Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20195D0451999-06-0303 June 1999 Proposed Tech Specs,Revised to Agree with Current Facility Defueled TS Format ML20206N2751999-05-11011 May 1999 Proposed Tech Specs Deleting Figure 5.1-1 Brp Site Map from Defueld TS Subsection 1.16,changing Definition of Site & Other Associated Editorial Changes ML20154M5431998-10-14014 October 1998 Proposed Defueled Tech Specs & Bases for Big Rock Plant ML20236T6681998-07-21021 July 1998 Proposed Defueled Tech Specs for Big Rock Nuclear Plant ML20248L5511998-06-0505 June 1998 Draft Proposed Tech Specs Rev,Incorporating Changes Responsive to 980416 RAI ML20138G2021997-04-30030 April 1997 Proposed Tech Specs,Illustrating Change to Current Facility License DPR-6 ML20138A9131997-04-22022 April 1997 Proposed Tech Specs,Withdrawing Petition to Implement Option B Performance Based Requirements to App J of 10CFR50 ML20134H6411996-11-0707 November 1996 Proposed Tech Specs Re New Air Compressor to Svc Air Segment of Svc & Instrument Air Sys ML20129C4871996-10-15015 October 1996 Proposed Tech Specs Allowing Use of Option B for Type a Test (Containment),Type B Test (Pneumatic Tests to Detect & Measure Local Leakage Rates Across Pressure Retaining, leakage-limiting Boundaries) & Type C Tests ML20056G3931993-08-24024 August 1993 Proposed Tech Specs Reflecting Revision to 10CFR50.36(a)(2) Changing Reporting Requirement for Effluent Releases from Semiannual to Annual ML20128D7251993-01-29029 January 1993 Proposed Tech Specs Re Administrative Controls ML20059A2181990-08-14014 August 1990 Proposed Tech Specs,Reflecting Administrative & Organizational Changes ML20006A4211990-01-17017 January 1990 Proposed Tech Specs,Removing Certain cycle-specific Parameter for Relocation to Core Operating Limits Rept ML20011D3141989-12-21021 December 1989 Proposed Tech Specs Re Intervals for Surveillances ML20005G4221989-11-17017 November 1989 Proposed Tech Specs Re RCS Heatup Limitations ML19327B4051989-10-19019 October 1989 Proposed Tech Specs,Authorizing Use of Vantage 5 Fuel & Combination of Vantage 5 Fuel & Present Optimized Fuel Assembly Core at Plant ML19325C6071989-10-0303 October 1989 Proposed Tech Specs Re Onsite Power Distribution ML18153B8371989-07-24024 July 1989 Proposed Tech Specs Reflecting Composition of Station Nuclear Safety & Operating Committee Following Recent Assignment of superintendent-engineering Position at Stations.Tech Spec Pages Include 6.1-6,6-5 & 6-6 ML20245K6991989-06-30030 June 1989 Corrected Proposed Tech Specs Paragraph 3.7 Re Containment Sphere Leakage Testing B13221, Proposed Tech Specs Re Inservice Insp of Steam Generator Tubes & Acceptance Criteria for Tubes1989-06-29029 June 1989 Proposed Tech Specs Re Inservice Insp of Steam Generator Tubes & Acceptance Criteria for Tubes ML20245H5671989-06-23023 June 1989 Proposed Tech Specs Revising Tech Spec Page 3.4.6.1, RCS Leak Detection Sys B13256, Proposed Tech Specs,Revising Administrative Controls for Radiological Effluent Monitoring Manual1989-05-25025 May 1989 Proposed Tech Specs,Revising Administrative Controls for Radiological Effluent Monitoring Manual ML20247L1141989-05-25025 May 1989 Proposed Tech Specs Aligning Specs to Current 10CFR50 App J Requirements That Permits Removal of 24 H Duration Restriction of Integrated Leak Rate Test ML20247H2841989-05-22022 May 1989 Proposed Tech Specs Re Types of Absorber Matls in Control Rod Assemblies ML20245F2581989-04-25025 April 1989 Proposed