Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20209B7411999-06-30030 June 1999 Proposed Tech Specs Section 3.8.5, DC Sources - Shutdown, Correcting LCO & Braidwood TS Section 3.8, Electrical Power Systems, Deleting Various References to At&T Batteries ML20204H9781999-03-23023 March 1999 Proposed Tech Specs,Revising Sections 3.7.15,3.7.16,4.3.1 & 4.3.3 to Support Installation of New Boral high-density SFP Storage Racks at Byron & Braidwood Stations ML20204H4291999-03-22022 March 1999 Proposed Tech Specs 3.9.3,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6 ML20198N2041998-12-29029 December 1998 Revised Tech Specs Change,Page 3/4 3-54,providing Early Implementation of Containment Floor Drain Sump Water Level Instrumentation Requirements ML20198N3471998-12-29029 December 1998 Proposed ITS Tables 3.3.1-1 & 3.3.2-1,revising Twelve Allowable Values ML20198A0811998-12-14014 December 1998 Proposed Rev T to Improved Tech Specs Section 3.4, Reactor Coolant Sys ML20196G6611998-11-30030 November 1998 Proposed Rev to Improved Tech Specs Section 3.1 ML20155J2051998-11-0505 November 1998 Proposed TS Converting to Its,Rev R ML20155J0041998-10-30030 October 1998 Proposed Tech Specs Section 5.6.2, Fuel Storage Drainage, to Identify Sf Pool Level Sufficient to Ensure SRP Acceptance Criteria ML20154S5011998-10-18018 October 1998 Proposed Rev N to Improved TS Section 3.7 ML20154M5281998-10-15015 October 1998 Revisions K,O & P of 961213 ITS Submittal ML20154A8881998-10-0202 October 1998 Proposed Rev L to Improved Tech Specs Section 3.8 Closeout ML20153G4331998-09-25025 September 1998 Revs J & M to Tech Specs Sections 3.6 & 5.0,converting to Improved Tech Specs (Its),Final Closeout Package ML20236W5851998-07-31031 July 1998 Proposed Rev G to Sections 3.1 & 3.2 of Improved Tech Specs ML20237B6391998-07-30030 July 1998 Proposed Rev H to Section 3.5 of Improved Tech Specs ML20237E9971998-07-21021 July 1998 Rev I to Proposed Improved Tss,Section 3.9 Re Final Closeout ML20237B7021998-07-0909 July 1998 Proposed Improved TS (ITS) Section 3.3 Issued as Result of Removing Generic Change Traveler TSTF-135,Rev E from ITS Submittal ML20236H6531998-07-0202 July 1998 Rev F to 961213 Improved TS Submittal,Containing Final Package Closeout for Improved TS Sections 1.0,2.0 & 3.0 ML20248M1491998-06-0101 June 1998 Proposed Tech Specs Bases Page B 3.8-58b,converting to Improved Tech Specs ML20248C5511998-05-29029 May 1998 Proposed Tech Specs Bases Section 3/4.4.4, Relief Valves, Specifically Crediting Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS at Power Accident ML20216D9431998-04-0909 April 1998 Modified Proposed TS Pages Re 980324 Request for Amends to Licenses NPF-37 & NPF-66 ML20217E1891998-03-24024 March 1998 Proposed Tech Specs Surveillance Sections & Bases Allowing Util to Defer 10CFR50,App J,Type a Testing of Byron Unit 2 Containment Until Next Refuel Outage in 1999 ML20217B2681998-02-14014 February 1998 Proposed Rev D to ITS ML20198C3181997-12-30030 December 1997 Proposed Tech Specs 3.7.1.3 Re Condensate Storage Tank ML20203M5921997-12-17017 December 1997 Proposed Tech Specs,Rev C Changes Improved TSs 3.0,3.3,3.7, 3.8 & 5.0 as Result of Removing Generic Change Traveler TSTF-115 from Improved TS Submittal ML20203D0361997-12-0909 December 1997 Proposed Tech Specs Pages Correcting Errors Discovered in Current TS W/Regards to Total RCS Volume & Correction to Increase in RCS Volume Associated W/Unit 1 Replacement SGs Accounting for Hot Conditions ML20199A4751997-11-0707 November 1997 Proposed Tech Specs Pages Revising TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.c & Bases to Allow Performance of 10CFR50 App J,Type a Testing ML20217K4461997-10-21021 October 1997 Proposed Tech Specs Re Boron Credit in SFP ML20202F4561997-10-10010 October 1997 Proposed