014 March 1997 Proposed Tech Specs,Reducing Allowable Unit 1 RCS Dose Equivalent I-131 from 0.35 Uci/Gram to 0.20 Uci/Gram for Remainder of Cycle 8 ML20137C7991997-03-14014 March 1997 Proposed Tech Specs Deleting 12 License Conditions from Unit 1 Operating License & Two License Conditions from Unit 2 Operating License ML20135E6851997-02-28028 February 1997 Proposed Tech Specs,Replacing Original W D4 SG at Byron & Braidwood W/B&W International SGs ML20136G1461997-02-24024 February 1997 Proposed Tech Specs,Reflecting Conversion to Improved TS to Be Consistent w/NUREG-1431 ML20138N6841997-02-24024 February 1997 Proposed Tech Specs Changing TS from Current TS to Improved TS Consistent w/NUREG-1431,Rev 1, STS - W Plants, Dtd Apr 1995 ML20134N8481997-02-18018 February 1997 Proposed Tech Specs Table 2.2-1 & Table 3.3-4 Re Sys Instrumentation Trip Setpoints,Ts 3.4.1.2 Re Reactor Coolant Sys & TS 4.4.1.2.1 Re Surveillance Requirements 1999-06-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20209B7411999-06-30030 June 1999 Proposed Tech Specs Section 3.8.5, DC Sources - Shutdown, Correcting LCO & Braidwood TS Section 3.8, Electrical Power Systems, Deleting Various References to At&T Batteries ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20204H9781999-03-23023 March 1999 Proposed Tech Specs,Revising Sections 3.7.15,3.7.16,4.3.1 & 4.3.3 to Support Installation of New Boral high-density SFP Storage Racks at Byron & Braidwood Stations ML20204H4291999-03-22022 March 1999 Proposed Tech Specs 3.9.3,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6 ML20202G9361999-01-30030 January 1999 Rev 1.4 to Chapter 10, Radioactive Effluent Treatment & Monitoring, Rev 1.6 to Chapter 11, Radiological Environ Program & Rev 1.6 to Chapter 12, Radioactive Effluent Technical Standards (Rets), for Odcm,Byron Annex ML20198N3471998-12-29029 December 1998 Proposed ITS Tables 3.3.1-1 & 3.3.2-1,revising Twelve Allowable Values ML20198N2041998-12-29029 December 1998 Revised Tech Specs Change,Page 3/4 3-54,providing Early Implementation of Containment Floor Drain Sump Water Level Instrumentation Requirements ML20198A0811998-12-14014 December 1998 Proposed Rev T to Improved Tech Specs Section 3.4, Reactor Coolant Sys ML20196G6611998-11-30030 November 1998 Proposed Rev to Improved Tech Specs Section 3.1 ML20155J2051998-11-0505 November 1998 Proposed TS Converting to Its,Rev R ML20155J0041998-10-30030 October 1998 Proposed Tech Specs Section 5.6.2, Fuel Storage Drainage, to Identify Sf Pool Level Sufficient to Ensure SRP Acceptance Criteria ML20154S5011998-10-18018 October 1998 Proposed Rev N to Improved TS Section 3.7 ML20154M5281998-10-15015 October 1998 Revisions K,O & P of 961213 ITS Submittal ML20154A8881998-10-0202 October 1998 Proposed Rev L to Improved Tech Specs Section 3.8 Closeout ML20153G4331998-09-25025 September 1998 Revs J & M to Tech Specs Sections 3.6 & 5.0,converting to Improved Tech Specs (Its),Final Closeout Package ML20236W5851998-07-31031 July 1998 Proposed Rev G to Sections 3.1 & 3.2 of Improved Tech Specs ML20237B6391998-07-30030 July 1998 Proposed Rev H to Section 3.5 of Improved Tech Specs ML20237E9971998-07-21021 July 1998 Rev I to Proposed Improved Tss,Section 3.9 Re Final Closeout ML20237B7021998-07-0909 July 1998 Proposed Improved TS (ITS) Section 3.3 Issued as Result of Removing Generic Change Traveler TSTF-135,Rev E from ITS Submittal ML20236H6531998-07-0202 July 1998 Rev F to 961213 Improved TS Submittal,Containing Final Package Closeout for Improved TS Sections 1.0,2.0 & 3.0 ML20248M1491998-06-0101 June 1998 Proposed Tech Specs Bases Page B 3.8-58b,converting to Improved Tech Specs ML20248K7361998-05-31031 May 1998 Commonwealth Edison Bnps Unit 1 Cycle 9 Startup Rept ML20248C5511998-05-29029 May 1998 Proposed Tech Specs Bases Section 3/4.4.4, Relief Valves, Specifically Crediting Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS at Power Accident ML20217Q8521998-05-0101 May 1998 Rev 9 to Bzp 310-2, Nuclear Accident Reporting Sys Form (Primary Responsibility - Station Director). W/Notes & Comments ML20216D9431998-04-0909 April 1998 Modified Proposed TS Pages Re 980324 Request for Amends to Licenses NPF-37 & NPF-66 ML20217E1891998-03-24024 March 1998 Proposed Tech Specs Surveillance Sections & Bases Allowing Util to Defer 10CFR50,App J,Type a Testing of Byron Unit 2 Containment Until Next Refuel Outage in 1999 ML20217B2681998-02-14014 February 1998 Proposed Rev D to ITS ML20199J7581997-12-31031 December 1997 Rev 1 to IST Plan Pumps & Valves Byron Nuclear Generating Station,Units 1 & 2 ML20198C3181997-12-30030 December 1997 Proposed Tech Specs 3.7.1.3 Re Condensate Storage Tank ML20203M5921997-12-17017 December 1997 Proposed Tech Specs,Rev C Changes Improved TSs 3.0,3.3,3.7, 3.8 & 5.0 as Result of Removing Generic Change Traveler TSTF-115 from Improved TS Submittal ML20203D0361997-12-0909 December 1997 Proposed Tech Specs Pages Correcting Errors Discovered in Current TS W/Regards to Total RCS Volume & Correction to Increase in RCS Volume Associated W/Unit 1 Replacement SGs Accounting for Hot Conditions ML20199A4751997-11-0707 November 1997 Proposed Tech Specs Pages Revising TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.c & Bases to Allow Performance of 10CFR50 App J,Type a Testing ML20216H8241997-10-31031 October 1997 Revs to OCDM for Byron Station,Including Rev 1.3 to Chapter 10,rev 1.5 to Chapters 11 & 12 & Rev 1.3 to App F ML20198M2621997-10-31031 October 1997 Revs to Offsite Dose Calculation Manual,Consisting of Rev 1.5 to Chapter 11 & Rev 1.5 to Chapter 12 ML20217K4461997-10-21021 October 1997 Proposed Tech Specs Re Boron Credit in SFP ML20202F4561997-10-10010 October 1997 Proposed Tech Specs,Deleting Lower Flow Rate Requirement Associated W/Nonaccessible Area Exhaust Filter Plenum & Fuel Handling Bldg Ventilation Sys ML20211D9421997-09-24024 September 1997 Proposed Tech Specs Revising Allowable Time Interval for Performing Turbine Throttle Valve & Turbine Valve SRs Requirements from Monthly to Quarterly ML20216G8541997-09-0808 September 1997 Proposed Tech Specs Change to TS 4.5.2.b & Associated Bases Bringing Byron Unit 1 & Braidwood Unit 1 Requirement in Conformance W/Unit 2 Requirements Approved by NRC in ML20217H6071997-08-0707 August 1997 Proposed Tech Specs Pages,Revising Bases for Proposed Improved TS SR 3.8.6.1 & 3.8.6.3,to Indicate That Correction for Level Is Not Required When Battery Charging Current Is Less than 2 Amps for Gould & Less than 3 Amps for C&D ML20148P7721997-06-30030 June 1997 Proposed Tech Specs,Revising TS 3.9.11,5.6.1.1 & 6.9.10 to Allow Util to Permanently Take Credit for Soluble B in Spent Fuel Storage Pool Water to Maintain Acceptable Margin of Subcriticality ML20141F3081997-06-24024 June 1997 Proposed Tech Specs,Changing TS for ECCS Venting ML20141B7781997-06-17017 June 1997 Proposed Tech Specs Revising TS Sections 3/4.6.1.6,4.6.1.2, 6.8.4 & 6.9.1.11 to Support New Requirements in 10CFR50.55a, Which Requires Utils to Update Existing Containment Vessel Structural Integrity Programs ML20148J3231997-06-0909 June 1997 Proposed TS Reflecting Latest Rev of Waste Gas Decay Tank Rupture Accident Dose Calculation ML20140D0081997-05-31031 May 1997 Proposed Tech Specs,Revising TS Surveillance Requirement Re ECCS Pump Casings & Discharge Piping High Points Outside of Containment ML20141K8991997-05-24024 May 1997 Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b to Encompass non-operating ECCS Pumps & Discharge Piping Which Are Provided W/High Point Vent Valves ML20141K3381997-05-23023 May 1997 Proposed Tech Specs Requesting Enforcement Discretion from Compliance W/Ts 4.5.2.b.1 Requirements of Venting of Emergency Core Cooling Sys Pump Casings & Discharge Piping High Points Outside of Containment ML20141K0011997-05-21021 May 1997 Proposed Tech Specs Relocating Reactor Vessel Surveillance Program Capsule Withdrawal Schedules IAW GL 91-01 ML20148B6151997-05-0606 May 1997 Proposed Tech Specs,Revising TS 3/4.7.5, Ultimate Heat Sink & Associated Bases to Support SG Replacement & Incorporate Recent UHS Design Evaluations ML20196G0501997-04-25025 April 1997 Proposed Tech Specs Revising Primary Containment & Reactor Coolant Sys Volume Associated W/Unit 1 Steam Generator Replacement ML20137S5341997-04-0707 April 1997 Proposed Tech Specs 3/4.8.2 Re D.C. Sources 1999-06-30
[Table view] |
Text
. .
