Proposed Tech Specs,Allowing Temporary Closing of Certain Valves in Safety Injection Sys During Surveillance of RCS Pressure Isolation ValvesML20137T491 |
Person / Time |
---|
Site: |
Byron, 05000000 |
---|
Issue date: |
11/26/1985 |
---|
From: |
COMMONWEALTH EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20137T484 |
List: |
---|
References |
---|
NUDOCS 8512090033 |
Download: ML20137T491 (7) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20209B7411999-06-30030 June 1999 Proposed Tech Specs Section 3.8.5, DC Sources - Shutdown, Correcting LCO & Braidwood TS Section 3.8, Electrical Power Systems, Deleting Various References to At&T Batteries ML20204H9781999-03-23023 March 1999 Proposed Tech Specs,Revising Sections 3.7.15,3.7.16,4.3.1 & 4.3.3 to Support Installation of New Boral high-density SFP Storage Racks at Byron & Braidwood Stations ML20204H4291999-03-22022 March 1999 Proposed Tech Specs 3.9.3,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6 ML20198N2041998-12-29029 December 1998 Revised Tech Specs Change,Page 3/4 3-54,providing Early Implementation of Containment Floor Drain Sump Water Level Instrumentation Requirements ML20198N3471998-12-29029 December 1998 Proposed ITS Tables 3.3.1-1 & 3.3.2-1,revising Twelve Allowable Values ML20198A0811998-12-14014 December 1998 Proposed Rev T to Improved Tech Specs Section 3.4, Reactor Coolant Sys ML20196G6611998-11-30030 November 1998 Proposed Rev to Improved Tech Specs Section 3.1 ML20155J2051998-11-0505 November 1998 Proposed TS Converting to Its,Rev R ML20155J0041998-10-30030 October 1998 Proposed Tech Specs Section 5.6.2, Fuel Storage Drainage, to Identify Sf Pool Level Sufficient to Ensure SRP Acceptance Criteria ML20154S5011998-10-18018 October 1998 Proposed Rev N to Improved TS Section 3.7 ML20154M5281998-10-15015 October 1998 Revisions K,O & P of 961213 ITS Submittal ML20154A8881998-10-0202 October 1998 Proposed Rev L to Improved Tech Specs Section 3.8 Closeout ML20153G4331998-09-25025 September 1998 Revs J & M to Tech Specs Sections 3.6 & 5.0,converting to Improved Tech Specs (Its),Final Closeout Package ML20236W5851998-07-31031 July 1998 Proposed Rev G to Sections 3.1 & 3.2 of Improved Tech Specs ML20237B6391998-07-30030 July 1998 Proposed Rev H to Section 3.5 of Improved Tech Specs ML20237E9971998-07-21021 July 1998 Rev I to Proposed Improved Tss,Section 3.9 Re Final Closeout ML20237B7021998-07-0909 July 1998 Proposed Improved TS (ITS) Section 3.3 Issued as Result of Removing Generic Change Traveler TSTF-135,Rev E from ITS Submittal ML20236H6531998-07-0202 July 1998 Rev F to 961213 Improved TS Submittal,Containing Final Package Closeout for Improved TS Sections 1.0,2.0 & 3.0 ML20248M1491998-06-0101 June 1998 Proposed Tech Specs Bases Page B 3.8-58b,converting to Improved Tech Specs ML20248C5511998-05-29029 May 1998 Proposed Tech Specs Bases Section 3/4.4.4, Relief Valves, Specifically Crediting Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS at Power Accident ML20216D9431998-04-0909 April 1998 Modified Proposed TS Pages Re 980324 Request for Amends to Licenses NPF-37 & NPF-66 ML20217E1891998-03-24024 March 1998 Proposed Tech Specs Surveillance Sections & Bases Allowing Util to Defer 10CFR50,App J,Type a Testing of Byron Unit 2 Containment Until Next Refuel Outage in 1999 ML20217B2681998-02-14014 February 1998 Proposed Rev D to ITS ML20198C3181997-12-30030 December 1997 Proposed Tech Specs 3.7.1.3 Re