Tech Specs,Deleting Lower Flow Rate Requirement Associated W/Nonaccessible Area Exhaust Filter Plenum & Fuel Handling Bldg Ventilation Sys ML20211D9421997-09-24024 September 1997 Proposed Tech Specs Revising Allowable Time Interval for Performing Turbine Throttle Valve & Turbine Valve SRs Requirements from Monthly to Quarterly ML20216G8541997-09-0808 September 1997 Proposed Tech Specs Change to TS 4.5.2.b & Associated Bases Bringing Byron Unit 1 & Braidwood Unit 1 Requirement in Conformance W/Unit 2 Requirements Approved by NRC in ML20217H6071997-08-0707 August 1997 Proposed Tech Specs Pages,Revising Bases for Proposed Improved TS SR 3.8.6.1 & 3.8.6.3,to Indicate That Correction for Level Is Not Required When Battery Charging Current Is Less than 2 Amps for Gould & Less than 3 Amps for C&D ML20148P7721997-06-30030 June 1997 Proposed Tech Specs,Revising TS 3.9.11,5.6.1.1 & 6.9.10 to Allow Util to Permanently Take Credit for Soluble B in Spent Fuel Storage Pool Water to Maintain Acceptable Margin of Subcriticality ML20141F3081997-06-24024 June 1997 Proposed Tech Specs,Changing TS for ECCS Venting ML20141B7781997-06-17017 June 1997 Proposed Tech Specs Revising TS Sections 3/4.6.1.6,4.6.1.2, 6.8.4 & 6.9.1.11 to Support New Requirements in 10CFR50.55a, Which Requires Utils to Update Existing Containment Vessel Structural Integrity Programs ML20148J3231997-06-0909 June 1997 Proposed TS Reflecting Latest Rev of Waste Gas Decay Tank Rupture Accident Dose Calculation ML20140D0081997-05-31031 May 1997 Proposed Tech Specs,Revising TS Surveillance Requirement Re ECCS Pump Casings & Discharge Piping High Points Outside of Containment ML20141K8991997-05-24024 May 1997 Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b to Encompass non-operating ECCS Pumps & Discharge Piping Which Are Provided W/High Point Vent Valves ML20141K3381997-05-23023 May 1997 Proposed Tech Specs Requesting Enforcement Discretion from Compliance W/Ts 4.5.2.b.1 Requirements of Venting of Emergency Core Cooling Sys Pump Casings & Discharge Piping High Points Outside of Containment ML20141K0011997-05-21021 May 1997 Proposed Tech Specs Relocating Reactor Vessel Surveillance Program Capsule Withdrawal Schedules IAW GL 91-01 ML20148B6151997-05-0606 May 1997 Proposed Tech Specs,Revising TS 3/4.7.5, Ultimate Heat Sink & Associated Bases to Support SG Replacement & Incorporate Recent UHS Design Evaluations ML20196G0501997-04-25025 April 1997 Proposed Tech Specs Revising Primary Containment & Reactor Coolant Sys Volume Associated W/Unit 1 Steam Generator Replacement ML20137S5341997-04-0707 April 1997 Proposed Tech Specs 3/4.8.2 Re D.C. Sources ML20137P0081997-03-24024 March 1997 Proposed Tech Specs Removing Values of cycle-specific Core Operating Limits from TS & Relocating Values to Operating Limits Rept ML20137C6381997-03-14014 March 1997 Proposed Tech Specs,Reducing Allowable Unit 1 RCS Dose Equivalent I-131 from 0.35 Uci/Gram to 0.20 Uci/Gram for Remainder of Cycle 8 ML20137C7991997-03-14014 March 1997 Proposed Tech Specs Deleting 12 License Conditions from Unit 1 Operating License & Two License Conditions from Unit 2 Operating License ML20135E6851997-02-28028 February 1997 Proposed Tech Specs,Replacing Original W D4 SG at Byron & Braidwood W/B&W International SGs ML20136G1461997-02-24024 February 1997 Proposed Tech Specs,Reflecting Conversion to Improved TS to Be Consistent w/NUREG-1431 ML20138N6841997-02-24024 February 1997 Proposed Tech Specs Changing TS from Current TS to Improved TS Consistent w/NUREG-1431,Rev 1, STS - W Plants, Dtd Apr 1995 ML20134N8481997-02-18018 February 1997 Proposed Tech Specs Table 2.2-1 & Table 3.3-4 Re Sys Instrumentation Trip Setpoints,Ts 3.4.1.2 Re Reactor Coolant Sys & TS 4.4.1.2.1 Re Surveillance Requirements 1999-06-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20209B7411999-06-30030 