0l EMERGENCY CORE COOLING SYSTEMS SDRVEILLANCE REQUIREMENTS 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE:
a.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the following valves are in the indicated positions with power to the valve operators removed:
Valve Number Valve Function Valve Position MV SI8806 Suction to the SI Open Pumps MDV SI8835 SI Pump Discharge Open*
To RCS Cold Legs MDV SI8813 SI Pump Recirculation Open To The RWST MDV SI8809A RHR Pump Discharge to Open*
RCS Cold Legs MDV SI88098 RNR Pump Discharge to Open*
RCS Cold Legs MDV SI8840 RHR Pump Discharge to Closed RCS Hot Legs MDV SI8802A SI Pump Discharge to Closed RCS Hot Legs MD .SI 2B SI Pump Discharge to po'r b k IIIV'4)b %10Ey$> - RCS Hot Le s Close L = --
g b.akleastonceper31daysby: ("ff - --
- 1) Venting the E M ump outside of containeen , andsings and discharge piping ighpaint [>
- 2) vejirVo. lye.S >
Verifying that each valve (manual, power-operated, o ^aut554tTtT' 7T in the flow path that is not locked, sealed, or et ise -
secured in position, is in its correct position re a= c to U RN c.
By a visual inspection which verifies that no loose debr gs trash, clothing, etc.) is present in the containment which could be transported to the containment sump and cause restriction of the pump suctions during LOCA conditions.
f be performed: " This_ visual inspection shall'
"~~. " Y -
5' 3)dischage Po'**$*$ 115'k,
- <#y m hin[ddhEE)oIe P c J o
/ ya
, ,rv w ie
/~-~
el FTem MJ )-
-xs
Valves may be realigned for testing pursuant to Specification 4.4.6.2.2.
(
hok SDo $ 050b$454 p PDR BYRON - UNI 1(( 3/4 5-AMENDMENT % 4 hin N
V, EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS 4.b.2 Each ECCS subsystem shall be demonstrated OPERABLE: I
- a. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the following valves are in the indicated positions with power to the valve operators i removed:
Valve Number Valve Function Valve Position MOV SI8806 Suction to the SI Open Pumps i
MOV SI8835 SI Pump Discharge Open*
To RCS Cold Legs MOV SI8813 SI Pump Recirculation Open l
To The RWST i
i MOV SI8809A I RHR Pump Discharge to Open*
l RCS Cold Legs MOV S188098 RHR Pump Discharge to Open*
l l
RCS Cold Legs l MOV SI8840 RHR Pump Discharge to Closed !
, RCS Hot Legs MOV SI8802A SI Pump Discharge to Closed RCS Hot Legs !
MOV SI8802B SI Pump Discharge to Closed RCS Hot Legs '
- b. At least once per 31 days by
- 1) Venting the ECCS pump casings and discharge piping high points outside of containment, and '
- 2) Verifying that each valve (manual, power-operated, or automatic) l in the flow path that is not locked, sealed, or otherwise i
secured in position, is in its correct position.