Condensate Storage Tank ML20203M5921997-12-17017 December 1997 Proposed Tech Specs,Rev C Changes Improved TSs 3.0,3.3,3.7, 3.8 & 5.0 as Result of Removing Generic Change Traveler TSTF-115 from Improved TS Submittal ML20203D0361997-12-0909 December 1997 Proposed Tech Specs Pages Correcting Errors Discovered in Current TS W/Regards to Total RCS Volume & Correction to Increase in RCS Volume Associated W/Unit 1 Replacement SGs Accounting for Hot Conditions ML20199A4751997-11-0707 November 1997 Proposed Tech Specs Pages Revising TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.c & Bases to Allow Performance of 10CFR50 App J,Type a Testing ML20217K4461997-10-21021 October 1997 Proposed Tech Specs Re Boron Credit in SFP ML20202F4561997-10-10010 October 1997 Proposed Tech Specs,Deleting Lower Flow Rate Requirement Associated W/Nonaccessible Area Exhaust Filter Plenum & Fuel Handling Bldg Ventilation Sys ML20211D9421997-09-24024 September 1997 Proposed Tech Specs Revising Allowable Time Interval for Performing Turbine Throttle Valve & Turbine Valve SRs Requirements from Monthly to Quarterly ML20216G8541997-09-0808 September 1997 Proposed Tech Specs Change to TS 4.5.2.b & Associated Bases Bringing Byron Unit 1 & Braidwood Unit 1 Requirement in Conformance W/Unit 2 Requirements Approved by NRC in ML20217H6071997-08-0707 August 1997 Proposed Tech Specs Pages,Revising Bases for Proposed Improved TS SR 3.8.6.1 & 3.8.6.3,to Indicate That Correction for Level Is Not Required When Battery Charging Current Is Less than 2 Amps for Gould & Less than 3 Amps for C&D ML20148P7721997-06-30030 June 1997 Proposed Tech Specs,Revising TS 3.9.11,5.6.1.1 & 6.9.10 to Allow Util to Permanently Take Credit for Soluble B in Spent Fuel Storage Pool Water to Maintain Acceptable Margin of Subcriticality ML20141F3081997-06-24024 June 1997 Proposed Tech Specs,Changing TS for ECCS Venting ML20141B7781997-06-17017 June 1997 Proposed Tech Specs Revising TS Sections 3/4.6.1.6,4.6.1.2, 6.8.4 & 6.9.1.11 to Support New Requirements in 10CFR50.55a, Which Requires Utils to Update Existing Containment Vessel Structural Integrity Programs ML20148J3231997-06-0909 June 1997 Proposed TS Reflecting Latest Rev of Waste Gas Decay Tank Rupture Accident Dose Calculation ML20140D0081997-05-31031 May 1997 Proposed Tech Specs,Revising TS Surveillance Requirement Re ECCS Pump Casings & Discharge Piping High Points Outside of Containment ML20141K8991997-05-24024 May 1997 Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b to Encompass non-operating ECCS Pumps & Discharge Piping Which Are Provided W/High Point Vent Valves ML20141K3381997-05-23023 May 1997 Proposed Tech Specs Requesting Enforcement Discretion from Compliance W/Ts 4.5.2.b.1 Requirements of Venting of Emergency Core Cooling Sys Pump Casings & Discharge Piping High Points Outside of Containment ML20141K0011997-05-21021 May 1997 Proposed Tech Specs Relocating Reactor Vessel Surveillance Program Capsule Withdrawal Schedules IAW GL 91-01 ML20148B6151997-05-0606 May 1997 Proposed Tech Specs,Revising TS 3/4.7.5, Ultimate Heat Sink & Associated Bases to Support SG Replacement & Incorporate Recent UHS Design Evaluations ML20196G0501997-04-25025 April 1997 Proposed Tech Specs Revising Primary Containment & Reactor Coolant Sys Volume Associated W/Unit 1 Steam Generator Replacement ML20137S5341997-04-0707 April 1997 Proposed Tech Specs 3/4.8.2 Re D.C. Sources ML20137P0081997-03-24024 