June 1999 Proposed Tech Specs Section 3.8.5, DC Sources - Shutdown, Correcting LCO & Braidwood TS Section 3.8, Electrical Power Systems, Deleting Various References to At&T Batteries ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20204H9781999-03-23023 March 1999 Proposed Tech Specs,Revising Sections 3.7.15,3.7.16,4.3.1 & 4.3.3 to Support Installation of New Boral high-density SFP Storage Racks at Byron & Braidwood Stations ML20204H4291999-03-22022 March 1999 Proposed Tech Specs 3.9.3,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6 ML20202G9361999-01-30030 January 1999 Rev 1.4 to Chapter 10, Radioactive Effluent Treatment & Monitoring, Rev 1.6 to Chapter 11, Radiological Environ Program & Rev 1.6 to Chapter 12, Radioactive Effluent Technical Standards (Rets), for Odcm,Byron Annex ML20198N3471998-12-29029 December 1998 Proposed ITS Tables 3.3.1-1 & 3.3.2-1,revising Twelve Allowable Values ML20198N2041998-12-29029 December 1998 Revised Tech Specs Change,Page 3/4 3-54,providing Early Implementation of Containment Floor Drain Sump Water Level Instrumentation Requirements ML20198A0811998-12-14014 December 1998 Proposed Rev T to Improved Tech Specs Section 3.4, Reactor Coolant Sys ML20196G6611998-11-30030 November 1998 Proposed Rev to Improved Tech Specs Section 3.1 ML20155J2051998-11-0505 November 1998 Proposed TS Converting to Its,Rev R ML20155J0041998-10-30030 October 1998 Proposed Tech Specs Section 5.6.2, Fuel Storage Drainage, to Identify Sf Pool Level Sufficient to Ensure SRP Acceptance Criteria ML20154S5011998-10-18018 October 1998 Proposed Rev N to Improved TS Section 3.7 ML20154M5281998-10-15015 October 1998 Revisions K,O & P of 961213 ITS Submittal ML20154A8881998-10-0202 October 1998 Proposed Rev L to Improved Tech Specs Section 3.8 Closeout ML20153G4331998-09-25025 September 1998 Revs J & M to Tech Specs Sections 3.6 & 5.0,converting to Improved Tech Specs (Its),Final Closeout Package ML20236W5851998-07-31031 July 1998 Proposed Rev G to Sections 3.1 & 3.2 of Improved Tech Specs ML20237B6391998-07-30030 July 1998 Proposed Rev H to Section 3.5 of Improved Tech Specs ML20237E9971998-07-21021 July 1998 Rev I to Proposed Improved Tss,Section 3.9 Re Final Closeout ML20237B7021998-07-0909 July 1998 Proposed Improved TS (ITS) Section 3.3 Issued as Result of Removing Generic Change Traveler TSTF-135,Rev E from ITS Submittal ML20236H6531998-07-0202 July 1998 Rev F to 961213 Improved TS Submittal,Containing Final Package Closeout for Improved TS Sections 1.0,2.0 & 3.0 ML20248M1491998-06-0101 June 1998 Proposed Tech Specs Bases Page B 3.8-58b,converting to Improved Tech Specs ML20248K7361998-05-31031 May 1998 Commonwealth Edison Bnps Unit 1 Cycle 9 Startup Rept ML20248C5511998-05-29029 May 1998 Proposed Tech Specs Bases Section 3/4.4.4, Relief Valves, Specifically Crediting Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS at Power Accident ML20217Q8521998-05-0101 May 1998 Rev 9 to Bzp 310-2, Nuclear Accident Reporting Sys Form (Primary Responsibility - Station Director). W/Notes & Comments ML20216D9431998-04-0909 April 1998 Modified Proposed TS Pages Re 980324 Request for Amends to Licenses NPF-37 & NPF-66 ML20217E1891998-03-24024 March 1998 Proposed Tech Specs Surveillance Sections & Bases Allowing Util to Defer 10CFR50,App J,Type a Testing of Byron Unit 2 Containment Until Next Refuel Outage in 1999 ML20217B2681998-02-14014 February 1998 Proposed Rev D to ITS ML20199J7581997-12-31031 December 1997 Rev 1 to IST Plan Pumps & Valves Byron Nuclear Generating Station,Units 1 & 2 ML20198C3181997-12-30030 December 1997 Proposed Tech Specs 3.7.1.3 Re Condensate Storage Tank ML20203M5921997-12-17017 December 1997 Proposed Tech Specs,Rev C Changes Improved TSs 3.0,3.3,3.7, 3.8 & 5.0 as Result of