ML19270F883 | 8 March 1979 | Preservice Insp & Testing Plan,Revision 3,March 1979. | |
ML19296D402 | 21 November 1979 | In-Plant Safety Relief Valve Test, Revision 2 | |
ML19305D696 | 11 April 1979 | Procedure for ASME Section XI Repairs & Revisions.Repair/ Revision Repts 5-8 & 23-30 Encl | Hydrostatic |
ML19325E365 | 26 October 1989 | Proposed Tech Spec Pages 3/4 8-1,3/4 8-1a,3/4 8-2,3/4 8-2a, 3/4 8-2b & Bases for 3/4 8-1 Re Diesel Generator Testing | Safe Shutdown Offsite Circuit |
ML19326E034 | 22 May 1979 | Emergency Procedures for Facility,Including General Abnormal Procedures,General Abnormal Index & Operating Abnormal Index | Reactor Vessel Water Level |
ML19327A752 | 16 August 1989 | Rev 2 to Combined Units 1 & 2 Inservice Testing Program for Pumps & Valves. | High Radiation Area Stroke time Cold shutdown justification Power Operated Valves |
ML19330C321 | 12 May 1980 | County 1 Sqrt Test Plan, Revision 1 | |
ML19340C409 | 27 October 1980 | of In-Plant Safety Relief Valve Test. | |
ML19354D700 | 15 December 1989 | Proposed Tech Specs,Clarifying General Requirements for Application to Limiting Conditions for Operations & Surveillance Requirements | Safe Shutdown Offsite Dose Calculation Manual Fire Barrier Hydrostatic Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Overtravel Offsite Circuit Continuous fire watch Fire Watch Hourly Fire Watch Grace period |
ML20004D272 | 1 June 1981 | Vol 7 of Equipment Qualification Post-Audit Documentation Impedance Test Rept. | |
ML20012C703 | 15 March 1990 | Corrected Tech Spec Page to 881129 Application for Amend to Licenses NPF-11 & NPF-18,removing Specific Load Profiles for Each Dc Battery | |
ML20023D191 | 21 October 1982 | Rev 0 to Project Instruction PI-LS-42, Review of QC Documentation for LaSalle County Station Units 1 & 2. | |
ML20024A153 | 3 May 1983 | Public Version of Rev 2 to Emergency Plan Implementing Procedure LZP-1330-32, Post-Accident Sampling of Ga Wide- Range Gas Monitor. Offsite Procedure Mod Forms & Revised Index Encl | Grab sample |
ML20024B103 | 24 June 1983 | Startup Test Procedure 9,Water Level Measurement. | |
ML20024B104 | 24 June 1983 | Startup Test Procedure 12,Average Power Range Monitor Calibr. | |
ML20024B107 | 24 June 1983 | Startup Test Procedure 17,Sys Expansion. | |
ML20024B109 | 24 June 1983 | Startup Test Procedure 23A,Feedwater Control Sys. | |
ML20024B110 | 24 June 1983 | Startup Test Procedure 26,Relief Valves. | Stroke time |
ML20024B111 | 24 June 1983 | Startup Test Procedure 29,Recirculation Flow Control Sys. | Power change |
ML20024B112 | 24 June 1983 | Startup Test Procedure 30,Recirculation Sys. | Flow Induced Vibration |
ML20024B115 | 24 June 1983 | Startup Test Procedure 33,Drywell Piping Vibration. | Coast down |
ML20024B116 | 24 June 1983 | Startup Test Procedure 35,Recirculation Sys Flow Calibr. | |
ML20024B119 | 24 June 1983 | Startup Test Procedure 74,Offgas Sys. | |
ML20024B788 | 28 April 1983 | Procedure IB-8307, Instructions for Installation of Close Latch Anti-Shock Spring in Hk Mechanism (Used in Breakers Less than 1,000 Mva). | |
ML20024D595 | 8 July 1983 | Public Version of Revised Lzp index.W/830712 Ltr | |
ML20024G790 | 24 April 1991 | Proposed Tech Specs Re Limiting Condition for Operation & Surveillance Requirements for Inoperable Control Rods & Operability of Scram Discharge Vol | Scram Discharge Volume |
ML20024H308 | 22 May 1991 | Proposed Tech Specs Re Radioactive Effluent/Radiological Environ Monitoring Program & Solid Radwaste Program | Shutdown Margin Reactor Vessel Water Level High Radiation Area Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Feedwater Controller Failure Pressure Boundary Leakage Fire Protection Program Fire Watch Power change Flow Induced Vibration |