- c. By a visual inspection which verifies that no loose debris (rags, trash, clothing, etc.) is present in the containment which could be transported to the containment sump and cause restriction of the l pump suctions during LOCA conditions. This visual inspection shall be performed:
i j " Valves may be realigned for testing pursuant to Specification 4.4.6.2.2.
}
l BYRON - UNIT g2 3/4 5 AMENDMENT N05.) # ag[
4
,r
. EMERGENCY CORE C0OLINg SYSTEMS
, BASES ECCS SUBSYSTEMS (Continued)
The limitation for a maximum of one centrifugal charging pump to be OPERABLE and the Surveillance Requirement to verify all charging pumps except the required OPERABLE Charging pump to be inoperable in MODE 4 with one or more of the RCS cold legs less than or equal to 330*F, MODE 5, and MODE 6 with r
)
the reactor vessel head on, provides assurance that a mass addition pressure N transient can be relieved by the operation of a single PO D or RHR suction )
relief valve. Similarly, the requirement to verify all Safety Injection pumps are inoperable in MODE 4 with the temperature of one or more of the RCS Cold Legs less than or equal to 330*F, in 400E 5 with pressurizer level greater than 5 percent (Level 409.5') and in MODE 6 with pressurizer level greater than 5 percent and the reactor vessel head resting on the reactor vessel flange, provides assurance that a mass addition pressure transient can be relieved by (
a single PORY or RHR suction relief valve.
In MODE 5 and MODE 6 with pressurizer level less than or equal to 5 percent, /
at least one Safety Injection pump or gravity feed from the RWST must be avail- V able to mitigate the effects of a loss of decay heat removal during partially )
drained conditions. Surveillance requirements assure availability, but prevent /
inadvertent actuation during these modes. The desired flow path for the SI (
pump or gravity feed varies with RCS configuration and is, therefore, procedurally )
addressed.
The Surveillance Requirements define what constitutes an udequate hot side vant for various plant conditions. It was determined that removing the reactor vessel head was an adequate vent under all conditions. Other venting alterna-tives have restrictions based on time from shutdown and RCS temperature. The values in the surveillance were taken from the graph on the following page, g The Surveillance Requirements provided to ensure OPERABILITY of each component ensures that at a minimum, the assumptions used in the safety analyses are met and that subsystas OPERA 81LITY is maintained. Surveillance Requirements for throttle valve position stops and flow balance testing provide assurance that proper ECCS flows will be maintained in the event of a LOCA. Maintenance of proper flow resistance and pressure drop in the piping system to each injection point is necessary to: (1) prevent total pump flow from exceeding runout conditions when the system is in its minimum resistance configuration, (2) provide the proper flow split between injection points in accordance with the assumptions used in the ECCS-LOCA analyses, and (3) provide an acceptable level of total ECCS flow to all injection points equal to or above that assumed in the ECOS-LOCA analyses. The Surveillance Requirements for leakge testing of ECCS check valves ensures that a failure of one valve will not cause an intersystem LOCA. In Mode 3, with pressurizar pressure below 1000 psig, the accumulators will. be available with their isolation valves either closed but energized, or open, whenever a S!8809 valve is closed to perform check valve leakage testi
@B[RON-URITS1serTA 2 8 1/4 S-2 AMENDMENT NO.
t
1 l
INSERT A i
For Unit 1, Surveillance Requirement 4.5.2.b.1 requires that the ECCS pump casings and l discharge piping high points equipped with vent valves be vented on a 31 day frequency.
This venting surveillance does not apply to subsystems in communication with operating systems because the flows and/or pressures prevalent in these systems are sufficient to provide confidence that water hammer which occurs from voiding would not result in unacceptable dynamic loads. Diring normal operation, this exclusion would apply to the High Head Safety Injection subsystem. During shutdown cooling operation, the exclusion would apply to the single re luired centrifugal charging pump and operating RH pump, in addition to the ECCS piping in commur.ication with the operating pumps. ,
Because the centrifugal charging pumps are not equipped with pump casing vent valves, and the pump design and system piping configuration allow the pumps to be maintained under positive pressure when in standby, manual venting of these pumps is not required. I 1
The surveillance requirement to uhrasonically examine selected portions of piping l involves the idle CV pump discharge piping up to the first check valve on the pump discharge and miniflow lines, and the stagnant portion of the piping upstream of the ISI8801 A/B adjacent to the vent valve ISIO45. This will provide added assurance that l the piping is water solid.
l l
l l
l i
l l
4 4
d