Tech Specs Re Administrative Controls in High Radiation Area ML20248G0051989-04-0303 April 1989 Proposed Tech Specs,Changing Tables 3.3-1 & 4.3-1,per Generic Ltr 85-09 for Reactor Trip Sys Automatic Actuation Using Shunt Coil Trip Attachments ML20247F1111989-03-23023 March 1989 Proposed Tech Specs,Adding 30-day Preliminary Special Rept as Well as 90-day Special Rept to Proposed Action 3.6.1.6.c & Tying Surveillance 4.6.1.6.1.d Re Tendon lift-off Stress to Action 3.6.1.6.a on Tendon lift-off Force B13098, Proposed Tech Specs Re Administrative Controls & Organizational Charts1989-03-13013 March 1989 Proposed Tech Specs Re Administrative Controls & Organizational Charts ML20246D2681989-03-0606 March 1989 Proposed Tech Specs Re Limiting Condition for Operation & Surveillance Requirements Re Control Room Ventilation Sys & Area Exhaust Filter Plenum Ventilation Sys ML20235J0671989-02-17017 February 1989 Proposed Tech Specs,Changing Administrative Controls Section 6.0 to Include Removal of Organizational Figures,Position Change from Radiation Chemistry Technician to Radiation Protection Technician,Per Generic Ltr 88-06 ML20196B7681988-11-28028 November 1988 Proposed Tech Spec 6.2.3 Re Safety Review Group ML20205H1671988-10-24024 October 1988 Revised Tech Specs Bases Page B 3/4 3-3 Re ESFAS Interlocks ML20204F8321988-10-10010 October 1988 Proposed Tech Specs Change Re Partial Stroke Testing Following Main Valve Seat Leakage Repairs ML20155F0581988-10-0404 October 1988 Proposed Tech Specs Re Installation of Automatic Leakage Rate Detection Sys to Provide Continuous Pressure Testing of Containment Air Lock Door Seal Gaskets ML20155C1591988-09-28028 September 1988 Proposed Tech Specs Re Reactivity Control Sys,Movable Control Assemblies & Group Height ML20154S6481988-09-22022 September 1988 Proposed Tech Specs,Allowing Independent Review & Audit Functions to Be Accomplished by Independent Organizational Unit Rather than Standing Committee ML20154P2191988-09-21021 September 1988 Proposed Tech Specs Reflecting Editorial & Administrative Corrections to Provide Clarification & Consistency ML20154D4821988-09-0808 September 1988 Proposed Tech Specs,Removing Organization Charts from Tech Specs & Informing NRC of Onsite Organizational Changes ML20151H6831988-07-21021 July 1988 Proposed Tech Specs Re Number of Members & Time as Member of Nuclear Review Board ML20151B6921988-07-11011 July 1988 Proposed Tech Specs,Removing Fixed Fxy Limits in Spec 4.2.2.2.e & Substituting Requirement to Submit Fxy Limits to NRC ML20150C7921988-07-0505 July 1988 Proposed Tech Specs Re Reactor Depressurization Sys Isolation Valves ML20154S5851988-05-31031 May 1988 Proposed Tech Spec Surveillance Requirement 4.8.1.1.2.f.2 Re Rejection of Largest Single Load from Diesel Generator B12915, Proposed Tech Specs Re Administrative controls-reporting Requirements1988-05-25025 May 1988 Proposed Tech Specs Re Administrative controls-reporting Requirements ML20154D4581988-05-0606 May 1988 Proposed Tech Specs 3/4.4.6 Re Reactor Coolant Sys Leakage Detection Sys ML20153E9591988-05-0404 May 1988 Proposed Tech Spec 3.3.3.6 & Tables 3.3-10 & 4.3-7 Reflecting Reg Guide 1.97 Reviews ML20154A0941988-04-29029 April 1988 Proposed Tech Spec Section 6 Re Administrative Controls ML20151U5551988-04-22022 April 1988 Proposed Tech Specs,Deleting Requirement to Provide Complete Listing of All Individual Results of All Radiological Environ Samples & All Environ Radiation Measurements