Removing Generic Change Traveler TSTF-115 from Improved TS Submittal ML20203D0361997-12-0909 December 1997 Proposed Tech Specs Pages Correcting Errors Discovered in Current TS W/Regards to Total RCS Volume & Correction to Increase in RCS Volume Associated W/Unit 1 Replacement SGs Accounting for Hot Conditions ML20199A4751997-11-0707 November 1997 Proposed Tech Specs Pages Revising TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.c & Bases to Allow Performance of 10CFR50 App J,Type a Testing ML20216H8241997-10-31031 October 1997 Revs to OCDM for Byron Station,Including Rev 1.3 to Chapter 10,rev 1.5 to Chapters 11 & 12 & Rev 1.3 to App F ML20198M2621997-10-31031 October 1997 Revs to Offsite Dose Calculation Manual,Consisting of Rev 1.5 to Chapter 11 & Rev 1.5 to Chapter 12 ML20217K4461997-10-21021 October 1997 Proposed Tech Specs Re Boron Credit in SFP ML20202F4561997-10-10010 October 1997 Proposed Tech Specs,Deleting Lower Flow Rate Requirement Associated W/Nonaccessible Area Exhaust Filter Plenum & Fuel Handling Bldg Ventilation Sys ML20211D9421997-09-24024 September 1997 Proposed Tech Specs Revising Allowable Time Interval for Performing Turbine Throttle Valve & Turbine Valve SRs Requirements from Monthly to Quarterly ML20216G8541997-09-0808 September 1997 Proposed Tech Specs Change to TS 4.5.2.b & Associated Bases Bringing Byron Unit 1 & Braidwood Unit 1 Requirement in Conformance W/Unit 2 Requirements Approved by NRC in ML20217H6071997-08-0707 August 1997 Proposed Tech Specs Pages,Revising Bases for Proposed Improved TS SR 3.8.6.1 & 3.8.6.3,to Indicate That Correction for Level Is Not Required When Battery Charging Current Is Less than 2 Amps for Gould & Less than 3 Amps for C&D ML20148P7721997-06-30030 June 1997 Proposed Tech Specs,Revising TS 3.9.11,5.6.1.1 & 6.9.10 to Allow Util to Permanently Take Credit for Soluble B in Spent Fuel Storage Pool Water to Maintain Acceptable Margin of Subcriticality ML20141F3081997-06-24024 June 1997 Proposed Tech Specs,Changing TS for ECCS Venting ML20141B7781997-06-17017 June 1997 Proposed Tech Specs Revising TS Sections 3/4.6.1.6,4.6.1.2, 6.8.4 & 6.9.1.11 to Support New Requirements in 10CFR50.55a, Which Requires Utils to Update Existing Containment Vessel Structural Integrity Programs ML20148J3231997-06-0909 June 1997 Proposed TS Reflecting Latest Rev of Waste Gas Decay Tank Rupture Accident Dose Calculation ML20140D0081997-05-31031 May 1997 Proposed Tech Specs,Revising TS Surveillance Requirement Re ECCS Pump Casings & Discharge Piping High Points Outside of Containment ML20141K8991997-05-24024 May 1997 Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b to Encompass non-operating ECCS Pumps & Discharge Piping Which Are Provided W/High Point Vent Valves ML20141K3381997-05-23023 May 1997 Proposed Tech Specs Requesting Enforcement Discretion from Compliance W/Ts 4.5.2.b.1 Requirements of Venting of Emergency Core Cooling Sys Pump Casings & Discharge Piping High Points Outside of Containment ML20141K0011997-05-21021 May 1997 Proposed Tech Specs Relocating Reactor Vessel Surveillance Program Capsule Withdrawal Schedules IAW GL 91-01 ML20148B6151997-05-0606 May 1997 Proposed Tech Specs,Revising TS 3/4.7.5, Ultimate Heat Sink & Associated Bases to Support SG Replacement & Incorporate Recent UHS Design Evaluations ML20196G0501997-04-25025 April 1997 Proposed Tech Specs Revising Primary Containment & Reactor Coolant Sys Volume Associated W/Unit 1 Steam Generator Replacement ML20137S5341997-04-0707 April 1997 Proposed Tech Specs 3/4.8.2 Re D.C. Sources 1999-06-30
[Table view] |
Text
e ATTACHMENT 22 DIESEL GENERATORS 1 ~. T.S. 3/4.8.1 (pages 3/4 8-1, 3/4 8-2 and 3/4 8-8) A.C. Sources HTo Action Statements a, b and d make the changes noted on the attached pages. Replace Table 4.8.1 with the attached Table.