March 1997 Proposed Tech Specs Removing Values of cycle-specific Core Operating Limits from TS & Relocating Values to Operating Limits Rept ML20137C6381997-03-14014 March 1997 Proposed Tech Specs,Reducing Allowable Unit 1 RCS Dose Equivalent I-131 from 0.35 Uci/Gram to 0.20 Uci/Gram for Remainder of Cycle 8 ML20137C7991997-03-14014 March 1997 Proposed Tech Specs Deleting 12 License Conditions from Unit 1 Operating License & Two License Conditions from Unit 2 Operating License ML20135E6851997-02-28028 February 1997 Proposed Tech Specs,Replacing Original W D4 SG at Byron & Braidwood W/B&W International SGs ML20138N6841997-02-24024 February 1997 Proposed Tech Specs Changing TS from Current TS to Improved TS Consistent w/NUREG-1431,Rev 1, STS - W Plants, Dtd Apr 1995 ML20136G1461997-02-24024 February 1997 Proposed Tech Specs,Reflecting Conversion to Improved TS to Be Consistent w/NUREG-1431 ML20134N8481997-02-18018 February 1997 Proposed Tech Specs Table 2.2-1 & Table 3.3-4 Re Sys Instrumentation Trip Setpoints,Ts 3.4.1.2 Re Reactor Coolant Sys & TS 4.4.1.2.1 Re Surveillance Requirements 1999-06-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20209B7411999-06-30030 June 1999 Proposed Tech Specs Section 3.8.5, DC Sources - Shutdown, Correcting LCO & Braidwood TS Section 3.8, Electrical Power Systems, Deleting Various References to At&T Batteries ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20204H9781999-03-23023 March 1999 Proposed Tech Specs,Revising Sections 3.7.15,3.7.16,4.3.1 & 4.3.3 to Support Installation of New Boral high-density SFP Storage Racks at Byron & Braidwood Stations ML20204H4291999-03-22022 March 1999 Proposed Tech Specs 3.9.3,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6 ML20202G9361999-01-30030 January 1999 Rev 1.4 to Chapter 10, Radioactive Effluent Treatment & Monitoring, Rev 1.6 to Chapter 11, Radiological Environ Program & Rev 1.6 to Chapter 12, Radioactive Effluent Technical Standards (Rets), for Odcm,Byron Annex ML20198N3471998-12-29029 December 1998 Proposed ITS Tables 3.3.1-1 & 3.3.2-1,revising Twelve Allowable Values ML20198N2041998-12-29029 December 1998 Revised Tech Specs Change,Page 3/4 3-54,providing Early Implementation of Containment Floor Drain Sump Water Level Instrumentation Requirements ML20198A0811998-12-14014 December 1998 Proposed Rev T to Improved Tech Specs Section 3.4, Reactor Coolant Sys ML20196G6611998-11-30030 November 1998 Proposed Rev to Improved Tech Specs Section 3.1 ML20155J2051998-11-0505 November 1998 Proposed TS Converting to Its,Rev R ML20155J0041998-10-30030 October 1998 Proposed Tech Specs Section 5.6.2, Fuel Storage Drainage, to Identify Sf Pool Level Sufficient to Ensure SRP Acceptance Criteria ML20154S5011998-10-18018 October 1998 Proposed Rev N to Improved TS Section 3.7 ML20154M5281998-10-15015 October 1998 Revisions K,O & P of 961213 ITS Submittal ML20154A8881998-10-0202 October 1998 Proposed Rev L to Improved Tech Specs Section 3.8 Closeout ML20153G4331998-09-25025 September 1998 Revs J & M to Tech Specs Sections 3.6 & 5.0,converting to Improved Tech Specs (Its),Final Closeout Package ML20236W5851998-07-31031 July 1998 Proposed Rev G to Sections 3.1 & 3.2 of Improved Tech Specs ML20237B6391998-07-30030 July 1998 Proposed Rev H to Section 3.5 of Improved Tech Specs ML20237E9971998-07-21021 July 1998 Rev I to Proposed Improved Tss,Section 3.9 Re Final Closeout ML20237B7021998-07-0909 July 1998 Proposed