ML20151F9191988-04-0707 April 1988 Proposed Tech Specs,Changing Required Surveillance Interval for Ice Condenser Lower Inlet Doors from Current Frequencies to 100% Insp Every 18 Months ML20151K2881988-04-0101 April 1988 Proposed Tech Specs,Broadening Scope of Mods Allowed to Fuel Assemblies Involving Fuel Rod Locations & Delete Specified Max Total Fuel Rod U Weight Limit ML20151D1381988-04-0101 April 1988 Proposed Tech Specs Allowing Credit to Be Taken for Radiation Monitor EMF-36 (Unit Vent Monitor) If EMF-39 (on Containment Purge Sys) Inoperable Below Mode 4 (Hot Shutdown) 1999-06-03
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20195D0451999-06-0303 June 1999 Proposed Tech Specs,Revised to Agree with Current Facility Defueled TS Format ML20206N2751999-05-11011 May 1999 Proposed Tech Specs Deleting Figure 5.1-1 Brp Site Map from Defueld TS Subsection 1.16,changing Definition of Site & Other Associated Editorial Changes ML20154M5431998-10-14014 October 1998 Proposed Defueled Tech Specs & Bases for Big Rock Plant ML20238E8141998-08-31031 August 1998 Revised Big Rock Point Defueled Emergency Plan ML20236T6681998-07-21021 July 1998 Proposed Defueled Tech Specs for Big Rock Nuclear Plant ML20248L5511998-06-0505 June 1998 Draft Proposed Tech Specs Rev,Incorporating Changes Responsive to 980416 RAI ML20217P3811998-02-28028 February 1998 Revised Defueled Emergency Plan ML20138G2021997-04-30030 April 1997 Proposed Tech Specs,Illustrating Change to Current Facility License DPR-6 ML20138A9131997-04-22022 April 1997 Proposed Tech Specs,Withdrawing Petition to Implement Option B Performance Based Requirements to App J of 10CFR50 ML20216A9611997-01-0101 January 1997 Rev 13 to Big Rock Point Radiological Effluent T/S Required Documents,Offsite Dose Calculations & Process Control Program ML20134H6411996-11-0707 November 1996 Proposed Tech Specs Re New Air Compressor to Svc Air Segment of Svc & Instrument Air Sys ML20129C4871996-10-15015 October 1996 Proposed Tech Specs Allowing Use of Option B for Type a Test (Containment),Type B Test (Pneumatic Tests to Detect & Measure Local Leakage Rates Across Pressure Retaining, leakage-limiting Boundaries) & Type C Tests ML20199J7411995-10-0303 October 1995 Rev 6 to Users Guide for Vectora CL-200 Polyethylene High Integrity Containers ML20058N6421993-10-11011 October 1993 Rev 16 to Vol of Administrative Procedures,Procedure 3.2.1, Maint Order Processing, Pages 21 & 22 ML20056G3931993-08-24024 August 1993 Proposed Tech Specs Reflecting Revision to 10CFR50.36(a)(2) Changing Reporting Requirement for Effluent Releases from Semiannual to Annual ML20058N6401993-07-15015 July 1993 Rev 20 to Procedure T7-28, Emergency Diesel Generator Auto Test Start ML20058N6331993-07-15015 July 1993 Rev 142 to Vol 3 of Operating Procedure - Sys SOP-14, Substation ML20128D7251993-01-29029 January 1993 Proposed Tech Specs Re Administrative Controls ML20127N4321993-01-11011 January 1993 Third Interval ISI Program ML20141M5531992-03-10010 March 1992 Rev 8 to Vol 25 to Procedure Big Rock Point Radiological Effluent TS Required Documents,Offsite Dose Calculations & Process Control Program ML20059A2181990-08-14014 August 1990 Proposed Tech Specs,Reflecting Administrative & Organizational Changes ML20006C0571990-01-18018 January 1990 Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan. ML20006A4211990-01-17017 January 1990 Proposed Tech Specs,Removing Certain cycle-specific Parameter for Relocation to Core Operating Limits Rept