These changes are requested.in accordance with Generic Letter 84-15 " Proposed Staff Actions to Improve and Maintain Diesel
. Generator Reliability " dated July 2, 1984.
x
+
i O
, 8502110010 29 PDR ADOCK 0 454
.6-
@ 26 g 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
- a. Each Class 1E 4160 volt bus capable of being powered from:
- 1) Either transformer of a given units normal System Auxiliary Transformer bank, and
- 2) Either transformer of the other units System Auxiliary Transformers bank, with Each units System Auxiliary Transformer bank energized from an independent transmission circuit,
- b. Two separate and independent diesel generators, each with:
- 1) A separate day tank containing a minimum volume of 450 gallons of fuel,
- 2) A separate Fuel Oil Storage System containing a minimum volume of 44,000 gallons of fuel, and
- 3) A separate fuel transfer pump.
APPLICABILITY: MODES 1, 2, 3,.and 4.
ACTION:
- a. With either an offsite circuit or diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Specification 4.8.1.1.la - " " --^'- ' " ' ' " within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafttre; restore at least two offsite circuits Coad SpeciReah'an and two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at q, g . i. t . 2. o . 9 least HOT STANOBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within bink 24 hoort the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- b. With one offsite circuit and one diesel generator'of the above required A.C. electrical power sources inoperable, demonstrate the OPERASILITY of the remaining A.C. sources by performing Specifications 4.8.1.1.la = " " ^ 1 '-
r; within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter4 restore at least one of the inoperable sources to OPERABLE statuT within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY pg gF; peg
- within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SMUT 00WN within the following 4.8 11 2***N 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore at least two offsite circuits and two diesel
- gp 8 hoors generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of
.... initial loss or be in at least HOT STANOBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
BYRON - UNIT 1 3/4 8-1
r OCT 2 6 ggpq ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION I ACTION (Continued) ;
- c. ' With one diesel generator inoperable in addition to ACTION a. or b. '!
above, verify that:
- 1. All required systems, subsystems, trains, components and devices ,
that depend on the remaining OPERA 8LE diesel generator as a '
source of emergency power are also OPERA 8LE, and
- 2. When in MODE 1, 2 or 3, the diesel-driven auxiliary feedwater pump is OPERA 8LE and the Unit 2, A diesel generator is OPERA 8LE,"
if the inoperable diesel generator is the emergency power supply i for the motor-driven auxiliary feedwater pump.
If these conditions are not satisfied within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> be in at least HOT STAN08Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. '
- d. With two of the above required offsite A.C. circuits inoperable, demonstrate the OPERABILITY of two diesel generators by performing l-Specification 4.8.1.1.2a.4) within E . _ _. _ = i i; : t ence --
A hours 1, , A- , unless the diesel generators are already operating; restore at least one of the inoperable offsite sources to OPERA 8LE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STAN08Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. With only one offsite source restored, restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STAN08Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
-e. With two of the above required diesel generators inoperable, ;
demonstrate the OPERA 8ILITY of two offsite A.C. circuits by perform- .
ing Specification 4.8.1.1.la. within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable diesel generators to OPERA 8LE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STAND 8Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore at least two diesel generators to.