Improved TS (ITS) Section 3.3 Issued as Result of Removing Generic Change Traveler TSTF-135,Rev E from ITS Submittal ML20236H6531998-07-0202 July 1998 Rev F to 961213 Improved TS Submittal,Containing Final Package Closeout for Improved TS Sections 1.0,2.0 & 3.0 ML20248M1491998-06-0101 June 1998 Proposed Tech Specs Bases Page B 3.8-58b,converting to Improved Tech Specs ML20248K7361998-05-31031 May 1998 Commonwealth Edison Bnps Unit 1 Cycle 9 Startup Rept ML20248C5511998-05-29029 May 1998 Proposed Tech Specs Bases Section 3/4.4.4, Relief Valves, Specifically Crediting Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS at Power Accident ML20217Q8521998-05-0101 May 1998 Rev 9 to Bzp 310-2, Nuclear Accident Reporting Sys Form (Primary Responsibility - Station Director). W/Notes & Comments ML20216D9431998-04-0909 April 1998 Modified Proposed TS Pages Re 980324 Request for Amends to Licenses NPF-37 & NPF-66 ML20217E1891998-03-24024 March 1998 Proposed Tech Specs Surveillance Sections & Bases Allowing Util to Defer 10CFR50,App J,Type a Testing of Byron Unit 2 Containment Until Next Refuel Outage in 1999 ML20217B2681998-02-14014 February 1998 Proposed Rev D to ITS ML20199J7581997-12-31031 December 1997 Rev 1 to IST Plan Pumps & Valves Byron Nuclear Generating Station,Units 1 & 2 ML20198C3181997-12-30030 December 1997 Proposed Tech Specs 3.7.1.3 Re Condensate Storage Tank ML20203M5921997-12-17017 December 1997 Proposed Tech Specs,Rev C Changes Improved TSs 3.0,3.3,3.7, 3.8 & 5.0 as Result of Removing Generic Change Traveler TSTF-115 from Improved TS Submittal ML20203D0361997-12-0909 December 1997 Proposed Tech Specs Pages Correcting Errors Discovered in Current TS W/Regards to Total RCS Volume & Correction to Increase in RCS Volume Associated W/Unit 1 Replacement SGs Accounting for Hot Conditions ML20199A4751997-11-0707 November 1997 Proposed Tech Specs Pages Revising TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.c & Bases to Allow Performance of 10CFR50 App J,Type a Testing ML20198M2621997-10-31031 October 1997 Revs to Offsite Dose Calculation Manual,Consisting of Rev 1.5 to Chapter 11 & Rev 1.5 to Chapter 12 ML20216H8241997-10-31031 October 1997 Revs to OCDM for Byron Station,Including Rev 1.3 to Chapter 10,rev 1.5 to Chapters 11 & 12 & Rev 1.3 to App F ML20217K4461997-10-21021 October 1997 Proposed Tech Specs Re Boron Credit in SFP ML20202F4561997-10-10010 October 1997 Proposed Tech Specs,Deleting Lower Flow Rate Requirement Associated W/Nonaccessible Area Exhaust Filter Plenum & Fuel Handling Bldg Ventilation Sys ML20211D9421997-09-24024 September 1997 Proposed Tech Specs Revising Allowable Time Interval for Performing Turbine Throttle Valve & Turbine Valve SRs Requirements from Monthly to Quarterly ML20216G8541997-09-0808 September 1997 Proposed Tech Specs Change to TS 4.5.2.b & Associated Bases Bringing Byron Unit 1 & Braidwood Unit 1 Requirement in Conformance W/Unit 2 Requirements Approved by NRC in ML20217H6071997-08-0707 August 1997 Proposed Tech Specs Pages,Revising Bases for Proposed Improved TS SR 3.8.6.1 & 3.8.6.3,to Indicate That Correction for Level Is Not Required When Battery Charging Current Is Less than 2 Amps for Gould & Less than 3 Amps for C&D ML20148P7721997-06-30030 June 1997 Proposed Tech Specs,Revising TS 3.9.11,5.6.1.1 & 6.9.10 to Allow Util to Permanently Take Credit for Soluble B in Spent Fuel Storage Pool Water to Maintain Acceptable Margin of