ML15264A1571990-01-0202 January 1990 Revised Crisis Mgt Implementing Procedures,Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9,Rev 1 to CMIP-14 & Rev 30 to CMIP-21 ML16152A8951990-01-0202 January 1990 Rev 33 to Public Version of Crisis Mgt Plan for Nuclear Stations. ML20012A3801990-01-0101 January 1990 Rev 28 to, Offsite Dose Calculation Manual,Oconee,Mcguire & Catawba Nuclear Stations. ML20012A3791990-01-0101 January 1990 Rev 27 to, Offsite Dose Calculation Manual,Oconee Nuclear Station. ML20012A3771990-01-0101 January 1990 Rev 26 to, Offsite Dose Calculation Manual McGuire Nuclear Station. ML20012A3751990-01-0101 January 1990 Rev 25 to, Offsite Dose Calculation Manual,Cawtaba Nuclear Station. ML20011D3141989-12-21021 December 1989 Proposed Tech Specs Re Intervals for Surveillances ML20012A3691989-12-0505 December 1989 Rev 8 to, Process Control Program,Mcguire Nuclear Station. ML20011D2441989-12-0101 December 1989 Crisis Mgt Implementing Procedures. ML20012A3721989-11-27027 November 1989 Rev 4 to, Process Control Program,Cawtaba Nuclear Station. ML20005G4221989-11-17017 November 1989 Proposed Tech Specs Re RCS Heatup Limitations ML20012A3731989-11-15015 November 1989 Rev 4 to, Process Control Program Oconee Nuclear Station. ML19325F1931989-11-0101 November 1989 Public Version of Rev 32 to, Crisis Mgt Plan for Nuclear Stations. ML19332C8451989-11-0101 November 1989 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 31 to CMIP-1,Rev 28 to CMIP-4,Rev 32 to CMIP-5,Rev 37 to CMIP-6,Rev 36 to CMIP-7,Rev 25 to CMIP-8,Rev 31 to CMIP-9 & Rev 19 to CMIP-13 ML19327B4051989-10-19019 October 1989 Proposed Tech Specs,Authorizing Use of Vantage 5 Fuel & Combination of Vantage 5 Fuel & Present Optimized Fuel Assembly Core at Plant ML19325C6071989-10-0303 October 1989 Proposed Tech Specs Re Onsite Power Distribution ML20247H3371989-09-15015 September 1989 Revised Corporate Organization for Nuclear Incidents (Coni) Procedure Manual Including Rev 15 to CONI-1.01, Preparation,Issuance & Control Procedures, Rev 30 to CONI-1.02, Coni & Rev 19 to CONI-1.03, Alerting .. ML20246J1841989-08-25025 August 1989 Rev 4,Vol 25 to, Big Rock Point Radiological Effluent Tech Spec Required Documents for Offsite Dose Calculation Manual & Process Control Program ML20245L7651989-08-0707 August 1989 Rev 0 to Offsite Dose Calculation Manual ML20247M7921989-07-31031 July 1989 Rev 6 to PWR Operations Guideline Number 12 Simulator Testing Program. Simulator Transient Test Review Data Encl ML20247M9151989-07-27027 July 1989 Procedure Generation Package ML18153B8371989-07-24024 July 1989 Proposed Tech Specs Reflecting Composition of Station Nuclear Safety & Operating Committee Following Recent Assignment of superintendent-engineering Position at Stations.Tech Spec Pages Include 6.1-6,6-5 & 6-6 ML20245K6991989-06-30030 June 1989 Corrected Proposed Tech Specs Paragraph 3.7 Re Containment Sphere Leakage Testing B13221, Proposed Tech Specs Re Inservice Insp of Steam Generator Tubes & Acceptance Criteria for Tubes1989-06-29029 June 1989 Proposed Tech Specs Re Inservice Insp of Steam Generator Tubes & Acceptance Criteria for Tubes ML20245H5671989-06-23023 June 1989 Proposed Tech Specs Revising Tech Spec Page 3.4.6.1, RCS Leak Detection Sys ML20247N0421989-06-19019 June 1989 Rev 5 to SS-1, Braidwood Simulator Steady State Performance Test ML20247M7581989-05-26026 May 1989 Rev 0 to Test NO-1, Braidwood Simulator Normal Operations Testing 1999-06-03
[Table view] |