ML20028E304 | 31 May 1982 | Rev 0 to LaSalle County Station Radiation Chemistry Technician Basic Training Program. | High Radiation Area Grab sample |
ML20028F372 | 20 January 1983 | Verification Testing of Separation Between Class IE & Nonclass IE Power Cable in Raceways for Use in LaSalle Nuclear Generating Station - Units 1 & 2, Rev a | |
ML20028G966 | 21 September 1990 | Proposed Tech Spec Changes Re Conductor Overcurrent Devices | |
ML20038B856 | 30 November 1981 | to LaSalle County Station Offsite Dose Calculation Manual. | Offsite Dose Calculation Manual |
ML20038C589 | 8 December 1981 | Proposed Tech Spec 3/4.7.9 Changes Re Snubbers | |
ML20039A884 | 13 November 1981 | Public Version of Revised Lzp Procedures Manual,Including Procedures LZP-1210-1 Re Hazardous Matl Incidents Reporting & LZP-1330-11 Re Dilution & Transfer of Gas Samples.Index & Tabs Encl | |
ML20039G570 | 29 July 1981 | Process Control Program for Radwaste Solidification Sys | Process Control Program |
ML20040H503 | 5 February 1982 | Technical Proposal PR-5792, Program Plan - Independent Design Review. Book 1 of 2 | |
ML20041C026 | 19 January 1982 | Public Version of Revised Lzp Procedures,Including Procedures LZP-1120-1 Re Operations Director & LZP-1160-01 Re Administrative Director.Revised Index Enxl | Safe Shutdown Grab sample Nuclear Accident Reporting System Earthquake Fatality |
ML20041C134 | 22 February 1982 | Proposed Tech Spec Table 4.3.3.1-1 Re ECCS Actuation Instrumentation Surveillance Requirements.Footnote (a) of Items A.1.F,A.2.C & B.2.C Should Be Deleted | Reactor Vessel Water Level |
ML20041E659 | 8 March 1982 | to Process Control Program | Process Control Program |
ML20042C297 | 12 March 1982 | to Process Control Program. | Process Control Program |
ML20042C490 | 10 February 1982 | Revised Tech Spec Table 3.7.9.2 & List of Unit 2 Snubbers for Possible Table 3.7.9.3 | |
ML20043B176 | 16 May 1990 | Proposed Tech Specs Revising Single Largest Load Reject Value for Div III Diesel Generator & Clarifying Requirements for Automatic Bypassing of Diesel Generator Trips on ECCS Actuation Signal | Reactor Vessel Water Level Fuel cladding Coast down |
ML20043G479 | 18 May 1990 | Offsite Procedures,Including Rev 1 to LZP-1330-12,Rev 2 to LPZ-1330-13,Rev 1 to LZP-1330-14 & Rev 6 to LPZ-1330-14 | Grab sample |
ML20044B149 | 11 July 1990 | Proposed Tech Spec 3.6.1.8 Re Periodic Cycling of pneumatically-operated Valves & Tech Spec Table 3.6.3-1, Primary Containment Isolation Valves. | |
ML20045B592 | 28 May 1993 | Rev 1 to Procedure LZP-1210-4, Reporting of Transportation Accident. | Nuclear Accident Reporting System |
ML20050A551 | 28 February 1982 | to Procedure 0291A, Meteorological Monitoring, Offsite Dose Calculation Program for Emergency Preparedness at Operating Nuclear Power Plants. | Offsite Dose Calculation Manual Met Tower Nuclear Accident Reporting System |
ML20050B611 | 8 September 1981 | Reporting of 10CFR21 Offenses. | |
ML20050H003 | 8 April 1982 | Revised Tech Spec Table 4.4.6.1.3-1 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule | |
ML20052A439 | 31 March 1982 | Offsite Dose Calculation Manual,Revision 4 | Grab sample Offsite Dose Calculation Manual |
ML20052B530 | 1 April 1982 | Public Version of Revision 0 to Lzp Procedure LZP-1330-29, Sampling at High Radiation Sampling Sys (Valve Operations at Hrss Valve Control Panel. Revised Index Encl | |