Subcriticality ML20141F3081997-06-24024 June 1997 Proposed Tech Specs,Changing TS for ECCS Venting ML20141B7781997-06-17017 June 1997 Proposed Tech Specs Revising TS Sections 3/4.6.1.6,4.6.1.2, 6.8.4 & 6.9.1.11 to Support New Requirements in 10CFR50.55a, Which Requires Utils to Update Existing Containment Vessel Structural Integrity Programs ML20148J3231997-06-0909 June 1997 Proposed TS Reflecting Latest Rev of Waste Gas Decay Tank Rupture Accident Dose Calculation ML20140D0081997-05-31031 May 1997 Proposed Tech Specs,Revising TS Surveillance Requirement Re ECCS Pump Casings & Discharge Piping High Points Outside of Containment ML20141K8991997-05-24024 May 1997 Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b to Encompass non-operating ECCS Pumps & Discharge Piping Which Are Provided W/High Point Vent Valves ML20141K3381997-05-23023 May 1997 Proposed Tech Specs Requesting Enforcement Discretion from Compliance W/Ts 4.5.2.b.1 Requirements of Venting of Emergency Core Cooling Sys Pump Casings & Discharge Piping High Points Outside of Containment ML20141K0011997-05-21021 May 1997 Proposed Tech Specs Relocating Reactor Vessel Surveillance Program Capsule Withdrawal Schedules IAW GL 91-01 ML20148B6151997-05-0606 May 1997 Proposed Tech Specs,Revising TS 3/4.7.5, Ultimate Heat Sink & Associated Bases to Support SG Replacement & Incorporate Recent UHS Design Evaluations ML20196G0501997-04-25025 April 1997 Proposed Tech Specs Revising Primary Containment & Reactor Coolant Sys Volume Associated W/Unit 1 Steam Generator Replacement ML20137S5341997-04-0707 April 1997 Proposed Tech Specs 3/4.8.2 Re D.C. Sources 1999-06-30
[Table view] |
Text
.
ATTACRMENT A PROPOSED CHANGE TO APPENDIX A TECHNICAL SPECIFICATIONS OF FACILITY OPERATING LICENSE NPF-37 Revised Pages: NPF-37, page 3/4 5-4 page B 3/4 5-2 8512090033 851126 PDR ADOCK 05000454 P PDR
~
~
ATTAot mhr ~
EMERGENCY CDRE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE:
- a. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the following valves are in the indicated positions with power to the valve operators removed:
Valve Number Valve Function Valve Position MOV SI8806 Suction to the SI Open Pumps
. MOV $18835 SI Pump Discharge Open To RCS Cold Legs MOV SI8813 SI Pump Recirculation -
Open To The RWST MOV SI8809A RHR Pump Discharge to Open*
RCS Cold Legs MOV SI88098 RHR Pump Discharge to Open" RCS Cold Legs MOV SI8840 RHR Pump Discharge to Closed RCS Hot Legs MOV SI8802A SI Pump Discharge to 'losed C
RCS Hot, Legs .
MOV SI88028 SI Pump Discharge to Closed' -
RCS Hot Legs
- b. At least once per 31 days by:
, 1) Verifying that the ECCS piping is full of water by venting the ECCS pump casings and accessible discharge piping high points, and
- 2) Verifying that each valve (manual, power-operated, or automatic) in the flow path that is not lecked, sealed, or otherwise secured in position, is in its correct position. -
- c. By a visual inspection which verifies that no loose debris (rags.
trash, clothing, etc.) is present in the containment which could be transported to the containment sump and cause restriction of the pump suctions during LOCA conditions. This visual inspection shall i
be performed:
N Valves may be. reali3ned fo tesiing PMuoni- +0 SPECahon 4 4 6.2.2, BYRON - UNITS 1 & 2 3/4 5-4 c-,- - - - ----- ,,-
--,.---.,_e,,-,, ,, ,- y - - , - , - , ,-,---y---, ,- --w,- -
' (MEkGENCY CORE COOLING SYSTEMS BASES ECCS SUBSYSTEMS (Continued) .