OPERA 8LE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in
- least HOT STAN08Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- Until 2 years after' issuance of an operating license for Unit 1 the Unit 2, A diesel _ generator must be capable of providing power to bus 141, and the LCO,
- ACTION and' SURVEILLANCE' requirements of Specifications 3/4.8.1.3 shall be applicable. Subsequently, LC0 3.'8.1.1.b.1), 2), and 3), and Surveillance Requirements 4.8.1.1.2 shall be applicable to the Unit 2, A diesel as applicable for demonstrating that the Unit 2, A diesel is OPERA 8LE as an emergency power
. supply for the Unit 1 motor-driven auxiliary feedwater pump.
- BYRON - UNIT 1 3/4 8-2 i
~
I
Table 4.8.1 DIESEL GENERATOR TEST SCHEDULE Number of Failuresin
, last 20 Valid Tests
- Test Frequency i1 At least once per 31 days 22 At least once per 7 days"
- Criteria for determining number of failures and nunber of valid tests shall be in accordance with Regulatbry Position C.2.e of Regulatory Guide 1.108, Revison 1, August 1977, where the number of tests and failures is detennined on a per diesel generator basis. For the purposes of this test schedule, only valid tests conducted after the esmpmtion of-%e pm.openhuwl test reguirements of Re3unatog Ca* l.108, Rev 1, Aus 1997, shall be indoded in4he. comPut* H8h of %e. " last - 2o valid +csts. "
"This test frecuency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 val d demands has been reduced to one or less.
BYRON - UNIT.1
l ATTACHMENT 23 REMOTE SHUTDOWN MONITORING INSTRUMENTATION
- 1. Table 3.3-9 and Table 4.3-6 (pages 3/4 3-51 and 3/4 3-52)
Delete Item 8 "RHR Flow Rate" from Tables 3.3-9 and 4.3-6.
-Also renumber Items 9 and 10 as 8 and 9 respectively. This deletion is requested since RHR flow rate is not a required parameter in performing a safe and controlled remote shutdown.
Other indications of adequate core cooling are provided by the RCS temperature, pressure and level indications.
/
O e
. ~
, i e
IA8tf 4.3-6 e
j RfMDIE S4RalDOWN MONITORING INS 1RUMENIATION z SURVITLLANCE RfQUltfMINls 3
e CHANNEL CHANNEL CHfCK CAtl8AAll0N *
$ INSimuMENT
- 1. Intermediate Range Neutron flux M R
- 2. M* R Source Ranee Meutron flux ,
- 3. Reactor Coolant Temperature - Wide Rasu>e M R
- 4. Pressurizer Pressure M A ,
't
- 5. Pressurizer Level M R
- 6. Steam Generator Pressure M R s
- 7. Steam Gener.itor Level M A
[e-E ^
. " Z ..v s... ;; a"-
O./ RHR leeparature M R 9.E Auxiliary fee h ter flow Rate M R hihen below P-6.
c O
M M
O>
TABLE 3.3-9 REMOTE SHU100WN MONITORING INSTRUNENTATION TOTAL NO. MINIMUM REA00ui Of CHANNELS ,
INSTRUMENT LOCAll0N CHANNELS OPERA 8tf ,
- 1. Intermediate Range Neutron Flux ,PLO6J 2 1
- 2. Source Range Neutron Flux ,PLO6J 2 1
- 3. Reactor Coolant Temperature -
.Jide R'nge a
- a. Ilut Leg iPLO5J 1/ loop 1/ loop
- b. C01 1 t eg ,Pt05J 1/ loop 1/ loop .
- 4. ,
Pressuruer Pressure iPLO6J l 1
- 5. Pressurizer Level .PLO6J 2 1
- 6. Steam Generator Pressure PLG4J/ lPLn5J 1/ste gen 1/sta gen
- 7. Steam Generator Level pPLO4J 1/sta gen 1/sta gen
-0. " ;^ f; _ ^ M
., ! " ^2 ? ?
O. f. AttR Temperature LOCAL 2 1
- 9. J&. Auxiliary feedwater flow Rate Pt04J/ Pt05J 2/ste gen 1/ste gen C3 M
to on E
4 Q- . - . - - - - - - - a