- The limitation for a maximum of one centrifugal charging pump to be OPERABLE and the Surveillance Requirement to verify all charging pumps and Safety Injection pumps except the required OPERABLE charging pump to be inoper-able below 330*F provides assurance that a mass addition pressure transient can be relieved by the operation of a single PORV.
The Surveillanca Requirements provided to ensure OPERABILITY of each component ensures that at a minimum, the assumptions used in the safety analyses are met and that subsystem OPERABILITY is maintained. Surveillance Requirements for throttle valve position stops and flow balance testing provide assurance
, that proper ECCS flows will be maintained in the event of a LOCA. Maintenance of proper flow resistance and pressure drop in the piping system to each injection point is necessary to: (1) prevent total pump flow from exceeding runout conditions when the system is in its minimum resistance configuration, (2) provide the proper flow split between infection points in accordance with the assumptions used in the ECCS-LOCA analyses, and (3) provide an acceptable level of total ECCS flow tg all injection points equal to or above that assumed in the ECCS-LOCA analyses.T The Surveillance Requirements for leakage tasting of ECCS check valves ensures that a failure of one valve will not cause an intersystem LOCA.-%
3/4.5.4 REFUELING WATER STORAGE TANK .
l' The OPERABILITY of the refueling water storage tank (RWST) as part of the ECCS ensures that a sufficient supply of borated water is available for injection by the ECCS in the event of a LOCA. The limits on RWST minimum volume and boron concentration ensure that: (1) sufficient water is available within containment to I permit recirculation cooling flow to the core, and (2) the reactor will remain subcritical in the cold condition following mixing of the RWST and the RCS water volumes with all control rods inserted except for the most reactive control l assembly. These assumptions are consistent with the LOCA analyses...
The contained water volume limit includes an allowance for water not usable because of tank discharge line location or other physical characteristics.
A minimum contained borated water level of 89% ensures a volume of greater than or equal to 395,000 gallons.
The limits on contained water volume and boron co'ncentration of the RWST also ensure a pH value of between 8.5 and 11.0 for the solution recirculated within containment after a LOCA. This pH band minimizes the evolution of iodine and minimizes the effect of chloride and caustic stress corrosion on mechanical systems and components.
valve.s sr seo'l 4 or a m.3 be. closed, be only on r. ei a Hs " h P *cf**
leekg3 Mn3 of %e. Eccs c. heck. valves. ihe. sr eseg yo vt will only l(.
l be closed when perneming the .surveillanc4. fkereb: minimiz.ig th< We.
%e. Ecc.3 is in a de3raded dond;Kon. In add;h he. Accomolahrs will be. OPEMASLE When the. chec.k. velVc. sure,vcillanc%
is _ +beingerformCCIM" t %e. Rts ms. sore. is greak -Ann looo E 3/4 gsis,.
3-2 '
, BYRON - UNIISJ_&_2 l
l _ . -. - . _ - - _ _ _ - . _ . --- .. .
'1 .
ATTACHMENT B REASONS FOR PROPOSED CHANGE Technical' Specification 4.4.6.2.2 requires reactor coolant system (RCS) pressure isolation valves to be periodically checked for potential back leakage into interconnected systems of lower pressure. Specifically, check valves S.I. 8818A,B,C,D in the accumulator cold leg injection lines must be checked for back leakage into the residual heat removal (RHR) system when the plant is in Mode 3.(Refer to figure 1-M61-4)
Previously, the valve line up used for performing this surveillance involved closing the RHR pump discharge to RCS cold leg isolation valves, SI 8809A and SI8809B. However, it has been determined that this valve alignment is not in accordance with assumptions in the FSAR analysis for a large break loss of coolant accident (LOCA). Closure of a S.I. 8809 valve isolates injection flow from both RHR Pumps into two RCS cold legs, yet the accident analysis assumes injection flow into all four cold legs during a large break LOCA.
The feasibility of performing this surveillance with valves SI8809A and SI8809B in the open position has been evaluated and the following concerns have been identified.
- 1. Other systems could leak into the check valve test lines and cause false readings of check valve leakage.
- 2. The time required to perform this surveillance would be significantly increased.
- 3. When check valve back leakage is detected, it would become more difficult to determine which of soveral valves is leaking.
For these reasons, a change to technical specification 3/4.5.2 is necessary to permit closure of valves SI8809A and SI8809B for testing purposes.
)
l L
9 ,
't
- ATTACHMENT C SIGNIFICANT HAZARDS CONSIDERATION BACKGROUND 10 CFR 50.92 states that a proposed amendment will involve a no significant hazards consideration if che proposed amendment does not:
(1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) Create the possibility of a ner or different kind of accident from any accident previously evaluated; or (3) Involve a significant reduction in a margin of safety.
In addition, the Commission has provided guidance in the practical application of these criteria by publishing eight examples in 48 FR 14870.
The discussion below addresses each of these three criteria and demonstrates that the proposed amendment involves a no significant hazards consideration.
BASIS FOR NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION Does the proposed amendment (1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) Create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) Involve a significant reduction in a margin of safety?
DISCUSSION - ITEM 1 The postulated accident that is potentially affected by a reduction in delivered RHR flow is a (LOCA) loss of coolant accident. It should be noted that either the SI8809A or B valve would be shut while the reactor is suberitical with corresponding lower initial fuel temperatures than was. evaluated in the B/BR FSAR. This single facet provides an overwhelming amount of conservatism relative to the previous evaluated accident.
'3 . .
t
- The LOCA analysis presented in the Byron /Braidwood FSAR addresses large and small RCS pipe breaks with consideration for the effect of minimum and maximum safeguards actuation. The small break LOCA analysis relies on injection flow from the Centrifugal Charging (CC) and Safety Injection (SI) pumps rather than the RHR pumps.
Therefore, the small break LOCA analysis presented in the FSAR is not affected by the closure of the 8809 valves.
For the-large break LOCA analysis with minimum safeguards actuation, Westinghouse assumed the broken RCS cold leg is one of the two aligned to receive RHR Injection flow. With this configuration, the RHR pumps can deliver 190 lbs. sac. during the core reflood phase rather than the 390 lbs/sec. flow currently modeled. Early in the large break LOCA scenario the accumulators inject to fill the downcomer completely. Then the ECCS pumps must supply sufficient flow to maintain the downcomer level. The CC and SI pumps together can supply 110 lbs/sec. and this flow combined with the RHR pumps flow of 190 lbs/sec. results in flow to the RCS of 300 lbs./sec. Westinghouse's review of the analysis indicates the 300 lbs/sec. is adequate flow to maintain the downcomer water level. Therefore, very little or no penalty in calculated peak clad temperature can occur in the Byron minimum safeguards large break LOCA FSAR analysis due to 8809A or B being closed.
The large break LOCA analysis with maximum safeguards is the actual limiting case for the l'yron analysis. This postulated accident results in ECCS flow in excess of that required to maintain downconer level. Therefore, there is little effect on the current analysis with the 8809 valve closed.
The conclusion from the review of the FSAR analysis is that '
there is minimal impact on the analysis results. In addition, the 8809 valve would only be closed for a short period of time required to perform the check valve surveillance. The probability of a LOCA occurring during this period is highly unlikely. If a LOCA did occur these valves are operable from the Control Room and the operator would open them as required by the Byron Emergency Operating Procedures.
DISCUSSION - ITEM 2 As discussed above this change only affects the simple closure of a single valve to allow for testing for short period of time. Thus chis change does not create the possibility of a new or different kino of accident.
1 ..
DISCUSSION - ITEM 3 Rather than involving a reduction in the margin of safety this change will result in an overall increase in the margin of safety for Byron. Tnis is accomplished by offse ting the insignificant reduction in delivered RHR flow a; 'iscussed in item 1 above against the increased assurance of the integrity of the RHR injection check valves SI8818A,B,C,D. This increased assurance of the check valve integrity is accomplished by the closing of the SI8809A&B valves. Thus the probability of an intersystem LOCA Initiated by the failure of these check valves is reduced.
Based on the preceeding assessment, it is concluded that the proposed amendment meets the standards provided in 10 CFR 50.92 and therefore, does not constitute a significant hazards consideration.
0940K P
- . ~ ,